You are on page 1of 3

EDGE/GPRS

Number of GPRS DL TBF release due to N3105 overflow


Number of GPRS DL signaling TBF release due to N3105 overflow

Throughput:
DL EDGE Throughput= (8*1000/1024)(C900040068/C900040069)
Bytes of LLC frame on EGPRS DL data TBF

Duration of EGPRS DL data TBF

UL EDGE Throughput= (8*1000/1024)(C900040066/C900040067)


Bytes of LLC frame on EGPRS UL data TBF

Duration of EGPRS UL data TBF

DL GPRS Throughput= (8*1000/1024)(C900040060/C900040061)


Bytes of LLC frame on GPRS DL data TBF
Duration of GPRS DL data TBF
UL GPRS Throughput= (8*1000/1024)(C900040058/C900040059)
Bytes of LLC frame on GPRS UL data TBF
Duration of GPRS UL data TBF
Volume:
RLC Volume DL=C900040056/ (1024*1024)
Bytes of effective upper layer protocol data sent on DL PDCH
RLC Volume UL=C900040057/(1024*1024)
Bytes of effective upper layer protocol data received on UL PDCH
TBF Interruption:
TBF Interruption Rate (%)=((C900040037+C900040042)+(C900040020C900040037)+(C900040028-C900040042)+(C901000054+C901000060)+(
C900040002C900040149)+C900040011)/(C900040025+C900040033+C900040007+C900040015
+C900040026+C900040008+C900040034+C900040016)
Number of GPRS UL signaling TBF release due to N3101 overflow
Number of EGPRS UL signaling TBF release due to N3101 overflow
Number of GPRS UL TBF release due to N3101 overflow
Number of EGPRS UL TBF release due to N3101 overflow

C901000054
C901000060

Number of EGPRS DL TBF release due to other reasons

Number of GPRS UL signaling TBF establishment


Number of EGPRS UL signaling TBF establishment
Number of GPRS DL signaling TBF establishment
Number of EGPRS DL signaling TBF establishment
Number of GPRS UL data TBF establishment
Number of GPRS DL data TBF establishment
Number of EGPRS UL data TBF establishment
Number of EGPRS DL data TBF establishment
TBF Establishment:
TBF Establishment Success Rate= 100*((C900040007+C900040015+C900040008+
C900040016)/(C900040141+C900040142+C900040143+C900040144+C900040145+
C900040146+C900040147+C900040148))
Number of GPRS DL signaling TBF establishment
Number of EGPRS DL signaling TBF establishment
Number of GPRS DL data TBF establishment
Number of EGPRS DL data TBF establishment

Number of GPRS DL TBF establishment requests before T3192 expiration


Number of GPRS DL TBF establishment using existing DL TBF resource
Number of GPRS DL TBF establishment requests on PACCH
Number of GPRS DL TBF establishment requests on CCCH/PCCCH
Number of EGPRS DL TBF establishment requests before T3192 expiration
Number of EGPRS DL TBF establishment using existing DL TBF resource
Number of EGPRS DL TBF establishment requests on PACCH
Number of EGPRS DL TBF establishment requests on CCCH/PCCCH
UL_TBF_Est_Succ_Rate=100*((C900040025+C900040026+C900040033+C90004003
4)/(C900040159+C900040160+C900040161+C900040168+C900040163+C90004016
4+C900040165+C900040166))
Number of GPRS UL signaling TBF establishment
Number of GPRS UL data TBF establishment
Number of EGPRS UL signaling TBF establishment
Number of EGPRS UL data TBF establishment
Number of GPRS UL TBF establishments in release state
Number of GPRS UL TBF establishment with existing UL resource
Number of GPRS UL TBF establishment requests on PACCH
Number of GPRS UL TBF establishment requests on CCCH/PCCCH
Number of EGPRS UL TBF establishments in release state
Number of EGPRS UL TBF establishment with existing UL resource
Number of EGPRS UL TBF establishment requests on PACCH
Number of EGPRS UL TBF establishment requests on CCCH/PCCCH
PDCH Allocation Failure:
PDCH Allocation Failure=100* (1((C900040025+C900040033+C900040007+C900040015+C900040026+C900040008+
C900040034+C900040016)/(C900040159+C900040160+C900040161+C900040163+
C900040164+C900040165+C900040166+C900040168+C900040141+C900040142+C
900040143+C900040144+C900040145+C900040146+C900040147+C900040148)))
Number of GPRS UL signaling TBF establishment
Number of EGPRS UL signaling TBF establishment
Number of GPRS DL signaling TBF establishment
Number of EGPRS DL signaling TBF establishment
Number of GPRS UL data TBF establishment
Number of GPRS DL data TBF establishment
Number of EGPRS UL data TBF establishment
Number of EGPRS DL data TBF establishment

