LANDSCAPE MASTERPLAN

SEPTEMBER 2009
PORTFOLIO: ANKIA BORMANS
BURGUNDY ESTATE - MEDIUM INCOME HOUSING ESTATE
CONSISTING OF PHASES A,B,C,D AND E
BRIEF DESCRIPTION:

Medium income Housing Estate on re-zoned agricultural land. Landscaping included all road tree planting and
verges, small internal parks, channels to accommodate stormwater and extensive landscaping of the servitude

CONSISTING OF PHASES A,B,C,D AND E


area under the Powerlines. This included a Mashie Golf Course, Irrigaiton ponds using treated effluent and other
amenities.
The project is currently in implementation and implementation is done in Phases.

BURGUNDY ESTATE - MEDIUM INCOME HOUSING ESTATE


RESPONSIBILITIES:

PHASE A and B (completed)

Site Management during implementation


Contract management
Approval of Claims
Site Inspection and quality control
Client liaising
On site problem resolution (design and construction)
Site inspection for practical and final completion

PHASE C (practical completion, under maintenance)

Planting design
Planting plans
Working drawings
Tender Documentation
Bill of Quantities
Design of individual internal parks, including smaller hardlandscaping detail
Site Management during implementation
Contract management
Approval of Claims
Site Inspection and quality control
Client liaising
On site problem resolution (design and construction)
Site inspection for practical completion

PHASE D and E (under implementation)

Planting design
Planting plans
Working drawings
Tender Documentation
Bill of Quantities
Design of individual internal parks, including smaller hardlandscaping detail
Site Management during implementation
Contract management
Approval of Claims
Site Inspection and quality control
Client liaising
On site problem resolution (design and construction)

PORTFOLIO: ANKIA BORMANS


SEPTEMBER 2009
BUH-REIN ESTATE - MEDIUM INCOME HOUSING ESTATE
LANDSCAPE MASTERPLAN
BRIEF DESCRIPTION:

Medium income Housing Estate on re-zoned agricultural land. Landscaping included all road tree planting and
verges, small internal parks, and landscaping of the servitude area under the Powerlines. This included Irrigaiton
ponds using treated effluent and other amenities.
The project is in the final design phase and construction on site is due to start in November.

RESPONSIBILITIES:
Working drawings
Cost Estimates
Design of individual internal parks
Client liaising
Meeting with Council officials
Plan approvals
Documentation
PORTFOLIO: ANKIA BORMANS
SEPTEMBER 2009
STONEHURST CLOSE - HIGH INCOME HOUSING ESTATE
LANDSCAPE PLAN

BRIEF DESCRIPTION:

High income Housing Estate. Landscaping included all individual houses, small internal park.
The project has been completed

RESPONSIBILITIES:

Working drawings
Bill of Quantities
Design of some of the individual gardens
site supervision
Contract mangement
Client liaising
Detail design

PORTFOLIO: ANKIA BORMANS


SEPTEMBER 2009
CENTRAL PARK - LIGHT INDUSTRIAL BUSINESS PARK

CONCEPTUAL MASTERPLAN

CONCEPTUAL STREET SECTIONS


PORTFOLIO: ANKIA BORMANS
SEPTEMBER 2009
BRIEF DESCRIPTION:

Light Industrial business Park on re-zoned agricultural land. Landscaping included all road tree planting
and verges, and rehabilitation of the ecologically sensitive areas.
The project is in the final design phase and planning approval is pending.

RESPONSIBILITIES:

Masterplan Design
Working drawings (CAD)
Cost Estimates
Client liaising
Documentation
Landscape guidelines/documentation

CENTRAL PARK - LIGHT INDUSTRIAL BUSINESS PARK


PORTFOLIO:
PORTFOLIO: ANKIA
ANKIA BORMANS
BORMANS

SEPTEMBER
SEPTEMBER 2009
2009
ERF 5109 LEUKENBERG - MIXED USE DEVELOPMEMT
CONCEPTUAL MASTERPLAN

BRIEF DESCRIPTION:

Mixed use Development on re-zoned agricultural land. Landscaping included all road tree planting and verges,
and rehabilitation of the ecologically sensitive areas including the rehabilitaion of the riverine area.
The project is still in the conceptual phase/early stages of design.

RESPONSIBILITIES:

Masterplan Design
Cost Estimates
Client liaising
Meetings with client, peers and other diciplines.
Documentation
City liaising
PORTFOLIO: ANKIA BORMANS
SEPTEMBER 2009
WATERGAET ESTATE - LOW INCOME HOUSING DEVELOPMEMT
CONSISTING OF PHASES A,B AND C
PHASE A - CONCEPTUAL MASTERPLAN


PHASE B AND C - LANDSCAPE PLAN (COUNCIL SUBMISSION)

PHASE A - CONCEPTUAL SECTION THROUGH PIAZZA

PORTFOLIO: ANKIA BORMANS


SEPTEMBER 2009
BRIEF DESCRIPTION:

WATERGAET ESTATE - LOW INCOME HOUSING DEVELOPMEMT


Low Income Housing Development. Landscaping included all road tree planting and verges, small internal parks
and sporting facilities. Creative implementation with a limited budget allowed for solutions to create dignified
spaces in an impoveridged area.

