Job Description
3 CCW HX A strainer cleaning
3 Pre-filter replacement
3 CCW HX B FRP coating
3 Mist eliminator installation
2 CCW HX B strainer cleaning & FRP coating
1 Decanting of HSD Pit
2 CCW HX A leakage rectification
2 CCW pit dewatering
1 CCW pit dewatering
1 CCW HX Inlet & Outlet valve PM

3/26/2013

1 Pre-filter replacement

3/27/2013
3/28/2013
3/28/2013
3/29/2013
3/29/2013
3/29/2013

1 Pre-filter replacement
1 CCCW valves greasing
2 CCCW HX-A Strainer cleaned
2 Shifting of HE filter
2 CCW HX A FRP coating
3 Shifting of HE

3/30/2013

3/30/2013 HSD

Removal Of Scrap material from HSD Dyke wall


2 Measurement of Lube oil tank Dip-570 mm

3/30/2013

3/30/2013
3/30/2013
3/31/2013
3/31/2013
3/31/2013
3/31/2013
4/1/2013
4/1/2013
4/1/2013
4/1/2013
4/1/2013
4/1/2013
4/1/2013
4/2/2013
4/2/2013
4/2/2013
4/2/2013
4/2/2013
4/5/2013
4/5/2013
4/6/2013

Replacement of HE

Inspection and adjustment of Mist eliminator NRV


2 Bearing no. 2 gasket inspection
3

1
2
2
2
3
3
2
2
3
1
3
1
2

Replacement of HE filter
3 Measurement of Lube oil tank Dip-540 mm
3 Lube oil top up 1 drum
3 Bearing no. 2 gasket inspection
CCCW Pump pit cleaning / decanting
CCCW Pump pit cleaning / decanting
Sump tank emptying
Water washing drain pit emptying
Sump tank emptying
Water washing drain pit emptying
88BT-2 Removal preperation
Housekeeping of GT Hall
Vacum adjustment
Vacum adjustment
Lube oil top up 2 drum
Lube oil top up 1 drum
CCCW Pump pit cleaning / decanting
CCCW Pump pit cleaning / decanting
PM of HSD Area Pumps

4/6/2013
4/6/2013
4/6/2013
4/8/2013
4/8/2013

1
2
3
1
3

4/8/2013
4/10/2013
4/11/2013
4/11/2013
4/12/2013
4/13/2013
4/13/2013
4/13/2013
4/13/2013
4/14/2013
4/14/2013
4/14/2013
4/14/2013
4/15/2013
4/15/2013
4/15/2013
4/16/2013
4/16/2013
4/16/2013
4/17/2013
4/18/2013
4/18/2013
4/18/2013
4/18/2013
4/18/2013
4/18/2013
4/19/2013
4/19/2013
4/19/2013
4/19/2013
4/22/2013
4/23/2013
4/23/2013
4/23/2013
4/23/2013
4/23/2013
4/23/2013
4/23/2013
4/23/2013
4/23/2013
4/23/2013

PM of GT CCW Pumps and valves


PM of GT CCW Pumps and valves
PM of GT CCW Pumps and valves
CCW pit dewatering
CCW pit dewatering
OMS container material sagregation and disposal

3
3
1
1
1
1
1
1
1
1
1
1
1
2
3
1
2
3

Replacement of colesar filter


Replacement of colesar filter
Shiftng of Dura V filter
Oil sump pit decanting
Lube Oil make up
Mist eliminator Removal
Shifting of Dura-V and Removal of Pre- filter
Shifting of Dura-V and Removal of Pre- filter
Replacement of Dura-V
Replacement of Hydrualic filters
Bearing no. 2 gland packing tightening
Lube oil leakage rectification
Auxiliary GT # 1 compartment inspection
Auxiliary GT # 2 compartment inspection
Auxiliary GT # 3 compartment inspection
Auxiliary GT # 1 compartment inspection
Auxiliary GT # 2 compartment inspection
Auxiliary GT # 3 compartment inspection

Hosekeeing of GT Hall
1
2
3
1
2
3
1
1
2
3
1
2
3
1
1
2
2
HSD
HSD
HSD
HSD

Auxiliary GT # 1 compartment inspection


Auxiliary GT # 2 compartment inspection
Auxiliary GT # 3 compartment inspection

CCCW pump A
CCCW pump A
CCCW pump A
Mist eliminator installation
Auxiliary GT # 1 compartment inspection
Auxiliary GT # 2 compartment inspection
Auxiliary GT # 3 compartment inspection

CCCW Pump pit cleaning / decanting


Replacement of JOP filters
Replacement of JOP filters
PM OF CLSD CYCLE COOLING WATER P#1, GT 1
PM OF CLSD CYCLE COOLING WATER P#2, GT 1
PM OF CLSD CYCLE COOLING WATER P#1 GT 2
PM OF CLSD CYCLE COOLING WATER P#2 GT 2
PM OF HSD GT 1 Pump A
PM OF HSD GT 1 Pump B
PM OF HSD GT 2Pump A
PM OF HSD GT 2Pump B

4/23/2013
4/23/2013
4/23/2013
4/23/2013
4/23/2013
4/23/2013
4/23/2013
4/23/2013
4/23/2013
4/23/2013
4/24/2013
4/25/2013
4/25/2013
4/26/2013
4/26/2013
4/26/2013
4/27/2013
4/27/2013
4/29/2013
4/30/2013
5/2/2013
5/3/2013
5/3/2013
5/3/2013
5/4/2013

HSD
HSD
HSD
HSD
HSD
HSD
HSD
HSD
HSD
HSD
1
2
1
2
3
3
2
1
2
3
HSD
2
1
1
3
1

5/4/2013
5/5/2013
5/5/2013
5/5/2013
5/5/2013
5/5/2013
5/5/2013
5/6/2013
5/7/2013
5/8/2013
5/10/2013
5/13/2013
5/13/2013

PM
PM
PM
PM
PM
PM
PM
PM
PM
PM

OF
OF
OF
OF
OF
OF
OF
OF
OF
OF

HSD GT 3Pump A
HSD GT 3Pump B
OIL UNLOADING PUMP # 1
OIL UNLOADING PUMP # 2
OIL UNLOADING PUMP # 3
OIL UNLOADING PUMP # 4
WASTE OIL PUMP OF OIL PUMP HOUSE
WASTE OIL PUMP OF OIL TANK AREA
OIL TRANSFER PUMP # 1
OIL TRANSFER PUMP # 2

Replacement of colesar filter


Hydraulic filter A replaced
Fuel oil Sump pit decanting
Hydraulic filter B replaced
Hydraulic filter A & B replaced
Lube oil top up 2 drum
Lube oil top up 2 drum
Lube oil top up 2 drum
Replacement of colesar filter(PDI-100=400,PDI101=250)
Repair of dead plug of CCW pump no. 1
PM of all Pumps of HSD
GT #2 88BT fan removal arrangement completed
GT #1 CCCW HX B vent valve repair and installation
GT#1 CCCW pit dewatering
GT#3 CCCW HX#B strainer cleaning
GT#1 CO2 cylinder alarm inhibit to keep fire system
in service by lifting dead weight of cylinder
Accessory compartment lube oil cleaning

Accessory compartment lube oil cleaning and


leakage identification

Accessory compartment lube oil cleaning and


leakage identification
CCCW HX B strainer cleaning

2
2

CCCW HX inlet flange leakage rectification by


tightening loose bolts

Shifting of scaffolding and blind plate from exhaust


roof to turbine comp. roof
PM of gt rotary equipments
Shifting of CO2 cylinder
HSD pumps
Housekeeping of GT Hall
Inspection of auxilary compartment
PM of gt rotary equipments

PM
1
GT Hall
GT 1,2,3
PM

5/14/2013
5/15/2013
5/17/2013
5/17/2013
5/17/2013
5/17/2013
5/18/2013
5/20/2013
5/20/2013
5/21/2013
5/22/2013
5/22/2013
5/23/2013
5/24/2013
5/25/2013
5/27/2013
5/27/2013
5/28/2013
5/28/2013
5/29/2013
6/2/2013
6/3/2013
6/4/2013
6/6/2013
6/8/2013
6/8/2013
6/10/2013
6/10/2013
6/11/2013
6/12/2013
6/12/2013
6/12/2013
6/13/2013
6/13/2013
6/14/2013
6/16/2013
6/17/2013
6/17/2013
6/17/2013
6/17/2013
6/17/2013
6/17/2013
6/17/2013
6/18/2013
6/19/2013
6/19/2013
6/19/2013
6/20/2013

PM
2
2
2
2
3
GT 1,2,3
GT 1,2,3
PM
2
HSD
GT 1,2,3
GT 2,88BT
GT 3
GT 3
GT 2
GT 3
2
1,2,3
3
2
1,2,3
1,2,3
2
1,2,3
1
PM
1,2,3
1
2
3
2
2
2
1
1
1
1
1
1
1
2
2
2
GT 1,2,3
3
3

HSD pumps
GT#2 pre filter shifting
GT#2 pre filter installation
GT#2 88BT fan removal
GT#2 booster compressor v-belt replacement
GT#3 booster compressor v-belt replacement
Inspection of auxilary compartment
Inspection of auxilary compartment
PM of gt rotary equipments
Cleaning of HX B
PM of HSD pumps
Inspection of Auxilary compartment
Fan Motor decouple
Coalescer filter shifting to air intake house
Coalescer filter replacement
AA Bosster Compressor inspection
CCW HX B cleaning
GT 2 HX B strainer cleaning
Aux compartment inspection
CCW HX A cleaning
CCW HX A cleaning
PM of gt rotary equipments
GT HX cleaning
GT Accessory compartment inspection
GT #2 HX A cleaning
GT Accessory compartment inspection
GT Accessory compartment inspection
PM of gt rotary equipments
Cleaning of vent pipe
Hydrualic filter cleaning
GT Accessory compartment inspection
Installation of submersible pump
Cleaning of HX B
GT#2 88BT fan coupling
Cleaning of HX A
AA cooler and PA cooler inspection
Bearing #2 packing replacement
88-BT #2 installation
CCCW HX A & B strainer cleaning
CCCW pump A strainer cleaning
AA cooler vent pipe line installation
start-up support
GT #2 CCCW HX B strainer cleaning
88BT fan motor removal
Weeky PM
Rotary equipment PM
Cleaning of HX A
Weeky PM

6/24/2013
6/25/2013
6/26/2013
6/26/2013
6/26/2013
6/27/2013
6/27/2013
6/27/2013
6/27/2013
7/2/2013
7/3/2013
7/4/2013
7/4/2013
7/4/2013
7/5/2013
7/5/2013
7/5/2013
7/7/2013
7/7/2013
7/7/2013
7/8/2013
7/8/2013

HSD
2
GT 1,2,3
2
3
1
2
3
3
GT 1,2,3
GT 1,2,3
GT 1,2,3
Co2 container
CCW pits
1
1
1
3
3
3
3
3

7/8/2013

7/8/2013
7/8/2013
7/9/2013
7/10/2013
7/10/2013
7/12/2013
7/12/2013
7/12/2013
7/13/2013
7/13/2013

3
3

7/13/2013

7/15/2013
7/18/2013
7/18/2013

GT 1,2,3
1
3

7/22/2013

7/23/2013
7/23/2013
7/24/2013
7/24/2013
7/24/2013
7/24/2013
7/24/2013

2
1
1
2
3
1,2,3

2
3
2
2
1
2
3

PM of all Pumps of HSD


GT #2 CCCW HX B strainer cleaning
Housekeeping of GT Hall
Removal of 88TK cover
Inspection of EF 2 damper
GT #1 CCCW HX B strainer cleaning
GT #2 CCCW HX B strainer cleaning
GT #2 CCCW HX A strainer cleaning
Decoupling of 88BT
Housekeeping of GT Hall
Housekeeping of GT Hall
Housekeeping of GT Hall
cleaning of cylinders
Decanting of CCW pit
88 EF fan motor replacement
Bearing #2 packing and gasket replacement
Pre-filter replacement
Pre-filter replacement
Coaleser replacement
88 BT-2 replacement
88 BT-1 replacement
Bearing #2 packing and gasket replacement
Liquid fuel check valve replaced of combuster 3,4
AA booster compressor belt installtion
Cleaning of Air filter house
Coupling of Fan
Coleser filter replacement
4 drum lube oil make-up
88 BT fan removal
CCW HX A cleaning
CCW HX B cleaning
CCW HX B cleaning
CCW HX B cleaning
Shifting of 88BT backcover to GT enclosure top
inspection of all 88 BT fan
2 drum lube oil make-up
3 drum lube oil make-up
Replacement of Expanssion make up Tank valve
Lube oil filter replaced
Waste fuel oil tank emptied in drums
GT-1 DD Hyd oil filled
GT-2 lube oil make up of 2 drums
GT-3 weekly PM
GT water injection pumps PM
GT compressor washing pumps 1,2 PM

7/25/2013
7/26/2013
7/27/2013
7/27/2013
7/29/2013
7/29/2013
8/12/2013
8/12/2013
8/12/2013
8/13/2013
8/13/2013
8/13/2013
8/15/2013
8/15/2013
8/15/2013
8/18/2013
8/18/2013
8/18/2013
8/18/2013
8/18/2013
8/19/2013
8/19/2013
8/19/2013
8/19/2013
8/19/2013
8/19/2013
8/20/2013
8/21/2013
8/21/2013
8/21/2013
8/21/2013
8/21/2013
8/21/2013
8/22/2013
8/23/2013
8/23/2013
8/23/2013
8/26/2013
8/26/2013
8/26/2013
8/27/2013
8/28/2013
8/28/2013
8/28/2013
8/28/2013

1
GT 1,2,3
2
2
2
1
2
1
2
1
1,2,3
2
3
1,3,2
1
1

GT-1 weekly PM
88 BT fan inspection
Attend leakage of Primary gas fuel valve hydraulic
line
Installation of drain tray in DLN skid
CCW pit dewatering
88BT-1 flow issue
DD room cleaning
DD room cleaning
Maintenance of petrol driven pump
HX B cleaning
GT-1 weekly PM
GT water injection pumps PM
GT-2 weekly PM
GT-3 weekly PM
Filter Inspection
Installation of JOP
Inspection of AA filter
Inspection of torque converter filter
replactment of VTR 2-1, 1-1
88BT 2 damper rectification

Replacement Liquid fuel check valve combustor 14,


2 nos

Replacement Liquid fuel check valve in combustor


11, 1 nos
Inspection of AA filter
Inspection of torque converter filter
replactment of VTR 2-1, 1-1
88BT 2 damper rectification
Decanting of CCW pit
Main Hydrualic filter cleaning
DD room cleaning
HX B cleaning
HX B cleaning
GT-2 weekly PM
GT-3 weekly PM
GT-3 weekly PM
CCW valve PM
Tool container audit
Replacement of Hydrualic filter B
Cleaning of DLN skid
CCW valve PM
Decanting of CCW pit
Fitting arrangement of GT CCW pit pump
Fitting arrangement of GT CCW pit pump
CCW valve PM
Decanting of CCW pit
Decanting of CCW pit

3
3
3
3
1,2,3
3
3
2
3
2
3
1
1,2,3
3
2
1,2
1,2

1
2
1

8/29/2013
8/29/2013
8/29/2013
8/29/2013
8/30/2013
8/31/2013
8/31/2013
9/1/2013
9/1/2013
9/1/2013
9/1/2013
9/1/2013
9/1/2013
9/1/2013
9/1/2013
9/1/2013
9/1/2013
9/1/2013
9/3/2013
9/3/2013
9/3/2013
9/4/2013
9/4/2013
9/4/2013
9/5/2013
9/5/2013
9/5/2013
9/5/2013
9/6/2013
9/6/2013
9/6/2013
9/7/2013
9/7/2013
9/7/2013
9/9/2013
9/9/2013
9/16/2013
9/16/2013
9/16/2013
9/17/2013

2
3
2

Cleaning of HX
Decanting of CCW pit B
Decanting of CCW pit B
Fitting arrangement of GT CCW pit pump

Fitting arrangement of GT CCW pit pump/testing will


start tommorow
Testing of GT CCW pit pump
Cleaning of HX B
Replacement of Brg#2 Packing and gasket.
Inspection and cleaning of AA filter.

