SHOP DRAWING CONTROL LIST

Urban Regeneration Project at

DRAWING No

SHEET
NO

DRAWING TITLE

DRAWING
DATE

SUBMITTED
Drawing
SEC /UDA Comment
DATE
submittal No

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/ASB/A2/1

Pile Eccentricity Layout between Grid 1 To 7


(Block A2)

8/Oct/2012

15/Oct/2012

25 ,25R1&
25R2

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/ASB/A2/2

01

Pile Eccentricity Layout between Grid 8 To


13 (Block A2) Sheet 01

9/Nov/2012

9/Nov/2012

26

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/ASB/A2/2

02

Pile Eccentricity Layout between Grid 10 To


21 (Block A2) Sheet 02

6/Dec/2012

6/Dec/2012

27

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/ASB/A2/3

01

Pile Eccentricity Layout Between Grid 1 To


21 (Block A2) Sheet 01

9/Jan/2013

10/Jan/2013

28,28R1

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/ASB/A2/4

Pile Eccentricity Layout Between Grid 15 To


29 (Block A2)

8/Apr/2013

9/Apr/2014

33

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/ASB/A1/1

Pile Eccentricity Layout Between Grid 14 To


29 (Block A1)

7/Feb/2013

8/Feb/2014

29

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/ASB/A1/2

Pile Eccentricity Layout Between Grid 1 To


15A (Block A1)

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/ASB/C2/1

01

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/ASB/C2/2

C1
C1

AS BUILD

TYPE BLOCK

18/Aug/2013 19/Aug/2014

42

Pile Eccentricity Layout Between Grid 1 To 8


21/Oct/2013 21/Oct/2013
(Block C2)

49

Pile Eccentricity Layout Between Grid 1 To


13 (Block C2)

22/Nov/2013 23/Nov/2014

52

CMLMTDSQMJV/UDA/RUSP/FE
R/ASB/C1/1

Pile Eccentricity Layout Between Grid 4 To


13 (Block C1)

26/Dec/2013 27/Dec/2013

57

CMLMTDSQMJV/UDA/RUSP/FE
R/ASB/C1/2

Pile Eccentricity Layout Between Grid 1 To


13 (Block C1)

