TECHNICAL CLARIFICATIONS TO PRE-BID QUERIES as on 03.05.2011


TENDER NO : CMM/ FTP/23-34-1-1091
UGP & WMP PACKAGE FOR KAPP 3&4 AND RAPP 7&8
S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

L&T

1
dtd.06/
04/11

Sec-E

L&T

Sec-C32

L&T

REFERENCE
CLAUSE NO

BOQ

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

Technical
specification/data
sheets

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

The following data sheets are not there along with


tender document. Request to provide the same.
PC-E-612
PC-E-263
PC-E-542
PC-E-262

PC-E-612 is to be read as PC-E-611 (Section-E is also


changed accordingly). PC-E-262 & PC-E-263 are already
given in Section-C Div-3. PC-E-611 and PC-E-542 are being
enclosed with this Clarification.

suggested List of Pipes & Pipe Fittings


Vendors

Please provide the contact address & telephone


Number for M/s commercial Supplying Agency,
Mumbai. Following Parties have regretted to
quote.
TISCO -Rejected since the same is not in their
product range.
Echjay Industries -Rejected since the it is
uneconomical

Please Refer Section-C.15.2 of Tender Document. Bidder may


suggest New Reputed vendors for consideration of NPCIL. For
contact details refer yellow pages / Internet.

List of drawings

The following drawings are missing in the tender


documents. Please issue .
KAPP-3&4/34924/2001/DD : Feed Storage Tank
KAPP-3&4/34924/2004/DD : Level Control Pot
KAPP-3&4/34924/2003/DD : Condensate
Collection Tank
KAPP-3&4/34930/2024/DD: Top Vent Condenser
KAPP-3&4/79228/5061/TD : Laundry Equipment
( Washing Towering with Tube axial Fan)
KAPP-3&4/71409/2102/DS : Restriction Orifice.

Following drawings are enclosed with this clarification.


KAPP-3&4/34924/2001/DD : Feed Storage Tank
KAPP-3&4/34924/2004/DD : Level Control Pot
KAPP-3&4/34924/2003/DD : Condensate Collection Tank
KAPP-3&4/34930/2024/DD: Top Vent Condenser
Drg no: KAPP-3&4/79228/5061/TD : Laundry Equipment (
Washing Towering with Tube axial Fan) - Given in Laundry
System Specification PC-E-681.
Drg no KAPP-3&4/71409/2102/DS ( Restriction Orifice). Shall
be read as KAPP-3&4/71409/2010/DS and is provided in
Section C-Div-2-A

Drawing List

1 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

L&T

4
dtd.26/
04/11

Canned Motor Pumps. 1. Gasket : As per Data Sheet : SS Spiral and As 1. SS Spiral is only acceptable.
KAPP3&4/34930/2066/D Tag Nos: 0-3492,3493 pper Spec. EDPM. We will Provide EDPM Pl. 2. Both are acceptable.
& 3494
confirm
3. Both are acceptable.
S,
2. Shaft Material: As per Data Sheet: A 479 SS
2067,2052,2051,20
316L and as per Spec SA182 F 316L. We will
53,2060,2071
provide A 479 316L.
Pl confirm
Spec : PC-E 166
3. Stator and Rotor can Material.: As per Data
Sht: HAST Alloy C-276 , as per Spec. INCONEL X
750. We will provide HAST ALLOY C-276. Pl
confirm.

L&T

KAPP3&4639493/2008/IS
S

The capacity mentioned in the Flow Rate Ignore flow rate ( Min/Norm/Max). Instrument range is correct
(Min/Norm/Max) and mentioned in the Instrument and shall satisfy the actual process flow rate.
Range is not matching. Please clarify bidder to
consider the given Flow rate or Instrument Range.

6 Punj Lloyd
1
SECTION-C Div- Refer Cl. No. 3.1
Limited dtd.06/ 3\C & I.zip
of Page No. 5 of
04/11
29

PC-E-592

Spare I/O's of PLC shown in Table - 1 is includes


spare I/O's or not, please clarify

Ref Doc is PC-E-792 not PC-E-592. Table-1 does not take


care of the spare input and output. Refer clause no:3.27 of PCE-792 for providing spares.

7 Punj Lloyd
Limited

SECTION-C Div- Refer Cl. No.


3\C & I.zip
2.1.2 of Page No.
4 of 29

PC-E-592

Engineering Work Station (EWS) and Operator


Work Station (OWS) are separate or together,
please clarify.

EWS/OWS are not separate. From the same work station,


operation and engineering change of programme shall be
possible with password features. Suitable SCADA software
should be supplied by the bidder.

8 Punj Lloyd
Limited

Section - C Div 2

KAPP 3&4/34924/2001/DD

Feed storage tank datasheet is not opening,


please furnish correct file.

1. Drg no: KAPP-3&4/34924/2001/DD is enclosed with this


clarification.

9 Punj Lloyd
Limited

Section - C Div - 2

KAPP 3&4/34924/2004/DD

Level control pot datasheet is not opening, please 1. Drg no: KAPP-3&4/34924/2004/DD is enclosed with this
furnish correct file.
clarification.

10 Punj Lloyd
Limited

Section - C Div - 2

KAPP 3&4/34924/2003/DD

Condensate collection tank datasheet is not


opening, please furnish correct file.

2 of 58

1. Drg no: KAPP-3&4/34924/2003/DD is enclosed with this


clarification.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

Bidder understand that there no scope for


firefighting equipment in WMP as same has not
been included in SOR sheet, please confirm.

RESPONSE FROM NPCIL

11 Punj Lloyd
Limited

Section - E

12 Punj Lloyd
Limited

Section - E

Sr No. 88, 89 &


90

13 Punj Lloyd
Limited

SECTION-C Div- 3\C & I

PP-E-1147,
PP-E-1103,
PP-E-1126,
PP-E-1445,
PC-E-626,
PP-E-577

14 Punj Lloyd
Limited

SECTION-C Div- 3\C & I

KAPP/ 60000/2424/DD These (DD No.) documents are missing. Kindly


Provide the same.

It is support stand drawing and the DRG no should be


corrected to KAPP-3&4/60000/2024/DD instead of 2424/DD
and is being enclosed along with this clarification.

15 Punj Lloyd
Limited

10

SECTION-C Div- 2

PC-E-612

NPCIL Piping Material Spec. missing. Kindly


provide the same.

PC-E-612 is to be read as PC-E-611 (Section-E is also


changed accordingly) this is enclosed with this Clarification.

16 Punj Lloyd
Limited

11

SECTION-C Div- 2

PC-E-542

NPCIL Valve Material Spec. missing. Kindly


provide the same.

PC-E-542 is enclosed with this Clarification.

17 Punj Lloyd
Limited

12

SECTION-C Div- 2

KAPP-3&4/34933/2076 NPCIL Valve VSS missing. Kindly provide the


KAPP-3&4/34933/2077 same.

18 Punj Lloyd
Limited

13

SECTION-C Div- Section C-5


1
Exclusions

KAPPFire hose cabinet assembly, hose reel, 80 NB


3&4/34930/2005/PIS. restriction orifice plate for fire water system
considered in SOR for UGP equipment. But not
shown in the UGP utility services

These (standard modules of specifications)


documents are missing. Kindly Provide the same.

Scope of delivery of Columns after testing from


NPCIL Stores, Trombay, Mumbai to respective
sites. Please clarify.

3 of 58

Yes, Confirmed

Fire hydrant includes these items. For detail refer data sheet
no: KAPP-3&4/71400/2101/DS, KAPP-3&4/71400/2102/DS
and KAPP-3&4/71409/2010/DS

Following Specifications are replaced as shown below and are


already included in Section-C-Div-3
PP-E-1147 Replaced by PC-E-240
PP-E-1103 Replaced by PC-E-234
PP-E-1126 Replaced by PC-E-342
PP-E-1445 Replaced by PC-E-347
PC-E-626 Replaced by PC-E-262
PP-E-577 Replaced by PC-274

1. Drg no: KAPP-3&4/34933/2076 is to be read as KAPP3&4/32003/2076 and 2. Drg no: KAPP-3&4/34933/2076 as


KAPP-3&4/32003/2077, which are enclosed with tender.
Section-C-Div-2 (A) ( Section E is to be corrected
accordingly.)

Columns after testing at BARC will be delivered to respective


sites by NPCIL. Refer section -C-5.1.1

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

19 Punj Lloyd
14
Limited dtd.26/
04/11

Section - C

PB-E-541
PB-E-1209
PB-E-1211
PB-E-1212
PB-E-1213
PB-E-1214
PP-P-198

These specifications are listed in Specification for These are the test procedures for cleaning and NDT and will
Canned Motor Pumps (PC-E-166) as applicable be given to successful bidder.
specs.
These (standard modules of specifications)
documents are missing. Kindly Provide the same.

20 Punj Lloyd
Limited

15

Section - C

PC-E-615

The Specification PC-E-615 is incomplete.


Please provide the complete specification.

21 Punj Lloyd
Limited

16

Section - C

KAPP3&4/79228/5061/TD
KAPP3&4/79228/5042/TD

These documents are missing. Kindly Provide the Following drawings are enclosed with this clarification.
same.
1. Drg no: KAPP-3&4/79228/5061/TD : Laundry Equipment (
Washing Towering with Tube axial Fan) - Given in Laundry
System Specification PC-E-681.
2. KAPP-3&4/79228/5042/TD is drawings is clubbed with
Drg No: KAPP-3&4/79228/5033/TD. ( Drg KAPP3&4/79228/5034/TD and KAPP-3&4/79228/5042/TD , and
KAPP-3&4/79228/5004/TD ) and is available in Section-C Div2-E

22 Punj Lloyd
Limited

17

Section E
GK

23 Punj Lloyd
Limited

18

Section E
GK

Refer Sl. No. 65


Schedule of Rates
(SOR) for UGP C & I
Items (Indigenous) ,
Option -1

Please provide specification for PC for D2O Refer PC-E-792. Standard module of reputed make is
upgrading Plant including all accessories and acceptable. Details considered by bidder my be submitted in
furniture details.
Part-1 Section-D-15.

24 Punj Lloyd
Limited

19

Section E
GK

Refer Sl. No. 48


Schedule of Rates
(SOR) for WMP C & I
Items (Indigenous) ,
Option -1

Please provide specification for 5 KVA UPS: O/P No NPCIL Specification for UPS is provoided . Reputed
240 V AC with suitable VRLA battery (autonomy company make UPS (like Keltron, Trivendram; Hi-Rel, Baroda;
period 1 hr).
DB electronics, Pune ) shall be acceptable.

Refer Sl. No. 47


Schedule of Rates
(SOR) for WMP C & I
Items (Indigenous) ,
Option -1

This is being enclosed with this clarification.

Please provide specification for Local Control Follow PC-E-730 enclosed in Section- C, Div-3
Panel for LESS-67921-PL-5..

4 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

25 Punj Lloyd
Limited

20

Section E
GK

Refer Sl. No. 64


Schedule of Rates
(SOR) for UGP C & I
Items (Indigenous) ,
Option -1

Please provide specification for 10 KVA UPS: with No NPCIL Specification is provoided . Reputed company
suitable VRLA battery (autonomy period 1 hr).
make UPS (like Keltron, Trivendram; Hi-Rel, Baroda; DB
electronics, Pune ) shall be acceptable.

26 Punj Lloyd
Limited

21

Section - C

PC-E-542

These documents are missing. Kindly Provide the This is being enclosed with this clarification.
same.

27 Punj Lloyd
Limited

22

SECTION-C Div2

KAPP3&4/79228/5017/TD

Client to suggest Vendors list of Johnson screen Refer sr no. 1.20 of Section C-32.
for Resin Receiver Columns Tag No. 0-7922-RRC
0301 & 302

28 Punj Lloyd
Limited

23

SECTION-C Div2

KAPP3&4/79228/5008/TD

Client to suggest Vendors list of Vee wire screen Refer sr no. 1.20 of Section C-32.
for Disposable CS Hopper Tag No. 0-7922-csh301

29 Punj Lloyd
Limited

24

SECTION-C Div2

KAPP3&4/34930/2037/DD
KAPP3&4/34924/2006/DD

Please Refer Section-C.15.2 of Tender Document. Bidder may


Client to suggest Vendors list of Demister & Mist suggest New Reputed vendors for consideration of NPCIL.
Eliminator for Feed Evaporator Tag. No. 0-3493-1EV-1, 0-3493-2-EV-1, 0-3493-3-EV-1 & 0-3493-4EV-1, Alkaline Evaporator Tag. No. 0-3492-EV-1 &
EV-2

30 Punj Lloyd
Limited

25

SECTION-C Div2

KAPP3&4/79224/5024/TD
KAPP3&4/34930/2030/DD
KAPP3&4/34930/2031/DD
KAPP3&4/34930/2032/DD
KAPP3&4/34930/2033/DD

Weight mentioned in drawing is not matching with Please refer note 5 of Section E-BK
SECTION-E (Schedule of quantities and rates) for
flowing items
1) Evaporator Feed Tank Tag. No. 7922-TK-2401
2) Feed Tank Tag. No. 3493-1-TK7 & TK8,3493-2TK7 & TK8, 3493-3-TK7 & TK8 & 3493-4-TK7 &
TK8
3) Reject Tank Tag. No. 3493-1-TK11, 3493-2TK11,3493-3-TK11 & 3493-4-TK11,
4) Product Tank Tag. No. 3493-1-TK10, 3493-2TK10,3493-3- TK10 & 3493-4-TK10,
5) Buffer Tank Tag. No. 3493-1-TK13, 3493-2TK13, 3493-3- TK13 & 3493-4- TK13
Kindly Confirm.

5 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER
31 Punj Lloyd
Limited

26

32 Punj Lloyd
Limited

27

33 Punj Lloyd
Limited

28

34 Punj Lloyd
Limited

TENDER
SECTION

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

REFERENCE
CLAUSE NO

KAPP3&4/34930/2016/DD

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

SECTION-C Div2

SECTION-C Div2

SECTION-C Div2

29

SECTION-C Div2

KAPP3&4/34930/2019/DS

Weight is on Lower side in SECTION-E (Schedule Please refer note 5 of Section E-BK
of quantities and rates) of Cartridge Filter Tag. No.
0-3492-FR-2 & FR-3. Client to check and confirm.

35 Punj Lloyd
Limited

30

SECTION-E
SOR

Client to confirm that Mandatory Spares to be Please refer Section C-22


defined for all static equipment like Pressure
Vessels, Heat Exchangers, Tanks, Columns,
Separators, Filters, Disposable Drum, Mixer Tanks,
Cask & Evaporator Chamber

36 NUBERG
ENGG
LTD

Evaporation &
cleanup system
Section C-2

List of drawings Sl. No. Drawings no. KAPP-3&4_34924_2001_DD_R0,


31 Part B-Equipment 3&4_34924_2003_DD_R0 &
details sr. no 5,7 & 8. 3&4_34924_2004_DD_R0 & KAPP3&4_34930_2024_DD_R0 preview not available.

1. Following drawings are enclosed with this clarification.


KAPP-3&4/34924/2001/DD : Feed Storage Tank
KAPP-3&4/34924/2004/DD : Level Control Pot
KAPP-3&4/34924/2003/DD : Condensate Collection Tank
KAPP-3&4/34930/2024/DD: Top Vent Condenser

37 NUBERG
ENGG
LTD

Section C-32
Suggested list of
vendors

1.1 & 1.2 of


Mechanical Part

As clarified during pre-bid meeting and please refer SectionC.15.2 of Tender Document, bidder may suggest New
Reputed vendors for consideration of NPCIL.

KAPP3&4/79224/5008/TD &
KAPP3&4/34924/2002/DD

KAPP3&4/34930/2181/DS

Confirmed.
Client to confirm Phosphor Bronze wire mesh is
being used as packing Material will be free Issued
As per clause No. 4 of PCE-423 for Distillation
Column Tag. No. 0-3493-1-DU, 0-3493-2-DU, 03493-3-DU & 0-3493-4-DU in KAPP-3&4 and
RAPP 7&8. Please confirm.
Client to suggest Vendors list of Agitator & Motor Approved make motor as per motor specification should be
for Chemical feeding tank and stirrer with SS tray used. Fabrication details given in the respective data sheets/
Tag No. 0-7922-TK-302 & 302, 0-7922-ST-302 & drawings. Bidder may refer section C-32 for vendor list.
ST-303 And NaOH Mixing Tank Tag. No. 0-3492TK-2
Weight is on Lower side in SECTION-E (Schedule Please refer note 5 of Section E-BK
of quantities and rates) for Moisture Separator
Tag. No. 0-3493-1-MS-1, 0-3493-2-MS-1, 0-34933-MS-1, 0-3493-4-MS-1 & Spare-1 No. Client to
check and confirm.

We are having our own workshop for fabrication


items like shell & tube type heat exchanger,
pressure vessels, tanks, columns etc. You are
requested to accept such items fabricated in own
facility.

6 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

38 NUBERG
ENGG
LTD

Section C-3

3.5, Site Inspection

We wish to visit site to get familiarized with site


conditions. Kindly inform when this visit can be
made to both KAPP & RAPP.

Contact respective site representatives for KAPP-3&4-: Mr.


Anil Kumar : 09428822053 and for RAPP-7&8-: Mr. R. P.
Singh: 09413358216

39 NUBERG
ENGG
LTD

List of drawings

Drawing No. KAPP3&4/34930/2016/DD

We request you to accept SA 182 F 304L for


flanges of distillation column as an alternative to
SA 266 CL2.

Material shall be as per tender drawing

40 NUBERG
ENGG
LTD

List of drawings

Drawing No. KAPP3&4/34930/2016/DD

We request you to accept SA 240 Gr. 304L for


cover flanges of distillation column as an
alternative to SA 182 F304L.

Material shall be as per tender drawing

41 NUBERG
ENGG
LTD

Scope of work

Section C-4 Reno 4.3e Kindly confirm the bidders have to submit design & Bidder to submit design and design calculations wherever
design calculation for approval for equipments like asked for in respective specifications, data sheets and tender
columns, heat exchangers, vessels etc. are
drawings.
excluded from the scope of contractor.