2
3
2
2
2

Inspection and cleaning of Torque converter lube oil


filter.

leakage rectification of GCV Hyd oil filter supply line


(DLN compartment).

2
2
2
2
2
2
2
1
1
2
2
1
2
1,2,3
3
2
1
1
2
1
3
2
2
1
1
1,2
1
3

leakage rectification of CCCW HX A ACW inlet line.


leakage rectification of CCCW HX B ACW inlet line.
Inspection of exhaust duct.
Cleaning of CCCW HX A strainer.
Cleaning of CCCW HX B strainer.
Arrangement for AA cooler inspection.
Fitting arrangement of GT CCW pit pump.
Decating of WW pit GT-1
Decating of CCCW pit GT-1
Decating of CCCW pit GT-2
Weeky PM
Weeky PM
leakage rectification of CCCW HX A ACW inlet line.
WI Pump
Aux compartment inspection
Fitting arrangement of GT CCW pit pump/testing.
Tool container audit
Inspection of CCCW MOV
Fitting arrangement of GT CCW pit pump/testing.
Decanting of GT CCCW pit
Inspection of GT CCCW tank MOV
Cleaning HX B
Black start pump FRP line repair work
Decating of CCCW pit
Decating of CCCW pit
Replacement of Hyd filter A
Inspection of Auxilary compartment
Automizing air vent rectification
CCCW system MOC

9/17/2013
9/17/2013
9/18/2013
9/18/2013
9/18/2013
9/18/2013
9/19/2013
9/19/2013
9/20/2013
9/20/2013
9/23/2013
9/23/2013
9/23/2013
9/24/2013
9/24/2013
9/24/2013
9/24/2013
9/24/2013
9/24/2013
9/25/2013
9/25/2013
9/25/2013
9/25/2013
9/25/2013
9/25/2013
9/25/2013
9/25/2013
9/25/2013
9/25/2013
9/29/2013
9/29/2013
9/30/2013
9/30/2013
10/1/2013
10/2/2013
10/2/2013
10/2/2013
10/7/2013
10/7/2013
10/7/2013
10/7/2013
10/7/2013
10/7/2013
10/8/2013
10/8/2013
10/10/2013
10/10/2013

1,2,3
GT 1,2,3
3
1,2,3
3
1
3
1
1
1
3
2
3
HSD
HSD
1
3
HSD
HSD
1
1
1
1
HSD
HSD
1
1
1,2,3

WI Pump
CCCW pit pump stand epoxy painting
Decanting of Sump pit
Mist oil eliminator tray empty
Decanting of CCCW pit
Decanting WW pit
88 BT-2 damper issue rectified
Decanting of CCCW pit
Decanting from WW pit
Installation of pump in WW pit
WI pump PM
WI pump PM
DD ferrule fitting work
PM OF WASTE OIL PUMP OF OIL PUMP HOUSE
PM OF WASTE OIL PUMP OF OIL TANK AREA
Weekly PM of GT - 1
Weekly PM of GT -3
PM OF HSD GT 1 Pump A
PM OF HSD GT 1 Pump B
PM OF JACKING OIL PUMP A, GT 1
PM OF JACKING OIL PUMP B, GT 1
PM OF CLSD CYCLE COOLING WATER P#1, GT 1
PM OF CLSD CYCLE COOLING WATER P#2, GT 1
PM OF HSD GT 2Pump A
PM OF HSD GT 2Pump B
Piping arrangement for GT1 CCW pit pump
Make-up tank flange tightening
DD MCC room cleaning

DD leage check minor seakage kept under


observation
HX B cleaning
HX B cleaning
Shifting of coleaser filter
Shifting of coleaser filter
Replacement of coleaser filter
Weekly PM of GT - 2 (Aux Comp checks)
Weekly PM of GT - 1
Weekly PM of GT -3
Coalescer filter replacement.
01 Secondary fuel liquid check valve
Jacking oil pump union leakage
Took measurement of Bearing # 2 drain
Inspection of Turbine compartment
Inspection of Auxilary compartment
GT 2 HX B valve handle installation
Fabrication of support for JOP
DD leage check cleaning done
PM OF CLSD CYCLE COOLING WATER P#1, GT 1

2
3
3
2
2
2
1
3
3
3
3
3
3
3
2
1
1
1

10/10/2013
10/10/2013
10/10/2013
10/10/2013

1
2
2
1

PM OF CLSD CYCLE COOLING WATER P#2, GT 1


PM OF CLSD CYCLE COOLING WATER P#1, GT 2
PM OF CLSD CYCLE COOLING WATER P#2, GT 2
Decanting of CCW pit

Nature
CM
PM
CM
CM
CM
PM
CM
CM
CM
PM

Notification Opening date

WO openining date

PM

780002517

PM
PM
CM
CM
CM
CM

780002517

CM
HSEQ
PM
CM
PM
PM
PM
PM
PM

Housekeeping
CM
CM
PM
PM
CM
CM
PM

PM
PM
PM
CM
CM
Housekeeping
PM
PM
PM
Housekeeping
CM
Support to electrical
PM
PM
PM
CM
PM
PM
PM
PM
PM
PM
PM
PM
Housekeeping
PM
PM
PM
PM
PM
PM
CM
PM
PM
PM
Housekeeping
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM

780003245
780003245
780003245
690002948/690002949

780005203, 780005185
780005193, 780005194
780005195
780005178
780005181
780005202
780005239
780005240
780005241
780005242

PM
PM
PM
PM
PM
PM
PM
PM
PM
PM

780005332
780005333
780005231
780005232
780005233
780005234
780005237
780005238
780005235
780005236

PM
CM
Housekeeping
CM
CM
CM
CM
CM
PM
CM
PM
CM
CM
CM
CM

CM
CM
CM
CM
CM
CM
PM
CM
PM
PM
PM

690003019
690003019
690003045
690003069
690003068

PM
CM
PM
CM
CM
CM
PM
PM
PM
CM
PM
PM
CM
PM
PM
CM
CM
CM
PM
CM
CM
CM
PM
CM
PM
PM
PM
PM
CM
CM
Rain Emergency
CM
CM
CM
CM
CM

PM
PM
CM
PM

PM
PM
Housekeeping
Support to electrical
Inspection
CM
CM
CM
Support to electrical
Housekeeping
Housekeeping
Housekeeping
Housekeeping
Housekeeping
Support to electrical
CM
PM
PM
PM
PM
PM
CM
CM
CM
Housekeeping
CM
PM
CM
CM
CM
CM
CM
CM
Housekeeping
CM
CM
CM
CM
CM
CM
CM
CM
PM
PM
PM

PM
PM
CM
CM
Housekeeping
CM
CM
CM
CM
CM
PM
PM
PM
PM
PM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
Housekeeping
CM
CM
PM
PM
PM
PM
CM
PM
CM
CM
betterment
betterment
CM
CM
CM

CM
CM
CM
betterment
betterment
betterment
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
PM
PM
CM
PM
PM
betterment
CM
betterment
Housekeeping
CM
CM
CM
CM
CM
CM
PM
CM
betterment

PM
betterment
Housekeeping
Housekeeping
Housekeeping
Housekeeping
CM
Housekeeping
Housekeeping
betterment
PM
PM
PM

WO Closing date

man power deployed


Aurengzeb
Adeel, Razaq
Aurengzeb
Adeel, Razaq
Aurengzeb
Adeel
Razak, Adeel
Farrooq
Razak
Adeel

8
8
8
8
8
5
3
3
2
2

Adeel, Razaq, Aurengzeb

4 Hr

Razaq, Aurengzeb
Adeel
Adeel
Adeel, Abrar
Abrar
Adeel, Abrar

4 Hr
1 Hr
2 Hr
8 Hr
CP
8 Hr

Adeel, Farrok, Razak,


aurengzeb

8 Hr

Razzak, Farroq
Razzak

2 Hr
1 hr

Adeel, Farrok, Razak,


aurengzeb
Razzak
Razak

12 Hr
1 hr
1 Hr

Farooq ,
Farooq ,
Farooq ,
Farooq ,
Farooq ,
Farooq ,
Razzak
Farooq ,

2
2
2
2
2
2
1
3

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

1
1
3
4
4

Hr
Hr
Hr
Hr
Hr

Razak
Razak
Razak
Razak
Razak

Razzak
Razzak
Razzak
Razzak
Razzak
Razzak
Razzak

time
hr
hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

Adeel
Adeel
Adeel
Farooq

1
1
1
2
2

Hr
Hr
Hr
Hr
Hr

Adeel

5 Hr

Razak, Adeel, Aurengzeb


Razak, Aurengzeb
Razak
Adeel
Adeel, Razzak
Razak
Adeel
Farooq
Adeel,Aurengzeb
Razak
Razak
Razak/Sanower
Razak
Razak
Razak
Adeel
Adeel
Adeel
Aurengzeb
Adeel
Adeel
Adeel
Farooq
Farooq
Farooq
Razaq
Adeel
Adeel
Adeel
Razak
Razak
Aurengzeb
Aurengzeb
Aurengzeb
Razak
Razak
Razak
Razak
Razak
Razak

8 Hr
5 Hr
3 Hr
3 Hr
3 Hr
2 Hr
5 Hr
12 Hr
12 Hr
2 Hr
2 Hr
2 Hr
1 Hr
1 Hr
1 Hr
1 Hr
1 Hr
1 Hr
1 Hr
1 Hr
1 Hr
1 Hr
1 Hr
1 Hr
1 Hr
3 Hr
1 Hr
1 Hr
1 Hr
1 Hr
3 Hr
3 Hr
0.5 Hr
0.5 Hr
0.5 Hr
0.5 Hr
0.5 Hr
0.5 Hr
0.5 Hr
0.5 Hr

Razak
Razak
Razak
Razak
Razak
Razak
Adeel
Adeel
Adeel
Adeel

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5

Razak, Aurengzeb, Farooq


Farooq
Adeel
Farooq
Farooq
Aurengzeb
Razak
Razak

4
4
2
2
2
2
2
2

Razak, adeel
Razak
Aurengzeb

6 Hr
2 Hr
5 Hr

Aurangzaib

2 hr

5/5/2013 Razak,Aurangzaib
Aurangzaib
Razak

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

5 hr
1 hr
1 hr

Farooq
Aurangzaib

30 min
30 min

Aurangzaib

30 min

Aurangzaib
Aurangzaib, Aziz

30 min
30 min

Aurangzaib, Aziz

30 min

Kafeel
razak
Adeel

30 min
2 Hr
2 Hr

Farooq
Aurengzeb
Aurengzeb

2 Hr
2 Hr
2 Hr

Aurengzeb
Adeel, Razzak

2 Hr

Aurengzeb
Aurengzeb
razak
Aurengzeb
Aurengzeb
Aurengzeb
M. Razzak
M. Razzak
M. Razzak,Aurengzeb
M. Razzak
M. Razzak
M. Razzak
M. Razzak
M. Razzak
Farooq

2
2
4
2
2
2
4
4
5
3
2

Aurangzaib
Adeel
Adeel
Razak
Razak
Farooq
Razak,Aurengzeb
Razak,Aurengzeb
Razak,Aurengzeb
Farooq,Aurengzeb
Razak
Razak

Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb

Hr
Hr
Hr
Hr
Hr
Hr
Hr
hr
hr
hr
hr

Aurengzeb
Aurengzeb
Aurengzeb
Razaq
Razaq
Aurengzeb
Aurengzeb
Aurengzeb
Razaq
Razaq
Adeel
Farooq' Aurengzeb
Farooq' Aurengzeb
Farooq' Aurengzeb
Sanower/Sakhidad
Razaq
Farooq' Aurengzeb
Farooq
Farooq, Aurengzed
Farooq, Aurengzed
Farooq, Aurengzed
Razaq

2
2
1
2
2
2
3
8
2
5
5
5

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

4
4
4
4
4

Hr
Hr
Hr
Hr
Hr

Aurengzeb, razaq
Aurengzeb
Aurengzeb
Razaq
Razaq, Adeel
Razaq
Razaq, Aurengzeb
Farooq
Farooq
Farooq
Farooq

2
2
2
2
4
2
6
2
2
2
2

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

Aurengzeb
Razak
Razak
Razak

2
2
2
2

Hr
Hr
Hr
Hr

Aurengzeb
Razzak
A Noor

5 Hr

Razak

3 Hr

Adeel
Adeel
Farroq
Aurengzeb
Razak
Razak
Razak
Razak
Razak
Razak
Aurengzeb
Aurengzeb
Razak

3
2
1
3
3
3
3

Hr
Hr
Hr
Hr
Hr
Hr
Hr

1
1
3
3
1

Hr
Hr
Hr
Hr
Hr

Razak

1 Hr

Razak
Razak
Razak

1 Hr
1 Hr
1 Hr

Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb
Farooq
Farooq
Farooq
Farooq
Razak
Razak
Razak
Adeel, Razak
Adeel
Adeel
Adeel
Adeel

1
1
1
1
1
2
2
2
2
2
2
1
1
1
5
5
1
1
1

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

Adeel
Adeel
Adeel
Aurengzeb

1
1
1
5

Hr
Hr
Hr
Hr

Aurengzeb
Razak
Farooq
Aurengzeb
Aurengzeb

5
5
5
5
2

Hr
Hr
Hr
Hr
Hr

Aurengzeb

2 Hr

Aurengzeb

2 Hr

Razak

2 Hr

Razak
Razak
Razak
Razak
Razak
Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb
Adeel
Adeel