24/Jan/2014

24/Jan/2014

60

Pile Eccentricity External Sump

18/Jun/2014 18/Jun/2014

82

External CMLMTDSQMJV/UDA/RUSP/FE
Sump R/ASB/S_EXT/1

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A2/3F/1

Deviation Of Column Positions At 3rd Floor


Slab Level Block - A2 Grid 1 -9

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A2/6F/1

Deviation Of Column Positions At 6th Floor


Slab Level Block - A2 Grid 1 -15

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A1/GF/1

Deviation Of Column Positions At GF Floor


Slab Level Block - A1 Grid 23 -29

Page 1 of 18

2/Apr/2014

2/Apr/2014

29/May/2014 30/May/2014

5/Jun/2014

7/Jun/2013

32

Verticality are within


the acceptable limit.
But it is necessary to
do the internal
columns also

35

Acceptance

36

Accepted

REMARKS

Column setting out

TYPE BLOCK

DRAWING No

SHEET
NO

DRAWING TITLE

DRAWING
DATE

SUBMITTED
Drawing
SEC /UDA Comment
DATE
submittal No

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A2/9F/1

Deviation Of Column Positions At 9th Floor


Slab Level Block - A2 Grid 1 -15

10/Jul/2014

12/Jul/2013

40

Accepted

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A1/GF/2

Deviation Of Column Positions At Ground


Floor Slab Level Block - A1 Grid 15a -22

10/Jul/2014

12/Jul/2013

39

Accepted

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A1/3F/1

Deviation Of Column Positions At 3rd Floor


Slab Level Block - A1 Grid 15a -29

6/Aug/2014

7/Aug/2013

41

Accepted

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A2/GF/1

Deviation Of Column Positions Ground Floor


17/Aug/2014 14/Oct/2013
Slab Level Block - A2 Grid 15a - 29

44

Accepted

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A2/3F/3

Deviation Of Column Positions 3rd Floor Slab


13/Sep/2014 14/Oct/2013
Level Block - A2 Grid 15A - 29

46

Accepted

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A2/6F/2

Deviation Of Column Positions At 6th Floor


Slab Level Block - A2 Grid 15a - 29

11/Oct/2014 14/Oct/2013

48

Accepted

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A1/9F/1

Deviation Of Column Positions At 9th Floor


Slab Level Block - A1 Grid 15a - 29

30/Sep/2014 14/Oct/2013

47

Accepted

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A1/6F/1

Deviation Of Column Positions At 6th Floor


Slab Level Block - A1 Grid 15A - 29

29/Aug/2014 14/Oct/2013

45

Accepted

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A2/9F/2

Deviation Of Column Positions At 9th Floor


Slab Level Block - A2 Grid 15A - 29

7/Nov/2014 23/Nov/2014

53

Accepted

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A1/3F/2

Deviation Of Column Positions At 3rd Floor


Slab Level Block - A1 Grid 1 -15

23/Jan/2014

24/Jan/2014

62

Accepted

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A1/GF/2

Deviation Of Column Positions At Ground


Floor Slab Level Block - A1 Grid 1 - 15

23/Jan/2014

24/Jan/2014

61

Accepted

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A1/GF/F/1

Deviation Of Column Positions At Ground


Floor Slab Level Block - A1 Grid 1 - 29

23/Mar/2014 6/May/2014

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A1/3F/F/1

Deviation Of Column Positions At 3RD Floor


Slab Level Block - A1 Grid 1 - 29

23/Mar/2014 6/May/2014

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A1/6F/F/1

Deviation Of Column Positions At 6th Floor


Slab Level Block - A1 Grid 1 - 29

23/Mar/2014 6/May/2014

76

Accepted

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A1/9F/F/1

Deviation Of Column Positions At 9th Floor


Slab Level Block - A1 Grid 1 - 29

23/Mar/2014 6/May/2014

Page 2 of 18

REMARKS

Column s

76

TYPE BLOCK

DRAWING No

SHEET
NO

DRAWING TITLE

DRAWING
DATE

Accepted

SUBMITTED
Drawing
SEC /UDA Comment
DATE
submittal No

A1

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A1/RF/1

