You are on page 1of 16

PT.

ADIARTHA SWABUANA
Engineering, Maintenance, Construction and Manpower Supply

PROJECT EXPERIENCE
VISION :
Leading in real Engineering, Maintenance, Construction and
Manpower Supply of oil and gas industry in Indonesia

MISSION :
To be a growth and profitable company in oil and gas
industry and to to create excellent values added for
stakeholders.
Running the Company with respectable cost
effectiveness and efficiency

PROJECT EXPERIENCE

Table of Contents
I.
II.
III.
IV.
V.
VI.
VII.

Board of Management
Operational Environment
Project Responsibility Services
Project Execution Plan
Project Experience
Organization Chart
Company Licenses :
Tanda Daftar Perusahaan ( TDP )
Nomor Pokok Wajib Pajak (NPWP) & Pengukuhan
Pengusaha Kena Pajak
Surat Keterangan Domisili Perusahaan
Surat Ijin Usaha Perdagangan ( SIUP )
Surat Ijin Usaha Jasa Konstruksi ( SIUJK)
Sertifikat Badan Usaha Jasa Konstruksi (SBUJK)
Surat Ijin Operasional Perusahaan Penyedia Jasa
Pekerja/Buruh
Serifikat Jamsostek
Surat Keterangan Terdaftar MIGAS (SKT-MIGAS )
Tanda Anggota INKINDO
Sertifikat ISO 9001 : 2008
Sertifikat OHSAS 18001 : 2008

PROJECT EXPERIENCE
PT. ADIARTHA SWABUANA, a company specializing in the Engineering, Maintenance,
Construction and Manpower Supply the Onshore /Offshore Oil and Gas Industries,
Drilling Ship, Submersible, Jack Up Drilling and Construction Barge. Was formed in
November 1987. Initially the company suppiel skilled personnel in Indonesia and
overseas, but with rapid growt and development the company expanded its services by
supplying expatriate to Oil Company.
To date, PT. Adiartha Swabuana has successfully completed numerous projects in the
Asian Pasific region and Consequently can now gread up to offer rapid mobilization of
skilled personnel to meet Client demands in any part the world.
PT. Adiatha Swabuana implements an effective an auditable Quality System in order
that all personnel are effective and compotent in their respective skill. Our records
information such as :

Names and starting/finishing dates of personnel.


Curriculum Vitae giving, in detail, qualifications (including copies of relevant
certificate).
Previous working experience (s)
Previous employees testimonials.

PT. Adiartha Swabuana Directors aims are to provide the best possible personnel by
ensuring that such personnel are properly trained and more than adeguate proficiency
in their chosen profession.

PROJECT EXPERIENCE

Operational Environment
I.

ACTIVITIES
A.

Derrick Barge Mode


1.
2.
3.
4.
5.

B.

Hook-Up Mode
1.
2.
3.

C.

Process Piping, Electrical, Equipment & Instrument


Installation on Platform
Testing and Pre-commissioning of platform System
Assistance for Facilities Start-up

Pipeline Mode
1.
2.
3.
4.
5.

II.

Lift & Set Jackets


Drive Piling
Lift & Set Decks
Lift & Set Bridges, Flare Booms, Equipment Packages
Install Export Mooring Buoys ( SPM, Slam, ect. )

Lay Submarine Pipeline


Install Platform Riser
Pig & Test Completed Pipeline
Tie-In Riser to Existing Platform Piping
Install Submarine Pipeline Manifolds

SUPPORT SERVICES PROVIDE


1. Diving
2. Survey
3. Non Destructive Testing ( X Ray, U.T )
4. Catering
5. Anchor / Tow Tug Boat
6. Supply Boat
7. Cargo Barge and Tow Tugs
8. Pipeline Engineering Stress Analysis
9. Transport Dynamic Analysis
10. Tie-Down Design

PROJECT EXPERIENCE
III.

PERSONNEL PROVIDED
A.

Support
1.
2.
3.
4.

Personnel Services
Procurement Services
Sub Contractors Coordination
Project Management Services :
a.
b.
c.
d.
e.
f.
g.
h.
i.

B.