Number of GPRS UL TBF establishments in release state


Number of GPRS UL TBF establishment with existing UL resource
Number of GPRS UL TBF establishment requests on PACCH
Number of EGPRS UL TBF establishments in release state
Number of EGPRS UL TBF establishment with existing UL resource
Number of EGPRS UL TBF establishment requests on PACCH
Number of EGPRS UL TBF establishment requests on CCCH/PCCCH
Number of GPRS UL TBF establishment requests on CCCH/PCCCH
Number of GPRS DL TBF establishment requests before T3192 expiration
Number of GPRS DL TBF establishment using existing DL TBF resource
Number of GPRS DL TBF establishment requests on PACCH
Number of GPRS DL TBF establishment requests on CCCH/PCCCH
Number of EGPRS DL TBF establishment requests before T3192 expiration
Number of EGPRS DL TBF establishment using existing DL TBF resource
Number of EGPRS DL TBF establishment requests on PACCH
Number of EGPRS DL TBF establishment requests on CCCH/PCCCH
UPPB DSP Utilization:
PCU Utlz (DSP Level)=Maximum of used DSP TS/Maximum of the used
sampling according to DSP TS*100
C901440001:Maximum of used DSP TS
C901440002:Maximum of the used sampling according to DSP TS
UPPB DSP Congestion:
RRResource(PDTCH)CongestionRate=(C901170008+C901170037+C90118
0008+C901180037+C901190016+C901190065+C901200016+C901200065)
*100/(C900040108+C900040112+C900040114+C900040118+C900040120
+C900040126+C900040128+C900040134)

Number of GPRS DL TBF establishment failure due to RR congestion


Number of GPRS DLTBF resource reallocation failure due to RR
congestion for LLC transmission
Number of EGPRS DL TBF establishment failure due to RR congestion
Number of EGPRS DL TBF resource reallocation failure due to RR
congestion for LLC transmission
Number of GPRS UL TBF establishment failure due to RR
congestion
Number of GPRS UL TBF resource reallocation failure due to RR
congestion for resource request
Number of EGPRS UL TBF establishment failure due to RR congestion
Number of EGPRS UL TBF resource reallocation failure due to RR
congestion for resource request
Number of GPRS DL TBF establishment Requests
Number of GPRS DL TBF resource reallocation requests due to LLC
transmission
Number of EGPRS DL TBF establishment requests
Number of EGPRS DL TBF resource reallocation requests due to LLC
transmission
Number of GPRS UL TBF establishment Requests
Number of GPRS UL TBF resource reallocation requests for
resource request
Number of EGPRS UL TBF establishment requests
Number of EGPRS UL TBF resource reallocation requests for resource
request
AbisResourceCongestionRate=(C901170007+C901170036+C901180007+C
901180036+C901190015+C901190064+C901200015+C901200064)*100/(C
900040108+C900040112+C900040114+C900040118+C900040120+C9000
40126+C900040128+C900040134)
Number of GPRS DL TBF establishment failure due to Abis congestion
Number of GPRS DL TBF resource reallocation failure due to Abis
congestion for LLC transmission
Number of EGPRS DL TBF establishment failure due to Abis congestion
Number of EGPRS DL TBF resource reallocation failure due to Abis
congestion for LLC transmission
Number of GPRS UL TBF establishment failure due to Abis congestion
Number of GPRS UL TBF resource reallocation failure due to Abis
congestion for resource request
Number of EGPRS UL TBF establishment failure due to Abis congestion
Number of EGPRS UL TBF resource reallocation failure due to Abis
congestion for resource request
Number of GPRS DL TBF establishment requests
Number of GPRS DL TBF resource reallocation requests due to LLC
transmission
Number of EGPRS DL TBF establishment requests
Number of EGPRS DL TBF resource reallocation requests due to LLC
transmission
Number of GPRS UL TBF establishment Requests
Number of GPRS UL TBF resource reallocation requests for
resource request
Number of EGPRS UL TBF establishment requests
Number of EGPRS UL TBF resource reallocation requests for resource
request
UPPB DSP Resource Congestion Rate=
(C901170009+C901170038+C901180009+C901180038+C901190017+C90
1190066+C901200017+C901200066)*100/(C900040108+C900040112+C90
0040114+C900040118+C900040120+C900040126+C900040128+C900040
134)