Deviation Of Column Positions At Roof Slab


Level Block - A1 Grid 1 - 29

23/Mar/2014 6/May/2014

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/C2/GF/1

Deviation Of Column Positions At Ground


Floor Slab Level Block - C2 Grid 1 - 13

16/Feb/2014

1/Apr/2014

70

Accepted

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/C2/3F/1

Deviation Of Column Positions At 3rd Floor


Slab Level Block - C2 Grid 1 - 13

16/Feb/2014

1/Apr/2014

71

Accepted

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/C2/6F/1

Deviation Of Column Positions At 6th Floor


Slab Level Block - C2 Grid 1 - 13

16/Feb/2014

7/Apr/2014

73

Accepted

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/C2/9F/1

Deviation Of Column Positions At 9th Floor


Slab Level Block - C2 Grid 1 - 13

27/Apr/2014 6/May/2014

75

Accepted

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/C2/RF/1

Deviation Of Column Positions At Roof Slab


Level Block - C2 Grid 1 13

17/Jun/2014 18/Jun/2014

84

Accepted

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/C1/GF/1

Deviation Of Column Positions At Ground


Floor Level Block - C1 Grid 1 - 13

18/Jun/2014 18/Jun/2014

83

Accepted

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/C1/3F/1

Not Submit yet

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/C1/9F/1

Not Submit yet

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/C1/RF/1

Not Submit yet

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A2/GF/F/1

Deviation Of Column Positions At Ground


Floor Slab Level Block - A2 Grid 1 - 29

1/Apr/2014

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A2/3F/F/1

Deviation Of Column Positions At 3RD Floor


Slab Level Block - A2 Grid 1 - 29

1/Apr/2014

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A2/6F/F/1

Deviation Of Column Positions At 6th Floor


Slab Level Block - A2 Grid 1 - 29

1/Apr/2014

72

Accepted

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A2/9F/F/1

Deviation Of Column Positions At 9th Floor


Slab Level Block - A2 Grid 1 - 29

1/Apr/2014

A2

CMLMTDSQMJV/UDA/RUSP/FE
R/CSO/A2/RF/1

Deviation Of Column Positions At Roof Slab


Level Block - A2 Grid 1 - 29

1/Apr/2014

Page 3 of 18

REMARKS

TYPE BLOCK

DRAWING No

SHEET
NO

DRAWING TITLE

DRAWING
DATE

SUBMITTED
Drawing
SEC /UDA Comment
DATE
submittal No

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/A2/1

Electrical Conduit lay out first floor slab to


11th floor slab-Block A2

13/Feb/2013 13/Feb/2013

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/A2/2

Electrical conduit lay out for single house


units 9Typical -Block A2

13/Feb/2013 13/Feb/2013

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/A2/3

Electrical conduit lay out for store,jenitor


room and shops(Typical)Block A2

13/Feb/2013 13/Feb/2013

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/A1/1

Electrical Conduit lay out first floor slab to


11th floor slab-Block A1

13/Jun/2013 13/Jun/2013

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/A1/2

Electrical conduit lay out for single house


units 9Typical -Block A1

13/Jun/2013 13/Jun/2013

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/A2/3

Electrical conduit lay out for Police post &


gramasevaka,s office ,meter room, and
shops and shops(Typical)Block A1

13/Jun/2013 13/Jun/2013

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/C2/1

Electrical Conduit Layout First Floor Slab To


11th Floor Slab- Block -C2

11/Feb/2014

3/Mar/2014

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/C2/2

Electrical Conduit Layout for Single House


Unit (Typical) Block-C2

11/Feb/2014

3/Mar/2014

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/C2/3

Electrical Conduit Layout for Meter Room &


Shops (1 & 2) (Typical) Block -C2

11/Feb/2014

3/Mar/2014