New Work Proposal Services


Prepared Project Execution Plans
Work Schedule Development & Maintenance
Client Interface ( Meetings, Correspondence )
Interface Pipeline & Transport Engineering
Contract Administration
Material Take-Off
Welding Procedure Development
Progress Reporting to Client

Operations
1. Craftsmen - Welders, Riggers, Mechanics, Electricians,
Fitter, Crane Operators, Anchor Operators
2. Supervision- Barge Superintendent, Barge Foreman,
Welding Foreman, Chief Mechanic, Chief Electrician, Ladder men,
Rigger Foreman
3. Clerical - Timekeeper/Radio Operator, Warehouse,
Medic, Security

C.

Safety
To be effective in a competitive market, we employ only
competent national crew that are trainable to work with
expatriates.
The Construction Industries have strict requirements
pertaining to the qualifications of construction personnel and as
a personnel and as a responsible contractor we put emphasis on
safety to human lives and equipment.

PROJECT EXPERIENCE

Project Responsibility Services


TRANSPORTATION
RIG & DE-RIG CARGO BARGES
TRANSPORTATION ANALYSIS
CERTIFICATION FOR TOW
CUSTOM CLEARANCE
CARGO BARGES DOCUMENTATION
MATERIAL MASTER LIST FOR CUSTOMS
SUPPLY PERMANENT MATERIAL
SUPPLY CONTINGENCY MATERIAL
FIELD JOINT MATERIAL
START UP SUPPLIES
BUILDER RISK INSURANCE
NOTIFICATION OF CHANGE IN WORK SCOPE
NOTIFICATION OF PROJECT COMPLETION
NOTIFICATION OF FACILITIES SHOUT DOWN
FURNISH AFC DRAWING & SPECIFICATION
SPECIAL PERMITS FOR ACCESS TO SITE
HOT WORK PERMITS
CERTIFICATION OF FACILITIES
INVOICING SUPPORT DOCUMENTATION
PROGRESS REPORTING TO CLIENT
APPROVAL OF BARGE DAILY PROGRESS REPORT
SUBCONTRACTORS FOR TRANSPORT SPREADS
SUBCONTRACTOR FOR SPECIALIZED SERVICES
SUPPLY VENDORS REPRESENTATIVES
PILE DRIVE ABILITY ANALYSIS
LIFT WEIGHTS AND CENTER OF GRAVITY
INSTALLATION PROCEDURES
TESTING PROCEDURES
PRE-COMMISSIONING PROCEDURES
WELDING PROCEDURES
MECHANICAL HOOK-UP WORK
PRE-COMMISSIONING WORK
LOAD OUT FOR STRUCTURES
LOAD OUT FOR PIPELINE MATERIAL
LOAD OUT FOR MECHANICAL HOOK-UP MATERIAL

PROJECT EXPERIENCE

Project Execution Plan


STANDARD OUTLINE
I.

Scope of Work

II.

General Statement
Listing of Lifts
Listing of Pipeline
Listing of Riser & Sub-sea Hook up
Listing of Mechanical Hook-up Tie-in Points
Field & General Drawing/Sketches
Project Schedule

III.

Installation Sequence
Transport Spread Schedule
Project Logic Network & Bar Charts

Progress Reporting

IV.

Lift Listing
Pipeline Listing
Risers listing
Pipeline Crossing Listing
Mechanical Hook Up Task Listing

Contract Summary

V.

Responsibility matrix
Communication Data
Statement of Responsibilities ( Contract Brief )
Variance Procedure
Drawing List
Specification List
Insurance Requirements

Transportation

Barge Layouts
Load out and Tie Down Design

PROJECT EXPERIENCE

Dynamic Stability Analysis

Tow Routes
Packing List for Ship Loose Items

VI.

Installation Method Statement

VII.

Barge Set up Diagrams

VIII.

Lift Studies

IX.

Rigging Diagram
Rigging Lifting
Design Calculation
Lift Study Drawings

Pipe Lay Data

X.

Tension & Stinger Ballast Schedules


Riser Pick-up Schedules
Abandonment & Recovery Procedure
Buckle Repair Procedure
Pig & Test Procedure
Welding

XI.