2
2
2
2
2
2
2
2
2
1
1

Adeel
Farooq
Farooq

3 Hr
5 Hr
5 Hr

Aurengzeb
Farooq
Aurengzeb

5 Hr
5 Hr
1 Hr

Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb
Razak
Aurengzeb
Razak
Aurengzeb, Razak

3
2
2
2
2
2
2
2
2
2
8

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

Farooq
Razak
Farooq
Farooq
Farooq
Farooq
Aurengzeb
Aurengzeb
Aurengzeb, Farooq
Aurengzeb, Farooq
Farooq
Farooq
Farooq

5
5
2
2
2
2
4
1
5
5
2
2
2

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

Aurengzeb
Aurengzeb
Aurengzeb

1
1
1
1
1
1
2
2
1

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

Aurengzeb,Razak

2 Hr

Aurengzeb,Farooq
Aurengzeb,Farooq
Aurengzeb,Farooq

2 Hr
2 Hr
5 Hr

Aurengzeb
Aurengzeb
Farooq
Farooq

3
2
2
1

Razak(80012039)
Razak(80012039)
Razak(80012039)
Farroq(15571)
Farroq(15571)
Farroq(15571)

Hr
Hr
Hr
Hr

Farooq
Farooq
Farooq
Farooq

1
1
1
1

Hr
Hr
Hr
Hr

status/cause of unattended work


Complete
Complete
Complete
Complete
Complete
Complete
In progress
Complete
Complete
Complete
In progress
Complete
Complete
Complete
Complete
On hold till Monday
Complete
Complete
Complete
Done

Done
Done
Complete
In progress
Complete
Complete
Complete
Complete
In progress
Done

Done
Done
In progress
In progress
Done

Done
Done
Done
Done
Done
In progress
In progress
Done
Done
Done
Done
Done
In progress
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
In progress
done
done
done
done
Done
Done
Done
Done

done
Done
Done
In progress
Done
Done
Done
Done
Done
Done
Done
Done

Done
Done
Done
Done

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
done
done
done
done
done
done

done
done
done
done
done
done
done
done
done
done
done
done
done
done

done
done
done
done

done
done
done
done
done
done
done
done
done
done
done
done
done
done
inprogress
inprogress
done
done
done

done
done
done
inprogress
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
In Progress

done
DOne

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
In Progress

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done

S.No
3/19/2013
3/19/2013
3/20/2013
3/20/2013
3/22/2013
3/22/2013
3/23/2013
3/26/2013
3/27/2013
3/27/2013
3/28/2013
3/30/2013
4/2/2013
4/4/2013
4/4/2013
4/4/2013
4/5/2013
4/6/2013
4/6/2013
4/8/2013
4/9/2013
4/11/2013
4/11/2013
4/11/2013
4/12/2013
4/12/2013
4/12/2013
4/13/2013
4/15/2013
4/16/2013
4/16/2013
4/16/2013
4/17/2013
4/18/2013
4/19/2013
4/19/2013
4/20/2013
4/20/2013
4/22/2013
4/24/2013
4/24/2013
4/24/2013
4/25/2013

NG#
CCW

CCW
1,2,3
1,3
CCW
1,2,3
CCW
CCW
1
3
CCW

CCW
NGC 1
NGC 3
CCW
CCW
NG 1
NG 3
NG area
CCW

CCW
NG 3
NGC
NG 3
NG 2
NG area
CCW
CCW
CCW
NGC
NGC

4/27/2013
4/27/2013
4/30/2013
4/30/2013
4/30/2013
4/30/2013
4/30/2013
5/4/2013
5/4/2013
5/5/2013
5/6/2013
5/7/2013
5/7/2013
5/8/2013
5/8/2013
5/8/2013
5/8/2013
5/8/2013
5/9/2013
5/10/2013
5/10/2013
5/12/2013
5/12/2013
5/12/2013
5/13/2013
5/13/2013
5/14/2013
5/14/2013
5/15/2013
5/15/2013
5/15/2013
5/15/2013
5/15/2013
5/16/2013
5/20/2013
5/21/2013
5/21/2013
5/21/2013
5/22/2013
5/23/2013
5/24/2013
5/24/2013
5/27/2013
5/28/2013
5/28/2013
5/29/2013
5/29/2013
5/29/2013

CCW
CCW
CCW
1
3
CCW
N2 station
CCW
1
CCW
CCW
1,2,3 CCW
NGC 2
CCW
NGC 1,2,3
NGC 1,2,3
CCW
NGC 1,2,3

NGC 1,2,3
NGC 1
NGC 2
NGC 3
NGC1,3
NGC 2
NGC 3

NGC
NGC
NGC
NGC
NGC
NGC
NGC

NG CCW
NG1,2
NG
NG CCW
NG CCW
NG 1

5/29/2013
5/30/2013
5/31/2013
5/31/2013
6/1/2013
6/1/2013
6/2/2013
6/4/2013
6/4/2013
5/31/2013
6/4/2013
6/5/2013
6/6/2013
6/7/2013
6/7/2013
6/8/2013
6/8/2013
6/9/2013
6/9/2013
6/9/2013
6/10/2013
6/10/2013
6/10/2013
6/10/2013
6/11/2013
6/11/2013
6/12/2013
6/12/2013
6/13/2013
6/13/2013
6/14/2013
6/14/2013
6/14/2013
6/15/2013
6/15/2013
6/15/2013
6/15/2013
6/17/2013
6/17/2013
6/18/2013
6/18/2013
6/18/2013
6/19/2013
6/19/2013
6/20/2013
6/24/2013
6/24/2013
6/25/2013

NG
NG CCW
NGC 3
NGC
NG CCW
NG CCW
NG CCW
NG
NG
NGC

NG 2

NG
NG CCW
NG CCW
Air Comp
NG3
NG CCW
NG3
NG CCW
NG CCW
NG 3
NG CCW
NG CCW
NG CCW
NG CCW
NG CCW
NG
NG CCW
1
1
2,3
NG CCW

6/25/2013
6/26/2013
6/26/2013
6/26/2013
6/27/2013
6/27/2013
6/27/2013
6/28/2013
6/28/2013
6/28/2013
6/29/2013
6/29/2013
7/2/2013
7/3/2013
7/4/2013
7/11/2013
7/12/2013
7/13/2013
7/13/2013
7/16/2013
7/18/2013
7/24/2013
7/25/2013
7/25/2013
7/25/2013
7/27/2013
7/29/2013
8/12/2013
8/13/2013
8/12/2013
8/15/2013
8/15/2013
8/15/2013
8/20/2013
8/15/2013
8/20/2013
8/22/2013
8/22/2013
8/23/2013
8/27/2013
8/27/2013
8/28/2013
8/28/2013
8/29/2013
8/29/2013
8/28/2013
8/30/2013
8/30/2013

NG CCW
1
3
CCW
3
PM
3
1
CCW
CCW
CCW
3
1,2,3
1,2,3
1,2,3
1,2,3
CCW
CCW
CCW
1,2,3

SAC
IAC
N2
1
CCW
2
1
CCW

3
1
NG
NG
NG
NG-3
NG
NG
IAC
NG-3
NG-3
NGC

NGC
9/2/2013
IAC
9/3/2013
NG
9/3/2013
NG-3
9/3/2013
NG-3
9/5/2013
1,2,3
9/5/2013
NG
9/6/2013
IAC/SAC
9/6/2013
NG CCCW
9/7/2013
IAC-2
9/9/2013
9/9/2013
1,2,3
9/16/2013
NGC
9/17/2013
NGC
9/18/2013
1,2,3
9/20/2013
1,2,3
9/20/2013
N2
9/23/2013 Ng enclosure
9/25/2013
1,2,3
9/29/2013
NG CCCW
NG CCCW
9/30/2013
10/1/2013 Ng enclosure
3
10/2/2013
NG CCCW
10/8/2013
3
10/8/2013
2,3
10/10/2013
1
10/10/2013

Job Description
HX B FRP coating
NG Housekeeping and Pump PM
CCW Pump PM
Lube oil pump NGC 1 & 3
HX B FRP coating
Enclosure Cleaning Of NGC
Enclosure Cleaning Of NGC with ops(Alamgir)
NG OUTLET FILTER-2 CLEANING / REPLACING
HX A strainer cleaning
Housekeeping Of NGC
HX A FRP
HX B Stainer Cleaning
Housekeeping of NG station
2 drum lube oil top up
2 drum lube oil top up
HX A FRP coating
NG & SSGC area Housekeeping
PM of NG gas valves
NG Housekeeping
NG Housekeeping material sagregation and disposal
HX A strainer cleaning
Pumps PM
Pumps PM
HX A FRP coating
HX A FRP coating
PM of NGC LO Pumps
PM of NGC LO Pumps
Houskeeping
HX A FRP coating
NG area housekeeping
NGC #1,#2,#3 enclosure housekeeping
Cleaning of CCW HX B strainer
Hosekeeing of NG station
Lube oil filteration skid
Lube oil pump NGC 1 & 3
Lube oil filteration skid
Lube oil filteration skid
Housekeeping/Cleaning vendor
Measurement and fabrication of isolating valve platform
HX CCW A strainer
Installation of platform
PM of pump
PM of pump

HX CCW B strainer
HX CCW B
PM of pump
PM of pump
PM of pump
HX CCW A
Lubrication of drain valve
NG CCCW HX B strainer cleaning
Lube oil disposal and cleaning
NG CCCW HX A strainer cleaning
NG CCCW HX B strainer cleaning
NGC area rotary equipment
INstallation of emergency push botton
Ng hx B strainer cleaning also work on cccw outlet valve
Take measurement of trays for NG compressors
NG spilled oil cleaning and general house keeping
NG HX B strainer cleaning
NG station housekeeping done
PM of NG system valves
NG spilled oil cleaning and general house keeping
NG oil collecting tray installation
Cleaning of CCW HX B strainer
Cleaning of CCW HX A strainer
NG oil collecting tray installation
NG station housekeeping done
Installation of flushing skid and taken in service
Cleaning of separation tank
Installation of flushing skid
Floor housekeeping & enclosure cleaning
Separator tank cleaning
Flushing skid Installation
SSGC safety valve leakage finding
NGC area rotary equipment
Floor housekeeping & enclosure cleaning
Floor housekeeping & enclosure cleaning
PM of rotary equipments
Floor housekeeping & enclosure cleaning
PM of Valves
NG final discharge auto vent valve inspection for passing issue.
Installation of blinds on NG Discharge line, vent and drain
NGC 2 separator tank cleaning
Installation of blinds on NG Discharge line, vent and drain
Cleaning of HX B
Vapor extractor fan commissioning and inspection
Installation of blinds on NG Discharge line, vent and drain
Cleaning of HX A
Valve Gear Box installation
Mist eleminator Leakage ractification

PM rotary equipment
Valve Gear Box installation
Cleaning and leakage identification
Housekeeping as per WSA
Cleaning of HX B
Cleaning of HX A
Cleaning of HX A
PM rotary equipment
Installation of blinds on NG Discharge line, vent and drain
Housekeeping
NG rotary equipment PM
Installation of blinds on NG Discharge line, vent and drain
NG CCCW Valves PM (greasing)
NG CCCW Valves PM (greasing)
Installation of blinds on NG Discharge line, vent and drain
NG CCCW Valves PM (greasing)
NG housekeeping and cleaning
NG CCCW HX B strainer cleaning
Greasing of NG valves
Removing of scaffolding from NGC#2
Greasing of NG valves
NG housekeeping and cleaning
LEL Checking on drain & vent
oil tray installation
LEL Checking on drain & vent
LEL Checking on drain & vent
Installation of submersible pump
NG CCCW HX A strainer cleaning
NG CCCW HX A strainer cleaning
PM of Inst. & service air compressor
Cleaning with karcher pump
NG CCCW HX A strainer cleaning
Lube oil leakage cleaning
NG CCCW HX A strainer cleaning
NG CCCW HX B strainer cleaning
Cleaning of separation tank with high pressure pump
Valve handed over to workshop for fabrication of HX washing
NG CCCW HX A strainer cleaning
NG CCCW HX B strainer cleaning
NG area oil cleaning and housekeeping
NG CCCW HX A
NG CCCW HX B
Cleaning with high pressure pump
NG CCCW HX A
Cleaning with high pressure pump
Cleaning with high pressure pump
Cleaning enclosure
NG CCCW HX A

NG CCCW HX B
Cleaning with high pressure pump
Separator tank cleaning
NG CCCW HX A
CCCW HX B strainer cleaning
NG rotary equipment PM
Separator tank cleaning
Cleaning with high pressure pump
CCW inlet valve gear box bush installation
CCCW HX B strainer cleaning
CCCW HX B strainer cleaning
Housekeeping
Housekeeping
Housekeeping
Housekeeping
Housekeeping
CCCW HX B strainer cleaning
CCCW HX B strainer cleaning
CCCW HX A strainer cleaning
Housekeeping
N2 trolley fitting work in progress
NG N2 tank drain PM
NG N2 tank drain PM
SAC 2
IAC 1
Trolly installtion work
Barrier seal drain line
House keeping in NG enclosure
CCCW HX A strainer cleaning
House keeping in NG enclosure
Lube oil top up lVl 0.48
Lube oil top up lVl 0.5
Working N2 trolly
CCCW HX A strainer cleaning
Working N2 trolly
Housekeeping of NG Area
Filter selection valve leakage rectification
working N2 trolly
CCW valve PM
CCW valve PM
Painting work at separation tank
Surface Preparetion of LP Cooler for painting
CCW valve PM
CCCW HX B strainer cleaning
Cleaning of air inlet filter IAC 2
Surface Preparetion of HP Cooler for painting
Surface Preparetion of LP Cooler for painting
House keeping in NG enclosure

House keeping in NG enclosure


Cooler inspection
Housekeeping
Surface Preparetion of HP Cooler cleaning
Painting work at HP Cooler cleaning
Lube oil skid cleaning
Housekeeping
Material issuence for IAC/SAC PM
Removal of expanssion tank valve
Relacement of filters (Seperator, lube oil)and oil replacement
Lube oil skid cleaning
Housekeeping
Housekeeping
Enclosure cleaning
Enclosure cleaning
Bolts cleaning greasing
Housekeeping
Gernel Housekeeping
HX B cleaning
HX A cleaning
Housekeeping
N2 Press check of NG3-LO Acc (All 3 accumulators)
HX A cleaning
Shifting of purifier from NG1 to NG3
Enclosure cleaning
Painting Job

Nature
CM
PM
PM
PM
CM

CM
PM

Notification Opening date

690002823

CM
CM
Housekeeping
CM
CM
Housekeeping
PM
Housekeeping
Housekeeping
CM

PM
PM

Housekeeping
Housekeeping
CM
Housekeeping
Plant
improvement
PM
Plant
improvement
Plant
improvement
Housekeeping
Plant
improvement
CM
WSA
PM
PM