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/C2/1A

Electrical Conduit Layout First Floor Slab to


11th Floor Slab- Block -C2

8/May/2013

6/Aug/2014

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/C2/2A

ELECTRICAL CONDUIT LAYOUT FOR SINGLE


HOUSE UNIT (TYPICAL) BLOCK-C2

8/May/2013

6/Aug/2014

C2

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/C2/3A

ELECTRICAL CONDUIT LAYOUT FOR METER


ROOM & SHOPS (1 & 2) (TYPICAL)BLOCK
-C2

8/May/2013

6/Aug/2014

C1

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/C1/1

ELECTRICAL CONDUIT LAYOUT FIRST FLOOR


SLAB ,Meter room & shops (1 & 2) typical

5/Oct/2014 22/May/2014

C1

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/C1/2

ELECTRICAL CONDUIT LAYOUT 2nd FLOOR


SLAB TO 11TH FLOOR SLAB- BLOCK -C1

5/Oct/2014 22/May/2014

C1

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/C1/3

ELECTRICAL CONDUIT LAYOUT FOR SINGLE


HOUSE UNIT (TYPICAL) BLOCK-C1

5/Oct/2014 22/May/2014

A2

A1

Page 4 of 18

30

acceptance with
comment & need
resubmission

38,38R1

acceptance with
comment & need
resubmission

66

Shop Drawings are not


approved

66R1

Pending Reply

79

Not Approved

REMARKS

ELECTRICAL

TYPE BLOCK

SHEET
NO

DRAWING No

DRAWING TITLE

DRAWING
DATE

SUBMITTED
Drawing
SEC /UDA Comment
DATE
submittal No

C1

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/C1/1A

ELECTRICAL CONDUIT LAYOUT FIRST FLOOR


SLAB ,Meter room & shops (1 & 2) typical

8/May/2014

8/May/2014

C1

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/C1/2A

ELECTRICAL CONDUIT LAYOUT 2nd FLOOR


SLAB TO 11TH FLOOR SLAB- BLOCK -C1

8/May/2014

8/May/2014

C1

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/E/C1/3A

ELECTRICAL CONDUIT LAYOUT FOR SINGLE


HOUSE UNIT (TYPICAL) BLOCK-C1

8/May/2014

8/May/2014

A2

PEP/CML/C/SH/001

pubudu Engineering
Projects(pvt)Ltd

Details of Meter room & Cable management


19/Nov/2013 12/May/2013
System

A2

PEP/CML/C/SH/001R1

pubudu Engineering
Projects(pvt)Ltd

Details of Meter room & Cable management


28/Dec/2013
System

A1

WSCE018 & ELH001

Walker Sons & Co. Engineers


(pvt)Ltd

Cable tray layout path -Ground floor Block


A1

2/Jan/2014

WSCE018 & ELH002

Walker Sons & Co.Engineers


(pvt)Ltd

Arrangement of cable trays and laddersGround floor Block A1

7/May/2014 12/May/2014

A1

WSCE018 & ELH001A

Walker Sons & Co. Engineers


(pvt)Ltd

Cable tray layout path -Ground floor Block


A1

5/Jun/2014

WSCE018 & ELH002A

C1 & C2 WSCE018 & ELH003

C1 & C2 WSCE018 & ELH004

Arrangement of cable trays and laddersGround floor Block A1

5/Jun/2014

10/Jun/2014

Walker Sons & Co. Engineers


(pvt)Ltd

Arrangement of cable trays and laddersBlock C1 & C2

8/Apr/2014

20/Aug/2014

Arrangement of cable trays and laddersBlock C1 & C2

54

Need Resubmit

54R1

Acceptance with
comments as noted

77

Need Resubmit

77R1

Approved

86

Approved

10/Jun/2014

Walker Sons & Co. Engineers


(pvt)Ltd

Walker Sons & Co. Engineers


(pvt)Ltd

Pending Reply

7/May/2014 12/May/2014

A1

A1

79R1

8/Apr/2014

20/Aug/2014

CMLMTDSQMJV/UDA/RUSP/FE
R/EXT/MT

Proposed meter room trench

18/Aug/2014 2/Sep/2014

89

Need Resubmit

CMLMTDSQMJV/UDA/RUSP/FE
R/EXT/MT/A

Proposed meter room trench

11/Sep/2014 12/Sep/2014

89R1

Reject

CMLMTDSQMJV/UDA/RUSP/FE
R/EXT/MT/FX

Fixing details of Meters

Page 5 of 18

REMARKS

1/Sep/2014 12/Sep/2014

92

Acceptance with
comments &need
resubmit

CEB Meters fixing details


can be accepted .Trench
arrangement at under
ground CEB cable should
be revised as per the
CEB request

TYPE BLOCK

SHEET
NO

DRAWING No
TPL/NW/UP/2014/215

DRAWING TITLE

MEP/2013/14/06/0012

Walker Sons & Co. Engineers


(pvt)Ltd

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/TG(Sheet 01 of 02)

01 of 02

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/TG(Sheet 02 of 02)