Welding Procedure
Certified Welder Listing
Welding Consumable Take-Off
NDT Procedure

Bill of Materials ( Project Specific )

XII.

Weld Rod
Field Joint Material
Rigging
Testing & Pre-Commissioning
Mechanical Hook-up

Equipment

Supplemental of heavy equipment for offshore


construction such as:
Derrick/Lay Barge, Hook Up / Work Barge(s),Cargo
Barge(s), etc
Sub-contractor Diving, Survey, NDT Listing
Special Jigs/Fixtures Listing & Drawing

PROJECT EXPERIENCE

XIII.

Specialized Project Specific


Listing of Marine Support Equipment ( i.e. tug, supply,
transport, etc )

Personnel

Crew Listing ( as defined in bid estimate )

PROJECT EXPERIENCE
No.

Project

Description

Years

Owner/Client

Status

1.

Fabrication Electrical Support, Installation &


Precomm/Commissioning ASTI MILA A
Platform

Electrical Installation
Instrument Installation
Fabrication Support
Calibrasi

2014

Cnooc Ses Ltd/PT.


Bakrie Construction

On Progress

2.

Fabrication & Erection Structural, Piping


ASTI MILA A Platform

2014

Cnooc Ses Ltd/PT.


Bakrie Construction

On Progress

3.

Fabrication Jacket & Deck ASTI MILA A


Platform

Installation Deck Platform


ASTI & MILA
Fabrication & Installation
Piping Carbon
Fabrication & Installation
Piping Duplex
Fabrication & Installation
Piping Galvanis
Fabrication & Installation Pipe
Support
Fabrication Jacket & Deck
ASTI MILA A Platform

2013

Cnooc Ses Ltd/PT.


Bakrie Construction

Completed

4.

Fabrication & Installation Storage Tank

2012

Cnooc Ses Ltd/PT.


Bakrie Construction

Completed

5.

Construction Services, Work Unit Rate


Package D ( No. : 8967-XX)

2012

PT. Chevron Pacifik


Indonesia /
SUMIGITA
Consortium

Completed

6.

Manpower Supply to Support Operation

2012

PT. Huabei
Petroleum Services

On Progress

7.

Fabrication & Installation Mooring Buoy

Civil Work
Erection Tank
Mechanical , Piping &
Electrical
Earth Work, Piling
Civil Work
Fabrication
Installation Menchanical
Installation Piping
Installation Electrical
Installation Instrumen
Pingging & Test
Longging Operator
Roustabout, Welder, Pipe
Fitter
Engineering
Fabrication
Installation

2011

Kangeaan Energy
Indonesia Ltd

Completed

8.

Referbushment Services

2011

Cnooc Ses Ltd

Completed

9.

Manpower Supply to Support Fabrication &


Erection Jacket & Platform

Fabrication
Installation
Engineer
Welding Inspector
Welder
Fitter
Electrician
Driller, Drickman, Pumpman,
Floorman, Deck Foreman,
Roustabout, Meditician, Radio
Room, Electrician, Mechanic,
Painter, Oiler, Crane Operator,
Welder,
Driller, Drickman, Pumpman,
Floorman, Deck Foreman,
Roustabout, Meditician, Radio
Room, Electrician, Mechanic,
Painter, Oiler, Crane Operator,
Welder, Materialman

PT. Saipem
Indonesia

Completed

2011

COSL Drilling PanPacific Ltd

On Progress

UMW Standar
Drilling Sdn. Bhd

On Progress

10.

11.

Manpower Supply to Support Jackup Rig

Manpower Supply to Support Operation


Drilling Services Rig Naga -2

2011

2010

President Director
Commissary
Operation Director
HSE Manager

Secretary
General Manager

Project Manager

Project & Cost


Control Manager

Safety Marine

Legal & Finance


Manager

Logistic Manager

Safety Officer

Project Engineer

Project Control
Designer

Procurement

Materialman

Logistic

Finance &
Accounting

PROJECT EXPERIENCE

PROJECT EXPERIENCE

PROJECT EXPERIENCE

PROJECT EXPERIENCE

You might also like