42 Furnace
Fabrica
(India) Ltd.

Supplier List

43

Techno
fab Engg

Section-C-32

Section-C-32

44

WIL

Section C/
Division 2

A-Heavy Water Up
gradation Plant / Drg.
no. - KA3&4/34930/2007/GA

In common equipment list, quantity of Ion


Quantity given in Section-E ( BOQ) to be followed
Exchange Column (IEC) are given 115 where as
actual 8 no. IEC are shown in the drawing. Please
clarify the exact quantity of IEC.

45

WIL

Section C/
Division 2

A-Heavy Water Up
gradation Plant / Drg.
no. - KA3&4/34930/2006/PIS

What is the working pressure of Vent condenser Please follow given tender drawing for developing fabrication
CD6 ? Vacuum should be created in condenser for drawing.
condensation of D2O vapor ? Either blower or
vacuum line should be shown.

46

WIL

Section C/
Division 2

A-Heavy Water Up
gradation Plant / Drg.
no. - KA3&4/34930/2001/PIS 2
of 3

What is the elevation of reboiler ? How the D2O


transferred from COLUMN SUMP (TK9) to
REBOILER (EV2) since circulation pump is not
indicated.

Supplier Vendor List

Approval of FFIL as manufacturer /vendor for


pressure vessels/tanks / H.E.

Please Refer Section-C.15.2 of Tender Document. Bidder may


suggest New Reputed vendors for consideration of NPCIL.

Suggested Vendor list Required additional Vendors for Mechanical and Please Refer Section-C.15.2 of Tender Document. Bidder may
C&I Items,
suggest New Reputed vendors for consideration of NPCIL.

7 of 58

Please follow given tender drawing for developing fabrication


drawing.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

47

WIL

Section C/
Division 2

A-Heavy Water Up
gradation Plant / Drg.
no. - KA3&4/34930/2005/PIS 1
of 2

Mass flow rate of Steam is 8800 Kg/hr (peak


Process design of columns is not in bidder's scope.
requirement). The requirement of total mass flow
rate in the peak is 10000 Kg/hr (4500 for DU 1 &2
+ 4500 for DU 3&4 +1000 for clean up &
Evaporation).The steam mass flow rate is not
balancing if all the units run simultaneously during
peak operating conditions?

48

WIL

Section C/
Division 2

A-Heavy Water Up
gradation Plant / Drg.
no. - KA3&4/34930/2001/PIS 1
of 3

What is the working pressure of Reflux condenser Vacuum line is connected to vent condenser. Process design
& product condenser ? For condensation of D2O
of columns is not in bidder's scope.
vapor negative pressure is required in condenser.
No vacuum line is indicated for these two
condensers. Kindly check

49

WIL

Section C/
Division 2

A-Heavy Water Up
gradation Plant / Drg.
no. - KA3&4/34930/2001/PIS 2
of 3

Product Drum (Grid D ; 5) indicated for 04 UGP


has been indicated. Kindly confirm the scope of
supply, if it is in the bidders scope kindly forward
the specification and drawing

Product drum is not in bidder's scope.

50

WIL

PC-E-683(
Hydraulic Baling
Press)

5.2

What is the Space required on Table - is it only


for Single Drum /Filter

Space is required for single drum baling / filter baling as


specified. Refer respective specification.

51

WIL

PC-E-683(
Hydraulic Baling
Press)

Kindly indicate the required Working Life of


machine

Minimum 40 years.

52

WIL

PC-E-683(
Hydraulic Baling
Press)

6.2

The production required as indicated is 15 bales


per hour. Kindly indicate the details of the jobs to
be performed for one bailing cycle.

About 1:5 volume reduction is normally achieved during


compaction. After initial compaction, remaining 80% of the
volume will be loaded with waste. To avoid spring back, anti
spring back plate will be put after initial compaction. In this
manner 4 to 5 batches of waste will be loaded before final
closure of the drum with capping.

53

WIL

10

PC-E-683(
Hydraulic Baling
Press)

6.4

Kindly indicate the method of placement of Drum


on Table - Manual on table or Coveyorised

Drum is manually placed on table using overhead monorail


hoist. However if a simple roller conveyor is offered , it will be
preferred.

8 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

54

WIL

11

PC-E-683(
Hydraulic Baling
Press)

55

WIL

12

PC-E-683(
Hydraulic Baling
Press)

56

WIL

13

Section C-8

57

WIL

14

Section C-8

58

WIL

15

59

WIL

60

WIL

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

6.6/6.17

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

Kindly confirm the method of fixing of Compactor


Disc Anti - Spring Back Device.

Anti spring back device is manually placed over assorted


waste in the drum to be compacted. Design of disk is such that
it gets locked up with drum when ram is lifted after
compression.

As per NPCIL Vender List ,Only one Vender is


regietred for Supply of Bailing Press - We request
you to kindly confirm the same

Please Refer Section-C.15.2 of Tender Document. Bidder may


suggest New Reputed vendors for consideration of NPCIL.

8.2.2. LESS

In the paragraph it is writen that A centrifugal


pump P-005 having a capacity of 10 m3/hr is
provided in the sump. But in Drg. No. KAPP3&4/79210/5001/PIS, the pump in LESS sump is
shown as P-006, kindly clarify the designation.

The pump number is P006.

8.2.2. LESS

The following drawings referred in Drg. No. KAPP3&4/79210/5001/PIS, have not been provided.
A) Drg. No. KAPP-3&4/71720/5003/PIS.
B) Drg. No. KAPP-3&4/71720/5004/PIS. Kindly
provide the same

Terminal point scope is clearly marked in respective GA


drawings. These PIS Drg. No. A) Drg. No. KAPP3&4/71720/5003/PIS. And B) Drg. No. KAPP3&4/71720/5004/PIS are not required for reference.

DS/KAPP/3&4/71 CABINET PAGE 1/1


400/2101

CANOPY DETAILS AND MOC HAVE NOT BEEN


INDICATED

Canopy is not required, as it is located indoors.

16

DS/KAPP/3&4/71 CABINET PAGE 1/1


400/2101

ONE ROD IN THE CENTRE AND BOTTOM


SUPPORT FOR SUPPORTING THE HOSE TO
BE PROVIDED

Cabinet to be designed to accommodate hoses as given in


data sheet. Bidder to indicate / show details in fabrication
drawings.

17

Section C

We undersatand that there is a Common control


room for individual systems with individual PLC
panels except for WMP. Also 4 ES which can be
used interchangeably to control the individual
system. Kindly confirm the same .

For 4 Nos. of distillation columns, control room is common.


There are 2 Nos. of PLCs which control the 4 Nos. of
distillation columns and 4 Nos. of EWS/OWS from where
interchangeable operation of all towers shall take place.
Clause 4.6.7 of sec-C is very clear in this respect.

4.6.7

9 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

61

WIL

18

Section C

4.6.7.1

We understand that 1-ph control power supply is


mentioned in the purchaser's scope. The same
was asked to be derived from existing 3-ph supply
in bidder's scope. Kindly confirm the same.

In WMP and D2O upgrading plants 3 phase 415 VAC TPN


supply shall be made available by the purchaser from the
MCC. The contractor has to lay cable and utilise this supply
for deriving 240VAC and 24VDC as required for this PLC.

62

WIL

19

Section C

4.6.7.2

24 VDC supply is mentioned in the purchaser's


scope. The same was asked to be derived from
existing 1-ph supply in bidder's scope. Kindly
confirm the same.

24 VDC supply shall be derived from 240 VAC by the


contractor. A 415 VAC 3Phase TPN shall only be provided by
the purchaser in the MCC for further onward distribution by the
contactor.

63

WIL

20

Section C

4.6.7.3

Kindly Clarify the scope of 1-ph control power


supply and 24VDC supply for WMP

1Phase 240VAC Control power supply shall be taken from


MCC cell of 415 VAC, 3 Phase TPN(provided by purchaser) by
laying a cable from this cell by the contractor. 24 VDC shall be
derived by the supplier from this.

64

WIL

21

Section C

4.6.7

We understand that Two separate PLC


There are 02 Nos.PLC for 04 Nos. distillation units and 04
systems(apart from individual system PLCs) are
Nos. OWS. Clause no 4.6.7 of Section C-4 is self explanatory.
required for 4 no of distillation units. Kindly Confirm
the same.

65

WIL

22

Section C

12.11

Kindly confirm the location of main plant


compressed air supply system

Bidder to follow terminal points given in section C-7

66

WIL

23

Section C

8.2.1

We understand that Radiation monitoring is to be


done only for WMP and not for other individual
systems. We request you to kindly confirm the
same

Radiation monitoring is not in bidder's scope. Information


given in Section C-8.2.1" Radiation monitoring room is
provided in WMP" is for information only.

67

WIL

24

Section C

15.5.7

We understand that Radiation qualification test


certificates for instrument items not required.
Kindly confirm the same

It is confirmed that radiation qualification test certificates are


not required.

68

WIL

25

Section C

2.2-1.12

According to the clause site lies in active seismic


zone-II. Still as per clause 12.15 seismic
qualification and LOCA are not applicable. Kindly
confirm the same.

Seismic Qualification is required wherever specified. LOCA


qualification is not applicable.

69

WIL

26

KAPP-3 &
page 2 of 3
4/79228/5048/DS

The specification for the blower in the aircirculation unit in drying chamber of the
decontamination system has not been
provided.(Refer/79228/5048/DS)

Bidder to select suitable blower for the desired service as per


details given in specification.

10 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

KAPP-3 &
4/79228/5044/DS
Annexure-II

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

70

WIL

27

71

WIL

Pre-1

72

Lloyds
Steel Ind.
Ltd

Section -C ,Division
3,C& I Specifications

.zip file is corrupted, not able to access the file


Please try again since there is no such complain received from
after download from NPCIL website. The above
any other bidder.
mentioned corrupted file is also inaccessible in the
provided CD.

73

Lloyds
Steel Ind.
Ltd

Section -C ,Division
1,Intro.& tech req.of
UGP & WMP pkg,sub
section C-30 AND
division 2,UGP & WMP
package technical
specifications

The following drgs in the respective sub sections


under division 2 are not opening at our
computer,as we suspect these files are
corrupted.(KAPP-3&4/34930/2024/DD,KAPP3&4/34924/2001/DD,KAPP3&4/34924/2003/DD,KAPP-3&4/34924/2004/DD
AND KAPP-3&4-34924-2009-GA-R1).Requestign
to provide us with the above mentioned drawings
which are readable & non corrupted.

1. Following drawings are enclosed with this clarification.


KAPP-3&4/34924/2001/DD : Feed Storage Tank
KAPP-3&4/34924/2004/DD : Level Control Pot
KAPP-3&4/34924/2003/DD : Condensate Collection Tank
KAPP-3&4/34930/2024/DD: Top Vent Condenser
KAPP-3&4-34924-2009-GA-R1. - does not exist.

74

Lloyds
Steel Ind.
Ltd

Section -C ,Division
1,Intro.& tech req.of
UGP & WMP pkg,sub
section C32,suggested list of
vendors

Single vendor detail is provided for the following


items,requesting additional vendor
details(Atomising spray nozzles,Balling
Press,Digital humidity sensor,Hydraulic
jack,Hoist,CS hopper,Fire hose cabinet,High
pressure cleaners,Moisture separator,Laundry
eqpts.,insulation,quick release couplings)

Please Refer Section-C.15.2 of Tender Document. Bidder may


suggest New Reputed vendors for consideration of NPCIL.

The specification for the pump P-1801 in filtration


system for the ultrasonic tanks of the
decontamination system has not been
provided(Refer 79228/5044/DS Annexure-II)

Bidder to select suitable pump for the desired service as per


details given in specification.

1. Distillation Coloumns: Kindly indicate the time Refer Section C-18.2.1.2, 18.3.1.2 and Section C -18.4 of
for the work on the internals by NPCIL. Please tender document. Coloumns will be dispatched to meet project
indicate number of days that purchaser will take to schedule.
supply at site from the date of receipt at BARC.

11 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

PC-E-612 is to be read as PC-E-611 (Section-E is also


revised accordingly).
PC-E-611 is being given along with this clarification.
PC-E-615 is being given with clarification.
PC-ME-309 is to be read as PC-M- 309.
For PC-M 599 refered in Section C-30, page 27 of 32 at sr no.
9 is same as attached .pdf file. There is little mismatch in title
only- Both are same .
PC-E-501 Rev-1 is to be read as PC-E-501 Rev-0.
PM-M-1219 is to be read as PP-M-1219.
PC-E-263 is already given in Section-C Div-3.

75

Lloyds
Steel Ind.
Ltd

Technical
Specifications under
various packages in
Section-C Division 1

The following Technical Specifications are not


available along with the tender documents.PC-E612,PC-E-615,PC-ME-309(PC-M-309 is
available),PC-M-599(under description against
this TS,it is mentioned as Technical Specification
on CS pipe,pipe fittings & piping under SectionC,Div 1,subsection C-30,page no 27 of
32,sr.no.9,whereas the .pdf file shows Technical
Specification on CS pipe,pipe fittings & piping for
light water system.),PC-E-501(R0)(mentioned as
PC-E-501/R1 under section-C,Div 1,subsection C30,page no 27 of 32,sr.no.1),PM-M-1219(given as
PP-M-1219 under the same details),PC-E-263,

76

Lloyds
Steel Ind.
Ltd

80NB restriction orifice


plate for fire water
system DS No.KAPP3&4/71409/2102/DS/R
0

In the tender document, under Section Please note that KAPP-3&4/71409/2102 is to be read as
C,Div.2,UGP,in DS, it is written as KAPPKAPP-3&4/71409/2010/DS/R0
3&4/71409/2010/DS/R0,even if the content is
matching with the specifications. Please notify the
relevant no. as KAPP-3&4/71409/2102 or
2010/DS/R0

77

Lloyds
Steel Ind.
Ltd

Section-E, OptionI,Subsection-ECK,under sr.no.I &


sub.sr.no.64 for Activity
Monitor

The following Technical Detail,is not found in the


folder(section-c,Div.2),waste Management Plant
under the provideded TD section.KAPP3&4/79228/5042/TD

This drawings is clubbed with Drg No: KAPP3&4/79228/5033/TD. (also includes Drg KAPP3&4/79228/5034/TD and KAPP-3&4/79224/5004/TD ) and is
available in Section-C Div-2-E

78

Lloyds
Steel Ind.
Ltd

DS for Moisture
Separator under
Section-C,Div.1,Sub
section-C-30,Page
no.2 of 32,sr.no.21

KAPP-3&4/34930/2181/DS is not available under


Section -C,Div.2,UGP

Data sheet KAPP-3&4/34930/2181/DS is available under Section C,Div.2 A (DS)

79

Lloyds
Steel Ind.
Ltd

Capacity of Truck
under section-E-CK-Hsr.no.60 & in datasheet
no.KAPP3&4/79423/5001/DS is
different.

The capacity of truck is different in different


sections(in E-CK,section-H,sr.no.60 it is 18T and in
the DS KAPP-3&4/79423/5001/DS it is mentioned
as 15T Pay Load. Kindly confirm the capacity

Both capacities are correct. Load bearing capacity of truck


shall be 15Tas mentioned in the data sheet which is
equivalent to net weight. ( Gross vehicle weight ( 18T)chassis weight)

12 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

Quick
Connect/Release
coupling, under OptionI section-E-FK,page no
13 of 13,sectionN,sr.no.51.0 and
section-C div.1 and
sub section C-32,page
no 3 0f 11,sr.no1.16

In vendor list provided under section-C div.1 and


sub section C-32,page no 3 0f 11,sr.no1.16 Quick
release Coupling instead of quick Connect
coupling is mentioned. Out of 2 approved vendors
for M/S Hansen, USA - no data is available in the
internet and for another M/s. Jay Industries,
Mumbai- Many Companies are available in this
name. Requesting proper address & contact nos.
and/or alternative vendors.

Quick release and quick coupling is same. Hanson is a


approved brand name.
Please Refer Section-C.15.2 of Tender Document. Bidder may
suggest New Reputed vendors for consideration of NPCIL.

Lloyds
Steel Ind.
Ltd

81 EIL New
Delhi

KAPP3&4/34930/2016/
DD

ITEM(35)

NPCIL to provide detail drawing of Guide for


estimation

Details are as given in the drawing.

82 EIL New
Delhi

KAPP3&4/34930/2016/
DD

ITEM(33)

Size to be indicated by NPCIL

Details are as given in the drawing.

83 EIL New
Delhi

KAPP3&4/34930/2016/
DD

ITEM(38)

NPCIL to confirm if standard plugs can be used.

Details are as given in the drawing.

84 EIL New
Delhi

KAPP3&4/34930/2016/
DD

Radiography

Extent of Radiography to be indicated by NPCIL

Refer notes given in the drawing KAPP-3&4/34930/2017/DD .


Soft copy of the drawing is being enclosed here with.

85 EIL New
Delhi

KAPPR.F PADS FOR


3&4/34930/2016/ NOZZLES:N1,N2 & N4
DD

R.F PADS are not provided for these nozzles.


NPCIL to confirm requirement.

Reinforcement pad is to be provided for 50 NB and above


nozzles. Bidder to develop fabrication drawings as per ASME
Sec VIII Div-I and based on tender drawings provided by
NPCIL.

86 EIL New
Delhi

KAPP3&4/34930/2016/
DD

80

Item No2

NPCIL to confirm if the lip rings can be made out This will be finalised during approval of fabrication drawings.
of segments since it is machined after welding with
the CS Flange. NPCIL to clarify cl no, 6.6.4 of
specification no PCE 423 Page 6/42 about welding
of leap seal after testing the segments. NPCIL to
confirm if the lip sealrings can be welded to CS
Flange and machined after which the CS Flange is
to be welded to the shell.

13 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

NPCIL to confirm size of O ring.

RESPONSE FROM NPCIL

87 EIL New
Delhi

KAPP3&4/34930/2019/
DD

ITEM(19)

88 EIL New
Delhi

KAPP3&4/34930/2018/
DD

Top & Bottom


Supporting ring

89 EIL New
Delhi

KAPP3&4/34930/2020/
DD

Note(11)

90 EIL New
Delhi

10

KAPP3&4/34930/2020/
DD

ITEMS(5,6)

91 EIL New
Delhi

11

KAPP3&4/34930/2022/
DD

ITEM(2,33,36,37)

92 EIL New
Delhi

12

KAPP3&4/34930/2022/
DD

ITEM(27)

NPCIL to confirm Pipe mateial specification as SA Pipe material specification as SA 312 Tp.304L instead of SA
312 Tp.304L instead of SA 182 F304L as given in 182 F304L as given in the drawing is acceptable.
the drawing.