790002296

WO openining date

CM
CM
PM
PM
PM
CM
CM
CM
CM
CM
CM
PM
CM
CM
CM
CM
CM
PM

CM

PM
PM

PM
PM
PM
PM
PM
PM
CM
CM
CM
CM
CM
PM
CM
CM
CM
CM

690002958

PM
CM
CM
Housekeeping
CM
CM
CM
PM
CM
Housekeeping
PM
PM
PM
CM
PM
PM
CM
PM
CM
PM
PM
CM
PM
CM
CM
Rain Emergency
CM
CM
CM
Housekeeping
CM
Housekeeping
CM
CM
Housekeeping
betterment

cleaning
cleaning
cleaning
cleaning
cleaning
cleaning
cleaning
cleaning

cleaning
cleaning
cleaning
cleaning
PM
PM
cleaning
cleaning
CM
CM
CM
cleaning
cleaning
cleaning
cleaning
cleaning
cleaning
cleaning
cleaning
cleaning
CM
PM
PM
PM
PM
PM
CM
cleaning
cleaning
cleaning
CM
CM
CM
CM
CM
CM
CM
CM
PM
PM
PM
PM
PM
CM
CM
Housekeeping
Housekeeping
Housekeeping

Housekeeping
CM
Housekeeping
Housekeeping
Housekeeping
Housekeeping
Housekeeping
PM
PM
PM
Housekeeping
Housekeeping
Housekeeping
Housekeeping
Housekeeping
Housekeeping
Housekeeping
Housekeeping
CM
Housekeeping
CM
Housekeeping
Housekeeping

WO Closing date

man power deployed


Aurengzeb
Adeel
Abrar
Abrar
Aurengzeb
Farroq
Razak
Razak, Adeel, Aurangzeb
Razak, Aurengzeb
Aurengzeb
Aurengzeb
Farroq
Adeel
Razak, Adeel
Razak, Adeel

time
8 Hr
2 Hr
4 Hr
3 Hr
5 Hr
5 Hr
3 hr
3 hr
2 Hr
2 Hr
3 Hr
2 Hr
3 Hr
3 Hr
3 Hr

Adeel
Aurengzeb
Aurengzeb
Aurengzeb
RazaK
RazaK
RazaK
Aurengzeb
Aurengzeb, Razaque
RazaK
RazaK
RazaK
Aurengzeb
Adeel
Adeel

2 Hr
2 Hr
2 Hr
3 Hr
2 Hr
2 Hr
2 Hr
8 Hr
8 Hr
2 Hr
2Hr
4 Hr
8 Hr
2 Hr
2 Hr

Aurengzeb

1 Hr

Aurengzeb
Aurengzeb

8 Hr
2 Hr

Aurengzeb

3 Hr

Aurengzeb

2 Hr

Aurengzeb
Aurengzeb,
Aurengzeb,
Aurengzeb,
Aurengzeb,

3
3
3
3
4

Farooq
Farooq
Farooq
Farooq

Hr
Hr
Hr
Hr
Hr

Aurengzeb, Adeel
Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb
Adeel
Adeel
Aurangzaib
Farooq
Aziz
adeel
Aurengzeb

4 Hr
5 Hr
0.5 Hr
0.5 Hr
0.5 Hr
0.5 Hr
0.5 Hr
1 hr
1 hr
30 min
1 hr
3 hr

Razak
Razak
Farooq
Farooq
Farooq
Aurengzeb
Aurengzeb
Aurengzeb
Razak
Aurangzaib
Razzak
Razzak
Razzak

5
2
1
2
4
2
2
3
5

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

5
8
8
8
1

Hr
Hr
hr
hr
hr

Aurangzaib
Aurangzaib
Razak
Razak
Razak
M Razzaq
Aurangzaib
Razak
Aurangzaib
Razak
Razak
Razak
Razak
Razak
Razak

1 hr
3 hr
3 hr

Razak
Razak
Razak
Razak
Razak, Farooq
Razak, Farooq
Farooq
Aurangzaib
Farooq
Farooq

Aurangzaib
Aurangzaib
Razak
Aurangzaib
Aurangzaib
Adeel

Aurangzaib
Aurangzaib
Aurangzaib
Aurangzaib
Farooq
Farooq
Razak,Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb
Razak
Razak
Razak
Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb

Razak
Razak
Aurengzeb
Aurengzeb

3
3
6
6
2
2
2
3
4
2

hr
hr
hr
hr
hr
hr
hr
hr
hr
hr

Aurengzeb
Razak
Razak
Aurengzeb
Aurengzeb
Aurengzeb
Razak
Razak
Razak
Farooq
Farooq
Farooq
Adeel
Razak
Aurangzeb
Aurangzeb
Farooq
Farooq
Aurangzeb
Razak
Adeel
Aurengzeb
Aurengzeb
Aurengzeb
Aurengzeb
Adeel
Aurengzeb
Razak
Razak
Razak
Razak
Razak
Contractor
Aurengzeb
Contractor
Aurengzeb
Razak
Razak
Farooq
Farooq
Farooq
Adeel
Adeel
Adeel
Aurengzeb
Adeel
Farooq
Farooq

4
2
3
2
2
2
2
2
2
2
3
8
8
4
4
4
2
2
2
2
1
1
1
1
3
3
3
2
3
3
3
3
3
8
3
3
3
2
2
2
2
2
2
2
2
2
2

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

Farooq
Farooq
Farooq
Farooq
Farooq
Farooq
Farooq
Aurengzeb
Aurengzeb
Aurengzeb, Razak
Farooq
Farooq
Farooq
Farooq
Farooq
Adeel
FArooq
FArooq

4
4
4
4
4
4
4
2
2
5
2
2
2
2
2
2
3
3

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

FArooq
Farooq

2 Hr
2 Hr

Farooq
Farooq
Farooq
Farooq

2
2
2
2

Hr
Hr
Hr
Hr

status/cause of unattended work


In progress
In progress
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
In progress
Complete
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
In progress
In progress
Done
Done
Done
In progress
Done
Done
Done
In progress
Done
Done
Done
In progress
Done
Done
In progress
Done

Done
Done
Done
Done
Done
Done
Done
done
done
done
done
done

In progress
In progress
Done
Done
Done
Done
Done
In progress
Done
in progress
done
done
done
in progress
in progress
Done
in progress
Done
Done
in progress

Done
Done
in progress
Done
in progress
in progress

Done
Done
in progress
Done
Done
Done
Done
Done
in progress
Done

in progress
in progress
done
Done
done

in progress
in progress
in progress
in progress
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
in progress
Done

In progress
In progress
Done
Done

Done
In progress
In progress
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
In progress
In progress
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
done
done
done
done
done
done
done
done
In progress
In progress

In progress
In progress
In progress
In progress
In progress
Done
Done
Done
Done
Done
Done
In progress
In progress
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done

S.No
18/03/2013
3/20/2013
3/20/2013
3/22/2013
3/24/2013
3/24/2013
3/24/2013
3/25/2013
3/26/2013
3/28/2013
3/28/2013
3/29/2013
3/30/2013
4/1/2013
4/1/2013
4/1/2013
4/5/2013
4/10/2013
4/12/2013
4/15/2013
4/16/2013
4/17/2013
4/17/2013
4/18/2013
4/18/2013
4/19/2013
4/20/2013
4/22/2013
4/23/2013
4/23/2013
4/24/2013
4/25/2013
4/25/2013
4/25/2013
4/26/2013
4/26/2013
4/26/2013
4/27/2013
4/29/2013
4/29/2013
5/2/2013
5/6/2013
5/6/2013

Chiller #
GIS
CCR
CCR
CCR
CCR
CCR
Site office
Admin Building
CCR
GIS
BSDG
BSDG
GT 3
Admin Building
CCR
ST
ST
ST
HRSG
Store
FCU
Ractifier Room
Store
Chiller 2
NG
CCR
Intake Container
WTP
CO2 container
CCR
CCR
CEMS
Hypo generation
room

OMS container
Chiller 2
BSDG
BSDG
WTP
CO2 container
GIS

5/7/2013
5/10/2013
5/13/2013
5/14/2013
5/16/2013
5/16/2013
5/18/2013
5/20/2013
5/20/2013
5/20/2013
5/21/2013
5/22/2013
5/22/2013
5/23/2013
5/24/2013
5/24/2013
5/27/2013
5/28/2013
5/29/2013
5/29/2013
5/30/2013
5/30/2013
5/31/2013
5/31/2013
6/6/2013
6/8/2013
6/8/2013
6/8/2013
6/8/2013
6/10/2013
6/10/2013
6/10/2013
6/11/2013
6/11/2013
6/11/2013
6/12/2013
6/12/2013
6/13/2013
6/14/2013
6/18/2013
6/18/2013
6/18/2013
6/19/2013
6/20/2013
6/24/2013

CO2 container
CCR Chiller
Admin Building
CCR Chiller #3
CCR
CCR Main AHU

CCR Chiller #2
ST Excitation

GT#1

6/25/2013
6/25/2013
6/25/2013
6/26/2013
6/26/2013
6/27/2013
6/27/2013
6/28/2013
7/2/2013
7/3/2013
7/3/2013
7/4/2013
7/8/2013
7/8/2013
7/9/2013
7/11/2013
7/11/2013
7/12/2013
7/15/2013
7/15/2013
7/16/2013
7/22/2013
7/23/2013
7/23/2013
7/25/2013
7/25/2013
7/26/2013
7/27/2013
7/29/2013
7/27/2013
8/12/2013
8/13/2013
8/15/2013
8/15/2013
8/16/2013
8/16/2013
8/16/2013
8/20/2013
8/20/2013
8/22/2013
8/22/2013
8/23/2013
8/23/2013
8/26/2013
8/26/2013

WTP
CO2 container
BSDG
WTP
WTP
Store & Workshop
GIS
GIS
FF house
Sea Water Intake
BSDG
WTP
WTP
Site office
FF house
DD
CCR
CEMS
ST Excitation
Intake
CCR

GT 1
GT 2
NG LCR
CCR AHU

Store
PECC
Store
CCR

8/26/2013
8/27/2013
8/28/2013
8/29/2013
8/29/2013
8/26/2013
8/30/2013
8/31/2013
8/31/2013
8/31/2013
9/2/2013
9/2/2013
9/2/2013
9/4/2013
9/4/2013
9/4/2013
9/5/2013
9/5/2013
9/6/2013
9/6/2013
9/6/2013
9/7/2013
9/9/2013
9/9/2013
9/16/2013
9/16/2013
9/16/2013
9/16/2013
9/17/2013
9/18/2013
9/19/2013
9/19/2013
9/19/2013
9/20/2013
9/23/2013
9/23/2013
9/24/2013
9/24/2013
9/25/2013
9/25/2013
9/29/2013
9/29/2013
9/30/2013
10/1/2013
10/1/2013

CCR
GT Hall
GT Hall
CCR
OMS container
CCR
CCR
CCR
CCR
Intake
WTP

CCR
CCR
CCR
IAD-1
SAD-1
CCR
CCR

NGC LCR
WTP
CCR
CCR
CCR
CCR

Admin Building
Main Store
1,2,3
CCR

IAD&SAD

10/1/2013
10/1/2013
10/2/2013
10/2/2013
10/8/2013
10/8/2013
10/8/2013
10/8/2013
10/10/2013
10/10/2013

Tool

Job Description
PM of A/C
Gas Filling Chiler No 1
Gas Filling Chiler No 2
FCU servicing
CCR HVAC system PMs.
CCR HVAC lines insulation work at ground floor.
Site office splits units servicing and gas charging.
Hydro testing of fire water line
CCR HVAC lines insulation work at ground floor.
MRV outdoor card check
Breaker room unit leakage
Removal of damaged drain tray
Repair of drain pipe GT#3 PECC
Line layout checking
Housekeeping HVAC room
Housekeeping HVAC room
Checking of sampling room floor mounted air conditioner
Preparing of material for FCU in sampling room
Replacement of HRSG 1 CEMS room outdoor unit
Replacement of split air conditioner
Serviceing of ST Hall sampling room FCU
Breaker reset
Leakge from indoor unit attended
Compressor pressure gauge leakage rectify
A/C servicing
Restoration of HVAC system CCR
Installation of A/C unit in container
Admin office A/C indoor unit restoration
PM of A/C
Chiller # 2 inlet water thermocouple well fabrication
Chiller # 1 taken inservice with help of I&C
CEMS # 1,2,3 A/C.
CHECK RECTIFIER ROOM A/C JOB
Daily Routine Checks
Daily Routine Checks
Installation of A/C unit in OMS container
Installation of thermo well
AC not working in BSDG room
Removal Of Fan motor
Daily Routine Checks
Restoration of HVAC system
Gt 1 window unit inspection
Restoration of system

Gt 1 window unit inspection


Arrangement of pump for condenser cleaning
Hydro testing of chilled water line
Chiller condenser
Cutting of Poles extending from floor in AHU room
Installation of pulley cone
identification of HVAC issues and its cost estimation
NG LCR HVAC issue rectification
NG LCR gas makeup
Chiller condenser cleaning
Diagnosis of A/C of ST excitation room
GT-2 CO2 CONTAINER AC
HYDROGEN PLANT HMI ROOM AC
Instrument air 1 drier maintenance
Instrument air dryer #1 maintenance
Chiller compressor cleaning
ST Excitation room A/C
Hypo room ac rectification
ST Excitation room A/C
Hypo room ac rectification compressor fault identification
GT-1 CO2 CONTAINER AC
GT-2 CO2 CONTAINER AC
A/C breaker problem resolved with elec
PM of N2 dryer
ST Excitation room A/C
CCR Chiller #1 PLC trouble shooting (I&C scope)
CCR Chiller #3 fault finding and rectification (Motor safety relay to be replaced)
Service air dryer in air compressor room tripping rectification
Instrument and Service air dryer PM
Fixing of A/C of OMS
Housekeeping HVAC room
Removal of nitrogen cylinder
Attended complain of GIS building
Attended complain at site office
Arrangement of pump for condenser cleaning at GIS
Arrangement of pump for condenser cleaning at GIS
Dismantleing of Chilled water pump # 2 at CCR
Cleaning of Hypo unit by karcher pump
Installation of Chilled water pump # 2 at CCR
PEECC AC drain point leakage rectification
Chilled water pump valve inspection
NG control room AC fault rectification
Hypo A/C taken in service
NG MCC room AC fixing
NG MCC room AC fixing

Site office splits units servicing and gas charging.