90

Approved

87,87R1

Pending Reply

91

Reject

94

Pending Reply

31,31R1

Accepted

9/Sep/2014 12/Sep/2014

Supports for Over head brackets

27/Aug/2014 29/Aug/2014

Lay out of transformer room and generator


room

10/Sep/2014 12/Sep/2014

Lay out of transformer room and generator


room

10/Sep/2014 12/Sep/2014

Shop drawing for wall foundation at


transformer room

19/Sep/2014 12/Sep/2014

Shop drawings for Elevators

25/Mar/2014

Shop drawing for layout & sectional details


of sewer /waste water, clear water system
for a housing unit

13/May/2014 7/May/2013

34

need resubmit

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/PB/1A

Shop drawing for layout & sectional details


of sewer /waste water, clear water system
for a housing unit

14/Nov/2013 4/Nov/2013

34R1

acceptance with
comment & need
resubmit

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/PB/1B

Shop drawing for layout & sectional details


of sewer /waste water, clear water system
for a housing unit

21/Feb/2014 24/Feb/2013

34R2

acceptance with
comment & need
resubmit

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/PB/2

Strom water down pipe arrangement at


balcony in Housing

14/Nov/2013 15/Nov/2013
51

acceptance with
comment & need
resubmit

51R1

acceptance with
comment

02 of 02

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/TR/FD

SCAN Engineering

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/PB/1

plumbing

SUBMITTED
Drawing
SEC /UDA Comment
DATE
submittal No

Trade Promerters Limited


Details of Generator Room

Fire

DRAWING
DATE

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/PB/3

Proposed Layout & Sectional details of Pure


water system for a single housing unit

14/Nov/2013 15/Nov/2013

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/PB/2A

Strome water down pipe arrangement at


balcony in Housing

21/Feb/2014 24/Feb/2014

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/PB/3A

Proposed Layout & Sectional details of Pure


water system for a single housing unit

Page 6 of 18

21/Feb/2014 24/Feb/2014

REMARKS

plumbing

TYPE BLOCK

DRAWING No

SHEET
NO

DRAWING TITLE

DRAWING
DATE

SUBMITTED
Drawing
SEC /UDA Comment
DATE
submittal No

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/PB/4

General arrangement of Bath room

27/Dec/2013 27/Dec/2013

CMLMTDSQMJV/UDA/RUSP/FE
R/SMH/1

Sewer line Key plan

28/May/2014 28/May/2014

56

Acceptance with
comment

80

acceptance with
comment

CMLMTDSQMJV/UDA/RUSP/FE
R/SMH/2

Details of interceptor Manhole

CMLMTDSQMJV/UDA/RUSP/FE
R/EX/DR

Layout of External drain along furguson road 18/Sep/2014 19/Sep/2014

93

Pending Reply

CMLMTDSQMJV/UDA/RUSP/FE
R/EL/C2

Existing Spot level with reference to M.S.L.


at Block C2 area

7/Jun/2013

37

reply not received

CMLMTDSQMJV/UDA/RUSP/FE
R/EL/C1

Existing Spot level with reference to M.S.L.


at Block C21area

29/Dec/2013

58

reply not received

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/ST/C2/1

Proposed General arrangement at


1st,2nd,4th,5th,7th,8th,10th,11th floors
-Block C2

20/Sep/2013 20/Sep/2013

43

Accepted

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/SD/HR/1

Details of Hand Rail

31/Oct/2013 31/Oct/2013

50,50R1

Accepted

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/ST/C1/1

Proposed General arrangement at


1st,2nd,4th,5th,7th,8th,10th,11th floors
-Block C1

24/Dec/2013 25/Dec/2013
55

Accepted

Proposed General arrangement at 3rd, 6th,


and 9th floors -Block C1

24/Dec/2013 25/Dec/2013

59

Accepted

88

Accepted

95

pending Approval

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/ST/C1/2

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/WP/1
CMLMTDSQMJV/UDA/RUSP/FE
R/SD/WP/1

