Professional Documents
Culture Documents
Tangent
45-50
SECTION
65-70
55-60
1: 200
1: 225
6 Lane
1: 160
1: 180
1: 200
8 Lane
1: 150
1: 170
1: 190
1
Inside Edge Of Pavement
1
Tangent
Curve
1: 250
Profile Grade
1: d
Pavement Edges
0.2 L 1
Tangent
Centerline &
Full Superelevation
0.8 L 1
Of Curve
To Superelevation Slope
SUPERELEVATION TRANSITIONS
Curve
PC Or PT
Full Superelevation
0.2 L
Of Curve
0.8 L
PC Or PT
Normal Crown
0.8 L 2
Curve
0.2 L 2
PROFILES
Superelevation Transition L 2
Pavement Width
Full Superelevation
Pavement Width
W
Pavement Width
C
L
C
L
W
W
C
L
PROFILES
WITH SUPERELEVATION
Pavement Width
Pavement Width
Median
0.05
0.0
0.0
0.05
0.0
0.0
SECTION AA
SECTION BB
SECTION CC
WITH SUPERELEVATION
NORMAL SECTION
FULLY SUPERELEVATED
SECTION AA
SECTION BB
SUPERELEVATION TRANSITIONS
600
700
800
A shoulder
slope of 0.06 downward from the
SHOULDER ON HIGH
SIDE:
900
1000
1100
1200
1300
1400
1500
2000
2500
3000
4000
5000
Shoulder Width
0.10
5
1
4
.=
ax
m
D
10
a
Dm
Dm
13
15
.
x=
Dma
=
.
ax
65
60
0.07
4
=2
ax.
=7
0.07
45
Dm
0.06
0.06
0
0.05
=4
45
0.05
30
V=
0.04
0.04
V=Design Speed
0.03
0.03
0.02
0.02
eMAX. =0.10
See Table To Right
0.01
0.01
0
0
DEGREE OF CURVE
10
Than 0.06
and the shoulder flattened until the shoulder slope reaches the minimum
of 0.02 downward from the edge of pavement. Any further increase in
pavement superelevation will necessitate sloping the inside half of the
shoulder toward the pavement and the outer half outward, both at 0.02
0.08
m
D
0.09
.
x=
=
x.
15
0
3
3
.=
ax
D
m
D
m
0.08
1
=
.
ax
0.10
0.09
Shoulder Width
Maintain
SHOULDER ON LOW
SIDE: 0.06 drop across inside shoulder until
pavement cross slope reaches 0.06. For pavement cross slopes greater than
S
Superelevated Pavement
(Rate Steeper Than 0.05)
Shoulder Slope
See SHOULDER ON
NOTE:
These details apply to both paved and grassed shoulders.
Round
DESIGN SPEED, V
OF
CURVE
MPH
(D)
30
40
45/50
55
60
65
70
0^ 15
NC
NC
NC
NC
NC
NC
NC
0^ 30
NC
NC
NC
NC
RC
RC
RC
0^ 45
NC
NC
RC
RC
1^ 00
NC
NC
1^ 30
NC
0.021
2^ 00
RC
0.021 0.025
GENERAL NOTES
1. For curves in urban highways and high speed
urban streets, see Index No. 511.
RATE TO LEFT
DESIGN SUPERELEVATION RATES FOR RURAL HIGHWAYS, URBAN FREEWAYS AND HIGH SPEED URBAN HIGHWAYS
SUPERELEVATION
RURAL HIGHWAYS, URBAN FREEWAYS AND HIGH SPEED URBAN HIGHWAYS
Last
Revision
Sheet No.
00
1 of 2
Index No.
510
Full Superelevation
Travel Way
Outer Roadway
0.2 L 1
Curve
Tangent
0.0
0.0
0.0
0.0
0.0
Outer Roadway
10
0.0
09
0.0
0.
0.0
Shoulder
0.
08
0.
Crown Point
Crown Point
Both Roadways
Outer Roadway
0.0
0.0
Profile Grade
D1
0.0
6
0.0
0.02
0.0
Crown Point
Outside Pavt
0.04
Inner Roadway
Edges-Both
0.03
Roadways
0.03
0.02
0.0
0.0
L =S (D2 + D
4)
1
L2
L
3 -D
2)
2 =S (D
0.8 L 4
L
4 -D
3)
3 =S (D
0.2 L 4
Tangent
L4=L2+ L 3
0.0
Inner Roadway
E
F
0.00
0.0
Curve
0.01
Full Superelevation
S=SLOPE RATIO
0.01
L3
0.0
Inner Roadway
0.02
0.0
0.03
Median
W
4
W
4
Grade
4
0.0
0.0
D1
0.0
0.0
0.0
0.0
D3
D2
D2
SECTION A-A
NORMAL CROWNED SECTION
SECTION B-B
SECTION C-C
Profile
D1
0.0
0.O
0.
08
0.0
0.
09
0.0
0.
10
0.
09
0.1
Median
Profile
D4
D3
Grade
D4
SECTION D-D
PLANE INCLINED SECTION LT.
SUPERELEVATION TRANSITION RT.
SECTION E-E
SUPERELEVATION TRANSITION LT.
FULL SUPERLEVATION RT.
SHOULDER SLOPES ON
SUPERELEVATION SECTIONS
SECTION F-F
FULL SUPERELEVATION LT. & RT.
SUPERELEVATION
RURAL HIGHWAYS, URBAN FREEWAYS AND HIGH SPEED URBAN HIGHWAYS
Last
Revision
Sheet No.
00
2 of 2
Index No.
510