Number of GPRS DL TBF establishment failure due to UPPB-DSP


channel congestion
Number of GPRS DL TBF resource reallocation failure due to UPPB-DSP
channel congestion for LLC transmission
Number of EGPRS DL TBF establishment failure due to UPPB-DSP channel
Congestion
Number of EGPRS DL TBF resource reallocation failure due to UPPB-DSP
channel congestion for LLC transmission
Number of GPRS UL TBF establishment failure due to UPPB-DSP
channel congestion
Number of GPRS UL TBF resource reallocation failure due to UPPB-DSP
channel congestion for resource request
Number of EGPRS UL TBF establishment failure due to UPPB-DSP channel
congestion
Number of EGPRS UL TBF resource reallocation failure due to UPPB-DSP
channel congestion for resource request
Number of GPRS DL TBF establishment requests
Number of GPRS DL TBF resource reallocation requests due to LLC
Transmission
Number of EGPRS DL TBF establishment requests
Number of EGPRS DL TBF resource reallocation requests due to LLC
transmission
Number of GPRS UL TBF establishment requests
Number of GPRS UL TBF resource reallocation requests for resource
Request
Number of EGPRS UL TBF establishment requests
Number of EGPRS UL TBF resource reallocation requests for resource
request
The Max Simultaneous Existing TBF numbers:
C901000048 Downlink Max GPRS TBF Number of Simultaneous
Establishment
C901000050 Downlink Max EGPRS TBF Number of Simultaneous
Establishment
C901010046 Uplink Max GPRS TBF Number of Simultaneous Establishment
C901010048 Uplink Max EGPRS TBF Number of Simultaneous
Establishment
PDTCH Utilization
C900040140/ C900040136
Average number of used PDCH
Number of available PDCH
Gb Utilization:
Gb Utilization formula. (case when Gb over IP)
MAX(Number of bytes of packet received from GB board(Byte),Number of bytes of
packet sent to GB board(Byte))/1024/1024*8/Gr/Gb Bandwidh*100
Gr: query GRanularity ( hourly or 15Min or daily..)
Gb Bandwidh: Bandwidh of Gb link betwwen BSC & SGSN
C901020007:Number of bytes of packet received from GB board(Byte)
C901020005:Number of bytes of packet sent to GB board(Byte)
*Configuration:
-PsSupport
-BVCFlowCtrl: on Gb SGSN(execute)/BSS(control) downlinks.to avoid
-one BVC on BSS to abandon some LLC data (discard due to overtime caused from
grouping channel as too busy)
-new downlink LLC data because of memory resource limitations.
BVCFlowCtrl originates and SGSN confirmation is necessary if long statistics timer
stops,and if discrepant range of adjacent leaking rates is over CellFcThs.
BVCFlowCtrl originates and SGSN confirmation is necessary if short statistics timer
overflows and discrepant range of adjacent leaking rates is over CellFcThs
FlowCtrlMode:(1:actual traffic)(2:max traffic cell, recommended)
FlowCtlMode2Para: 800
-DRX_TIMER_MAX maximum time MS to stay in Non-DRx mode (4)
TBF link take short time

