Professional Documents
Culture Documents
Ref
PGD/DFE-LIFT/TRD/00377/14
For
Date
Validity
:
:
:
CLIENT
Address
Kind Attn
Email
Telephone
:
:
:
House-3/4,Road-3,Block-A,Lalmatia,Dhaka-1207 Tel8121619,8121568
Mr.Sumon Biswas
Submitted By
01819219977
Md. Zillur Rahman
Deputy Manager
01714-019264
Dear Sir,
Thanks for your interest in Energypac. With reference to your request for supply of Passenger Elevator, We are
hereby submitting our best offer for the above mentioned equipment with the following terms and conditions.
GENERAL DATA
BRAND
LIFTSALL
COUNTRY OF ORIGIN
CHINA
PORT OF SHIPMENT
PRICE SUMMARY:
SL
1
Specification
Type: Passenger Lift
Capacity: 630 kg
Floors/Stops/Opening: 10
Speed: 1 mps
Qty
1 Unit
Grand-Total
IN WORDS : BDT TWENTY FIVE LAC THIRTY THOUSAND THREE HUNDRED ONLY
The price quoted above is excluding VAT & AIT.
Technical Specifications
Terms and Conditions of Sales
: Attached, Annex-1
: Attached, Annex-2
BDT
2,530,300
2,530,300
Annex -1:
Technical Specifications
CLIENTS REQUIRED
No. of Lift
1 (one) No.
Types of Lift
Passenger Lift
630Kg. (8 Persons)
No. of Stops
10
Nos. of Opening
10
Speed
1.0 m/s
Entrance
Single
PROJECT INFORMATION
Shaft Size (Required)
Width-1800mm x Depth-1800mm
Traveling Height
27.0 M (Approx.)
Pit (Required)
1500mm
4200 mm
Shaft Construction
Brick
DRIVE SYSTEM
Type
Machine Room
Operation
Simplex
CABIN
Cabin Size
Width-1100mm x Depth-1400mm
Fan
1 (one) No.
Lighting
Spot lighting.
Car Floor
Ceiling
POWER
Main Driving Power
Light
01 (one)
Side Wall
10
Wall Mounting
Button Type
Push Button
DOOR
Cabin & Landing Door Size
Width-800mm x Height-2100mm
Door Sill
Aluminum
HANDRAILS
Handrail No.
01 (one)
Handrail Material
Handrail Location
In rear wall
Direction indicator
Emergency lighting
Floor indicator
Annex-2
1. Terms of Payment
All payment should be made in Pay Order or Account Payee cheque favoring Energypac Power Generation Ltd.
Payment should be following:
a) 50% Payment will be paid to us during place of work order.
b) 50% Payment will be paid to us before delivery materials at site.
2. Project Completion Period:
Delivery of Materials: Within 90 working days from the date of receiving of your work order.
Installation: Within 30 working days on availability of 3 phase stable power & lift shaft suitable for installation work.
3. Price Basis
The quoted price of equipment is based on the enclosed Technical Specification. Any specific requirements, which
need special engineering or change in the specification / quantity of equipment, may have a price impact and will
have to be mutually discussed and agreed further.
4. Warranty
12 months from commissioning or 18 months from ex works which comes earlier. Warranty covers replacement of
defective parts due to manufacturing defects and comes from bad workmanship.
The buyers shall take care of the goods after receiving it, and shall shoulder the responsibility of the quality for not
taking care of the goods well.
5. Our scope of work excludes
1. Construction of lift shaft, lobby, Machine Room Cabinet, Motor Base in overhead, Buffers pad in lift pit,
lift doors, indicator & push button holes & all others civil finishing works.
2. 3 (three) phase electrical cable, Necessary bus-bar, circuit breaker, MCB, Earthling in lift machine room.
3. Separator beam / I-joist if required in shaft and machine room.
4. Automatic Voltage Stabilizer (AVS) to keep input 3-phase power stable if any.
5. Automatic Resque Device (ARD)
==================