H2 HMI A/C
GIS building
H2 HMI A/C
Inspection of SA dryer
NG HMI A/C
Site office out door unit replacement
Servicing of WTP HVAC
VFD Room HVAC cooling issue
repair of CO2 container A/C
Working on LCR room
VFD Room installation of A/C from CCR
Drain installation
Drain installation
Servicing of GIS HVAC
repair of CO2 container A/C
reset of HVAC system
Installation of drain pipe
Installation of drain tray
repair of VFD room
Routine checks of HVAC
Repair of VFD room
Site office GE CPM room AC fixing
FF AC unit rectification work
PM of DD A/C
0.0 M & 4.5 M
PM of CEMS A/C on GT 1,2,3
PM of st excitation room
PM of MCC room
PM of MCC room
Routine checks of HVAC
Material arrangment for FCU installation
Routine checks of HVAC
Complanit of Shakeel Sb room A/C
Complanit of Shakeel Sb room A/C
CO2 container A/C installation
CO2 container A/C installation
MCC room outdoor unit condesor motor replaced
reset of HVAC system
Routine checks of HVAC
WTP HVAC A/C cleaning
PM of A/C
PM of A/C
Check split A/C
AHU on manual

FCU installation in I&C store


A/C installation in GT Crane
A/C installation in GT Crane
AHU on manual
Installation of A/C
FCU installation in I&C store
AHU on manual
Housekeeping HVAC room
AHU on manual
Complanit of BOP
Complanit of WTP CR
AHU on manual(Wirring Diagram)
Routine checks of HVAC
Routine checks of HVAC
AHU on manual(Wirring Diagram)
Testing of hydro jetting pump
AHU on manual
Routine checks of HVAC
AHU on manual
PM an filter replacement
PM an filter replacement
AHU on manual
FCU installation in I&C store
Routine checks of HVAC
Routine checks of HVAC
Inspection of unit
PM of office A/C
FCU installation in I&C store
FCU installation in I&C store
FCU installation in I&C store
AHU B taken in service
Routine checks of HVAC
Routine checks of HVAC
Routine checks of HVAC
Routine checks of HVAC
AHU inspection
Routine checks of HVAC
Indoor unit servicing
Routine checks of HVAC
PECC A/C PM
Routine checks of HVAC
Cleaning of AHU
Routine checks of HVAC
Routine checks of HVAC
Cleaning of IA & SA Dryer filter

Tool listing
Arrangement for brazing set
Brazzing of water cooler evaporator
Routine checks of HVAC
Routine checks of HVAC
Inspection of CEMS room GT 1 A/C
Inspection of site office split unit
GIS building HVAC system restored
Routine checks of HVAC
Inspection of site office split unit

Nature
PM
PM
PM
PM
PM
CM
PM

Notification Opening date

CM
CM
CM
CM
CM
PM
PM
PM
CM
CM

CM
CM
CM
PM
CM
Betterment
CM
PM
CM
Betterment
PM
CM
PM
PM
CM
CM
CM
PM
CM
CM
CM

690002939
690002940

WO openining date

CM
PM
PM

CM
CM
PM
CM

CM
CM
PM
CM
CM

CM
PM
CM
CM
CM
CM
PM
PM
PM
PM
CM
CM
PM
PM
CM
PM
PM
CM
CM
CM
CM
CM

CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
PM
CM
CM
CM
CM
CM
PM
CM
CM
CM
CM
CM
CM
CM
PM
PM
PM
Betterment
PM
CM
CM
CM
CM
CM
CM
PM
PM
PM
PM
CM
Betterment

Betterment
Betterment
Betterment
Betterment
Betterment
Betterment
Betterment
Housekeeping
Betterment
CM
CM
Betterment

Betterment
PM
PM
Betterment
Betterment
Betterment
Betterment
CM
PM
Betterment
Betterment
Betterment
Betterment
Betterment
Betterment
Betterment
Project

PM

PM
CM
CM
CM
PM
CM

WO Closing date

man power deployed


Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Aftab, Ilyas
Aftab, Ilyas
Aftab, Ilyas
Nadeem, Rashid
Aftab, Ilyas
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem
Nadeem
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid

time
8 hr
4 hr
4 hr
5 hr
2 hr
2 hr
2 hr
2 hr
6 hr
4 Hr
1 Hr
3 Hr
2 Hr
3 Hr
1 Hr
1 Hr
2 Hr
3 Hr
8 Hr
6 Hr
6 Hr
2 Hr
2 Hr
6 Hr
2 Hr
3 Hr
8 Hr
8 Hr
2 Hr
2 Hr
2 Hr
3 Hr

status/cause of unattended work


Complete
Complete
Complete
Complete
Complete
In Progress
Complete
In Progress
In Progress
Complete
Complete
Complete
Complete
Complete
Complete
Complete
In Progress
Complete
Complete

Nadeem, Rashid

2 Hr

Complete

Nadeem,
Nadeem,
Nadeem,
Nadeem,
Nadeem
Nadeem,
Nadeem,
Nadeem,
Nadeem,
Nadeem,

2
2
2
2
3
3
2
3
3
3

Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
In Progress
Complete

Rashid
Rashid
Rashid
Rashid
Rashid
Rashid
Rashid
Rashid
Rashid

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
In Progress
Complete
Complete

5/15/2013

5/15/2013

Nadeem,
Nadeem,
Nadeem,
Nadeem,

Rashid
Rashid
Rashid
Rashid

Nadeem
Nadeem
Nadeem, Rashid
Nadeem, Rashid
Rashid
Nadeem
Nadeem, Rashid
Nadeem Rashid
Rashid
Nadeem Rashid
Nadeem Rashid
Nadeem
Nadeem
Rashid
Rashid
Nadeem Rashid
Nadeem Rashid
Nadeem
Rashid
Rashid
Rashid
Rashid
Nadeem
Rashid
Rashid
Rashid
Nadeem
Nadeem
Nadeem
Rashid, Razaq
Rashid, Nadeem
Nadeem
Nadeem
Nadeem
Nadeem
Nadeem
Nadeem

3 Hr
3 Hr
3 Hr
12 Hr

In Progress
Complete
Complete
Complete
Complete
complete

2
2
8
8
2
3
4
4
6
6

complete
complete
Complete
In progress
Done
Done
In progress
Completed
completed
In progress
In progress
In progress
In progress
Done
Done
Done
Done
In progress
done
In progress
done
done
done
done
done
done
done
done
done
done
In progress
done

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
hr
hr

3 hr
3
3
4
2
4

Hr
Hr
Hr
Hr
Hr

done
done
done
In progress
Done

Nadeem
Rashid
Rashid, Rashid
Rashid
Rashid
Nadeem
Rashid
Rashid,Nadeem
Rashid,Nadeem
Nadeem
Nadeem
Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Aurengzeb
Rashid, Nadeem
Rashid, Nadeem
Rashid, Nadeem
Rashid, Nadeem
Rashid, Nadeem
Nadeem
Rashid
Rashid
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem

8
3
3
3
8
8
8
8
8
2
2
8
4
1
4
4
4
4
5

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

5
5
5
5
2
3
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

Done
In progress
Done
Done
Done
Done
Done
In progress
In progress
In progress
In progress
In progress
Done
Done
In progress
In progress
Done
In progress
Done
Done
Done
Done
done
done
done
done
done
done
done
done
Done
In progress
In progress
In progress
Done
Done
Done
done
done
done
done
done
done
done
done

Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid
Rashid
Rashid
Rashid
Rashid
Rashid
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid,Nadeem
Rashid
Rashid
Nadeem
Nadeem
Nadeem
Nadeem
Rashid
Nadeem
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid
Nadeem, Rashid

4
4
4
6
2
4
6
4
4
2
4
3
3
1
3
1
3
3
3
3
3
3
3
3
3
3
3
3
8
8
2
2
2
2
3
4

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

1 Hr
5 Hr

Done
Done

Nadeem
Nadeem
Nadeem

1 Hr
1 Hr
2 Hr

Done
Done
Done

done
In progress
done
In progress
done
In progress
In progress
In progress
In progress
In progress
Done
In progress
In progress
Done
Done
Done
In progress
In progress
In progress
In progress
In progress
Done
In progress
In progress
In progress
done
done
In progress
In progress
Done
Done
Done
Done
Done
Done
Done

Rashid
Nadeem
Nadeem
Nadeem
Nadeem
Nadeem,
Nadeem,
Nadeem,
Nadeem,
Nadeem,

Rashid
Rashid
Rashid
Rashid
Rashid

2
2
2
1
1
1
1
2
2
1

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done

Job Description
3/22/2013 Work shop house keeping/machines cleaning.
3/22/2013 Fabrication of safety screen for fabrication shop.

Nature
normal
normal

3/22/2013 Installation of exhaust fan in ware house containers.


Notification No.690002384.

normal

3/22/2013 Repairing /refixing of insulatioin in HVAC system in ST


building.

normal

3/22/2013 Scaffolding arrangement at the top floor of HRSG#2 for


hoist inspection/lubrication.

normal

3/22/2013 Fabrication of platform, access for operators Notification


No.690000393
3/22/2013 Shifting of sign board for HSEQ section.

normal

3/22/2013 Shifting of cable drums from work shop and SWI area to
BQPS 1 yard requested by Raza(electrical).

urgent

Site visit to check scope of work against pending


3/22/2013 notification Nos.690000393, 690000453, 690000464,
690000629, 690000627 and 690000642.

normal

3/22/2013 OCCW pump motor installation on foundation and


removed after inspection.

urgent

3/23/2013

urgent

Unloading of wooden boxes from container to china yard.


3/23/2013 Lifting arrangement for CW pump motor cover.
3/23/2013 Lifting of OCCW pump motor for alignment work.

urgent

urgent
urgent

3/23/2013 Fabrication of platform, access at Condensate pump for


operators Notification No.690000393
3/24/2013 Scaffolding Joints servicing/Lubrication.
3/24/2013 Fork lifter servicing and lubrication.

normal

3/25/2013 Tool box shifting with fork lifter behind work shop to ST
hall as requested by Mr. Solangi.

normal

3/25/2013 Loading of OCCW motor and parts in shehzore for


electrical section.

urgent

3/25/2013 Fabrication of platform, access at Condensate pump for


operators Notification No.690000393

normal

3/25/2013 Installation of exhaust fan in ware house containers.


Notification No.690002384.

normal

3/25/2013 Modification work at sealing fan foundation HRSG#2


requested by Mr.Nasir Jamal.

urgent

3/25/2013 site visit to check scope of work for access to operate


foam fire fighting system.
3/25/2013 HRSG#2 top floor hoist inspection/lubrication.

urgent

3/25/2013 Scaffloding arrangement for leak fixing of Clarifier sludge


pump discharge line near HRSG-3 requested by Mr.Asif.

normal
normal

normal
urgent

3/26/2013 Installation of exhaust fan in ware house containers.


Notification No.690002384.

normal

3/26/2013 Insulation work in HVAC system as requested by Rashid


khan.

normal

3/26/2013 Modification work at sealing fan foundation HRSG#2


requested by Mr.Nasir Jamal.

urgent

3/26/2013 Support for leak fixing of Clarifier sludge pump discharge


line near HRSG-3 requested by Mr.Asif.
3/26/2013 HRSG#2 top floor hoist inspection/lubrication.
3/26/2013 All cranes and hoist PM/operational check.

urgent

3/26/2013 Modification work in addmin building HVAC system


requested by Rashid khan.
3/26/2013 Servicing/inspection of rigging tools.

normal
normal
urgent
normal

Again Scaffloding arrangement and support for leak


3/26/2013 fixing of Clarifier sludge pump discharge line near HRSG3 requested by Mr.Asif.

urgent

3/26/2013 Shifting GT air filter with fork lifter requested by


Mr.murtaza.

normal

3/26/2013 Shifting of safety sign boards work shop to plant area


requested by Zohaib.

normal

3/26/2013 Shifting of scaffolding material from ware house


container area.

normal

3/26/2013 Hard barrication near HRSG#2 requested by Mr. Arsalan


(civil).

urgent

3/27/2013

normal

Adjustment of work shop O/H crane limit switch.

3/27/2013 Scaffloding arrangement at GT#1 CCCW system


requested by Raza(electrical).

urgent

3/27/2013 Installation of OCCW pump motor raquested by Mr.


Solangi.

urgent

3/27/2013 Leakage rectification of alkali pipeline in WTP requested


by Mr.Asif.

urgent

3/27/2013 Shifting of material site office to behind work shop with


fork lifter raquested by Mr. Solangi.
3/27/2013 Wooden boxes shifting for ware house.

urgent

3/27/2013 Modification work at sealing fan foundation HRSG#2


requested by Mr.Nasir Jamal.

urgent

3/27/2013 Modification work in addmin building HVAC system


requested by Rashid khan.
3/27/2013 Chain bloks servicing in work shop.

normal

3/27/2013 Support for GT#1 air filter replacement requested by Mr.


Murtaza.
3/27/2013 Diesel filling in fork lifter.
3/27/2013 HRSG#2 top floor hoist inspection/lubrication.

urgent

urgent

normal

normal
normal

3/27/2013 Fabrication of platform, access at Condensate pump for


operators Notification No.690000393

normal

3/27/2013 Drilling of holes and grinding of BFPump special tool in


work shop.

normal

3/27/2013 Shifting of boxes in site office for chinese requested by


Mr. Nasir Jamal.

normal

3/27/2013

normal

Fabrication of extension fork for fork lifter.

3/27/2013 Shifting of 6.6 kv breaker from site office for electrical


requested by Mr. Rehan.
3/28/2013 Work shop house keeping/machines cleaning.
3/28/2013 Scaffloding arrangement for P RO #2 filter
replacement.requested by Mr.Asif.

urgent
normal
urgent

3/28/2013 Installation of OCCW pump motor raquested by Mr.


Solangi.
3/28/2013 Modification work at sealing fan foundation HRSG#2
requested by Mr.Nasir Jamal.

urgent

3/28/2013

normal

Fabrication of extension fork for fork lifter.

3/28/2013 Repairing of sealing air fan motor bearing housing(cast


iron) requested by Mr.Waqar(electrical).
3/28/2013 Chain bloks servicing in work shop.

normal

3/28/2013 Wast sea water pump parts shifting in work shop


requested by Mr.Nasir Jamal.
3/28/2013 Washing of fork lifter rediator.

normal

3/28/2013 Modification work in addmin building HVAC system


requested by Rashid khan.
3/28/2013 HRSG#2 top floor hoist inspection/lubrication.

normal

3/28/2013 Fabrication of platform, access at Condensate pump for


operators Notification No.690000393
3/28/2013 painting of keys box for ware house.
3/28/2013 Insulation material keeping in container area.
3/29/2013 Work shop house keeping/machines cleaning.

normal

3/29/2013

normal

Fabrication of extension fork for fork lifter.


3/29/2013 Chain blocks servicing in work shop.

normal

urgent

normal

normal
normal
normal

normal

sealing bottom gap of gate by welding plate at western


3/29/2013 side of NG control room requested by Mr. Arsalan.
(Notification 680000230)

urgent

3/29/2013 Modification work in addmin building HVAC system


requested by Rashid khan.

normal

3/29/2013 Fabrication of platform, access at Condensate pump for


operators Notification No.690000393

normal

3/29/2013 Insulation material shifting BQPS 1 container area to


behind work shop.

normal

Shifting of chemical drums at GT#2 & GT#3 for GT off


3/29/2013 line washing requested by Mr. Aamir fayyaz khan
(performance).

urgent

3/29/2013 Shifting of Dura v air filters at GT#2 & 3 requested by Mr.