93 EIL New
Delhi

13

KAPP3&4/34930/2022/
DD

ITEM(40)

Full Coupling material specification to be revised


to SA 182 F304L instead of SA 403 WP 304

94 EIL New
Delhi

14

KAPP3&4/34930/2022/
DD

ITEM(29)Cone will be fabricated in 3/4 segments(with 3/4


FABRICATED CONE weld seams)NPCIL to confirm

Such details are finalised during fabrication stage.

95 EIL New
Delhi

15

KAPP3&4/34930/2022/
DD

Lifting lugs,Name
NPCIL to confirm requirement of Lifting lugs,
plates & earthing lugs Name plates & earthling lugs.

Lifting lug details are given in view DD of referred drawing.


Name plate details will be finalised during fabrication stage.

96 EIL New
Delhi

16

KAPPR.F PADS FOR


NPCIL to confirm requirement of RF Pads for
3&4/34930/2022/ NOZZLES:N1,N2 & N3 these nozzles.
DD

Position & location and fixing details with column


section required

This will be finalised during approval of fabrication drawings.

This will be finalised during approval of fabrication drawings.

Water holdup test procedure: NPCIL to confirm if it Water hold test is to be carried out to check integrity of liquid
is water filling test
collector.

Item 5 Ring shows double line. Section not shown. These details are to be taken care while preparing fabrication
Details required. Item 6 radius of curvature to be
drawings.
indicated.
NPCIL to confirm if in place of SA 285 Gr.C ,SA
516 Gr.70/IS 2062 Gr.B, can be used.

14 of 58

Follow material given in the drawing.

Acceptable

Reinforcement pad is to be provided for 50 NB and above


nozzles. Bidder to develop fabrication drawings as per ASME
Sec VIII Div-I and based on tender drawings provided by
NPCIL.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

97 EIL New
Delhi

17

KAPPSTIFFENERS FOR Please check & advise the requirement of


3&4/34930/2022/ NOZZLES:N4 ,N5 &N6 Stiffeners
DD

Such details are finalised during fabrication stage.

98 EIL New
Delhi

18

KAPP3&4/34930/2022/
DD

DESIGN

As per this note MSEL considered detailing only.


Design not considered. Process design,
mechanical design & civil design not in MSEL
scope

What is MSEL? Query is not clear.

99 EIL New
Delhi

19

KAPP3&4/34930/2022/
DD

Insulation clips

Design Temperature is 130C .Inlet and outlet


temperature is 55 and 54 degree centigrade.
NPCIL to confirm if insulation and insulation clits
are required.

Insulation is not in bidders scope.

100 EIL New


Delhi

20

KAPP3&4/34930/2022/
DD

Ladder /Platform clips

NPCIL to confirm requirement of pad plates for


fixing of ladders and platform.

No Platform or ladder required. Follow given tender drawing.

101 EIL New


Delhi

21

KAPP3&4/34930/2023/
DD

ITEM(13)

IS:2002 Gr.2A Required as per drawing , MSEL


provide SA 516 Gr.70,NPCIL may please check
and confirm.

What is MSEL? Query is not clear.


SA 516 Gr.70 is acceptable in place of IS 2002 Grade 2A.

102 EIL New


Delhi

22

KAPP3&4/34930/2023/
DD

ITEM(22)

Washer material Specification & applicable


standard required.

103 EIL New


Delhi

23

ITEM(24)&(28)

3 NPT PLUG, Required applicable Standard for


Procurement.

104 EIL New


Delhi

24

KAPP3&4/34930/2023/
DD
KAPP3&4/34930/2023/
DD

105 EIL New


Delhi

25

KAPP3&4/34930/2023/
DD

Lifting lugs, Name


plates & earthing lugs

Please confirm the requirement of Lifting lugs,


Name plates & earthing lugs. If required please
furnish details.

106 EIL New


Delhi

26

KAPP3&4/34930/2023/
DD

R.F PADS FOR


NOZZLES:N1 & N3

Please check & advise the requirement of R.F


PADS .

Note(14)

Washer material is ASTM A 325 Galvanised.

Such details are finalised during fabrication stage.

As per this note MSEL considered detailing only. What is MSEL? Query is not clear.
Design not considered. Process design,
mechanical design & civil design not in MSEL
scope

15 of 58

Such details are finalised during fabrication stage.

Reinforcement pad is to be provided for 50 NB and above


nozzles. Bidder to develop fabrication drawings as per ASME
Sec VIII Div-I and based on tender drawings provided by
NPCIL.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

Please check & advise the requirement of


Stiffeners

RESPONSE FROM NPCIL

107 EIL New


Delhi

27

KAPP3&4/34930/2023/
DD

STIFFENERS FOR
NOZZLES:N2,N4 ,N5
&N6

108 EIL New


Delhi

28

KAPP3&4/34930/2023/
DD

Insulation clips

109 EIL New


Delhi

29

KAPP3&4/34930/2023/
DD

Ladder /Platform clips

Ladder /Platform clips not considered in


estimation. Please confirm the requirement

Ladders / Platform not required.

110 EIL New


Delhi

30

KAPP3&4/34930/2023/
DD

Vacuum Testing
Procedure

Type of Vacuum testing Procedure required.

Such details are finalised during fabrication stage. Refer


clause 7.2 of specification PC-E-423 in section C-Div-2 (A)

111 EIL New


Delhi

31

KAPP3&4/34930/2042/
DD

ITEM(2)

DIMENSIONS REQUIRED

It is full coupling of 25 NB size NPTF & 3000 lb as per ANSI


16.1

112 EIL New


Delhi

32

KAPP3&4/34930/2042/
DD

NOTE(5)

How to test Sparger(assly of parts 1,2 &3)

113 EIL New


Delhi

33

List of Spares

Please arrange list of Spares ,if required

114 EIL New


Delhi

34

PC-E423,Technical
Specification

Clause(1.1)

Such details are finalised during fabrication stage.

Design Temperature is 160C,any insulations clips Insulations clips required.


requried or not. Please confirm.

Design not considered in our scope. NPCIL to


confirm.

16 of 58

Such details are finalised during fabrication stage.

Refer Section E. All required spares are given in Section E.


and respective specifications.

Design is not in bidder's scope. Fabrication drawings are to be


developed by vendor.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER
115

Dolphin
Offshore

116

Dolphin
Offshore

TENDER
SECTION

1
Section-C
dtd.11/
04/11

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

Div-3, Data sheet


for Glass Tube
rotometer of
Instruments.

Spec No: KAPP1. Sr no:7 to 10: Instrument range 30-300 m3/hr is


3&4/63493/2008/ISS very high to be accommodated in 1/4" size meter Please clarify.
2. Sr No.43 & 51 instrument range 0-1000 LPM is
very high to accommodate i 1/2"size meter- Please
clarify.
3. Range
specified is very high and cannot be
accommodated in glass tube rotometers will
require 6" by pass rotometers for point 1 and 3" ro
4" metal tube rotometer for point 2.
4. Sr no. 15 to 30 and 47 to 48 instrument range
620 -6200 LPH/9.5 -95 LPM is very high to
accommodate i 1/2"size meter- Please clarify.
5. As per the vendor the tube size will be 11/2" for
all rotometers with flow range above 0-3000 LPM.
6. Regarding the flow rate to be measured , there
are two ranges mentioned in data sheet in column
3 Flow min/ Nor/Max is mentioned & Column 4
Instrument range is mentioned. Please clarify
which rage is referred for calculation.

PC-E-612 Piping
Specification

DESCRIPTION OF THE QUERY

PC-E-612 Piping Specification is not available.


Request NPCIL to provide it.

RESPONSE FROM NPCIL

Kindly refer KAPP-3&4/34930/2001/PIS and KAPP3&4/34920/2001/PIS. FG under Sl. No.7 to 10 and Sr. No. 43
and 51 of specification No. KAPP-3&4/63493/2008/ISS are all
bypass type. Main line flow is 330m3/hr and 1000 LPM
respectively.. End connection of 1-1/2 " size shall be OK for
above 0-3000 LPM flow. Ignore value of flow min/nor/max in
this specification. Instrument range is correct and shall satisfy
the actual process flow range. Flow gauge assembly as
indicated in sr. no. 7 of SOR of E-GK consist of orifice, flange,
range orifice. It is a by-pass rotameter.

PC-E-612 is to be read as PC-E-611 (Section-E is also


changed accordingly).

117

KAPP-3&4/79228/5061/TD

Dolphin
Offshore

SECTION -E
SCHEDULE OF
RATES
OPTION I
SECTION E-CK
WMP
EQUIPMENT
SL.NO.54WASHING
TOWER

KAPP-3&4/79228/5061/TD NOT AVAILABLE IN TENDER


DOCUMENT - REQUEST NPCIL TO PROVIDE THE SAME

17 of 58

Drg no: KAPP-3&4/79228/5061/TD : Laundry Equipment (


Washing Towering with Tube axial Fan) - Given in Laundry
System Specification PC-E-681.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

118

Dolphin
Offshore

119

Dolphin
Offshore

Refer section C32


SUGGESTED
APPROVED
VENDOR LIST

MECHANICAL ITEMS VENDOR QUERIES


Please Refer Section-C.15.2 of Tender Document. Bidder may
We request NPCIL to provide Vendor List for these suggest New Reputed vendors for consideration of NPCIL.
items
1) High pressure cleaner
2) Electronic weighing machine
3) Activity Monitor
4) Wash basin for sampling at LESS,Resin fixation
Area,Pump Room,Filter room,Evaporation
area,sampling room
5) Victaulic Coupling (For resin fixation &
evaporation system)
6) Hydraulic Hand Pallet Truck
7) Service Air Station
8) Instrument air manifold
9) Mask Air Station
10) Hydrant Valves
11) Orifice Flange
WE REQUEST NPCIL TO PROVIDE VENDOR
LIST

120

Dolphin
Offshore

Refer section C32


SUGGESTED
APPROVED
VENDOR LIST

INSTRUMENTS VENDOR NAME QUIERIES

2 34924/2001/DD 0 KB DD Drawings are not opening and are 0 KB files.


File
We request NPCIL to provide new drawings.
3 34924/2001/DD 0 KB
File
4 34924/2001/DD 0 KB
File

FOLLOWING INSTRUMENTS VENDOR HAS


NOT FOUND IN THE SUGGESTED VENDOR
LIST

18 of 58

Query is not clear. Same drawing no is mentioned thrice. Drg


No: KAPP-3&4/34924/2001/DD is being enclosed along with
clarification.

Please Refer Section-C.15.2 of Tender Document. Bidder may


suggest New Reputed vendors for consideration of NPCIL.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

Refer section C-32


7
SUGGESTED
dtd.27/
APPROVED
04/11
VENDOR LIST

121

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

MECHANICAL ITEMS VENDOR QUERIES


Please Refer Section-C.15.2 of Tender Document. Bidder may
We request NPCIL to provide Vendor List for these suggest New Reputed vendors for consideration of NPCIL.
items
1) Heavy Water Sampling Station
2) Shield Door for RB access tunnel
3) Sampling Station Cabinet
4) Filteration Chamber for drying tumblers exhaust
5) Washing tower with tube axial fan

Dolphin
Offshore

WE REQUEST NPCIL TO PROVIDE VENDOR


LIST

122
Dolphin
Offshore

123

Technip

Piping1

124

Technip

125

Technip

C&I
SECTION -E
SCHEDULE OF
RATES
OPTION I
SECTION E-GK
,E-HK
SCHEDULE OF
RATES FOR WMP

Specification PC-E-1147, PC-E-1103 , PC-E-1104


are not availabe in tender document, we request
NPCIL to clarify whether it has be read has PC-E234, PC-E-236, PC-E-240. If not please provide us
the required document

Following Specifications are replaced as shown below and are


already included in Section-C-Div-3
PP-E-1147 Replaced by PC-E-240
PP-E-1103,1104 Replaced by PC-E-234

Section-C

C1,1.2 WMP

Bidders understand that the no of systems of


WMP for KAPP-3&4 and RAPP-7&8 are same. Pl
Confirm

Refer clause Section C-1.2. Evaporation System and bailling


systems are not required in RAPP-7&8 and only pump heads
of WMP of RAPP is slightly different than that of KAPP-3&4.

Piping2

Section-C

C1,1.5.1.1a

PLRL and isometrics will be given by npcil for


UGP and WMP.Pl confirm.

PLRL and isometrics will be given to successful bidder.

Piping3

Section-C

C1,1.5.1.2 a

The PURCHASER is carrying out design and


Refer Section C-4.4.2 for details.
detailed engineering in- house and through
consultants for 700 MWe PHWR projects. The civil
software and other programmes and the 3D model
will be provided by the purchaser to successful
bidder.pl confirm creation of virtual plant in 3D
model by using Cadmatic / PDMS drawings, etc
are being prepared in AutoCAD and used as input
for drawings, flow sheets, PIS, IS, piping layout
drawings, equipment

19 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

126

Technip

Piping4

Section-C

C4,4.2

The scope of supply of all equipment, items, pipes, Supply scope is as per Section-E. For additional quantity
pipe fittings, piping components like valves,
required if any refer clause no: 1.10 of Section -E notes.
strainers, trays, relief valves, PRVs, rupture discs,
C & I items, etc. are generally as per the BOQ
enclosed along with this tender (refer Section E).
How

127

Technip

Piping5

Section-C

C4,4.4.6

The scope of supply of all equipment, items, pipes, Supply scope is as per Section-E. For additional quantity
pipe fittings, piping components like valves,
required if any refer section -E notes.
strainers, trays, relief valves, PRVs, rupture discs,
C & I items, etc. are generally as per the BOQ
enclosed along with this tender (refer Section E).
How

128

Technip

Piping6

Section-C

C4,4.5.3

Estimation of Bill Of Quantity (BOQ) for piping


supports in terms of support member, size and
lengths, is in the scope of Contractor.pl confirm.

129

Technip

Piping7

Section-C

C5,5.1.2

Beyond the building terminal points as indicated in Refer drawing No. KAPP-3&4/34930/2046/GA for Terminal
the enclosed drawing No. KAPPpoint location of utilities for Upgrading Plant.
3&4/34930/2046/GA Terminal point location of
utilities for Upgrading Plant, pl confirm.

130

Technip

Piping8

Section-C

C5,5.1.7

5.1.7 Insulation of equipment & piping. Excluded


confirm for ugp and wmp, pl confirm

Confirmed

131

Technip

Piping9

Section-C

C5,5.2.8

5.2.8 Fire water piping and fire fighting cabinets


excluded confirm for wmp,pl confirm

Confirmed

132

Technip

Piping10

Section-C

C7,7.1

All utility piping service viz. Service water, Chilled


Water, Instrument Air, Service Air, Mask Air,
Domestic water, DM water, Fire water and steam
line from Main Plant up to the building terminal
points of upgrading plant shall be provided by the
PURCHASE

Yes. Confirmed

133

Technip

Piping11

Section C,DivKAPP3&4-32000-2100-DS2,A_HEAVY_WATER R2.pdf


_UPGRADING

Supply scope is as per Section-E. For additional quantity


required if any refer section -E notes.

As per ANSI B 36.19, Sch 40S is not available for SS 350NB & 400NB pipes are not included in BOQ given in
size 350NB & 400NB, But in Doc bearing no
section -E.
KAPP3&4-32000-2100-DS-R2.pdf it is shown, Pl
clarify.

20 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

134

Technip

Piping12

Section C-7

KAPPAs per dwg KAPP-3&4_34930_2046_GA-R0 root Scope of Bidder is as indicated in referred GA drawing and
3&4_34930_2046_GA- valves & its companion flanges, gaskets, bolts etc. section C-7.1
R0
not marked in contractor scope but in section C-7
in point 7.1 mention Terminal point location of
utilities for Upgrading Plant. All the items up to this
point

135

Technip

Piping14

Section C-30

KAPP3&4/34920/2001/FS

As per Section C-30 Activated charcoal filter no. is No is 3492 FR-1. Flow sheet will be corrected accordingly.
3492-FR-1 and in KAPP-3&4/34920/2001/FS no. is
3493-FR-1. pl confirm

136

Technip

Piping15

Section C-30

KAPP3&4/34920/2001/FS

As per Section C-30 Alkaline Evaporator


Condenser no. is 3492-CD-2 and in KAPP3&4/34920/2001/FS no. is 3493-CD-2. pl confirm

3492 CD-2 is correct. Flow sheet will be corrected


accordingly.

137

Technip

Piping16

General query

DOC not opening showing error, Pl send

Query is not clear. Which document is not opening?

138

Technip

Piping17

General query

139

Technip

Piping18

General query

Pl provide the schematic diagram or details for SA Follow PC-E-702


& MA manifolds OR Can we take it from PC-E-702R0.pdf,pl confirm

140

Technip

Piping19

General query

Wind speed for KAPP 3 & 4 is not given, pl


provide.

Not Required.

141

Technip

Piping20

General query

Pl specify the piping stress analysis software

Not Required.

142

Technip

Piping21

General query

Pl send the Stress Analysis Design Basis (Static


and Dynamic)

Query is not clear.

143

Technip

Piping22

General query

Pl specify the Environment Qualification required


for the components/items etc, if any.

Not Required.

KAPP-3&4/34924/2001/DD,
KAPP-3&4/34924/2003/DD,
KAPP-3&4/34924/2004/DD

Specification PP-E-1209 AND PP-E-1212,PC-EPC-E-612 is to be read as PC-E-611 which is being enclosed


612 (only two pages are available) not available, pl with this clarification. PP-E-1209 is replaced as PP-P-2396 &
send
PP-P-2397 and PP-E-1212 is replaced as PP-P-2356 which
are already included in Section-C,Div-2(F).

21 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

WMP building plan and section layout will be


given by npcil, pl confirm.

RESPONSE FROM NPCIL

144

Technip

Section C

C1,1.5.1.2 a

Refer drg list given in Section-C Div-2 (E)

145

Technip

Section-C,
Division-1,
Section C-1

Cl. No. 1.4.c,


1.5.3 and Section
C-5, Cl. No. 5.0.