28/May/2014 28/May/2014

6/Jul/2013

1 of 02

Shop Drawing for water Proofing above roof


30/Dec/2013 30/Dec/2013
slab(Block A1,A2,C1 & C2

2 of 2

Shop Drawing for water Proofing above roof


30/Dec/2013 30/Dec/2013
slab(Block A1,A2,C1 & C2

CMLMTDSQMJV/UDA/RUSP/FE
R/EXT/LD

Details of ladders to the Machine room and


water tank

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/PR

Layout & Details of pump room

Page 7 of 18

9/Feb/2014

3/Sep/2014

22/Sep/2014 22/Sep/2014

REMARKS

A1,A2,C1 & C2

TYPE BLOCK

SHEET
NO

DRAWING No

DRAWING TITLE

DRAWING
DATE

SUBMITTED
Drawing
SEC /UDA Comment
DATE
submittal No

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/PR/1

Details of pump room for Block A2,C2 & Fire


31/Oct/2014
pump room

7/Nov/2014

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/PR/2

R/F Details for pump room for Block A2 ,C2


& fire pump Room

31/Oct/2014

7/Nov/2014

CES/14/Q/997R1/RP /R0

Civicon Engineering services


PVT LTD

Shop Drawing for Roof plan

14/Jul/2014 20/Aug/2014

CES/14/Q/997R1/T1X-01/R1

Civicon Engineering services


PVT LTD

Shop Drawing for Roof -Type 1X

14/Jul/2014 20/Aug/2014

CES/14/Q/997R1/T1Y-01/R1

Civicon Engineering services


PVT LTD

Shop Drawing for Roof -Type 1Y

14/Jul/2014 20/Aug/2014

CES/14/Q/997R1/T1Z-01/R1

Civicon Engineering services


PVT LTD

Shop Drawing for Roof -Type 1Z

14/Jul/2014 20/Aug/2014

CES/14/Q/997R1/T2A-01/R1

Civicon Engineering services


PVT LTD

Shop Drawing for Roof -Type 2A

14/Jul/2014 20/Aug/2014

CES/14/Q/997R1/T2B-01/R1

Civicon Engineering services


PVT LTD

Shop Drawing for Roof -Type 2B

14/Jul/2014 20/Aug/2014

CES/14/Q/997R1/T3A-01/R1

Civicon Engineering services


PVT LTD

Shop Drawing for Roof -Type 3A

14/Jul/2014 20/Aug/2014

CES/14/Q/997R1/T3B-01/R1

Civicon Engineering services


PVT LTD

Shop Drawing for Roof -Type 3B

14/Jul/2014 20/Aug/2014

CES/14/Q/997R1/T3C-01/R1

Civicon Engineering services


PVT LTD

Shop Drawing for Roof -Type 3C

14/Jul/2014 20/Aug/2014

CES/14/Q/997R1/T1X1-02/R1

Civicon Engineering services


PVT LTD

Shop Drawing for Roof -Section C-C

14/Jul/2014 20/Aug/2014

CES/14/Q/997R1/T1X1-03/R1

Civicon Engineering services


PVT LTD

Shop Drawing for Roof -Section C1-C1

14/Jul/2014 20/Aug/2014

CES/14/Q/997R1/B01/R1

Civicon Engineering services


PVT LTD

Cross Sectional View

14/Jul/2014 20/Aug/2014

CES/14/Q/997R1/B02/R1

Civicon Engineering services


PVT LTD

blown-up view of PV system fixing

14/Jul/2014 20/Aug/2014

CES/14/Q/997R1/EJ01/R1

Civicon Engineering services


PVT LTD

Fixing Details at the Expansion Joint

14/Jul/2014 20/Aug/2014

CMLMTDSQMJV/UDA/RUSP/FE
R/ASB/WT/1

CMLMTDSQMJV/UDA/RUSP/FE
R/SUMP/C1/1

Shop Drawing for water Tank arrangement


Block A1 & A2

Shop Drawing for sump located in Block c1

Page 8 of 18

13/Feb/2014 13/Feb/2014

11/Mar/2014 11/Mar/2014

97

Accepted

85

pending Approval

64

PVC welded collars to


be embedded in the
concrete structure

67

Get verified whether


110 dia sleeve is
adequate enough for
maintenance of the
foot valve from the
sump cover slab level

