Methodology:
A.
A
8
B
16
C
24
Course Topic:
1.
Safety.
PPE hardhat, safety glasses, hearing protection, full body safety
harness.
OHS procedures for controlling hazards / risks in workplace noise,
ventilation, illumination, impact, pressure, noise, temperature,
radiation, and biological and chemical hazardous materials.
Dealing with workplace accidents, fire and emergencies
Assistance in the event of a workplace emergency.
Control of heavy lift rigging equipment and rigging work execution.
Fall protection devices including safety belts, lifelines, lanyards, and
safety nets.
Requirements for signaling, barricading, electrical lock-out, tagging,
rigging, scaffolding; safe use of material handling equipment including
rope, slings, chains, shackles, and hooks; hand tools, power operated
tools, abrasive wheels and tools, and jacks; welding and cutting outfit;
requirements for fire prevention; material inspection for damage or flaws
that might cause injury during installation.
Potential hazards in underground obstructions such as existing
utilities, energized electrical cables and process lines; inadequate
slope or shore or trenches or excavations; work in tight or cramped
quarters.
Hot work permits.
Confined space entry permits.
2.
3.
4.
5.
Structural.
Welding.
Pipe sizes and materials.
Pipe joints and bending.
Pipe fittings.
Pipe flanges.
Flange bolting.
Gaskets.
Flex joints.
Valves.
Strainers and traps.
Electrical plans.
Structural plans.
Welding Procedures Specifications (WPS).
Piping and instrument diagram
Piping isometric.
Plot plans.
Piping class sheets.
Piping support details and hanger drawings.
Procedure of piping layout.
Template development.
Tack welding.
Construction procedures.
Underground piping installation.
Above ground piping installation.
Field fabrication of pipe spools.
Pressure testing of piping.
B.
Skills training:
CATEGORIES
NUMB NUMBER OF HOURS
1.
2.
3.
4.
5.
6,
A
8
B
16
C
24
17. What are the two types of gaskets used in piping system?
18. What is a large bore?
19. Enumerate the cleaning and flushing methods of a piping system.
20. Explain and enumerate tools used in pipe fabrication.
VI.
Duration
CATEGORIES
CLASSROOM WORK, HRS.
SKILLS TRAINING
EXAMINATION
TOTAL, HRS.
VII.
A
8
8
1
17
B
16
16
1
33
C
24
24
1
49