BsCvMax: Max Blocks Transmission in each TS(15)suggestion some MS can only


support 0-12, so change 15 to 9
T3198 by MS=BsCvMax.
T3200 MS in Non-Drx mode.=4BsCvMax.
N3104max =(3(BsCvMax+3)Number of timeslots assigned in the uplink)
-SIGNAL_EUTBF: supports signaling uplink extended TBF can hold the link and TFI
resource for some time, it affect downlink throughput
-EXT_UTBF: Support extended uplink TBF(Cell) after uplink TBF link have sent last
RLC data block, the link dont release for short time, if there have data to send, the
link will be used
-Support EGPRS_PACKET_CHANNEL_REQUEST Access Program
EGPRSPacketChReq: EGPRS mobile can set up packet access program on RACH or
PRACH can improve uplink throughput.
EGPRS Phone Quality Measure Mode (LinkQuaMeaMode): indicates the
measurement report mode of EGPRS MS in the cell. makes the network side be able
to respond the change of radio environment quickly.
BURST: MEAN_BEP_TNx0-7)(error bit rate per time slot), I_LEVEL_TN0-7.
TBF: MEAN_BEP (average error bit rate of the radio block),CV_BEP (variance
coefficient of radio block error bit rate).
In report mode, 0 means report based on TBF, 1~3 means report based on
timeslot(BURST).
report based on timeslot, affects adjustment of coding mode(MCS1-9)
Average filter period for uplink/downlink BEP:EGPRS MS will determine to report
the MEAN_REP_AV and CV_BEP_AV under the whole TBF, or the measurement
data per time slot MEAN_BEP_TNx (0-7).
There is an oblivion factor e, whose value is defined by average period of BEP filter.
the value is more, and the reliability of BEP is high.
Suggestion value: both are 10 blocks
-GPRS MAX initial access signal level: 5 for GSM900, 2 for DCS1800
-EDGE Property(BSC Level):
RS: Uplink throughput weight value at Gb interface, 6
RR: Downlink throughput weight value at Gb interface, 12
RA: Weight value of EGPRS MS accessing request times, 6
RM: Weight value of high-bandwidth request times, 10
RB: Weight value of the highest bandwidth usage,6
RG and RE: This parameter defines weights of GPRS carrier proportion, 15 45
RS+RR+RA+RM+RB+RG+RE must be equal to 100
-Bandwidth Limit(kb): 5600
Problem Analysis:
* Interference: bit rate<11
-GPRS/EDGE MS Power control:
- GPRS phone init coding defult [ CS2, CS2, CS4, CS4]
-EGPRS phone init coding defult [ MCS6, MCS6, MCS9, MCS9].
-select/reslect parameters: CRO, ACCMIN
-GSM Parameters for interference: DTX, Power control
-Compare with CS interference: PMR, RNO, drop reason, HO due to quality, high
HO reverse, percent of IHO & reason
-HW problem:
-External Interference: ICM Band >3
-Frequency Retune: (1/3) more capacity, (3/9) high C/I
-Feature: EGPRS_Link_Adaption
Max_EGPRS_Window_Sizes_(depending_on_allocated_timeslots)_Configurable
*Mobility: high nbr of reselection, High TBF interruption
-Drive test: from last UL message in old cell
_to successfully decode SI13 in new cell long(interference)
_to immediate assignment in new cell long (capacity)
_to DL TFI message in new cell long (problem application)
-Reselection Parameters: high CRH in border C2n>C2s(+CRH)
-Routing Area updated: design proper not in highway
-Ping Pong Reselection & unwanted EDGE coverage:
C1(ACCMIN,CB/CBQ),C2(CRO), Tilt, Direction, Power,
-Swap to NOM1 & use PBCCH: C31/C32 better control
GPRSNWMODE=1or3, FPDCH>=1: when NW MODE 1 or 3 PHCSTHR,PLAYER,
PROFFSET, GPREVALID(BA)

-Feature: NACC (Network Assisted Cell change) reduce interruption from 3-4s to 1s
(3GPP release 4) intra BSC
*Capacity:
*CCCH Capacity: immediate assignment & paging
Page Discarded BTS = C901640001+C901640002
Page Congestion BSC =TOTCONGPAG
-Reduce MFRMS,AGBLK=0
-Combined BCCH: BCCHTYPE=NCOMB
-Decrease LA/RA size:
-ATT: attach/detach
-TDD
-T3314 READY TIMER MAX (120) MIN (10)
-Mobile Reachable Timer (T3212):3840
-Implicit Detach Timer: 3600:
*PCU Capacity:
UPPB have 14 DSP each DSP has
16Kbps
160
CS3/4
80
EDGE
40
Sector
15
-move DSP congestion cells to other DSP
-Reduce FPDCH: when low PS traffic
- Max PS user PERTS(MaxPsUserPerts): increase
-CRH
-DSP Faulty: Many problem in same DSP
-UPPB Expansion: when high PS traffic
- protection timer T3193 of the downlink TBF: decrease
EBRP 2 DSP
Each DSP alone configured cell on this DSP
DSP utilization =(N of FPDCH+ N of Dynamic PDCH+N of static data channel
(Abis)+N of Dynamic data channel (Abis))/80
*PDCH Capacity:
-static PDTCH to the middle between the TCHs with Dynamic TS
-Because the PS Service Preference Property is set to No Preference, the subscribers
of both GPRS and EGPRS will share the PDTCH to transmit data, the modulation will
use GMSK to code data, the throughput will be lower. So we must change the
configuration to support GPRS and EGPRS subscribers separately
TRX1

TRX2

Max PS user PERTS(MaxPsUserPerts)=2


1500ms for T3192, 1520ms for T3193
-PsPreemptionInd
Immediate assignment on TCH, HR, HO traffic, Abis , SDCCH configuration
-Feature: Flexible_Priority_Handling_of_Packet_Data_Channel
*Transmission: Problem of transmission (link failures, high BER) which can be seen
on alarms window (Alarms management).
*Abis:
TS EGPRS in E1: idle TS in pool
*Gb utilization (IP):
http://www.scribd.com/doc/44960523/TTSL-Orissa-EGPRS-Download-ThroughputImproved-new

http://www.scribd.com/doc/127028349/E-GPRS-Radio-Network-Planning-V3-0
http://www.scribd.com/doc/125923680/78922321-Introduction-to-ZXSDRProducts-GSM

You might also like