REMARKS

TYPE BLOCK

DRAWING No

SHEET
NO

DRAWING TITLE

DRAWING
DATE

SUBMITTED
Drawing
SEC /UDA Comment
DATE
submittal No

CMLMTDSQMJV/UDA/RUSP/FE
R/SUMP/EXT/1

Shop Drawing for External Sump

CMLMTDSQMJV/UDA/RUSP/FE
R/GFP/C1

Shop Drawing for Ground floor plan Block c1 24/Mar/2014 24/Mar/2014

9/Jun/2014

Fire duct door dimension &fire hydrant


cabinet arrangement

9/Jun/2014

28/Mar/2014

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/MR & WT/01

01 of 02

G.A. at above roof slab in Machine room and


29/Apr/2014 29/Apr/2014
water tank area

CMLMTDSQMJV/UDA/RUSP/FE
R/SD/MR & WT/01

G.A. at above roof slab in Machine room and


02of 02
29/Apr/2014 29/Apr/2014
water tank area

CMLMTDSQMJV/UDA/RUSP/FE
R/COD/1/B(Sheet 01 of03)

1 of 03

Coordination Drawing(Longitude section)

3/Sep/2014

4/Sep/2014

CMLMTDSQMJV/UDA/RUSP/FE
R/COD/1/B(Sheet 02of03)

2 of 03

Coordination Drawing(Cross section view)

3/Sep/2014

4/Sep/2014

CMLMTDSQMJV/UDA/RUSP/FE
R/COD/1/B(Sheet 03 of 03)

3 of 3

Coordination Drawing(Cross section view)