146

Technip

Section-C,
Division-1,
Section C-7

Cl. No. 7.3

The control power supply, 240V AC, single phase


required for space heater, panel
lighting,annunciation etc. shall be provided
separately or has to be derived from 415A power
supply which is going to provided by NPCIL.

147

Technip

Data Sheet No :
KAPP3&4/34930/2066
/DS : KAPP3&4/34930/2067
/DS, : KAPP3&4/34930/2052
/DS, : KAPP3&4/34930/2051
/DS, : KAPP3&4/34930/2060
/DS, : KAPP3&4/34930/2071
/DS

Sr. No. 14

According to the pump data sheet, Seismic


Required. Canned motor pump is a single integrated unit
qualification is required for pump but if we refer the hence seismic qualification is required for pump motor
motor data sheet i.e., Annexure A, it is specified
assembly.
that the Seismic qualification of motor and its
driven equipment is 'N.A.'. NPCIL to clarify if
seismic qualification for both is required or not.

NPCIL to confirm that only Supply & erection of


Refer Section C-5 of tender document.
electrical drives for equipment specified in the
tender document is in the contractor's scope (for
both UGP & WMP) Exclusions from the contractors
scope (for UGP & WMP) consists of : 1. Laying
and supply of cables up to MCCs and further
distribution up to the terminal box of the load point.
2. Supply of MCC, lighting systems, grounding
etc. 3. Plant grounding mat. 4. Erection of cable
trays, cable tray supports, power cables, lighting
cables, grounding wires, erection of electrical
equipments except the equipments listed in the
SOR.

22 of 58

240 VAC Supply for control use shall be derived by the


contractor from 415 VAC 3 Phase TPN cell provided by the
purchaser.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER
148

Technip

149

Technip

TENDER
SECTION

Data Sheet No. :


KAPP3&4/79212/5001/DS :
KAPP3&4/79222/5002/DS
: KAPP3&4/79222/5004/DS
: KAPP3&4/79222/5001/DS :
KAPP3&4/79222/5005/DS
: KAPP3&4/79222/5003/DS :
KAPP3&4/79222/5006/DS
: KAPP3&4/79228/5020/DS:
KAPP3&4/79228/5022/DS
: KAPP3&4/79228/5046/DS :
KAPP3&4/79228/5055/DS
: KAPP3&4/79228/5056/DS
: KAPP3&4/79228/5058/DS
: KAPP3&4/79228/5060/DS
: KAPP3&4/79413/5001/DS
: KAPP-

Data Sheet No.


KAPP3&4/79228/5020
/DS

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

Motor data sheet is not available. Also, seismic


qualification requirement is not specified in the
pump data sheet. NPCIL to provide the same.

Sr. No. 6

RESPONSE FROM NPCIL

No seismic qualification is required for these pump motor sets.


Motor data sheet will be given to successful bidders.

Motor data sheets not available. NPCIL to provide. Motor data sheet will be given to successful bidders.
Also, as specified in the said data sheet, the motor
is flameproof. So, IS 2148 is to be followed ? Does
NPCIL have there own standards / specifications
for Flameproof motors ? If yes then NPCIL to
provide the same.

23 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

150

Technip

. : KAPP3&4/79212/5001
/DS
:
KAPP3&4/79222/5002
/DS
: KAPP3&4/79222/5004
/DS
: KAPP3&4/79222/5001
/DS
: KAPP3&4/79222/5005
/DS
: KAPP3&4/79222/5003
/DS

151

Technip

Data Sheet No. :


KAPP3&4/79228/5022
/DS & KAPP3&4/79413/5001
/DS

152

Technip

Data Sheet No. : Sr. No. 4, 4, 4 & 3


KAPPresp.
3&4/79228/5055
/DS, KAPP3&4/79228/5056
/DS,
KAPP3&4/79228/5058
/DS &
KAPP3&4/79228/5060
/DS

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

Motor data sheets not available. NPCIL to provide. Motor data sheet will be given to successful bidders.
Also, applicable standards are not mentioned in
these data sheets. NPCIL to provide.

Sr. No. 4 & 7


resp.

Motor data sheets not available. NPCIL to provide. Motor data sheet will be given to successful bidders. No
Also, as per the equipment data sheet, the
special requirement of radioactive area, LOCA / MSLB is
motorised trolley is specified to be in Radioactive required.
area. As motor data sheet is not available, the
specific requirements for motors to suit the
radioactive area, and the requirements for
LOCA/MSLB are not clear. Hence the motor data
sheet to be provided and the requirements to be
specified clearly.
Motor data sheets not available. NPCIL to provide. Motor data sheet will be given to successful bidders. No
Also, as specified in the said data sheets, the
special requirement of radioactive area is required.
equipments are located in RAB-4, i.e., the reactor
building. As per PC-E-501, there are special
requirements for equipments in reactor building.
Does NPCIL have there own standards /
specifications for such kind of motors ? If yes then
NPCIL to provide the same.

24 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

153

Technip

Data Sheet No :
KAPP3&4/79228/5055
/DS

Sr. No. 10

154

Technip

10

Specification
No. P-E-501

Cl. No. 5.1.7 Motors up to 22


KW shall meet
requirements as
per efficiency 1
with stating
current limit of
600% ( with IS
tolerance )

155

Technip

11

Specification
No. P-E-501

Cl. No. 5.1.7 Motors beyond 22


KW shall meet
requirements as
per efficiency 2
with stating
current limit of
600% ( with IS
tolerance )

156

Technip

12

Section E,
Option I, Section
E-CK and
Option II,
Section E-CR

Sr. No. 14 & 15


resp.

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

The motor is VFD driven. NPCIL to confirm that


the procurement of VFD will be taken care by
NPCIL. If it is to be supplied by Bidder / Vendor,
NPCIL to provide the relevant specification and
data sheet for VFD.

RESPONSE FROM NPCIL

Procurement of VFD motors is not in NPCIL scope. This is part


of washer extractor and manufacturer has to use reputed
make VFD motors.

IS 12615 - For motors up to 1.5 KW the starting


Bidder to follow given specification PC-E-501
current limit is 650% and beyond up to 22 KW it is
700% - please clarify / confirm the requirement.
Please clearly specify whether the starting current
limit shall include or exclude the tolerance.

IS 12615 - For motors beyond 22 KW it is 650% please clarify / confirm the requirement. Please
clearly specify whether the starting current limit
shall include or exclude the tolerance.

Bidder to follow given specification PC-E-501

Option I lists the pumps tagged as 0-7921-001 to Information given is correct. Confirmed. Data sheet for P-007
005 (refer Option I, Section E-CK, Sr. No. 14).
to P-012 for option-2 will be given to successful bidder.
Whereas, in Option II (refer Option II, Section ECR, Sr. No. 15) P-007 to 012 are also listed in
addition to 0-7921-001 to 005. Also, the data sheet
no. KAPP-3&4/79212/5001/DS, have details of
pumps with tag nos. 0-7921-P-001 to 005. Nothing
is mentioned about P-007 to 012. NPCIL to first
confirm that P-007 to 012 are addition to the
pumps in KAPP 3&4. If so, NPCIL to provide all
the relevant documents for P-007 to 012.

25 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

157

Technip

13

Section E,
Option I, Section
E-CK and
Option II,
Section E-CR

Sr. No. 17 & 16


resp.

Option I lists the pumps tagged as 0-7921-006 &


Information given is correct. Confirmed.
7922-1101 to 1104 & 304 (refer Option I, Section ECK, Sr. No. 14). Whereas, in Option II (refer
Option II, Section E-CR, Sr. No. 15) only 0-7921006 & 7922-304 are listed. Also, the data sheet no.
KAPP-3&4/79222/5004/DS, have details of pumps
with tag nos. 0-7921-006 & 7922-1101 to 1104 &
304. So, NPCIL to confirm that 7922-1101 to 1104
are not to be considered in Option II.

158

Technip

14

Section E,
Option I, Section
E-CK

Sr. No. 18 & 19

The pumps listed in Option I, Section E-CK, Sr. no. Information given is correct. Confirmed.
18 & 19 are not considered in Option II. NPCIL to
confirm.

159

Technip

15

Section E,
Option I, Section
E-CK and
Option II,
Section E-CR

Sr. No. 57 & 52


resp.

Option I lists the pumps tagged as 0-7922-HSTInformation given is correct. Confirmed.


1401, 1801 & 1501 & 001 (refer Option I, Section
E-CK, Sr. No. 57). Whereas, in Option II (refer
Option II, Section E-CR, Sr. No. 52) only 0-7922HST-1801 & 1501 & 001 are listed, 0-7922-HST1401 is not considered. Also, the data sheet no.
KAPP-3&4/79222/5004/DS, have details of pumps
with tag nos. 0-7922-HST-1401, 1801 & 1501 &
001. So, NPCIL to confirm that 0-7922-HST-1401
is not to be considered in Option II.

160

Technip

16

General Queries
:

161

Technip

Pip-1

Is there any requirement of Intermediate junction Each motor has to have local emergency off push button for
boxes for termination of power cables for motors ? which no data sheet is necessary. An Emergency push button
Whether each motor has to have separate Local
is to be wired in a small box.
Push Button Station other than Local Control
Panel for the entire package, where Start / Stop
facility can be there for all / any motor under that
package - please confirm. If yes, please provide
relevant specification and datasheet Three phase
and single phase receptacle system and Welding
receptacles shall be in NPCIL's scope.

Section C

C4,4.2

Will NPCIL issue 3D model to the successful


bidder.

26 of 58

No

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

REFERENCE
CLAUSE NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

162

Technip

Pip-2

Section C-30

KAPP3&4/34920/2001/FS

As per Section C-30 Activated charcoal filter no. is As per Section C-30 Activated charcoal filter no. is 3492-FR-1
3492-FR-1 and in KAPP-3&4/34920/2001/FS no. is is correct. FS is to be corrected.
3493-FR-1. pl confirm

163

Technip

Pip-3

Section C-30

KAPP3&4/34920/2001/FS

As per Section C-30 Alkaline Evaporator


Condenser no. is 3492-CD-2 and in KAPP3&4/34920/2001/FS no. is 3493-CD-2. pl confirm

As per Section C-30 Alkaline Evaporator Condenser no. is


3492-CD-2 is correct. FS is to be corrected.

164

Technip

Pip-4

Section C,Div2,B_EVAPORATI
ON_CLEAN_UP_
SYSTEM_DOWN
GRADED_HEAV
Y_WATER_ST_D
rgs

KAPP3&4/34924/2001/DD
KAPP3&4/34924/2003/DD
KAPP3&4/34924/2004/DD

DOC not opening showing error, Pl send

Following drawings are enclosed with this clarification.


KAPP-3&4/34924/2001/DD : Feed Storage Tank
KAPP-3&4/34924/2004/DD : Level Control Pot
KAPP-3&4/34924/2003/DD : Condensate Collection Tank

165

Technip

Pip-5

General query

Specification PP-E-1209 AND PP-E-1212,PC-EPC-E-615 is being enclosed with this clarification. PP-E-1209
615 (only two pages are available) not available, pl is replaced as PP-P-2396 & PP-P-2397 and PP-E-1212 is
send
replaced as PP-P-2356 which are already included in SectionC,Div-2(F).

166

Technip

Pip-6

General query

Pl specify the Piping Stress Analysis Software

167

Technip

Mec-1

Columns, Tanks
& Vessel for
WMP / UGP

168

Technip

Mec-2

Canned Motor
line 14 on page 2/6
Seismic qualification is applicable as per pump
Required. Canned motor pump is a single integrated unit
pump datasheets and line 10.5 on pg 6/6 datasheet but not applicable as per motor
hence seismic qualification is required for pump motor
for UGP & WMP
datasheet. We understand that motor is not to be assembly.
seismic qualified as separate unit whereas pump &
motor assembly is to be seismic qualified. Kindly
confirm.

169

Technip

Mec-3

Pumps for UGP & WMP

No piping analysis is in bidder's scope.

Seismic qualification requirements is not explicitly Seismic qualification is required wherever specified in tender
mentioned in datasheet / drawings for static
drawings, data sheets or specification.
equipment. We assume that seismic qualification
is not applicable for such equipment. Kindly
confirm.

Specification for Mechanical Seal and Sealing


Mechanical seals are to be procured from NPCIL approved
system is missing, Kindly confirm whether API 682 make.
can be followed or NPCIL to provide requirements,
if any.

27 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

REFERENCE
CLAUSE NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

170

Technip

Mec-4

Tanks & Vessel


for WMP

KAPP-3&4/79214/5005/TD, reference drawing for


Tank / vessel is missing. Kindly furnish the same.

This drg will be given to successful bidder as indicated in


Section C-30.

171

Technip

Mec-5

Sec C div 3

PC-E-730

Kindly clarify whether requirement of PC-E-730 is


applicable for machine mounted panel or only for
local control panel.

Applicable for all general control panels.

172

Technip

Mec-6

Sec D

subsection D-16

Kindly clarify whether format D-16 for control


panels is to be filled up for machine mounted
panels.

Yes, to be filled.

173

Technip

Mec-7

KAPP
Line 14 - applicable
We understand that PC-E-686 is applicable for
3&4/79228/5007/ technical specs - PC-E- high pressure cleaner and not PC-E-679. Kindly
DS - datasheet for 679
confirm.
high pressure
cleaner

174

Technip

I&C-1

SECTION-C /
DIVISION
1/Section C-30
Page 30 of 32
SECTION E/Excel
Sheets/SECTIONE-OPTION IIIKAPP-3&4 AND
RAPP-7 & 8

Sr. No of ISS is
required to be supplied
as per the quantity
mentioned in the SOR

As per the SOR against each C&I item to be supplied, certain


quantities are mentioned. In order to match these quantities
with the series no. of ISS , NPCIL has provided the Sr. Nos. of
ISS on page 30 of 32 of SECTION-C30 for WMP. However for
UGP Sr No. of ISS to be supplied is not specified on page no
29 of 32 of Section C-30. NPCIL is requested to provide us the
Sr No. of ISS of UGP.
For Eg:
1) SOR OPTION III,SECTION-E-GRC , SL No. 17 & 18 supply
quantity of Pressure switches is 28 whereas in KAPP3&4/63493/2015/ISS supply quantity is 23.
2)SOR OPTION III,SECTION-E-GRC , SL No. 14 ,15 &16
supply quantity of Pressure gauges is 112 whereas in KAPP3&4/63493/2014/ISS supply quantity is 107.
3)SOR OPTION III,SECTION-E-GRC , SL No. 13 supply
quantity of Displacer Level switch is 8 whereas in KAPP3&4/63493/2010/ISS supply quantity is 7.
4)SOR OPTION III,SECTION-E-GRC , SL No. 21 supply
quantity of DP Transmitter is 69 whereas in KAPP3&4/63493/2006/ISS & KAPP-3&4/63493/2011/ISS total
supply quantity is 64.
5) SOR OPTION III,SECTION-E-GRC , SL No. 30 supply
quantity of E/A converter is 33 whereas in KAPP3&4/63493/2004/ISS supply quantity is 28.
6)SOR OPTION III,SECTION-E-GRC , SL No. 33supply
quantity of 3 Valve Manifolds is 53 whereas in
KAPP-3&4/63493/2023/ISS supply quantity is 61.

28 of 58

PC-E-686 is correct specification to be referred.

It is to be supplied as per BOQ. Sr no need not be mentioned


for D20 UGP as the spec is only for D2O UGP.ISS referred in
WMP are spec for entire plant excluding D2O UGP. Only sr no
mentioned items are applicable for WMP.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

175

Technip

I&C-2

SECTION-C /
DIVISION
1/Section C-4
Page 8 of 15

4.4.6 & 4.4.7

Bidder understands that the quantities of C & I


items to be supplied are mentioned in the BOQ of
section E
However clause no. 4.4.7 of the tender specifies
that the quantities are indicative and for guidance
only. NPCIL is requested to clarify this
contradictory statement.

C& I item shall be supplied mostly as per schedule of rate.


However, contractors also has the responsibility to see this
and come to point with purchaser.

176

Technip

I&C-3

SECTION-C /
DIVISION
1/Section C-7
Page 3 of3

7.3.1

As per the clause 415 V 3 phase power supply will


be available at respective system panel. However
as per section E SOR WMP & UGP has 2 UPS
each, hence bidder understands that every UPS
shall be provided with 415 V 3 phase AC Supply
by NPCIL. NPCIL to kindly confirm this
understanding of the bidder.

UPS need not be provided with 3 Phase power supply. It


could be single phase UPS also. For power supply 3 phase
TPN feeder shall be given from MCC by the purchaser to the
contractor.

177

Technip

I&C-4

SECTION-C /
DIVISION
1/Section C-12
Page 3 of 4

12.9.3

As per SOR UPS is to be supplied by bidder, but


Reputed company make UPS (like Keltron, Trivendram; Hino NPCIL spec is provided .NPCIL to provide spec Rel, Baroda; DB electronics, Pune ) shall be acceptable.
for UPS

178

Technip

I&C-5

SECTION-C /
4.6.9
DIVISION
1/Section C-4
Page 14 of 15
SECTION E/Excel
Sheets/SECTIONE-OPTION IIIKAPP-3&4 AND
RAPP-7 & 8

179

Technip

I&C-6

SECTION-C /
DIVISION
1/Section C-32

As per SOR there are 3 Panels required, 1panel


each for LESS, Resin Fixation System and
Evaporation System whereas clause 4.6.9 of
section C-4 specifies 2 hardwired relay logic
panels, Kindly clarify .

This panel are required. One panel is total PLC load for entire
Waste management plant other two panel are hard wire relay
based one for evaporation and other for resin transfer system.

2.12 Apart from suggested vendor list for Instrument Air Please Refer Section-C.15.2 of Tender Document.
Header & Manifolds. bidder would like to add M/s
EXCEL HYDRO PNEUMATIC .NPCIL to review
and give us approval .

29 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

180

Technip

I&C-7

SECTION-C /
DIVISION
1/Section C-32

UPS

As No vendor is suggested for UPS in the


Please Refer Section-C.15.2 of Tender Document. Bidder may
suggested vendor list, Bidder would like to suggest suggest New Reputed vendors for consideration of NPCIL.
following vendors:
M/s HI REL ELECTRONICS PVT.
LTD.AHMEDABAD,
M/s KELTRON, TRIVANDRAM
M/s ADOR-POWERTRON LIMITED PUNE
M/s DB ELECTRONICS PUNE
Bidder requests NPCIL to approve the above
vendors for our further action.