Hasan.

normal

3/29/2013 Support for GT#2 air filter replacement requested by Mr.


Murtaza.

normal

3/29/2013 Repairing of level gauge glass for LP & HP drum HRSG#2


requested by Mr. Asad.

urgent

3/29/2013 Insulation material shifting from BQPS 1 and keeping in


container area.

normal

Scaffolding removal from air receiving tank near N2


2/4/2013 system & air compressor and shifting of material in
garage.

normal

2/4/2013 Metalic box fabrication for emergency push button


requested by Mr.Nasir Jamal.
2/4/2013 safety screen fixing near NG area.

normal

2/4/2013

normal

Fabrication of extension fork for fork lifter.

urgent

2/4/2013 oil drum shifting with fork lifter behind ware house to
scrape yard.

urgent

2/4/2013 Removal of scaffolding and material shifting from Ghgger


Phatak to BQPS 2 as requested sajid security section.

urgent

2/4/2013

urgent

scaffolding and support for CW motor cooler servicing.


2/4/2013 Dirty oil drum shifting from GT#3 to srape yard.
2/4/2013 Dirty oil drum shifting from NG area to srape yard.

urgent
urgent

2/4/2013 Material shifting site office to CW pump area requested


by Mr.Asif.

urgent

2/4/2013

normal

Repairing of acid dosing tank as requested by Mr. Asif.


2/4/2013 Painting of wast water treatment plant.

normal

3/4/2013 Removal of scaffolding and material shifting from CCR


building to garage as requested Rashid khan HVAC.

urgent

3/4/2013 Painting of all isolating valve handle at Diesel unloading


area.
3/4/2013 Support for CW Pump motor coolers servicing.

urgent

3/4/2013 Union installation/welding in CW Pump motor cooling


water system as requested by Mr. Asif.

urgent

urgent

3/4/2013 Tool box shifting for GT section requested by Mr.Abdur


Razzaque.

urgent

3/4/2013 Material segregation and shifting site office to behind


work shop.

normal

3/4/2013 Material racks shifting from china yard to behind work


shop as requested by Ashfaq (electrical).

urgent

3/4/2013 Pipe cross overs fixing in diesel unloading area with crane
as requested by Murtaza.

urgent

4/4/2013

urgent

Support for CW Pump motor coolers servicing.

4/4/2013

normal
Material segregation and shifting site office to behind
work shop.

4/4/2013 Material racks shifting behind work shop as requested by


Ashfaq (electrical).

urgent

4/4/2013

urgent

Dirty oil drums rearranged in scrape yard.


4/4/2013 Painting of wast water treatment plant.

normal

4/4/2013

normal

4/5/2013

Inspection/lubrication of hoist at HRSG#2 top floor.


Dirty oil drums and used filters rearranged in scrape
yard.

urgent

4/5/2013 Painting of wast water treatment plant.

normal

4/5/2013 Inspection/lubrication of hoist at HRSG#2 top floor.

normal

4/5/2013 Removal and shifting of scaffolding from NG station.

urgent

4/5/2013

Removal and shifting of scaffolding from CW Pump


station.

4/5/2013 Shifting and installation of HRSG sealing air fan motor.


4/5/2013

BF Pump parts receiving, unloading and keeping in work


shop.

urgent
urgent
urgent

4/7/2013 CONDENSATE PUMP B BEARING REMOVAL SUPPORT


4/7/2013

GT # 2 88BT-2 : BLIND PLATE SHIFTED ON ROOF OF GT


COMPARTMENT

4/8/2013

Waste sea water pump casing (cast iron)


repairing/welsing work requested by Mr. Asif.

normal

4/8/2013

Shifting of tool/equipment container from china yard to


behind work shop requested by Mr. Nasir Jamal.

normal

4/8/2013

Support for BF Pump assembling in work shop requested


by Mr.solangi.

urgent

Empty oil drum shifting GT container to scrape yard


requested by Mr. Murtaza.
4/8/2013 Making special tools for BF Pump assembling.
4/8/2013 Cleaning and house keeping of work shop.
4/8/2013

urgent
normal
normal

4/8/2013

Shifting of tool/equipment container from ST to behind


work shop for repairing requested by Mr. Nasir Jamal.

urgent

4/8/2013

ST OCCW heat exchanger cleaning support requested by


Kafeel.

urgent

4/8/2013

Plaster of paris bages shifting with forklifter requested by


Danesh (civil).

urgent

4/8/2013 Boiler tube welding in BQPS 1 requested by Mr. Aabroo.

urgent

4/8/2013 Painting of wast water treatment plant.


normal
Support for BF Pump assembling in work shop requested
4/9/2013
urgent
by Mr.solangi.
4/9/2013

Making PVC reducing nipple for petrol engine pump


suction pipe requested by Aurang zaib.

urgent

4/9/2013

Special tool plate cutting from BQPS 1 requested by Mr.


Solangi.

urgent

4/9/2013

Fabrication of electric box cover requested by Mr Nasir


Jamal.

urgent

4/9/2013

Shifting of material china yard to behind work shop


requested by Mr. Arsalan.

urgent

4/9/2013

Shifting of material china yard to behind work shop


requested by Mr. Nasir Jamal.

urgent

4/9/2013

Shifting of material china yard to behind work shop


requested by Electrical section through Mr. Kurram.

urgent

4/9/2013 Cleaning and house keeping of work shop.


4/9/2013 chain block servicing.
Painting of wast water treatment plant requested by Mr.
4/9/2013
Arsalan.
4/9/2013

Fabrication of special tools for BF Pump assembling


requested by Mr. Solangi.

normal
normal
normal
normal

4/10/2013

Support for BF Pump assembling in work shop requested


urgent
by Mr.solangi.

4/10/2013

Fabrication of gauge glass covers for transfarmer


requested by Mr Nasir Jamal.

urgent

4/10/2013

Shifting of material china yard to behind work shop


requested by Mr. Nasir Jamal.

4/10/2013 Cleaning and house keeping of work shop.


4/10/2013 chain block servicing.
Painting of wast water treatment plant requested by Mr.
4/10/2013
Arsalan.

urgent
normal
normal
normal

4/10/2013

Welding work at Sealing fan HRSG# 2 requested by Mr.


Asad.

4/11/2013

Support for BF Pump assembling in work shop requested


urgent
by Mr.solangi.

4/11/2013

Fabrication of gauge glass covers for transfarmer


requested by Mr Nasir Jamal.

urgent

4/11/2013

Shifting of material china yard to behind work shop


requested by Mr. Nasir Jamal.

urgent

4/11/2013 Cleaning and house keeping of work shop.

urgent

normal

4/11/2013

Plateform shifting up to condensate pump for installation


normal
against notification # 690000393.

4/11/2013

Painting of wast water treatment plant requested by Mr.


Arsalan.

normal

4/11/2013

Segrigation/rearranged maerialand boxes behaind work


shop/ware house.

urgent

4/11/2013

Shifting of electric cabinet and boxes behind work shop


requested by Mr. Waqar (electrical)

urgent

4/11/2013

Shifting of wooden boxes china yard to garage requested


urgent
by Mr. Ali Raza.

4/11/2013

Drilling and welding work main gas inlet pressure


requested by Amjad (I&C).

4/12/2013

Support for BF Pump assembling in work shop requested


urgent
by Mr.solangi.

4/12/2013 Machines Cleaning and house keeping of work shop.


4/12/2013

normal

Plateform shifting up to condensate pump for installation


normal
against notification # 690000393.

Scaffolding arrangement for Acid tank repairing


requested by Mr. Asif.
4/12/2013 chain block servicing.
4/12/2013 repairing of acid tank as requested by Mr. Asif.
Fabrication of 4 Nos. base plate for light fixing requested
4/12/2013
by Mr. Waqar(electrical).
4/12/2013

urgent

urgent
normal
normal
urgent

Dirty oil drum shifting GT to scrape yard requested by


Mr.Murtaza.
4/12/2013 Dirty oil drum shifting china yard to scrape yard.
Welding of lock nut with shaft at ST OCCCW pump
4/12/2013
requested by Abdul Aziz.
4/14/2013 Condenser Water Box A repairing requested by Mr. Nasir
4/12/2013

urgent
urgent
urgent
J urgent

4/14/2013 Rigging jobs at ST condenser area requested by Mr. Asad. urgent


4/14/2013

Support for GT#1 air filter replacement requested by Mr.


urgent
Khurram Nazir.

4/14/2013

Shifting of wooden boxe behind ware house to china yard


urgent
requested by Mr. Mashood.

4/14/2013

Scaffolding arrangement in ST condenser area requested


urgent
by Mr. Asif.

Lifting eye welding in condenser inlet MOV cover


requested by Kafeel.
4/14/2013 Oil leakage fixing in GT#1.
Acid tank manhole bolts cutting with grinder requested
4/14/2013
by Mr. Asif.
4/14/2013

urgent
urgent
urgent

4/14/2013

Repairing work at ST condenser ball collector requested


by Mr. Asad.

urgent

4/14/2013

Removal of scaffolding from GT hall rquested by Mr.


Hasan.

urgent

4/16/2013

Support for BF Pump assembling in work shop requested


urgent
by Mr.solangi.

4/16/2013 Machines Cleaning and house keeping of work shop.

normal

4/16/2013

Polishing/cleaning OCCW pump parts requested by Mr.


Solangi.

urgent

4/16/2013

Thread making in flange for installatioin of transmeter


requested by Mr.Zuhair (I&C).

normal

4/16/2013 Scaffolding arangement in GIS building for I&C section.


OCCW motor shifting in work shop requested by Tariq
(Electrical).
4/16/2013 40 Nos. of wooden plenks given to HE(chinese).
Scaffolding arrangement at HRSG#2 for shed fixing at
4/16/2013
elect. Pannel.
4/16/2013

urgent
urgent
urgent
urgent

4/16/2013 Fabrication and installation of shed for elctrical panels.

urgent

4/16/2013 Padestal grinder foundation repairing in work shop.

urgent

4/17/2013 Support for House keeping/ preparation for audit.

Scaffolding arrangement at HRSG#3 for lifting


arrangement of BF Pump.
4/18/2013 Welding of lifting eyes for BF Pump at HRSG#3.
Fabrication and installation of shed at BF Pump lube oil
4/18/2013
skid elctrical panels at HRSG#1 &3.
4/18/2013

normal
normal
urgent

4/18/2013 Looking for under ground water leak fixing near HRSG#2. urgent
4/18/2013

Making list of available material/tool in container given


by chines.

urgent

4/18/2013

Fabrication of spool for auto vent valve requested by


Farooq.

urgent

Fixing arrangement for level transmeter in blow down


tank for I&C section.
4/18/2013 ST OCCW pump motor removal/installation.
4/18/2013

normal
urgent

4/18/2013 Installation of BF Pump in HRSG#3

normal

4/19/2013 Removal of OCCW motor hub with heating in work shop.

urgent

4/19/2013
4/19/2013
4/19/2013
4/19/2013
4/19/2013
4/19/2013

Scaffolding arrangement at HRSG#1 stack #1 for I&C


section.
Making list of available material/tool in container given
by chines.
Installation of misteleminator at G#3.
Painting of waste water treatment plant.
Fabrication of 3 Nos. 5 ft stand for NG station requested
by I&C.
Thread repairing in blow down shaft.

normal
urgent
urgent
normal
urgent
urgent

4/20/2013 Work shop house keeping and cleaning of machines.

normal

4/20/2013 HRSG#2 top floor hoist inspection/lubrication.


Making list of available material/tool in container given
4/20/2013
by chines.
4/20/2013 Painting of waste water treatment plant.
Preparation of heating and cutting arrangement in work
4/20/2013
shop.

normal
urgent
normal
normal

4/20/2013

Scaffolding arrangement at ST lube oil filter requested by


urgent
Kafeel.

4/20/2013

Support for BF Pump assembling in work shop requested


normal
by Mr.solangi.

4/20/2013

Removal of concrete block with fork lifter requested by


Mr.Arsalan.

urgent

4/22/2013 Work shop house keeping and cleaning of machines.

normal

4/22/2013 HRSG#2 top floor hoist inspection/lubrication.

normal

4/22/2013 Painting of waste water treatment plant.


normal
Support for BF Pump assembling in work shop requested
4/22/2013
normal
by Mr.solangi.
4/22/2013

Making 2 Nos. of lock nut as per sample requested by Mr.


urgent
Hasan.

4/22/2013 Material shifting yard to work shop for fabrication work.

normal

4/22/2013 Fabrication of plateform for NG HE isolating valves.

urgent

Repairing of OCCW motor terminal box(cast iron) in work


normal
shop.
4/22/2013 Painting of Hoist at top of the HRSG#2.
normal
Support for material shifting from HSD tank area
4/23/2013
urgent
requested by Aurangzeb.
4/22/2013

4/23/2013 HRSG#2 top floor scaffolding removal aftrer hoist


inspection/lubrication.
normal
4/23/2013 Painting of waste water treatment plant.
normal
Support for BF Pump assembling in work shop requested
4/23/2013
normal
by Mr.solangi.
4/23/2013 Fabrication of plateform for NG HE isolating valves.
4/23/2013

Fabrication/erection of shed at HRSG #1 & 3 BFP ump LO


normal
electric pannel.

4/23/2013 Scaffolding removal from GT#1 stack #1 after I&C work.


4/23/2013

urgent

Making pipe nipple with lathe machine requested by


Aurang Zeb

normal
normal

4/23/2013 Installation of OCCW motor Hub by heating in work shop. normal


4/23/2013

Machining of sealing fan motor bearing outer housing


requested by Tariq electrical.

4/23/2013

Cutting and grinding of turning arrangement of BF Pump


urgent
requested by Mr.Solangi.

4/23/2013

Shifting of material/ Matalic boxes china yard to behind


work shop.

urgent

4/23/2013

Support of sealing air fan motor maintenance in work


shop.

normal

4/23/2013

Installatioin of sealing air fan motor requested by Mr.


Asad.

urgent

4/24/2013 HRSG#2 top floor scaffolding removal aftrer hoist


inspection/lubrication.

urgent

normal

4/24/2013

Support for BF Pump assembling in work shop requested


normal
by Mr.solangi.

4/24/2013

Fabrication and erection of plateform for NG HE isolating


urgent
valves.