3/Sep/2014

4/Sep/2014

Page 9 of 18

81

Need resubmit with


missing details

68,68R1

Accepted

69

Need resubmit with


missing details

74

Accepted

78r2

Accepted

REMARKS

fire duct detail in asbuild


folder

CML - MTD SUIRE MECH JV

S.No

Disipline
code

Drawing No
CMLMTDSQMJV/UDA/RUSP/FER/ASB/G/001

CMLMTDSQMJV/UDA/RUSP/FER/ASB/G/002

CMLMTDSQMJV/UDA/RUSP/FER/ASB/G/003

CMLMTDSQMJV/UDA/RUSP/FER/ASB/G/004

CMLMTDSQMJV/UDA/RUSP/FER/ASB/G/005

CMLMTDSQMJV/UDA/RUSP/FER/ASB/A/001

CMLMTDSQMJV/UDA/RUSP/FER/ASB/A/002

CMLMTDSQMJV/UDA/RUSP/FER/ASB/A/003

CMLMTDSQMJV/UDA/RUSP/FER/ASB/A/004

10

CMLMTDSQMJV/UDA/RUSP/FER/ASB/A/005

11

CMLMTDSQMJV/UDA/RUSP/FER/ASB/C/001

12

CMLMTDSQMJV/UDA/RUSP/FER/ASB/C/002

13

CMLMTDSQMJV/UDA/RUSP/FER/ASB/C/003

14

CMLMTDSQMJV/UDA/RUSP/FER/ASB/C/004

15
16

CMLMTDSQMJV/UDA/RUSP/FER/ASB/C/005
D

CMLMTDSQMJV/UDA/RUSP/FER/ASB/D/001

17

CMLMTDSQMJV/UDA/RUSP/FER/ASB/D/002

18

CMLMTDSQMJV/UDA/RUSP/FER/ASB/D/003

19

CMLMTDSQMJV/UDA/RUSP/FER/ASB/D/004

20

CMLMTDSQMJV/UDA/RUSP/FER/ASB/D/005

21

CMLMTDSQMJV/UDA/RUSP/FER/ASB/E/001

22

CMLMTDSQMJV/UDA/RUSP/FER/ASB/E/002

23

CMLMTDSQMJV/UDA/RUSP/FER/ASB/E/003

24

CMLMTDSQMJV/UDA/RUSP/FER/ASB/E/004

File Name

Rev

S.No

Disipline
code

25
26

Drawing No
CMLMTDSQMJV/UDA/RUSP/FER/ASB/E/005

CMLMTDSQMJV/UDA/RUSP/FER/ASB/F/001

27

CMLMTDSQMJV/UDA/RUSP/FER/ASB/F/002

28

CMLMTDSQMJV/UDA/RUSP/FER/ASB/F/003

29

CMLMTDSQMJV/UDA/RUSP/FER/ASB/F/004

30

CMLMTDSQMJV/UDA/RUSP/FER/ASB/F/005

31

CMLMTDSQMJV/UDA/RUSP/FER/ASB/H/001

32

CMLMTDSQMJV/UDA/RUSP/FER/ASB/H/002

33

CMLMTDSQMJV/UDA/RUSP/FER/ASB/H/003

34

CMLMTDSQMJV/UDA/RUSP/FER/ASB/H/004

35

CMLMTDSQMJV/UDA/RUSP/FER/ASB/H/005

36

CMLMTDSQMJV/UDA/RUSP/FER/ASB/L/001

37

CMLMTDSQMJV/UDA/RUSP/FER/ASB/L/002

38

CMLMTDSQMJV/UDA/RUSP/FER/ASB/L/003

39

CMLMTDSQMJV/UDA/RUSP/FER/ASB/L/004

40

CMLMTDSQMJV/UDA/RUSP/FER/ASB/L/005

41

CMLMTDSQMJV/UDA/RUSP/FER/ASB/M/001

42

CMLMTDSQMJV/UDA/RUSP/FER/ASB/M/002

43

CMLMTDSQMJV/UDA/RUSP/FER/ASB/M/003

44

CMLMTDSQMJV/UDA/RUSP/FER/ASB/M/004

45

CMLMTDSQMJV/UDA/RUSP/FER/ASB/M/005

46

CMLMTDSQMJV/UDA/RUSP/FER/ASB/R/001

47

CMLMTDSQMJV/UDA/RUSP/FER/ASB/R/002

48

CMLMTDSQMJV/UDA/RUSP/FER/ASB/R/003

49

CMLMTDSQMJV/UDA/RUSP/FER/ASB/R/004

50

CMLMTDSQMJV/UDA/RUSP/FER/ASB/R/005

51

CMLMTDSQMJV/UDA/RUSP/FER/ASB/S/001

52

CMLMTDSQMJV/UDA/RUSP/FER/ASB/S/002

53

CMLMTDSQMJV/UDA/RUSP/FER/ASB/S/003

File Name

Rev

S.No

Disipline
code

Drawing No

54

CMLMTDSQMJV/UDA/RUSP/FER/ASB/S/004

55

CMLMTDSQMJV/UDA/RUSP/FER/ASB/S/005

56

CMLMTDSQMJV/UDA/RUSP/FER/ASB/T/001

57

CMLMTDSQMJV/UDA/RUSP/FER/ASB/T/002

58

CMLMTDSQMJV/UDA/RUSP/FER/ASB/T/003

59

CMLMTDSQMJV/UDA/RUSP/FER/ASB/T/004

60

CMLMTDSQMJV/UDA/RUSP/FER/ASB/T/005

61

CMLMTDSQMJV/UDA/RUSP/FER/ASB/V/001

62

CMLMTDSQMJV/UDA/RUSP/FER/ASB/V/002

63

CMLMTDSQMJV/UDA/RUSP/FER/ASB/V/003

64

CMLMTDSQMJV/UDA/RUSP/FER/ASB/V/004

65

CMLMTDSQMJV/UDA/RUSP/FER/ASB/V/005

File Name

Rev

Description

Description

Description

DESCIPLINE CODE
G

GENERAL / SKETCH

ARCHITECTURAL

CIVIL

DRAINAGE / SEWERAGE

ELECTRICAL

FIRE

LANDSCAPING

MECHANICAL

PLUMBING

RENDERING / ANIMATIONS

STRUCTURAL

TELECOM

SURVEY

WATER SUPPLY

CMLMTDSQMJV / UDA / RUSP / FER / ASB / G / 001

CONTRACT
OR
CLIENT

PROJECT
NAME
SITE

ASBUIL
T
DESCIPLINE
CODE

DESCIPLINE CODE

CMLMTDSQMJV / UDA / RUSP / FER / ASB / G / 001

DESCIPLINE CODE

CMLMTDSQMJV / UDA / RUSP / FER / ASB / G / 001