181

Technip

I&C-8

UPS Batteries Location Equipment layout shows the location of control


room. Bidder understands that the UPS will be
located in the control room. However NPCIL to
confirm the location of the battery banks of UPS.

UPS along with VRLA battery shall be located also in to the


control room in a closed panel.

182

Technip

I&C-9

SECTION-C /
DIVISION
1/Section C-32

Suggested List of
Vendors

Please Refer Section-C.15.2 of TD. Bidder may suggest New


Reputed vendors for consideration of NPCIL. Few suggested
vendor names are indicated against respective Sr. Nos.
1) Already given in Sr. NO.2.8 of C-32. In addition M/S SBEM, Pune
may also be considered.
2) Already given in Sr. NO.2.8 of C-32. In addition M/S SBEM, Pune
may also be considered.
3) M/s Transducers & Control, Hydrabad, M/s Pune Techtrols, M/s
Levcon Instruments PVT Ltd, Kolcutta.
5) Already given in Sr. NO.2.7 of C-32, In addition Tempsens,
Udaipur can be considered.
6) Already given in Sr. NO.2.7 of C-32, In addition M/s
YOKOGOWA, M/s Smar can be considered.
7) M/s General instruments, Mumbai; M/s Precision Industries,
Ahmadabad.
8) M/s SBEM, Pune, Thermo Scientific , USA, WAREE Instruments,
Mumbai.
9) M/s Switzer Instruments, Chennai, M/s Sirco Control
10) M/s Bar Tech, Germany; Enders, Germany; Testo, Pune.
12) Orbit Technologies, Hydrabad.
14) & 15) M/sBella instruments , Mumbai; Emerson's Process
Industries ltd.
16) M/s Arvind Pipes & Fittings; Choksi Tubes
17) M/s Sandvik, Sweden; Fine tubes, UK.
18) M/s Gupta Workshop, Mumbai; National Engineering Co,
Baroda, Minco, Goa.
20) M/s Asian ancillary Corporation, Mumbai; Anand Udhyog,
Belgaon
21) M/s Avery

As No vendor is suggested for the following


instruments in the suggested vendor list.
1) Displacer Type Top Mounted LS
2) Magnetic Float Type LIS
3) Float & Tape Type LG
4) Radar LT
5) General purpose RTD
6) Electronic Transmitter
7) DP Type Flow Gauge
8) Ultrasonic Transmitter
9) Flow Switch
10) RH Transmitter
11) Current Transducer
12) Conductivity Element
13) Conductivity Transmitter
14) PH Element with Flow Cell
15) Ph Transmitter
16) Nipple
17) Tubing SS304L
18) Catch Pot & Condensing Pot
19) Instrument support Stand
20) Cable Trays/Light channels with tees, elbows
etc. with all mounting accessories
21) Electronic weighing machine
22) Venturi assembly and accessories
Bidder requests NPCIL to provide vendor list for

30 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

183

Technip

I&C-10

SECTION-E /
SI. NO.36.
Excel
Sheets/OPTION1/SECTION -EGK

As No NPCIL Spec or ISS provided.


Bidder requests NPCIL to provide
size,schedule,MOC,No of entries and their sizes
for the condensate and catch pot.

Respective drawings are being enclosed for required


information.

184

Technip

I&C-11

SECTION-E /
SI. NO.59,60
Excel
Sheets/OPTION1/SECTION -EGK

SI. NO.59 The brief description of cable glands


given in the SOR does not give the segregation of
total quantity based on their sizes. Bidder requests
NPCIL to give segregation of total quantity.
SI. NO.60 Bidder requests NPCIL to provide MOC
for instrument cable trays.

Cable glands are double compression type. MOC is brass with


tin coating. Sizes of glands to suit the cables and to be
estimated by the bidder. MOC for cable tray is 2 mm thk GI. Zn
coating is 55 micron.

185

Technip

I&C-12

SECTION-E /
SI. NO.46
Excel
Sheets/OPTION1/SECTION -EGK

KAPP/60000/2424/DD not found in the TENDOR


DOCUMENT

It is support stand drawing. and the DRG no should be


corrected to KAPP-3&4/60000/2024/DD instead of 2424/DD
and is being enclosed

186

Technip

I&C-13

SECTION-E /
SI. NO.41,42
Excel
Sheets/OPTION1/SECTION -EHK

SI. NO.41 The brief description of cable glands


given in the SOR does not give the seggregation
of total quantity based on their sizes. Bidder
requests NPCIL to give seggregation of total
quantity.
SI. NO.42 Bidder requests NPCIL to provide MOC
for instrument cable trays.

Cable glands are double compression type. MOC is brass with


tin coating. Sizes of glands to suit the cables and to be
estimated by the bidder. MOC for cable tray is 2 mm thk GI. Zn
coating is 55 micron.

187

Technip

I&C-14

SECTION-E /
SI. NO.42
Excel
Sheets/OPTION1/SECTION -EGK

PP-E-577 not found in the TENDOR DOCUMENT PP-E-577 is replaced by PC-E-274 and is already included in
Section C-Div-3

188

Technip

I&C-15

SECTION-E /
SI.NO.33 TO 40
Excel
Sheets/OPTION1/SECTION -EHK

PP-E-1445 / PP-E-1147 / PP-E-1103 / PP-E-1104 Following Specifications are replaced as shown below and are
not found in the TENDOR DOCUMENT
already included in Section-C Div-3 PP-E-1147 is replaced by
PC-E-240, PP-E1103 & 1104 are replaced by PC-E-234 and
PP-E-1445 is replaced by PC-347.

31 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

189

Technip

I&C-16

SECTION-C /
DIVISION 2/ A
HEAVY WATER
UPGRADING/VS
S

KAPP3&4/34933/2016/VSS
& KAPP3&4/34933/2017/VSS

KAPP-3&4/34933/2016/VSS & KAPP3&4/34933/2017/VSS valve specifications for Air


operated Diaphragm valve specifies seismic
requirement, Bidder understands that seismic
qualification of instruments are not applicable for
this tender.Please clarify.

Both VSS do not indicate any seismic requirement.

190

Technip

I&C-17

SECTION-C /
DIVISION 3/ BWASTE
MANAGEMENT
PLANT

KAPP-3&4-604515001-ISS

KAPP-3&4-60451-5001-ISS specification for


Electronic Controller specifies seismic test,Bidder
understands that seismic qualification of
instruments are not applicable for this
tender.Please Clarify.

Confirmed that seismic test are not required.

191

Technip

Cvil-1

Sec C

1.5.2 .

"Civil construction including provision of embedded Civil Construction is not in bidder's scope. Refer C-5 for
parts, pedestals foundations for HWUP" means
details of civil scope.
Design & engineering & Construction for all Civil
work will be done by NPCIL. Please confirm.If
construction is in bidders scope , concrete
quantities are not included in SOR.

192

Technip

Cvil-2

Sec C

1.5.2 .

"Fabrication & erection of structural steel tower"


means Preparation of fabrication drawings will be
in bidders scope which will be based on GA
drawings furnished by NPCIL.Please confirm.

193

Technip

Cvil-3

Sec C

194

Technip

Cvil-4

Sec C -4

4.3

For Field engineering of supports, quantities are


covered in SOR. Please confirm.

195

Technip

Sec C -5

4.3

For "Civil foundation work for outdoor piping in


Yes. Bidder to estimate cost based on available GA drawings
bidders scope, concrete quantities are not included and include in respective erection cost of piping.
in SOR.

1.5.2 .

Fabrication & erection of structural steel tower is not in


bidder's scope.

During "Removal of cross bracing" , alternative


Cross bracing is to be removed and re-install. No alternative
supporting arrangement will be enginerred by
arrangement is required. Cost is to be included in cost of
NPCIL. Structural steel required for alternative
erection of distillation columns.
arranegement is not included in SOR . Hence
supply will not be in bidder's scope.Please confirm.

32 of 58

Yes, Quantities in tonnage are indicated in SOR. Supports are


to be selected & fabricated as per typical support drgs which
will be given to successful bidder.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

196

Technip

Cvil-5

Sec C- 5

197

Technip

Cvil-6

General

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

5.1.3

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

"Placement of equipment on foundation along with Yes. Bidder to estimate cost of grouting based on available
grouting---" is understood as on existing foundation GA drawings and include in respective erection cost of
& also quantity for Grout is not included in SOR ,
equipment.
Please confirm.
Only Minor civil work , Preparation of fabrication
drawings & As built drawings is Scope of work for
CIVIL.

No as built drawings for civil are required. Fabrication drawings


for equipment and As-built drawings for piping and equipment
are in scope of bidder.

198 Avasarala
1
Tech
dtd.06/
04/11

Kindly explain about the Telescopic arrangement


(Drg No. KAPP 3&4/79228/5027/TD. Where the
system is used?

Follow drawing KAPP-3&4/79220/5004/PIS. This arrangement


is used in Resin Transfer and Fixsation system.

199 Avasarala
Tech

Kindly explain about the performance test at site


Performance test is to be carried out wherever it is mentioned
after erection & what is meant by commissioning ? in respective data sheet, specifications or drawings. For
(Refer Clause No. 4.1 of Section C-4)
commissioning refer C-4-4.1

200 Avasarala
Tech

Is there a possibility of providing space at site for


manufacturing large size tanks since some tanks
are not feasible for transportation.

201 Avasarala
Tech

In the following Items there is a quantity difference Quantity in SOQR is to be followed.


in data sheets and SOQR. Kindly confirm the
quantities.

202 Avasarala
Tech

Specification PC-E-542 and PC-E-612 for valves


not received. Request to forward the same.

PC-E-542 is enclosed along with this clarification. PC-E-612 is


to be read as PC-E-611 which is also enclosed.

203 Avasarala
Tech

For High Pressure Cleaner, (Sl. No. 59 of Section


E-CK), NPCIL Spec mentioned in SOQR is PC-E686, while in data sheet it is PC-E-679. Kindly
clarify as to which specification to be referred for
the same).

PC-E-686 is correct specification to be referred.

33 of 58

Bidder to indicate space required at site in section-D.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

204 Avasarala
Tech

Is there any seismic requirement for Valves,


Strainers and Steam Traps?

No Seismic requirement for Valves, Strainers and Steam


traps.

205 Avasarala
Tech

There is a requirement of steam in the system.


Kindly clarify the scope for insulation of steam
pipelines & tanks wherever steam is supplied.
(Refer drawing No. KAPP-3&4/34924/2006/DD ,
3492-EV1 & EV2)

Insulation is excluded from scope of work. Refer C-5-1.7

206 Avasarala
Tech

Degree of filtration (mesh size) for Cartridge Filter, 60 mesh


Datasheet No. KAPP-3&4/34930/2109/DS not
available. Kindly provide the same.

207 Avasarala
Tech

10

1. Followings drawings are not available in CD.


KAPP-3&4/34924/2001/DD Rev0
KAPP-3&4/34924/2003/DD Rev0
KAPP-3&4/34924/2004/DD Rev0
KAPP-3&4/34930/2024/DD Rev0
KAPP-3&4/79228/5061/TD (Washing Tower)

208 Avasarala
Tech

11

Whether NPCIL is providing crane facility at site for On chargeable basis. Refer Section B-2-16.0
erection of dyke area tanks and distillation
column?

209 Avasarala
Tech

12

In Spec PC-E-532, the quantity of reactor building Follow SOQR.


doors mentioned is 38 nos., while in SOQR the Qty
mentioned is 2 nos. Kindly confirm the quantities.

210 Avasarala
Tech

13

Drawing no. KAPP-3&4/39000/2030/DD, Note no. For lead shielding refer specification PC-E-663 provided in
V specifies lead shielding. No information is shown Section C-Div-2-A
on the drawing about lead shielding.

34 of 58

1. Drg no: KAPP-3&4/79228/5061/TD : Laundry Equipment (


Washing Towering with Tube axial Fan) - Given in Laundry
System Specification PC-E-681.
Following drawings are enclosed with this clarification.
KAPP-3&4/34924/2001/DD : Feed Storage Tank
KAPP-3&4/34924/2004/DD : Level Control Pot
KAPP-3&4/34924/2003/DD : Condensate Collection Tank
KAPP-3&4/34930/2024/DD: Top Vent Condenser
Drg no KAPP-3&4/71409/2102/DS ( Restriction Orifice). Shall
be read as KAPP-3&4/71409/2010/DS and is provided in
Section C-Div-2-D

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

211 Avasarala
Tech

14

Most of the pumps are standard catalogue


products. Is it necessary to perform 24 hrs
performance tests on each pump? Supplier is
insisting on 4 hr performance test on each type of
model.

One pump of each type is to be tested for 24 hrs and other


remaining pumps of that type are tested for 4 hrs.
Performance test has to be carried out for 100% of pumps.

212 Avasarala
Tech

15

Liquid Collector drawing no. KAPP3&4/34930/2020/DD item no.3 Cone. Can it be


welded construction on lip since it is difficult to
fabricate as a single piece.

This will be decided during manufacturing stage.

213 Avasarala
Tech

16

Kindly explain note no. 7 of drawing no. KAPP3&4/34930/2016/DD (Each Machined Lip Seal
Surface should be parallel to each other &
perpendicular to the axis of the section within 30
seconds).

Note is self explanatory.

214 Avasarala
Tech

17

Kindly explain Note No. 19 (Hand Lapping by oil


stone) and Note 22 (Weld Shrinkage) of drawing
no. KAPP-3&4/34930/2019/DD (UGP Distributor)

Note No. 19 (Hand Lapping by oil stone) and Note 22 (Weld


Shrinkage) of drawing no. KAPP-3&4/34930/2019/DD (UGP
Distributor) are self explanatory.

215 Avasarala
Tech

18

Scope of Supply of Ion Exchange Resin not clear. Scope of Supply of Ion Exchange Resin not in bidder's
Kindly explain.
scope.

216 Avasarala
Tech

19

Scope of Supply of Evaporation Chamber for WMP Query is not clear.


not clear. Kindly explain.

217 Avasarala
Tech

20

In DC equipment, data sheet no. KAPPNot Acceptable


3&4/79228/5046/DS for ultrasonic generators, the
operating frequency for transducers is mentioned
as 20 to 40 KHz +/- 3 KHz. Kindly confirm whether
+/- 5 KHz is acceptable.

218 Avasarala
Tech

21

In section C-1 page 5 of 6, it is mentioned that


Scope of supply of Evaporation Chamber for WMP is not in
MCC and Lighting system is in contractors scope. bidder's scope.
But it is not mentioned in SOQR and details not
available. Kindly clarify.

35 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

219 Avasarala
Tech

22

Whether Redundant Field IOs required?

Yes.

220 Avasarala
Tech

23

In Section C-8 page 13 of 15, it is mentioned that


the main fall out system control is entirely
hardwired. Kindly explain the same.

Main out fall system control is not in the scope of the bidder.

221 Avasarala

Pre-1

Kindly explain about Radiometry test ( Transport of For radiometry test refer Specification No: PC-E-663. Local
Radiometry source, up to what extent Avasarala
transport, if required will have to be arranged by the bidder.
assistance is required?)

222 Avasarala

Pre-2

Please provide approved source for Flame proff


motor. ( Refer Motorised Mixture clause no. 6.8 of
specification No: PC-E-673 R0)

Please Refer Section-C.15.2 of Tender Document. Bidder may


suggest New Reputed vendors for consideration of NPCIL.

223 Avasarala

Pre-3

Length of Anchor bolts need to be provided.

Bidder to estimate required length of anchor bolts based on


available GA drawings.

224 Avasarala

Pre-4

Kindly provide approved suppliers contact details ( Please refer Section-C-32.1.1 for detail list of Reputed
Concered person & Phone numbers) for Distillation vendors for distillation columns. For contact details refer yellow
Column assembly.
pages / Internet.

225 Hindustan
Dorr Oliver
Lid

SECTIONC\SECTION-C
Div-2

226 Hindustan
Dorr Oliver
Lid

227 Hindustan
Dorr Oliver
Lid
228 Hindustan
Dorr Oliver
Lid

KAPP3&4/34924/2001/DD

Not able to view the content/drawing. Pls furnish Drg is being provided along with this clarification.
the same.

SECTIONC\SECTION-C
Div-2

KAPP3&4/34924/2003/DD

Not able to view the content/drawing. Pls furnish Drg is being provided along with this clarification.
the same.

SECTIONC\SECTION-C
Div-2

KAPP3&4/34924/2004/DD

Not able to view the content/drawing. Pls furnish Drg is being provided along with this clarification.
the same.

SECTIONC\SECTION-C
Div-2

KAPP3&4/79228/5061/DD

Drawing not available and pls furnish.

36 of 58

Drg no: KAPP-3&4/79228/5061/TD : Laundry Equipment (


Washing Towering with Tube axial Fan) - Given in Laundry
System Specification PC-E-681.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

229 Hindustan
Dorr Oliver
Lid

Section E

Option I -KAPP
3&4/ E-EK

PC-E-542

Specification for 50NB SW Gate Valve is not Specification PC-E-542 is being provided along with this
available and kindly furnish the same.
clarification.

230 Hindustan
Dorr Oliver
Lid

Section E

Option I -KAPP
3&4/ E-FK

PC-E-612

Specification is not available and kindly furnish the PC-E-612 is to be read as PC-E-611 (Section-E is also
same.
changed accordingly) is being enclosed with.

231 Hindustan
Dorr Oliver
Lid

Section E

Option I -KAPP
3&4/ E-DK

PC-E-262

Specification for solenoid valve is not available and Specification PC-E-262 is already provided in section C Div-3.
kindly furnish the same.

232 Hindustan
Dorr Oliver
Lid

Section E

Option I -KAPP
3&4/ E-EK

PC-E-263

Specification for air filter regulator is not available Specification PC-E-263 is already provided in section C Div-3.
and kindly furnish the same.

233 Hindustan
Dorr Oliver
Lid

Section E

Option I -KAPP
3&4/ E-CK

79423-5001-DSTRUCK

Kindly clarify whether tripper is required or not for Tripper is not required.
the 18 T truck for waste removal purpose.