4/24/2013 Work shop house keeping and cleaning of machines.

normal

4/24/2013 Shifting of OCCW motor and installation on foundation.

normal

4/24/2013 HRSG#1 sealing air fan foundation modification work.

normal

4/24/2013 Fabrication of hose pipe connection requested by Waqar. urgent


4/24/2013 Cable drum shifting for chinese.
Shifting of sealing air fan motor HRSG to work shop for
4/24/2013
electrical.
4/25/2013 HRSG#2 top floor scaffolding removal aftrer hoist
inspection/lubrication.
Support for BF Pump shifting and installation requested
4/25/2013
by Mr.solangi.

urgent
urgent
normal
normal

4/25/2013 Removal of TBS cover with crane requested by Mr. Asad. urgent
4/25/2013 Work shop house keeping and cleaning of machines.

normal

4/25/2013 OCCW motor # 2 Shifting and installation on foundation. normal


4/25/2013 HRSG#1 sealing air fan foundation modification work.

normal

4/25/2013

Loading of sealing air fan motor in work shop for


electrical.

urgent

4/25/2013

Loading of dirty oil drum in shehzoor with fork lifter


requested by Mr. Murtaza.

urgent

4/25/2013 Fabrication of E button covers for CW pump area.

urgent

4/25/2013 Material cutting and Making nut for Blow down pump.

normal

4/25/2013 Screw making with lathe machine for pressure regulator. normal
4/25/2013 Shifting gas cylinders from GT hall with fork lifter.

urgent

4/25/2013 Fabrication of ss nipple/fittings for HVAC section.

urgent

4/26/2013

HRSG#2 top floor scaffolding removal and shifting at


HRSG#3.

4/26/2013

HRSG#1 sealing air fan motor removal and shifting in


work shop requested by Rashid electrical.

normal
urgent

4/26/2013 Work shop house keeping and cleaning of machines.


4/26/2013

Wooden box of BF Pump parts shifting work shop to


HRSG#1 requested by Mr.solangi.

4/26/2013 HRSG#1 sealing air fan foundation modification work.

normal
urgent
normal

4/26/2013

Shifting of tool box/container with fork lifter requested by


urgent
Mr.solangi.

4/26/2013

Shifting of material from Admin building area with fork


lifter for electrical.

4/26/2013 Fabrication of tool holder for lathe machine.


4/26/2013

Shifting of lube oil drum ware house to GT#3 requested


by Mr. Murtaza.

4/26/2013

PTW/LWP taken from SAP for OCCW hoist maintenance


and Lkey fixing in NG LCR door.

normal
normal

normal

4/26/2013 welding of L Key on Steel door of NG against notification


No.680000221

normal

4/26/2013 Submersible pump laying in condenser drain pit


requested by Mr. Asad.
Scaffolding arrangement at OCCW Pump for hoist
4/26/2013
inspection / maintenance.
4/26/2013 Inspection/maintenance of OCCW pump hoist.
Lifting/ installation of TBS cover at CW pump station
4/26/2013
requested by Mr. Khursheed.

urgent

4/27/2013 Work shop house keeping and cleaning of machines.

normal

4/27/2013 HRSG#1 sealing air fan foundation modification work.

normal

Shifting of material from Admin building area with fork


lifter for electrical.

normal

4/27/2013

4/27/2013 Fabrication of tool holder for lathe machine.

urgent
normal
urgent

normal

4/27/2013

Shifting of lube oil drum ware house to GT#3 requested


by Mr. Murtaza.

4/27/2013

Heating of BF Pump coupling for installation at HRSG#1.


urgent
requested by Mr.Hasan.

Material seggrigation in china yard and preparation for


shifting.
4/27/2013 Removal of scaffolding from OCCCW pump hoist.
Support for BF Pump installation requested by
4/27/2013
Mr.solangi.
4/27/2013

4/27/2013

normal
normal
normal

Hole making in BF Pump lubricating ring requested by Mr.


urgent
Hasan

4/29/2013 Fabrication of Emergency Push Button covers for NG


system.
4/29/2013 Modification if sealing air fan foundations at HRSG#1.
4/29/2013 Repairing of ACW TBS parts requested by Mr. Khursheed.
Making a nut for blow down pump shaft requested by Mr.
4/29/2013
Nasir jamal.
4/29/2013

Support for BF Pump installation/ alignment requested


by Mr.solangi.

urgent
normal
normal
urgent
normal

4/29/2013 Run out check for pump shaft requested by Kafeel.

urgent

4/29/2013 Work shop house keeping and cleaning of machines.

normal

4/29/2013

Material seggrigation in china yard and shifting up to


behind work shop.

normal

4/29/2013

Installation of ACW TBS cover requested by Mr.


Khursheed.

urgent

4/29/2013

Fabrication of trays for Mist oil eliminator vent line.

5/2/2013 Fabrication of Emergency Push Button covers for


HRSG#1,2 & 3 BF Pump.
Fabrication of SS nozzle for CW Pump motor cooler tubes
5/2/2013
cleaning requested by Mr. Hassan.
5/2/2013 Leak fixing of Shaper machine in work shop.
Scaffolding arrangement at CW Pump motor cooler
5/2/2013
requested by Raza (electrical).

urgent
urgent
urgent
normal
urgent

5/2/2013

Support for BF Pump installation/ alignment requested


by Mr.solangi.

normal

5/2/2013

Rigging work at CW Pump motor cooler dismentalling


requested by Raza (electrical).

urgent

5/2/2013 Work shop house keeping and cleaning of machines.


Material seggrigation in china yard and shifting up to
behind work shop.
5/2/2013 SS pipe spool fabrication for GT section.
5/2/2013

5/2/2013 HRSG#1 sealing air fan shaft internal thread repairing.


Scaffolding arrangement for CW Pump motor cooler
5/3/2013 cleaning requested by Raza (electrical).
5/3/2013

Work shop house keeping and cleaning of machines.

normal
normal
urgent
urgent
urgent
normal

Material shifting china yard to BQPS 1 Yard requested by


normal
5/3/2013 Mr.Yasir Electrical.

5/3/2013

HRSG#1 sealing air fan shaft internal thread making with


urgent
lathe machine requested by Mr. Asad.

5/3/2013
5/3/2013
5/3/2013

cable drum shifting plant to BQPS1 yard with fork lifter.

urgent

Scaffolding material shifting up to GT#2.

normal

blow down pump laying in pit requested by Mr. Asad.

urgent

Making barrel nipple with lathe machine requested by Mr.


urgent
5/3/2013 Solangi.
normal
5/3/2013 Making tool list.
Rectification of BF Pump cooling water line fittings
urgent
5/3/2013 requested by Mr. solangi.
CW Pump motor cooler assembling work requested by Mr.
urgent
5/3/2013 Asad.
Scaffolding arrangement at GT#1 CCCW system
5/3/2013 requested by Mr. Asif.
5/3/2013 Fabrication of stool for general use.
5/4/2013

urgent
normal

CW Pump motor cooler assembling & disassembling work


urgent
requested by Mr. Asad & Raza.

5/4/2013 Work shop house keeping and cleaning of machines.

normal

5/4/2013

Material and shifting china yard to BQPS 1 Yard


requested by Mr.Yasir Electrical.

normal

5/4/2013

Material shifting new admin building to behind work


shop with fork lifter.

normal

5/4/2013

Fabrication of trays for NG station requested by Abdul


Razzaque.

normal

5/4/2013

Insulation work at Start up boiler and other ST/HRSG area


normal
requested by Mr. Hasan & Mr. Asad.

5/4/2013 blow down pump laying in pit requested by Mr. Asad.

urgent

5/4/2013 Making tool list.

normal

5/4/2013 Fabrication of stool for general use.

normal

5/4/2013

Shifting of Lube oil drum ware house to CW intake


requested by Raza.

urgent

5/4/2013

Welding of gauges holser breaket at BF Pump HRSG#1


requested by Mr. Nasir Jamal.

urgent

5/4/2013 Polishing of OCCW pump parts with lathe machine.

normal

5/4/2013 Cleaning work at CW pump house O/H crane.


normal
Installation of blow down pump and NRV requested by Mr.
5/6/2013
normal
Hasan.
5/6/2013

Removal and shifting up to work shop OCCW Pump


requested by Mr. Nasir Jamal.

urgent

5/6/2013

Scaffolding arrangement at HRSG # 3 top floor for hoist


inspection/ lubrication.

5/6/2013

Shifting of barriers china yard to main gate requested by


urgent
Mr.Arsalan.

normal

5/6/2013 Making tool list.

normal

5/6/2013 Support for disassembling of OCCW pump in work shop.

normal

5/6/2013

Repairing of GT hall gate between GT#2 & #3 against


Notification #690003106

urgent

5/6/2013 Fabrication of tool for run out checking in work shop.

normal

5/7/2013 Support for disassembling of OCCW pump in work shop.

normal

5/7/2013 Fabrication of tool for run out checking in work shop.

normal

5/7/2013 Making tool list.

normal

Material shifting china yard to BQPS 1 Yard requested by


normal
Mr.Yasir Electrical.
5/7/2013 Hoist inspection/lubrication at HRSG#3 top floor.
normal
Scaffolding arrangement at HRSG#1 stack#2 for I&C
5/7/2013
urgent
section.
5/7/2013

5/7/2013

Fabricationof pipe spool for submersible pump requested


urgent
by Mr. Asad.

5/7/2013 Repairing of aluminium ladder requested by Mr. Asad.

urgent

Steel ladder Removal and shifting from security check


5/7/2013 post to behind work shop requested by Mr. Arsalan.
Against notification #680000220

normal

5/7/2013

PVC welding/leak fixing at RO plant requested by


Mr.Asad.

5/9/2013

Material shifting china yard to BQPS 1 Yard requested by


normal
Mr.Danesh civil.

Fabrication and erection of stair and railing on store


5/9/2013 offices roof requested by Mr. Zeeshan store against
notification #690001750 .

urgent

normal

5/9/2013

Hard barrication around the excavated pit requested by


HSEQ.

urgent

5/9/2013

Scaffolding arrangement at UF # 3 for isolating valve


repairing.

urgent

5/9/2013

Removal/Rigging work for isolating valve at UF3


requested by Waqar.

urgent

5/9/2013

Fabrication of shim plates for HRSG sealing air fan and


other support.

urgent

Run out check for OCCW pump sahft in BQPS1 and our
work shop requested by Mr. Nasir Jamal.
5/9/2013 Hoist inspection/lubrication at HRSG#3 top floor.
5/9/2013

5/9/2013 Work shop house keeping and cleaning of machines.


Safety sign board shifting with fork lifter plant to behind
work shop requested by Mr. Zohair.
5/9/2013 Dimension taken for all OCCW pump parts.
5/9/2013 V block making with lathe and shaper.
Lube oil drum shifting store to CW pump station
5/9/2013
requested by Mr. Raza.
5/9/2013

normal
normal
normal
urgent
normal
normal
urgent

5/9/2013

CO2 cylinder shifting with fork lifter behind work shop


requested by Abdur Razzaque.

5/9/2013

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

urgent

5/14/2013 Material shifting china yard to BQPS 2 Yard.

normal

5/14/2013 Barrier shifting/installation as requested by Mr.Arsalan.

urgent

Fabrication and erection of stair and railing on store


5/14/2013 offices roof requested by Mr. Zeeshan store against
notification #690001750 .

normal

5/14/2013

Scaffolding arrangement at NG area requested by Mr.


Murtaza.

urgent

5/14/2013 Hoist inspection/lubrication/painting at HRSG#3 top floor. normal


5/14/2013 Work shop house keeping and cleaning of machines.
5/14/2013

normal

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

5/14/2013 Manufacturing of OCCW pump parts.

urgent

5/14/2013 Fabrication of pipe spool requested by Mr. Murtaza.

urgent

5/14/2013

Repairing of Clarifier water pump suction bowl requested


urgent
by Waqar.

5/15/2013 Material shifting china yard to BQPS 2 Yard.


5/15/2013

Welding of CCCW HX out let RTD for NG system


requested by Amjad I&C.

normal
urgent

Fabrication and erection of stair and railing on store


5/15/2013 offices roof requested by Mr. Zeeshan store against
notification #690001750 .
5/15/2013

Removal of scaffolding from GT CCCW system and


shifting in garage requested by Mr.Asif.

normal
normal

5/15/2013 Hoist inspection/lubrication/painting at HRSG#3 top floor. normal


5/15/2013

Removal of scaffolding from RO plant and shifting in


garage.

5/15/2013

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

5/15/2013 Manufacturing of OCCW pump parts.

normal

urgent

5/15/2013

Rigging and crane operation work at ST hall requested by


normal
Mr.Hasan.

5/15/2013

Unloading of OCCW pump motor in work shop requested


urgent
by Naeem.

5/15/2013

Painting work at alkali transfer and over flow lines


requested by Mr. Khursheed.

normal

5/15/2013

Oil drum shifting scrap yard to CW pump station


requested by Waqar.

urgent

5/16/2013

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

5/16/2013

Shifting of OCCW pump motor work shop to ST and


installation on foundation requested by Naeem.

urgent

Painting of stair and railing on store offices roof


5/16/2013 requested by Mr. Zeeshan store against notification
#690001750 .

normal

5/16/2013

Removal of scaffolding from HRSG#2 stack#2 and


shifting in garage requested by Mr.Adeel.

5/16/2013

Shifting of cable drum plant to BQPS 1 yard requested by


urgent
Sajid.

5/16/2013 Work shop house keeping and cleaning of machines.

normal

normal

Fabrication and erection of platform for flow meter


5/16/2013 reading at clarifier tank against notification # 690000453 normal
.
5/16/2013

Run out check for wast water pump shaft requested by


Waqar.

5/16/2013 Manufacturing of OCCW pump parts.

urgent
urgent

5/16/2013 PVC welding/ leak fixing at RO plant requested by Waqar. normal

Fabricatin of industrial pump impeller key rquested by


Waqar.
5/16/2013 Material shifting china yard to BQPS 2 Yard.
5/16/2013

5/20/2013

Scaffolding arrangement at BQPS II main gate for name


plate fixing requested by Mr. Arsalan.

5/20/2013 Painting work in RO plant requested by Mr. Khursheed.

urgent
normal
normal
normal

5/20/2013

Fabrication and erection of platform & ladder for chemical


normal
bags lifting against notification # 690000627 .

5/20/2013

Fixing/welding of 2 Nos. of union CW Pump motor cooling


urgent
water system requested by Mr. Yasir.

5/21/2013

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

5/21/2013 Work shop house keeping and cleaning of machines.

normal

5/21/2013 Manufacturing of OCCW pump parts.

urgent

5/21/2013 PVC welding/ leak fixing at RO plant requested by Waqar. normal


5/21/2013 Material shifting china yard to BQPS 2 Yard.
5/21/2013

Scaffolding arrangement at BQPS II main gate for name


plate fixing requested by Mr. Arsalan.

normal
normal

5/21/2013 Painting work on new fabricated platform at clarifier tank. normal


5/21/2013

Fabrication and erection of platform & ladder for chemical


normal
bags lifting against notification # 690000627 .