CONSISTING OF PHASES A,B AND C


Phase A is in the final stages of design and Phase B and C has been approved by Council.

RESPONSIBILITIES:

Masterplan Design
Cost Estimates
Client liaising
Meetings with client, peers and other diciplines.
Documentation
City liaising

PORTFOLIO: ANKIA BORMANS


SEPTEMBER 2009
DEVELOPMEMT
OLIEVENHOUT MALL - COMMERCIAL
ROUGH CONCEPTUAL MASTERPLAN

BRIEF DESCRIPTION:


Commercial Shopping Development. Landscaping incorporated the existing trees on site and the existing
drainage lines and water systems. The pedestrian movement was a strong design influence. The parking areas
were carefully considered to create the least amount of impact on the environment.
The project is still in the conceptual phase/early stages of design.

RESPONSIBILITIES:

Masterplan Design
Landscape Plan
Working Drawings (CAD)
Cost Estimates
Client liaising
Meetings with client, peers and other diciplines.
Documentation
City liaising
Council approvals

PORTFOLIO: ANKIA BORMANS


SEPTEMBER 2009
SPORTING AND A 2010 TRAIING FACILITY
DEVELOPMENT INCLUDING
LANDSCAPE MASTERPLAN

PAARL WATERFRONT - MIXED USE

LANDSCAPE MASTERPLAN INCLUDING RIVER EDGE MANAGEMENT - SKETCH PROPOSALS


ARBORETUM

PORTFOLIO: ANKIA BORMANS


SEPTEMBER 2009
BRIEF DESCRIPTION:

SPORTING AND A 2010 TRAIING FACILITY


DEVELOPMENT INCLUDING
Mixed - use Development. Landscaping incorporated the existing trees on site and the existing drainage lines and
water systems. An extensive tree survey was done on site and certain tees were identified that were of value.
The existing sportsfield was incorporated and a creative and ecologically sound approach was taken to incorpo-
rate the river edge. The stormwater management on site was an important influence on the design.
The project is still in the early stages of design.

RESPONSIBILITIES:

Masterplan Design
Landscape Plan
Working Drawings (CAD)
Cost Estimates
Client liaising
Meetings with client, peers and other diciplines.
Documentation
City liaising
Council approvals

PAARL WATERFRONT - MIXED USE


PORTFOLIO:
PORTFOLIO: ANKIA
ANKIA BORMANS
BORMANS

SEPTEMBER
SEPTEMBER 2009
2009
ERF 12010 D’URBANVALE - RESIDENTIAL DWELLING
BRIEF DESCRIPTION:

A residential dwelling in a Ecological Estate. There were severe constraints in terms of conservation areas on site.
These areas were dealt with in a creative manner to incorporate them into the overall design without the risk of
damage to the areas. This was accomplished by means of a redirected wetland area as a buffer.

RESPONSIBILITIES:

Landscape Concept Design


Landscape Plan
Working Drawings (CAD)


Client liaising
Meetings with client, peers and other diciplines.
Documentation
City liaising
Council approvals

PORTFOLIO: ANKIA BORMANS


SEPTEMBER 2009

private work

PORTFOLIO: ANKIA BORMANS


SEPTEMBER 2009
HOUSE STELLING - CAMPS BAY

BRIEF DESCRIPTION:

A residential dwelling in a coastal area. The brief from the client was an “english type” garden with tranquil
areas, but it must accommodate her two active children and an entertainment area.

RESPONSIBILITIES:

Landscape Concept Design


Landscape Plan
Working Drawings (CAD)
Planting plans
Co-ordination with contractors on site
Contract management
Client liaising

Site supervision
Quality Control
PORTFOLIO: ANKIA BORMANS
SEPTEMBER 2009
HOUSE STELLING - CAMPS BAY

PORTFOLIO: ANKIA BORMANS


SEPTEMBER 2009

HOUSE MULLER - BAKOVEN

PORTFOLIO: ANKIA BORMANS


SEPTEMBER 2009
HOUSE MULLER - BAKOVEN

PORTFOLIO: ANKIA BORMANS


SEPTEMBER 2009
HOUSE MULLER - BAKOVEN

PORTFOLIO: ANKIA BORMANS


SEPTEMBER 2009
BRIEF DESCRIPTION:

A residential dwelling in a coastal area. The brief from the client was a low maintenance garden with indigenous

HOUSE MULLER - BAKOVEN


yet colourful plants. The challenge is that the garden is right on the sea edge and the choice of plant material
was essential to a successful design. There was a very close interaction between the architect and the interior de-
signer to accomplish the ultimate design and to accommodate the client’s wishes.

RESPONSIBILITIES:

Landscape Concept Design


Landscape Plan
Working Drawings (CAD)
Planting plans
Co-ordination with contractors on site
Contract management
Client liaising
Site supervision
Quality Control