234 Hindustan
Dorr Oliver
Lid

Section E

Option I -KAPP
3&4/ E-EK

79223/5026/VSS

Please
refer
the
excell
file
and
the Refer the excel file and the 79223/5026/VSS for filter
79223/5026/VSS for filter regulator. Excell file and regulator. Size shall be read as 25 NB.
the cover page of VSS indicate the size 25 NB but
in VSS page 2 the size is 15 NB. Please confirm
the correct size.

235 Hindustan
Dorr Oliver
Lid

10

Section E

Option I -KAPP
3&4/ E-DK

KAPP
3&4/34933/2076/VSS
KAPP
3&4/34933/2077/VSS

Drawings not available and pls furnish.

236 Hindustan
Dorr Oliver
Lid

11

Section C-15

Page 1 of 7 Cl:
15.1.3

Third party
Inspection(TPI)/
Purchaser Inspection.

Whether TPI is involved in this project. If yes, pls Clause itself is very clear.
confirm whether TPI engaged by owner or bidder?

37 of 58

1. Drg no: KAPP-3&4/34933/2076 is to be read as KAPP3&4/32003/2076 and 2. Drg no: KAPP-3&4/34933/2076 as


KAPP-3&4/32003/2077 which are enclosed with tender
Section C Div2 (A). ( Section E will be corrected
accordingly.)

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

Dismantelling and
reinstalling the
bracings and GI
sheets.

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

237 Hindustan
Dorr Oliver
Lid

12

Section C-13

Page 1 of 1 Cl:
13.5

Pls confirm the quantum of work in terms of No extra price for dismantling and re-installation . Quantum of
qty.Else the same shall be claimed as extra during extra work has to be estimated by the bidder based on GA
execution based on actuals.Pls confirm
drawings Bidder to include price in erection of distillation
columns.

238 Hindustan
Dorr Oliver
Lid

13

Section C-4

Page 4 of 15 Cl: For RAPP 7&8, layout Pls clarify this statement.
4.2 Prgh No:5 and pump details may
vary within 5% range.
Bidder shall consider
this variation in their
quotation for RAPP
7&8.

239 Hindustan
Dorr Oliver
Lid

14

Section E

Option I -KAPP
3&4/ E-CK

DC Equipments
Please confirm whether the water supply to DC All utility lines in DC area are in scope of this tender from
kapp3&4/79228/5046/ equipment is made available to package vendor by terminal points as indicated in drawing. Water will be made
DS
NPCIL or not.
available for commissioning.

240 Hindustan
Dorr Oliver
Lid

15

Section E

Option I -KAPP
3&4/ E-CK

DC Equipments
Please confirm that the ducting work connecting Not in Bidder's scope.
kapp3&4/79228/5046/ exhaust outlet of drying chamber and steam
DS
chamber to near by ventilation system is under
bidder scope on not.

241 Hindustan
Dorr Oliver
Lid

16

Section E

Option I -KAPP
3&4/ E-CK

DC Equipments
Please confirm the scope of below piping:
This is in the scope of bidder.
kapp3&4/79228/5046/ 1.Steam line up to steam chamber from DC
DS
2.Supply and return of chilled water from steam
chamber

242 Hindustan
Dorr Oliver
Lid

17

Section E

Option I -KAPP
3&4/ E-CK

DC Equipments
Generators are required to feed adequate No deviation from Data sheet is permitted.
kapp3&4/79228/5046/ numbers of permanently fitted high efficiency
DS
immersibles with PZT sandwich type transducer of
1 KW each with operating frequency of 20 KHz or
40 KHz nominal i.e., 5%. UG and transducers are
connected through co-axial cables. Pls confirm this
deviation.

38 of 58

Clause itself is very clear.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

243 Hindustan
Dorr Oliver
Lid

18

Section C-4

Page 10 of 15
Cl: 4.5.7

Assistance during
commissioning by
bidder.

Please provide estimated number manours / No separate rates for commissioning assistance. This cost is
provision in the price bid to quote for unit man hour part of erection cost.
rate.

244 Hindustan
Dorr Oliver
Lid

19

Section C- DIV3

SUGGESTED
LIST OF
VENDORS

Document No. KAPP- Emerson Regret to Quote and M/s IL, Kota M/s
3&4/34930/UGP&WM Chemtrol Engg. Ltd., Mumbai-Not There product
PP/01
Rangeas, we suggest ABB,
,Pressure/Differential
Pressure Transmitters

245 Hindustan
Dorr Oliver
Lid

20

Section C- DIV3

SUGGESTED
LIST OF
VENDORS

Document No. KAPP3&4/34930/UGP&WM


PP/01 ,Venturi/Radar
LT/Ultrasonic
LT/PRV/Flow switch

Require Approved Vendor List ,Ultrasonic LT, Please Refer Section-C.15.2 of Tender Document. Bidder may
Radar LT we suggest siemens,PRV/Flow switch
suggest New Reputed vendors for consideration of NPCIL.

246 Hindustan
Dorr Oliver
Lid

21

Section C- DIV- INSTRUMENT


3
SPECIFICATION
SHEET FOR
MAGNETIC
TYPE LEVEL
GAUGE

SPEC SHEET NO.:


KAPP-3&4 / 63493/
2009 / ISS,Visual
Indiaction : Easily
visible from 20-30meters

Case visibility from 20 to 30 metres distance will 10 meter visible distance is acceptable
not be possible.Vendor can Provide 10mters
distance Only.Please confirm

247 Hindustan
Dorr Oliver
Lid

22

Section C- DIV- INSTRUMENT


3
SPECIFICATION
SHEET FOR
MAGNETIC
TYPE LEVEL
GAUGE

SPEC SHEET NO.:


KAPP-3&4 / 63493/
2009 / ISS,Visual
Indication : Inert gas
filled and hermetically
sealed

Visual Indication cannot be inert gas filled & Accepted.


hermitically sealed, in order to check and maintain
roller assembly during usage the enclosure needs
to be opened for maintenance. Please confirm

248 Hindustan
Dorr Oliver
Lid

23

Section C- DIV- INSTRUMENT


3
SPECIFICATION
SHEET FOR
MAGNETIC
TYPE LEVEL
GAUGE

SPEC SHEET NO.:


Type of drain valve is not specified. Pls Specify.
KAPP-3&4 / 63493/
2009 / ISS,Vent plug &
Drain valve material :
SS-316

39 of 58

Sensor shall be capacitance type. Please Refer SectionC.15.2 of Tender Document. Bidder may suggest New
Reputed vendors for consideration of NPCIL. This was also
explained in the pre-bid meeting.

Type of drain valve shall be needle/globe.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

249 Hindustan
Dorr Oliver
Lid

24

Section C- DIV3

SUGGESTED
LIST OF
VENDORS

Document No. KAPP3&4/34930/UGP&WM


PP/01 ,PLC system

Require NPCIL SPEC PP-E1145,1147,1103,1104 These specification 1104 and 1145 are not applicable for
WMP and D2O UGP and can be ignored. 1103 to be read as
PC-E-234 and 1147 to be read as PC-E-240 which are
available in section C Div-3.

250 Hindustan
Dorr Oliver
Lid

25

Section C- DIV3

SUGGESTED
LIST OF
VENDORS

Document No. KAPP3&4/34930/UGP&WM


PP/01 ,PLC system

In case PLC vendors like ABB, Siemens are like Order for PLC should be placed only on NPCIL approved
quote through their system house which is manufacturers. M/s Schneider Electric, Delhi can also be
acceptable to NPCIL. Please confirm
considered as suggested vendor in addition to earlier list given
in Section -C-32.

251 Hindustan
Dorr Oliver
Lid

26

Section C- DIV- INSTRUMENT Document No. KAPP- Instrument Range 30-300 m3/hr is very high to be . Kindly refer KAPP-3&4/34930/5001/P&ID and KAPP3
SPECIFICATION 3&4/63493/ 2008 / ISS, accommodated in size meter-please clarify.
3&4/34920/5001/P&ID. FG under Sl. No.7 to 10 and Sr. No.
SHEET FOR
Sr. No. 7 to 10
43 and 51 of specification No. KAPP-3&4/63493/2008/ISS are
FLOW GAUGES
all bypass type. Main line flow is 330m3/hr and 1000 LPM
(ROTAMETER)
respectively.. End connection of 1-1/2 " size shall be OK for
above 0-3000 LPM flow. Ignore value of flow min/nor/max in
this specification. Instrument range is correct and shall satisfy
the actual process flow range.

252 Hindustan
Dorr Oliver
Lid

27

Section C- DIV- INSTRUMENT Document No. KAPP- Instrument Range 0-1000 LPM is very high to be Kindly refer KAPP-3&4/34930/5001/P&ID and KAPP3
SPECIFICATION 3&4/63493/ 2008 / ISS, accommodated in size meter-please clarify.
3&4/34920/5001/P&ID. FG under Sl. No.7 to 10 and Sr. No.
SHEET FOR
Sr. No. 43 and 51
43 and 51 of specification No. KAPP-3&4/63493/2008/ISS are
FLOW GAUGES
all bypass type. Main line flow is 330m3/hr and 1000 LPM
(ROTAMETER)
respectively.. End connection of 1-1/2 " size shall be OK for
above 0-3000 LPM flow. Ignore value of flow min/nor/max in
this specification. Instrument range is correct and shall satisfy
the actual process flow range.

253 Hindustan
Dorr Oliver
Lid

28

Section C- DIV- INSTRUMENT


3
SPECIFICATION
SHEET FOR
FLOW GAUGES
(ROTAMETER)

254 Hindustan
Dorr Oliver
Lid

29

P & ID

P & ID

Document No. KAPP- Instrument Range 620-6200 LPH/9.5-95 LPM is


3&4/63493/ 2008 / ISS, very high to be accommodated in size meterSr. No. 15 to 30 and 47 please clarify
to 48

Document No. KAPP3&4/34930/ 2001 &2 /


PIS,

Kindly refer KAPP-3&4/34930/5001/P&ID and KAPP3&4/34920/5001/P&ID. FG under Sl. No.7 to 10 and Sr. No.
43 and 51 of specification No. KAPP-3&4/63493/2008/ISS are
all bypass type. Main line flow is 330m3/hr and 1000 LPM
respectively.. End connection of 1-1/2 " size shall be OK for
above 0-3000 LPM flow. Ignore value of flow min/nor/max in
this specification. Instrument range is correct and shall satisfy
the actual process flow range.

WTH is what type of indication/description -Please WTH is Winding Temperature High. It is soft indication on
clarify
PLC. Temperature switch input is in-built in motor.

40 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

255 Hindustan
Dorr Oliver
Lid

30

C-4,4.3.2

a)Please explain whether design calculation that


should be checked by the contractor or
manufacture is refer to process design or
mechanical design or both.
b) Please
clarify whether the process flow diagram with
material and energy balance will be made
available to the successful contractor at later
stage.

256 Hindustan
Dorr Oliver
Lid

31

C-4,4.5.6

Please confirm whether radio active protection Not required during execution.
suits will be provided by NPCIL during execution of
outdoor work.

257 Hindustan
Dorr Oliver
Lid

32

T.S No:PC-E-166, and a)Please confirm whether seismic qualification is


KAPP 3&4-34930-2053- applicable or not for all Reject transfer pumps.
DS
b)Synchronous speed indicated as 3000rpm for all
canned motor pumps. Please clarify whether pump
motors at 3000rpm, 1500rpm & 1000rpm, as
available as per approved manufacturers can be
supplied.

a). Seismic qualification is required for the pumps wherever


specified. All such pumps to be designed as per respective
data sheets / Specifications.
b).Details of available models shall be submitted in section-D15 of technical offer.

258 Hindustan
Dorr Oliver
Lid

33

T.S No:PC-E-675, and


KAPP 3&4-34930-2054
to 2059,2061 & 2072DS

a). Seismic qualification is required for the pumps wherever


specified. All such pumps to be designed as per respective
data sheets / Specifications.
b).Details of available models shall be submitted in section-D15 of technical offer.

259 Hindustan
Dorr Oliver
Lid

34

C, Div-2,C-29

260 Hindustan
Dorr Oliver
Lid

35

C, Div-2,C-29

29.14

a)Please confirm whether seismic qualification is


applicable or not for all these pumps.
b)Please confirm the MOC for shaft sleeve for
pumps covered under DS-2057 & 2058.

a. All required data is given in the tender drawing and data


sheets of Evaporator. Design checks has to be done by
contractor/ Manufacturer and required to be submitted to
NPCIL for approval.
b. Not required.

Though description indicates spring hangers and Follow clause 29.14 for supports.. Supports will be fabricated
snubbers, the specification for the same has not as per the drg's which will be given to successful bidder.
been provided. The quantity for the same has also Quantity of support material is indicated in section-E.
not been indicated in the SOR. Pl. clarify.

T.S.No: PC-E-615-R0

The total specification write up for "paints in PC-E-615 is being enclosed.


nuclear power plants" is missing in the tender
enquiry documents. Please furnish the same.

41 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

Exclusions

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

261 Hindustan
Dorr Oliver
Lid

36

C, Div-2,C-5

5.2.4&5.2.5

As per exclusions complete exhaust ventilation Specification is for exhaust fan Ducting is excluded in the
system including connecting exhaust duct of scope of this tender.
certain equipment up to ventilation ducting are
excluded from the scope of the tender package.
However T.Sno: PC-E419 for ventilation fans has
been included in the tender document. Pl. clarify.

262 Hindustan
Dorr Oliver
Lid

37

Section C- DIV3

SUGGESTED
LIST OF
VENDORS

Document No. KAPP- We suggest ABB for these items, Pls confirm.
3&4/34930/UGP&WM
PP/01
,Pressure/Differential
Pressure Transmitters

263 Hindustan
Dorr Oliver
Lid

38

Section C- DIV3

SUGGESTED
LIST OF
VENDORS

Document No. KAPP3&4/34930/UGP&WM


PP/01 ,Venturi/Radar
LT/Ultrasonic
LT/PRV/Flow switch

Require Approved Vendor List ,Ultrasonic LT, Please Refer Section-C.15.2 of Tender Document. Bidder may
Radar LT we suggest siemens,PRV/Flow switch
suggest New Reputed vendors for consideration of NPCIL.

264 Hindustan
Dorr Oliver
Lid

44

P & ID/Schedule
of rates

P & ID

Document No. KAPP3&4/34930/UGP&WM


PP/2002,2003,2004
PIS

2-LE-9005,2-9006,3-LE-9005,3-9006,4-LE-9005,4- These are all Level switches which are covered in KAPP9006, Not considered in the ISS.-pl confirm
3&4/63493/2010/ISS.

265 Hindustan
Dorr Oliver
Lid

49

P & ID/Schedule
of rates

P & ID

Document No. KAPP- UFM-08 is not included in Schedule of rates- UFM-08 is included in schedule of rate item sl no 17 in sec E3&4/79220/ 5004 / PIS please clarify
HKC. It is shown in KAPP-3&4/79220/5003/P&ID. UFM -07 is
shown in KAPP-3&4/79220/5004/P&ID which is to be included
in BOQ.

42 of 58

Please Refer Section-C.15.2 of Tender Document. Bidder may


suggest New Reputed vendors for consideration of NPCIL.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER
266 Hindustan
Dorr Oliver
Lid

50

TENDER
SECTION

P & ID/Schedule
of rates

REFERENCE
CLAUSE NO

P & ID

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

Document No. KAPP- LG-16,17,19 , FE-09,GE-01,02, LS-01,02(EVC-2501), LG-16,17 & 19 are modified to LIS-16,17 & 19 magnetic types
3&4/79220/ 5003 / PIS FG-01,02,03(Rotameter) is not Found in ISS .Not level switches. Specification No.KAPP-3&4/60423/5003/ISS
considered in Schedule of rates-please clarify
which is included in tender document and covered in schedule
of rate (item serial no.2 of section E-HKC). Kindly refer P&ID
KAPP-3&4/79220/5003/P&ID. FE-09 is Ultrasonic Flow meter
specification no. of Ultrasonic Flow Meter is KAPP3&4/60431/5005/ISS. it is covered in schedule of rate (item
serial no.17 of section E-HK). GE-1&2 is shown in KAPP3&4/79220/5003/P&ID. These are Relative humidity
instrument, specification of this is KAPP-3&4/60430/5001/ISS
and covered in schedule of rate(item serial No.15 of section EHK). LS-01&02 are Level switches covered in the KAPP3&4/79220/5003/P&ID and schedule of rate (Item no.10 of
section E-HK). FG-01,02 & 03 are newly added items and
specification no. is KAPP-3&4/60414/5001/ISS Rev.P1. This
shall be attached and total 5 Nos.(3 nos +2nos spares) to
added in the schedule of rate.

267 Hindustan
Dorr Oliver
Lid

51

P & ID/Schedule
of rates

P & ID

Document No. KAPP- TI-01,02,03,04 Is it local Panel Indicator ?TE- T1-01,02 , 03 & 04 are Local panel indication. The
3&4/79220/ 5003 / PIS 01,02,03,04 Not considered in Schedule of rates- specification is KAPP-3&4/60482/5001/ISS and covered in
please clarify
schedule of rate (Item Serial No.22 of Section E-HKC). TE01,02,03 & 04 are RTD. Specification No. is KAPP3&4/60442/5001/ISS and is cover in schedule of rate (item Sl.
No.3 of Section E-HKC).

268 Hindustan
Dorr Oliver
Lid

52

P & ID/Schedule
of rates

P & ID

Document No. KAPP- PS-01(EV-2401),FI-11(EVC-2501),FI-12(EVPS-01 at the output of evaporation is added new. The
3&4/79220/ 5003 / PIS 2402),FI-13(EV-2401) is not Found in ISS-please specification of it shall be given. FI-11 is covered in ventilation
clarify
package & not in the scope of this tender. FI-12 & 13 are an
Electronic Flow Indication Alarm meter. The specification no.
is KAPP-3&4/60482/5001/ISS and covered in schedule of rate
(item serial no. 22 of section E-HK).

43 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

269 Hindustan
Dorr Oliver
Lid

53

P & ID/Schedule
of rates

P & ID

Document No. KAPP- GI-01,02(EVC-2501),GE-01,02(EVC-2501),KI-01,KT- GI-01,02 and GE-01,02 are Relative Humidity Instrument.
3&4/79220/ 5003 / PIS 01(1X-2401),KE-01 (1X-2401)is Not considered in Specification no. is KAPP-3&4/60482/5001/ISS for GI which
Schedule of rates-please clarify
Electronic type indication and are covered in schedule of rate
item serial no.22 of section E-HK and GE-01, & 02 is the
Relative Humidity Elements/ Transmitters. Specification no. is
KAPP-3&4/60430/5001/ISS and covered in schedule of rate
item serial no.15 of section E-HK similarly KI-01 which is
conductivity indicator is covered in this spec and KE/KT-01 is
conductivity element/Transmitters specification No. is KAPP3&4/60438/5001/ISS. This is inadvertently missed in the rate
of schedule and shall be included and spec. shall be given.

270 Hindustan
Dorr Oliver
Lid

54

P & ID/Schedule
of rates

P & ID

Document No. KAPP- QT-01,QE-01,QI-01(TK1109)is Not considered in QT,QE & QI are nuclear instrument and are included in other
3&4/79220/ 5001 / PIS Schedule of rates-please clarify
package. It need not be supplied by this package .only
mounting arrangement shall be provided.

271 Hindustan
Dorr Oliver
Lid

55

P & ID/Schedule
of rates

P & ID

Document No. KAPP- GT-9001(1-TK13),GT-9002(1-TK19),GTGT is the analogue position indicator and is the integral part of
3&4/34930/ 2001 / PIS 9005,9006(1-EV1),GT-9003,9004(1-TK18)is
Not control valve.
considered in Schedule of rates-please clarify

272 Hindustan
Dorr Oliver
Lid

56

P & ID/Schedule
of rates

P & ID

Document No. KAPP- GT-9001(4-TK13),GT-9002(4-TK19),GTGT is the analogue position indicator and is the integral part of
3&4/34930/ 2004 / PIS 9005,9006(4-EV1),GT-9003,9004(4-TK18)is
Not control valve.
considered in Schedule of rates-please clarify

273 Hindustan
Dorr Oliver
Lid

57

P & ID/Schedule
of rates

P & ID

Document No. KAPP- GT-9001(3-TK13),GT-9002(3-TK19),GTGT is the analogue position indicator and is the integral part of
3&4/34930/ 2003 / PIS 9005,9006(3-EV1),GT-9003,9004(3-TK18)is
Not control valve.
considered in Schedule of rates-please clarify

274 Hindustan
Dorr Oliver
Lid

58

P & ID/Schedule
of rates

P & ID

Document No. KAPP- GT-9001(2-TK13),GT-9002(2-TK19),GTGT is the analogue position indicator and is the integral part of
3&4/34930/ 2002 / PIS 9005,9006(2-EV1),GT-9003,9004(2-TK18)is
Not control valve.
considered in Schedule of rates-please clarify

44 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER
275 Hindustan
Dorr Oliver
Lid

59

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

Sr. no. 7/8/21/22 *Drg. No.: KAPPof Bill of Material 3&4/34924/2006/DD

We will use SA 516 GR 70 Material in place of SA Use material as per data sheet.
515 GR 70.
Same will be
Rev.1 for Alkaline
applicable for other datasheet wherever it is
Evaporator (3492-EV1 & applicable for all item of this package
EV2)

276 Hindustan
Dorr Oliver
Lid

60

*Drg. No.: KAPPSr. no.


1/2/3/32/43 TO 46 3&4/34930/2041/DD
of Bill of Material Rev.1 for Steam

We will use SA 516 GR 70 Material in place of IS Use material as per data sheet.
2002 GR.2A .
.Same will be
applicable for other datasheet wherever it is
Condensate Tank (3493- applicable for all item of this package
0-TK12)

277 Hindustan
Dorr Oliver
Lid

61

Sr. no. 25 of Bill Drg. No.: KAPPPlease advise us vendor list for Mist Eliminator
of Material
3&4/34924/2006/DD
Rev.1 for Alkaline
Evaporator (3492-EV1
& EV2)

278 Hindustan
Dorr Oliver
Lid

62

Sr. no. 32 to 48 of Drg. No.: KAPPBill of Material 3&4/34924/2002/DD


Rev.0 for NAOH
MIXING TANK
(3492-TK-2)

Please advise us vendor list for Agitator Assembly Please Refer Section-C.15.2 of Tender Document. Bidder may
suggest New Reputed vendors for consideration of NPCIL.

279 Hindustan
Dorr Oliver
Lid

63

Required for
Required for :
Sr. no. 32 to 48 of Drg. No.: KAPPBill of Material 3&4/34924/2002/DD
Rev.0 for NAOH
MIXING TANK
(3492-TK-2)

We require following data for agitator design : a) Use data related to NAOH.
Specific Gravity, b) Viscosity, C) Purpose of
Agitator, d) Percentage of Material Content in
process

280 Hindustan
Dorr Oliver
Lid

64

281 Hindustan
Dorr Oliver
Lid

65

Sr. no. 1.8

Section C-32 (Page


no. 2 of 11) :
Suggested List of
Vendors

Sr. no. 52 of Bill Drg. No.: KAPPof Material : For 3&4/34924/2006/DD


Pyrex Glass pipe Rev.1 for Alkaline
Evaporator (3492-EV1
& EV2) :

Request you to advise us more vendor for Tubes

Please Refer Section-C.15.2 of Tender Document. Bidder may


suggest New Reputed vendors for consideration of NPCIL.

Please Refer Section-C.15.2 of Tender Document. Bidder may


suggest New Reputed vendors for consideration of NPCIL.

Approved vendors suggest us to use the size ID Please Refer Section-C.15.2 of Tender Document. Bidder may
210mm / OD 228mm LENGTH 1500mm in place suggest New Reputed vendors for consideration of NPCIL.
of size of 170mm ID X 6mm X 1000mm thick due
to required size is not available, and manufacturing
the same is a lengthy and expensive process as it
requires to make a mould an minimum 1000 piece
order.

45 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

282 Hindustan
Dorr Oliver
Lid

66

Sr. no. 54 of Bill Drg. No.: KAPPof Material : For 3&4/34924/2006/DD


Gasket
Rev.1 for Alkaline
Evaporator (3492-EV1
& EV2) :

With reference to Bill of Material Table : It states Gasket details are as per respective drgs. Details are to be
that Gasket size will be as per drawing, We have worked out by bidder. No separate drawing is provided for
not found Gasket detail in drawing, Please advise gasket.
which drawing we have to refer for Technical
Dimension of Gasket & also provide detail of Pipe,
Flange & gasket Joint(Part no.52/53/54)

283 Hindustan
Dorr Oliver
Lid

67

Sr. no. 27 of Bill Drg. No.: KAPPof Material : For 3&4/34930/2022/DD


Gasket
Rev.1 for Reflux
Condenser (34931/2/3/4 -CD2) :

We refer Pipe Size and Material, Please advise Size is as per drawing.
us we have to Procure the forge bend Pipe of
40NB x SCH 40 x 1450 Long.

284

Kay
Bouuet

285

Kay
Bouuet

grouting of anchor bolts is to be quoted on


lumpsum basis.- NPC to confirm

Grouting of anchor bolts is in bidders scope. Bidder to


estimate cost based on available GA drawing and include in
respective erection cost of equipment.

286

Kay
Bouuet

Air Handling for instruments and controls with


pipeline is excluded from suppliers scope- Please
confirm

All utilities within terminal points are included in bidders scope.

287

Kay
Bouuet

Fire water piping and equipment is not in suppliers Fire water piping within UGP including supply and erection of
scope- Please confirm
hose cabinets , fire hydrants as indicated in Section-E is in
bidder's scope.

288

Kay
Bouuet

Insulation of Equipment & piping not in suppliers


scope- Please confirm.

GEI

289

IDUSTRIAL

SYS

KAPP/3&4/34930/2016 1. Point No-7,8 & 9 Please elaborate in detail


Rev-1
2.Alignment test at shop in seven sub assemblies
consist of some and 3 columns Section in vertical
condition- Please explain.

Sec-E

BOQ

Technical
specification/data
sheets

Refer the drawing along with Specification PC-E-423 for detail


requirement.

Confirmed.

For 50 NB and below Valves, SW ends should be SW ends 50 NB and below are required. 800 lb rating is also
800 lb class and 150 lb class should be flanged acceptable.
end. Please clarify.

46 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER
290

TENDER
SECTION

REFERENCE
CLAUSE NO

GEI

Technical
specification/data
sheets

IDUSTRIAL

SYS
2

291

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

Sec-E

BOQ

GEI
SYS

292

Sec-E

Price schedule.

GEI

293

SECTION-C

GEI
IDUSTRIAL

SYS
5

294

SECTION-C

GEI
IDUSTRIAL

SYS

295

For 50 NB and below Gate Valves, it is specified


SW ends 50 NB and below are required. 800 lb rating is also
as 900 lbs SW end. Please note that if it is 900 lbs, acceptable.
flanged end is only available. If the requirement is
SW, then it should be 800 lb class. Please note
that 900 lb flanged end would be much more costly
than SW end of the same size valve.

Valve Spec No. PC-E-542 is not available in the


PC-E-542 is being enclosed along with clarifications.
tender document. Kindly mail this document to us.

IDUSTRIAL

SYS

RESPONSE FROM NPCIL

In section 'E' price schedule, option I is for KAPP- Bidder to quote for all three options if he wants to be
3&4 and option II is for RAPP-7&8. Option III is for considered for all three options. This was also explained
combined quantity of KAPP-3&4 and RAPP-7&8. during pre-bid meeting.
However, it is observed that the quantities
mentioned against items in all the three options
are same. Please clarify.

IDUSTRIAL

DESCRIPTION OF THE QUERY

SECTION-C

GEI
IDUSTRIAL

SYS
7

SECTION-C

Spec.PC-E-166
canned pump & DS.
KAPP3&4/34930/2051/DS

1.Ref. Para 4 of Spec. Shaft material - SA182F


316L. In data sheet, specified is A 479 SS 316 L .
2.Stator and Rotor can as per spec. inconel x750.
As per DS Hastalloy C276. We presume, material
for shaft, starter and rotor shall be as per DS.
Please confirm.

Both are acceptable.

Spec.PC-E-166,Para 5.7Similar model pumps seismically qualified have


been supplied to M/s. NPCIL for TAPP-3&4,
KAIGA-3&4 and RAPP-5&6. Is it necessary to do
seismic qualification for KAPP-3&4 again or
submission of old report will do. Please confirm.

Only analytical seismic report is to be submitted. Floor


response spectra is different for every site. So analytical
report is required. Response spectra will be given to
successful bidder

Spec. PC-E-166
Para 8.14 General
performance test

Type test on one pump of each model is acceptable.

To establish the characteristic of CMP over entire


range of flow from 0 to 125% rate flow on each
pump motor, this test has been specified. This
being, a type test is done on one pump of each
model of same design. Please confirm.

47 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER
296

TENDER
SECTION

GEI
IDUSTRIAL

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

GEI
IDUSTRIAL

SYS

298

SECTION-C

GEI
IDUSTRIAL

SYS
9

299

SECTION-E

GEI
IDUSTRIAL

SYS

300

10

SECTION-E

GEI
IDUSTRIAL

SYS
11

301

GEI

SECTION-C

IDUSTRIAL

SYS

SECTION-E

12

RESPONSE FROM NPCIL

Para 8.15 Rated


performance test.

This test has been specified for duration of 24 hrs.


run of the each pump. This is run test of each
pump at rated flow and head to measure various
parameters like vibration, noise level , voltage
current etc. These parameters are stabilized after
about 2 hrs. run. Hence, general practice is to
measure these parameters after a run of 4 hrs.
Please confirm.

One pump of each type is to be tested for 24 hrs and other


remaining pumps of that type are tested for 4 hrs.
Performance test has to be carried out for 100% of pumps.
Ref C-8.14 & 15

Refer Section-C, subfolder name - Division2, Title : B-Evaporation


& clean up system.

Please note : Soft copies of the following drawings


are not opened up. Please send the soft copies.
KAPP-3&4/34924/2001/DD, KAPP3&4/34924/2003/DD, KAPP-3&4/34924/2004/DD,
/2024/DD

Following drawings are enclosed with this clarification.


KAPP-3&4/34924/2001/DD : Feed Storage Tank
KAPP-3&4/34924/2004/DD : Level Control Pot
KAPP-3&4/34924/2003/DD : Condensate Collection Tank

SYS

297

DESCRIPTION OF THE QUERY

Refer Section-E Option- Soft copy of PC-E-542 for Gate Valves is not
1, KAPP-3&4, Subincluded. Please send the soft copy,
section E-FK for
flanges Sr. No.7,
schedule of rates for
WMP valves.

PC-E-542 is being enclosed with this Clarification.

Refer Section-E,
Option-1, KAPP-3&4,
Sub section E- FK for
flanges Sr. No. 7.0

Soft copy for flange specification no. PC-E-612 is


not available. Please send the soft copy.

PC-E-612 is to be read as PC-E-611 (Section-E is also


changed accordingly). PC-E-611 is being enclosed with this
Clarification.

Refer Section-E,
Option-1, KAPP-3&4,
Sub section E- HK for
WMP C&I items

Sr.No.33,34,35,36,37,38,39,40 the following


specifications are required : i. PP-E-1445 ii. PP-E1147 iii. PP-E-1103. iv. PP-E-1104 Soft copies of
the above specification are not included. Please
send the set copies.

Following Specifications are replaced as shown below and are


already included in Section-C-Div-3
PP-E-1147 Replaced by PC-E-240
PP-E-1103 Replaced by PC-E-234
PP-E-1126 Replaced by PC-E-342
PP-E-1445 Replaced by PC-E-347
PC-E-626 Replaced by PC-E-262
PP-E-577 Replaced by PC-274

Refer upgrading plant, of the above drawing is illegible. Please send


drg. No. KAPPlegible soft copy of drg.
3&4/34930/2017/DD

48 of 58

This drawing is being provided with this clarifications.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER
302

TENDER
SECTION

REFERENCE
CLAUSE NO

GEI

303

13

SECTION-E

SECTION-E

Refer Section-E,
Please give the suggested vendors for doors.
Option-1, Subsection-EBK, sr. no. 75 for
sealing and shielding
door.

GEI
IDUSTRIAL

SYS

304

14

GEI
IDUSTRIAL

SYS
15

305

SECTION-E

GEI
IDUSTRIAL

SYS

306

16

SECTION-E

GEI
IDUSTRIAL

SYS
17

307

GEI
Industries

DESCRIPTION OF THE QUERY

Refer Section-E,
Option-1, schedule of
rate for UGP C&I
items, section-E, Sr.
No. 49 to 58.

IDUSTRIAL

SYS

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

SECTION-E

Control Globe
valve VSS no:
KAPP3&4/34933/2081
to 2088 VSS

RESPONSE FROM NPCIL

Mis match of description FRLS cables in BOQ with LHLS Jacketed EPR insulated cables shall be used. All the
respect to Spec. PC-E-240, PC-E-236, PC-E-234. relevant specifications are already included in this tender.
We are taking action as per specifications. Please Section E will be revised accordingly.
confirm.
Please Refer Section-C.15.2 of Tender Document. Bidder may
suggest New Reputed vendors for consideration of NPCIL.

Refer section E option1, subsection -E, CK


for WMP Equipment,
sr. no. 1&2 for LESS
area PAW storage
tank.

Drg. No. KAPP-3&4/79214/5005/TD (2 sheets)


Drg. No. KAPP-3&4/79214/5005/TD will be given to successful
mentioned in DS no. KAPP-3&4/79214/5006/DS is bidder.
not available. Please send soft copy of the drg. No.
KAPP-3&4/79214/5005/TD.

Refer Section - E,
Option-1, Schedule E,
GK, Sr. No. 64.

In BOQ for UPS, Spec. is not indicated. We are


taking action considering UPS as a standard
product. Please confirm.

Reputed company make UPS (like Keltron, Trivendram; HiRel, Baroda; DB electronics, Pune ) shall be acceptable.

Section-E, Option-1,
KAPP-3&4, Schedule
rate for UPG, SectionE-BK sr. no. 91, 92 &
93 for service air
station, instrument air
manifold, Mask air
station.

In specification no. PC-E-702, Valve specification


sheet (VSS) numbers for following valves are not
indicated : 1. 10 NB needle valve. Ii. 15 NB ball
valve. Iii. 15 NB angle globe valve. Please
intimate VSS numbers and send soft copies of
VSS of valves.

All manifolds are as per relevant specifications are to be


supplied .Each manifold is to be supplied with its own valves
as indicated in respective data sheets/ specifications.

These valve specification sheets are under No seismic test is required.


general, seismic requirements for OBE & SSE. No
requirement is stated against structural intigrity and
operability coloumns. But in test requirements it is
mentioned that static performance test and
dynamic responce test are required. Please
confirm whether above said two test are required
or not.

49 of 58

Annexure-I

S No

TENDER
SECTION

NAME OF
QUERY
THE
NO
BIDDER
308

GEI
Industries

309

GEI
Industries

310 NICCO

C4

311 NICCO

C8

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

REFERENCE
CLAUSE NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

Pressure gauge:
1. Refer sr no: 9 EHK of E -option-1
SS burdon tube
PG
KAPP3&4/60411/5001/I
SS Under
instrument range
0-20 kg/m2
2. Refer Section
C-12 Para 12.15
3. Refer Section
C-3 subsection
3.1 para C

1. As per ISS seismic test required. Seismic qualification & LOCA qualification are not required.
2. Seismic qualifications and loca qualifications of
instruments are not applicalbe for this tender.
3. In case of conflicting requirements specified in
two different sections of this specifications either
stringent one or as per interpretation of purchaser
will
govern.
Please confirm seismic test is required or not.

Refer section -E
GK sr no-34 for
pulsation
dampners (
Snubbers): sr no
36 for syphone,
sr no36 for catch
pot & condensing
pot.

Material specification sheet, data sheet and


drawings not indicated. Please provoid.

4.47 ESTIMATED
QUANTITIES FOR
SUPPLY OF
MATERIALS

8.1.3

MOTORISED STIRER
FOR NaOH MIXING
TANK - KAPP-3&434924-2002-DD

Bidder to select suitable reputed make items to suit pressure


gauges.

Supply of materials shall be as per BOQ (Section Yes, Refer clause no 1.10 of Section -E notes.
E) only. Any additional quantity to be supplied shall
be paid extra to contract on unit rate basis.

Bidder requests client to provide the MOC & RPM


of the motorised stirrer for NaOH mixing
tank.Bidder also requests client to provide
suggested vendor list for the stirrer.

50 of 58

Please Refer Section-C.15.2 of Tender Document. Bidder may


suggest New Reputed vendors for consideration of NPCIL.
Refer drg no. KAPP-3&4/34924/2002/DD for the required
information.

Annexure-I

S No

TENDER
SECTION

NAME OF
QUERY
THE
NO
BIDDER

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

312 NICCO

C8

8.1.3

MOTORISED STIRER Bidder requests client to include the motorised


FOR NaOH MIXING
stirrer as a separate item in the price schedule.
TANK - KAPP-3&434924-2002-DD

313 NICCO

C8

8.2.4

100 M TALL STACK

314

NICCO
5

315

NICCO
6

316

NICCO

317

NICCO

C8

8.2.5

RESPONSE FROM NPCIL

Not Acceptable

Bidder is not considering 100 M tall stack in his


Stack is not in bidder's scope.
scope of work as the same is not appearing in the
BOQ

ELECTRIC
Bidder requests client to clarify whether the crane
OVERHEAD
rail is in the scope of the bidder.
TRAVELLING CRANE KAPP-3&4-794135002-TD

Crane rail is in bidder's scope

SS ENCLOSURE
BELOW PLATFORM
AT RESIN FIXATION
AREA

Grade is SS 304L

FEED PUMP FOR


HEAVY WATER
EVAPORATION &
KAPP-3&4
CLEAN UP SYSTEM
/34930/2066/ DS (TAG NO.: 3492-0.P-1)

Bidder requests client to mention the grade of SS


material to be provided.

Sl. No. 5 - As per reputed vendor the flow rate of 5 Recirculation line is already provided in the drawing.
LPM is below the safe minimum flow of the pump.
Is it permissible to select a pump of higher capacity
and re-circulating a portion of the flow to suction?

CONDENSATE
Sl. No. 8 - As per reputed vendor the shut-off head Bidder to follow respective data sheets / Specifications.
TRUNSFER PUMP
of the pump is 113% of the rated head. Client to
FOR HEAVY WATER confirm his acceptance in this regard.
EVAPORATION &
KAPP-3&4
CLEAN UP SYSTEM
/34930/2067/ DS (TAG NO.: 3492-0.P-2)

51 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER
318

NICCO
9

319

NICCO
10

320

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

PRODUCT
TRUNSFER PUMP
KAPP-3&4
FOR HEAVY WATER
/34930/2052/ DS UPGRADING PLANT
(TAG NO.: 34931,2,3,4.P-3)
MOC OF SHAFT OF
PC-E-166

PC-E-166

NICCO
12

322

REFERENCE
CLAUSE NO

NICCO
11

321

TENDER
SECTION

PC-E-166

NICCO
13

PC-E-166

CANNED MOTOR
PUMP

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

Sl. No. 8 - As per reputed vendor the shut-off head Bidder to follow respective data sheets / Specifications.
of the pump is 112% of the rated head. Client to
confirm his acceptance in this regard.

Bidder is considering the MOC of shaft material


shall be as per individual pump data sheet only.

Confirmed.

MOC OF STATOR &


ROTOR CAN OF
CANNED MOTOR
PUMP

Bidder is considering the MOC of stator & rotor can Confirmed.


shall be as per individual pump data sheet only.

MOC OF GASKET
CAN OF CANNED
MOTOR PUMP

Bidder is considering the MOC of gasket shall be


as per individual pump data sheet only.

Confirmed.

INSTRUMENTATION - Cl. No. 5.8 - As per reputed vendor Canned motor Yes, Acceptable
BEARING WEAR
pump is to be drain before dismantling the bearing
MONITOR
monitor. Client to clarify.

323

NICCO

14

PC-E-166

RATED
PERFORMANCE
TEST

Cl. No. 8.15 - As per reputed vendor endurance


One pump of each type is to be tested for 24 hrs and other
test will be perform on 1 no./odel basis for 4 hours. remaining pumps of that type are tested for 4 hrs.
Client to clarify.
Performance test has to be carried out for 100% of pumps.
Ref C-8.14 & 15

324

NICCO

15

PC-E-166

NOISE LEVEL OF
CANNED MOTOR
PUMP

Cl. No. 5.2 - As per reputed vendor the noise level Follow Specification & data sheets. Details to be submitted by
of canned motor pumps shall be 85 db at 1 meter bidder in section-D.
distance from outline of equipment.

52 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER
325

NICCO

16

326

NICCO

17

327

NICCO

18

328

NICCO

329

330

331

TENDER
SECTION

REFERENCE
CLAUSE NO

ION EXCHANGE
VESSEL KAPP3&4/79226/5001/DS

PC-E-675

DESCRIPTION OF THE QUERY

Bidder is not considering the resin for ion


exchange vessel in his scope of supply. Client to
clarify.

TS OF CENTRIFUGAL As per Section-E, Option-III,BKC,CKC,BRC &


PUMP
CRC,PC-E-675 also applies to sump pumps.
Bidder requests client to recheck and confirm the
same.

RESPONSE FROM NPCIL

Resin is not in bidder's scope.

This is applicable to all centrifugal pumps.

ALL PUMP DATA


SHEET

As per pump data sheet bidder to provide reducer Not included in BOQ.
& expander at pump suction & discharge
respectively. Bidder requests client to clarify
whether these fittings are already included in the
BOQ or not?

19

DISTILLATION COLUMN
KAPP3&4/34930/2008/GA

In Section A - A & B - B of the referred drawing


These items are not in bidder's scope.
lightning arrestor & aviation lamp is shown. Bidder
requests client to clarify whether these items is
required to be supplied by bidder or not?

20

DISTILLATION COLUMN
KAPP3&4/34930/2008/GA

Plan at T.O. slab El. 158.177 shows one monorail This hoist is required for erection purpose only and will not be
hoist of 10 T capacity,but the same does not
required if crane is used by bidder. Crane / hoist is to be
appearing in the BOQ for UGP equipments. Bidder arranged by contractor.
requests client to clarify the scope of supply of 10
T monorail hoist.

21

FORGED STEEL
MANUAL GATE &
GLOBE VALVE

The specification of forged steel manual gate valve PC-E-542 is being enclosed along with this clarifications.
(PC-E-542) is not found in the tender document.
Bidder requests client to provide the same.

NICCO

NICCO

NICCO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

22

PC-E-542

PRICE SCHEDULE E- Sl. No. 20.0 - As per the referred clause the
Follow respective Specification, data sheets and VSS.
EK,E-ER,E-EKC,Especification of Pressure Reducing Valve is PC-EERC
542,which is identical with the specification of
Forged Steel Manual Gate & Globe Valve. Bidder
requests client to recheck & confirm.

53 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER
332

NICCO

333

NICCO

23

24

334

TENDER
SECTION

C2

NICCO

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

HOSE WITH END


FITTINGS

The drawing (Drg. No. KAPP-3&4/79228/5012/TD) This drawing is available in Section -C Div-2 (E)- DRG.
of Hose with end fittings (for resin fixation &
evaporation system) is not found in the tender
document. Bidder requests client to provide the
same.

DRAWINGS FOR
EVAPORATION &
CLEAN UP SYSTEM

The following drawings of Evaporation & Clean Up Drg Nos: KAPP-3&4/34924/2001/DD, 2003/DD & 2004/DD are
System are not opening: KAPPbeing provided along with clarifications.
3&4/34924/2001/DD, 2003/DD & 2004/DD

CENTRIFUGAL PUMP Bidder requests client to provide the drawings in


FOR WMP
legible format: KAPP-3&4/79212/5001/DS,
5002/DS, 5003/DS & 5004/DS

25

335

NICCO

336

NICCO

42

337

NICCO

43

C-32

RESPONSE FROM NPCIL

With respect to above mentioned DS the design


standard of the centrifugal pumps for WMP shall
be ISO:13709 / IS:15657 in stead of API 610.
Bidder requests client to confirm.

All data sheets are given Section C-Div-2(E). For correct data
sheet refer section-E. USI no is 79222.

Bidder to follow respective data sheets / Specifications.

PRICE SCHEDULE :E- Provide the erection quantity of pipe fittings( which Cost of erection of fittings is to be included in the cost of
FKC & E-FRC
would be less than supply qty) for calculating the erection of piping.
erection price of these fittings that would be
apportioned in the respective price for erection of
pipes.

SUGGESTED LIST OF Bidder requests client to provide the list of Please Refer Section-C.15.2 of Tender Document. Bidder may
VENDORS
suggested vendors for the following items: suggest New Reputed vendors for consideration of NPCIL.

Shielding
Door
for
RB
Hepa Filter
Roof Extractor
D2O Sampling station
Activity Monitor

54 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

338 EIL New


1 dtd
Delhi
27/4/11

SECTION-C DIV1

C-32/Suggested list of
vendors

For the following items in section-E , no vendor list is


attached: a) Venturi,
b) Magnetic Float type LIS
c) Ultrasonic transmitter
d) Wave rader type level transmitter
e) Temperature element with thermowell
f) Float operated magnetic LS (External cage type)
g) pH & Conductivity analyser
h)
Displacer type LS (Top mounted) .
Please provide the preferred vendor list of the above
items.

Please Refer Section-C.15.2 of Tender Document. Bidder may


suggest New Reputed vendors for consideration of NPCIL. For
contact details refer yellow pages / Internet.

339 EIL New


Delhi

SECTION-C DIV1

4.3 9d)/ Scope of


supply/work

In-house software "ionline" & other software like Auto


Cad, MS office etc shall be used for sizing, MR
preparation & detailed engineering. However, if any
specific software is required, please inform.

Relevant information is not in refered clause. No specifica


software is required.Working copy of inhouse software ( if
used) has to be given to NPCIL.

340 EIL New


Delhi

Section C-1

1.5.3/ Purchaser's
Earthing of all electrical equipment like motors, local
Responsibility - Electrical control stations etc. is excluded from contractor's
scope. Please confirm that our understanding is
correct.

341 EIL New


Delhi

Section C-1

1.5.3/ Purchaser's
In addition to power cables, all control cables and
Yes, Confirmed.
Responsibility - Electrical space heater cables for motors are also excluded from
contractor's scope. Please confirm that our
understanding is correct.

342 EIL New


Delhi

Section C-5

343 EIL New


Delhi

Section C-30

344 EIL New


Delhi

5.1.4/ Exclusions

The clause states that "Electrical power supply


including cabling, cable trays, tray supports etc. from
MCC to load point including its connection work are
excluded from contractor's scope". 'Load point' here
refers to motor/ local control panel, as applicable, and
the same is applicable for Waste Management Plant
also. Please confirm that our understanding is correct.

Yes, Confirmed.

Your understanding is correct. Local emmergency (Off-push


buttons) are in scope of this tender. Control wiring of this push
button up to MCC is in scope of this tender as C&I items.

List of C&I Specification, UPS system and VRLA battery are included in the
No NPCIL Specification for UPS is provoided . Reputed
Data Sheets, ISS
scope of this Package. However, specifications and
company make UPS (like Keltron, Trivendram; Hi-Rel, Baroda;
data sheets for these equipment are not included in the DB electronics, Pune ) shall be acceptable.
Tender Document. Please furnish the same.
Please confirm that the incoming and outgoing cables
to/ from UPS system are excluded from contractor's
scope.

55 of 58

In WMP & D2O Upgrading plants, 3 phase 415 VAC TPN


supply shall be made available by the purchaser from the
MCC. The contractor has to lay all incoming and outgoing
cables between MCC and UPS system.

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

RESPONSE FROM NPCIL

345 EIL New


Delhi

Section C-30

(A) Heavy Water


Upgrading/ List of
Specification

Specification no. 'PB-E-293 Rev. 3' referred in


Confirmed
Specification for Canned Motor Pumps (no. PC-E-166),
has been superceded by Specification no. 'PC-E-501
Rev. 0' . Please confirm that our understanding is
correct.

346 EIL New


Delhi

10

Section C-32

2.0/ Suggested List of


Vendors - C&I

Please furnish the list of acceptable vendors for UPS


system and VRLA battery.

347 EIL New


Delhi

11

348 EIL New


Delhi

12

Section C-4 :
Scope of
Supply/Work &
services

Cl.4.3 : Scope of Work of


Contractor

Cl.4.3.(5) mentions that changes need to be


Changes are to be incorporated in field in addition to changes
incorporated in Engg. Drawings. In the case of Piping
in drawings. No 3D modeling is in bidders scope.
Layout changes, does this imply changes to be
incorporated in Isometrics and BOQ only as mentioned
in Cl.4.3(4) or 3D model also?

349 EIL New


Delhi

13

Section C-4 :
Scope of
Supply/Work &
services

Cl.4.3 : Scope of Work of


Contractor

Cl.4.3.(6) mentions that small diameter piping/tubing


needs to be routed. Does small diameter mean 40DN
and below?

350 EIL New


Delhi

14

Section C-4 :
Scope of
Supply/Work &
services

Cl.4.3 : Scope of Work of


Contractor

Cl.4.3.(8) mentions review of documents, stress and


Yes, Confirmed
seismic analysis - Please confirm the understanding
that this review is limited to any documents/analysis by
Vendor and not any Piping stress analysis performed
by Detail Engineering Contractor.

351 EIL New


Delhi

15

Section C-4 :
Scope of
Supply/Work &
services

Cl.4.3 : Scope of Work of


Contractor

Cl.4.3.(9) mentions As-built drawings of erected


Piping/Tubing. Does this mean that Isometrics have to
be provided for all small diameter Piping/Tubing
erected at site? Is any 3D modeling required?

352 EIL New


Delhi

16

Section C-4 :
Scope of
Supply/Work &
services

Cl.4.4.7 : Bill of
Quantities

No NPCIL Specification for UPS is provoided . Reputed


company make UPS (like Keltron, Trivendram; Hi-Rel, Baroda;
DB electronics, Pune ) shall be acceptable.

Section C-1 :
1.5.1.1 :Purchasers
This Clause does not mention that BOQ shall be
BOQ has already been given for both UGP & WMP systems
Introduction to UGP Responsibility : Heavy provided for Pipes, Pipe Fittings, Valves etc. as has
in Section-E
& WMP Package water Upgradation Plant been done in Cl.1.5.1.2 for Waste Management Plant.
Purchaser to please confirm that same will be provided.

50 NB & below is considered as small diameter piping.

Yes. No 3 D Modelling is not in bidders scope.

Purchaser to please confirm understanding that BOQ


Clause no. 4.4.7 is self explanatory. This BOQ will also include
for pipes and Pipe fittings provided to successful
small diameter piping/ tubing.
Bidders is exact and not estimated. Only any minor
changes due to changes in Isometrics need to be
worked out later. Also, does this BOQ include small
diameter piping/tubing or does this have to be added in
later?

56 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

Drg. No: KAPP-3&4Soft files of the drawings are not opening. Please
34924-2001-DD, KAPP- provide us another copy.
3&4-34924-2002-DD,
KAPP-3&4-34924-2003DD and KAPP-3&434924-2004-DD

RESPONSE FROM NPCIL

353 EIL New


Delhi

17

Section C : Div 2 :
B Evaporation &
Clean-Up System &
Downgraded Heavy
Water Storage
Facility

354 EIL New


Delhi

18

Section C : Div 2 : Activity monitor (Drg. No. Mentioned drawing is not found with the tender. Please KAPP-3&4/79228/5042/TD is clubbed with Drg No: KAPPE Waste
KAPP - 3&4 / 79228 /
provide us a copy of the drawing
3&4/79228/5033/TD. ( Drg KAPP-3&4/79228/5034/TD and
management Plant 5042 / TD
KAPP-3&4/79228/5042/TD , and KAPP-3&4/79228/5004/TD )

These drawings are being provided along with clarification.

and is available in Section-C Div-2-E

355 EIL New


Delhi

19

Section C : Div 2 :
A Heavy water
Upgrading

PC- E- 423 : Annexure C

the technical data asked in this section is for Diaphram It is part of distillation coloumn assembly & to be supplied
valve, Globe valve & gate valve bu the specification is along with the columns, so data sheets are enclosed in
for distillation columns. Please clarify.
distillation coloumn specification.

356 EIL New


Delhi

20

General

Please clarify your criterea to categorize field / shop


fabricated tanks

No specific criteria

357 EIL New


Delhi

21

General

Please confirm for any equipment ASME stamping is


required or not.

ASME Stamping is not required.

358 EIL New


Delhi

22

Section C

KAPP
3&4/34930/2109/DS,
Datasheet for cartridge
filter

Bidder requests NPCIL to provide details of filter


cartridge, micron rating, efficiency etc for refered
cartridge filter.

60 mesh

359 EIL New


Delhi

23

Section C

KAPP
3&4/34930/2146/DS
datasheet for wire rope
monorail hoist

Bidder kindly informs that the provided datasheet is not Title is to be read as chain pully block in place of monorail
relevent to wire rope monorail hoist. Bidder requests
hoist.
NPCIL to provide corrected datasheet for wire rope
monorail hoist.

360 EIL New


Delhi

24

Section C

KAPP3&4/79225/5005/DS
Datasheet for Micron
filter

Bidder requests NPCIL to provide filteration efficicency Filters are high efficiency depth type filters. All data including
for reffered cartridge type micron filter.
efficiency have to be submitted by the bidders in Section-D of

Part-1 bid as per clause no.13.0 of specn. PC-E-682.

57 of 58

Annexure-I

S No
NAME OF
QUERY
THE
NO
BIDDER

TENDER
SECTION

REFERENCE
CLAUSE NO

REFERENCE DRG
NO/TECH SPECH NO/
INSTRUMENTATION
SHEET NO/VSS
NO/DATA SHEET NO

DESCRIPTION OF THE QUERY

361

Punj Lloyd
Limited

57 dtd
SECTION E
29/4/11

Excel File E-GK, row


no. 34

Client to provide the specification of Pulsation dampners


(Snubbers).

Excel File E-GK, row


no. 65.

Kindly provide the specification of PC & Furniture.

58 of 58

RESPONSE FROM NPCIL

Bidders to select suitable reputed make items to suit pressure


gauge.
Refer PC-E-792. Standard module of reputed make is
acceptable. Details considered by bidder my be submitted in
Part-1 Section-D-15.