5/21/2013

Scaffolding arrangement at NG station motor enclosure


requested by Mr. Yasir.

urgent

5/21/2013 Hard barrication in GT hall for Enclosure ventilation fan.

normal

5/21/2013

Shifting of material CW Pump station to Ware house


requested by Mr. Hasan.

urgent

5/21/2013

Rigging and crane operation work for CW pump motor


cooler dismentaling requested by Mr.Yasir.

urgent

5/21/2013

Run out checking with lathe maching and taking all sizes
urgent
requested by Mr. Hasan.

5/21/2013 UF3 feed pump suction bowl removal and shifting up to work shop
requested by Mr. Hasan.

5/21/2013

Channel and pipes shifting from admin building to work


shop for fabrication work.

urgent
normal

5/21/2013

DB shifting with fork lifter CCR building to main gate


requested by Rashid.

5/21/2013

Repairing of 2 Nos. MOP handles in work shop requested


urgent
by Mr. Rashid Bhatti.

5/21/2013

Potable water accumulator housing welding/repairing in


workshop requested by Mr. Hasan.

5/22/2013

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

urgent

normal

5/22/2013 Work shop house keeping and cleaning of machines.

normal

5/22/2013 Manufacturing of OCCW pump parts.

urgent

5/22/2013 Material shifting china yard to BQPS 2 Yard.


Scaffolding arrangement at BQPS II main gate for name
5/22/2013
plate fixing requested by Mr. Arsalan.

normal

5/22/2013 Painting work on HVAC system requested by Mr Rashid.

normal

normal

5/22/2013

Fabrication and erection of platform & ladder for chemical


normal
bags lifting against notification # 690000627 .

5/22/2013

Rigging and crane operation work for CW pump motor


cooler dismentaling requested by Mr.Yasir.

5/22/2013 UF3 feed pump suction bowl repairing in work shop requested by Mr.
Hasan.

urgent
urgent

5/22/2013

8 mm plates shifting with fork lifter china yard to work


shop requested by Mr. Asad.

5/22/2013

Sizing and preparation of HRSG#2 flue gas duct repairing


urgent
requested by Mr. Asad.

5/22/2013

Lifting of TBS cover with crane requested by Mr.


Khursheed.

5/23/2013

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

urgent

urgent

5/23/2013 Work shop house keeping and cleaning of machines.

normal

5/23/2013 Manufacturing of OCCW pump parts.

urgent

5/23/2013 Material shifting china yard to BQPS 2 Yard.


Scaffolding arrangement at BQPS II main gate for name
5/23/2013
plate fixing requested by Mr. Arsalan.

normal

5/23/2013 Painting work on HVAC system requested by Mr Rashid.

normal

5/23/2013

normal

Fabrication and erection of platform & ladder for chemical


normal
bags lifting against notification # 690000627 .

5/23/2013

Rigging and crane operation work for CW pump motor


cooler dismentaling requested by Mr.Yasir.

urgent

5/23/2013 UF3 feed pump suction bowl repairing in work shop requested by Mr.

urgent

5/23/2013 Scaffolding arrangement at HRSG#2 for flue gas duct


repairing requested by Mr. Asad.

urgent

5/23/2013 HRSG#2 flue gas duct repairing requested by Mr. Asad.

urgent

5/23/2013 Repairing of CW Pump#1 TBS requested by Mr. Faizan.

urgent

5/23/2013 Support for OCCW pump assembling in work shop.

normal

Hasan.

5/24/2013

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

5/24/2013 Work shop house keeping and cleaning of machines.

normal

5/24/2013 Manufacturing of OCCW pump parts.

urgent

5/24/2013 Material shifting china yard to BQPS 2 Yard.


Scaffolding arrangement at BQPS II main gate for name
5/24/2013
plate fixing requested by Mr. Arsalan.

normal

5/24/2013 Painting work on HVAC system requested by Mr Rashid.

normal

normal

5/24/2013

Fabrication and erection of platform & ladder for chemical


normal
bags lifting against notification # 690000627 .

5/24/2013

Rigging and crane operation work for CW pump motor


cooler dismentaling requested by Mr.Yasir.

5/24/2013 UF3 feed pump suction bowl repairing in work shop requested by Mr.
Hasan.

urgent
urgent

5/24/2013 Scaffolding material shifting CW pump station to garage. normal


5/24/2013

Material shifting site office to CW Pump station


requested by Mr. Asad.

5/24/2013 Fabrication of fan pulling arrangement for GT section.


5/24/2013

PVC welding/leak fixing at RO plant requested by Mr.


Faizan.

5/24/2013 Support for OCCW pump assembling in work shop.


5/25/2013

normal
urgent
urgent
normal

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

5/25/2013 Work shop house keeping and cleaning of machines.

normal

5/25/2013 Manufacturing of OCCW pump parts.

urgent

5/25/2013 Material shifting china yard to BQPS 2 Yard.

normal

5/25/2013 Painting work on HVAC system requested by Mr Rashid.

normal

5/25/2013

Fabrication and erection of platform & ladder for chemical


normal
bags lifting against notification # 690000627 .

5/25/2013

Rigging and crane operation work for CW pump motor


cooler dismentaling requested by Mr.Yasir.

urgent

5/25/2013 UF3 feed pump suction bowl repairing in work shop requested by Mr.

urgent

5/25/2013 Support for OCCW pump assembling in work shop.

normal

5/25/2013 UF3 feed pump suction bowl installation after repairing in work shop

normal

Hasan.

requested by Mr. Hasan.

5/25/2013

Welding of SS valves with pipe nipples requested by Mr.


Hasan.

5/25/2013

Making of shim plates for HRSG sealing air fan requested


urgent
by Masroor.

5/25/2013

HRSG sealing air fan motor shifting work shop to HRSG


and installation requested by Masroor.

5/27/2013

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

urgent

urgent

5/27/2013 Work shop house keeping and cleaning of machines.

normal

5/27/2013 Manufacturing of OCCW pump parts.

urgent

5/27/2013 Material shifting china yard to BQPS 2 Yard.

normal

5/27/2013 Painting work on HVAC system requested by Mr Rashid.

normal

5/27/2013

5/27/2013

Fabrication and erection of platform & ladder for chemical


normal
bags lifting against notification # 690000627 .

UF feed pump suction bowl repairing work requested by Mr. Faizan.

urgent

5/27/2013 Support for OCCW pump assembling in work shop.

normal

5/27/2013 HRSG-2 LP & HP drum Level gauge repairing requested


by Mr. Asad.
Chemical drum shifting BQPS1 yard to GT#2 requested
5/27/2013
by Mr.waqar performance.

urgent

5/27/2013

CO2 cylinder shifting with fork lifter GT#2 behind work


shop.

urgent
normal

5/27/2013

4 Nos. SS pipe nipple making 1 1/2" X 12" requested by


Mr. Faizan.

5/28/2013

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

urgent

5/28/2013 Work shop house keeping and cleaning of machines.

normal

5/28/2013 Manufacturing of OCCW pump parts.

urgent

5/28/2013 Material shifting china yard to BQPS 2 Yard.

normal

5/28/2013 Painting work on HVAC system requested by Mr Rashid.

normal

5/28/2013

urgent

UF feed pump#4 suction bowl repairing work requested by Mr. Faizan.

5/28/2013 Support for OCCW pump assembling in work shop.

normal

5/28/2013

Shifting and installation of OCCW pump requested by Mr.


urgent
Asad.

5/28/2013

Support for removal of motor and fan In GT hall


requested by Mr. Waqar electrical.

5/28/2013

Shaft making with lathe machine for transformer cooling


urgent
air fan requested by Mr. Waqar electrical.

5/28/2013

Removal and shifting of waste wter pump suction bowl in


normal
work shop for repairing requested by Mr. Faizan.

5/28/2013 Cutting of bolts at acid tank requested by Mr. Faizan.

urgent

urgent

5/28/2013 Empty cylinder refilling from fine gas.


urgent
5/28/2013 Removal of scaffolding from HRSG#1 top floor.
urgent
Fixing of pulling arrangement In heat exchanger strainer
5/28/2013
urgent
requested by AbdurRazzaque.
5/29/2013

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

5/29/2013 Work shop house keeping and cleaning of machines.

normal

5/29/2013 Manufacturing of OCCW pump parts.

urgent

5/29/2013 Material shifting china yard to BQPS 2 Yard.

normal

5/29/2013 Painting work on HVAC system requested by Mr Rashid.

normal

5/29/2013

Shifting and installation of OCCW pump requested by Mr.


urgent
Solangi.

5/29/2013

Waste wter pump suction bowl repairing in work shop


requested by Mr. Faizan.

urgent

5/29/2013

Drain provided for condectivity and turbidity meter at


ACW pump against notification# 690000739.

5/29/2013

Modification of ST CW pump back wash requested by Mr.


urgent
Faizan.

5/29/2013

Increasing of OCCW pump motor foundation holes


requested by Mr. Nasir jamal.

5/29/2013

Machining of ware ring for OCCW pump requested by Mr.


urgent
Nasir jamal.

5/29/2013

Repairing of fire tender water line requested by Mr.


Dilawer.

urgent

5/29/2013

Scaffolding arangement for light repairing in work shop


requested by Naeem electrical.

normal

5/29/2013 Removal of scaffolding from HRSG#1 top floor.

normal

urgent

urgent

5/29/2013

Scaffolding arangement at CW intake requested by Gul


Naseer electrical.

5/30/2013

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

5/30/2013 Work shop house keeping and cleaning of machines.

urgent

normal

5/30/2013

Shifting and installation of OCCW pump motor requested


urgent
by Mr. Solangi.

5/30/2013

Waste wter pump suction bowl repairing in work shop


requested by Mr. Faizan.

urgent

5/30/2013

Drain provided for condectivity and turbidity meter at


ACW pump against notification# 690000739.

normal

5/30/2013

Modification of ST CW pump back washing system


urgent
requested by Mr. Faizan against notification #680000268.

5/30/2013

Repairing of fire tender water line requested by Mr.


Dilawer.

urgent

5/30/2013

Scaffolding arangement for light repairing in work shop


requested by Naeem electrical.

normal

5/30/2013

Scaffolding arangement at CW intake area for lighting


maintenance requested by Gul Naseer electrical.

urgent

5/30/2013

6 Nos. of SS pipe nipple making with lathe machine


requested by Mr. Nasir jamal.

urgent

5/30/2013

2 Nos. of Chemical drum shifting BQPS 1 yard to behind


ware house with fork lifter requested by Absar.

5/30/2013 SS shims cutting for OCCW pump requested by Kafeel.


5/31/2013

urgent
urgent

Modification of HRSG sealing air fan foundation requested


normal
by Mr. Nasir Jamal.

5/31/2013 Work shop house keeping and cleaning of machines.

normal

5/31/2013

Drain provided for condectivity and turbidity meter at


ACW pump against notification# 690000739.

normal

5/31/2013

Waste wter pump suction bowl repairing in work shop


requested by Mr. Faizan.

urgent

5/31/2013

Scaffolding arangement for light repairing in work shop


requested by Naeem electrical.

normal

5/31/2013 SS shims cutting for OCCW pump requested by Kafeel.

urgent

5/31/2013

Fork lifterr maintenance ( oil and filters replaced) by fleet


normal
section team.

5/31/2013

ACW cooler shifting with fork lifter work shop to CW


pump station.

N2 cylinder shifting air compressor room to behind work


shoo requested by Rashid khan.
5/31/2013 Scaffoldint material shifting main gate to garage.
5/31/2013

urgent
urgent
normal

5/31/2013 Material shifting at ST hall requested by Mr. Solangi.

urgent

5/31/2013 GT air filters shifting container to ware house.

urgent

5/31/2013

OCCW pump cooling water line and fittings making with


lathe machine requested by Kafeel.

urgent

5/31/2013

OCCW pump sleeve and bushes making in work shop


requested by Kafeel.

urgent

5/31/2013
6/1/2013
6/1/2013
6/1/2013
6/4/2013
6/4/2013

Crane operating work at OCCW pump for alignment work


urgent
requested by Kafeel.
Shifting of filters to store from container
normal
Shifting of scaffolding material to main gate.
normal
Fabriction of bush.
normal
Fabrication of step ladder for ST hall 6 Mtr against
normal
Notification #690002159.
Fabrication of plateform for OCCW auto back wash filter
isolating valves against Notification #690000643.

6/4/2013 Painting work at NG station requested by Mr. Arsalan.

normal
urgent

6/4/2013 GT air filter shifting container to ware house.

normal

6/4/2013 work shop house keeping and machines lubrication.

normal

6/4/2013

Scaffolding removal from ST OCCW system after leak


fixing requested by Kafeel.

6/4/2013 Manufacturing of OCCW parts with lathe machine.

normal
normal

6/4/2013

AT CW O/H crane inspection and repairing work for


BUZZER.

normal

6/4/2013

Cable drum shifting BQPS 1 yard to CW pump area with


fork lifter requested by Mr. Waqar.

urgent

6/4/2013

Gas cylinder shifting BQPS 1 work shop to air compressor


urgent
building requested by Mr. Murtaza.

6/4/2013

Fabrication of pipe clamp in work shop for GRP line to


fixing of leakage requested by Mr. Khurram.

normal

5/6/2013

UF pump suction bowl repairing work requested by Mr.


Faizan.

urgent

5/6/2013

Fabrication of plateform for OCCW auto back wash filter


isolating valves against Notification #690000643.

normal

5/6/2013 work shop house keeping and lathe machine servicing.

normal

Scaffolding arrangement at ST OCCW back washing


5/6/2013 system for motor removal requested by Mr. Waqar
electrical.

urgent

5/6/2013 Manufacturing of OCCW parts with lathe machine.

normal

5/6/2013

AT CW O/H crane inspection and repairing work for


BUZZER.

normal

5/6/2013

Fabrication of pipe clamp in work shop for GRP line to


fixing of leakage requested by Mr. Khurram.

normal

5/6/2013 Repairing of pipe spool for acid line requested by Waqar. normal
5/6/2013

Shifting of oil drums BQPS 1 to CW intake area requested


urgent
by Mr. Yasir.

5/6/2013

Scaffolding arrangement at RO plant for leak fixing


requested by Mr. Faizan.

normal

5/6/2013

Scaffolding arrangement at HRSG HP BFPump for leak


fixing requested by Mr. Asad.

urgent

5/6/2013

Platform/pipe cross over shifting FF pump house to work


shop for modification.

urgent

5/6/2013

Waste water pump suction bowl shifting work shop to site


normal
with out any work.

6/6/2013 Fabrication of hand rail for FF systm pipe cross overs


urgent
against notification # 680000276.
Removal of ST OCCW back washing motor and shifting up
6/6/2013
urgent
to work shop requested by Kafeel.
6/6/2013

Material shifting admin building area to work shop for


hand rail making.

urgent

6/6/2013

Fabrication of plateform for OCCW auto back wash filter


isolating valves against Notification #690000643.

normal

6/6/2013

Making hose pipe nipple with lathe machine requested by


normal
Mr. Nasir Jamal.

6/6/2013

HRSG#2 sealing air fan foundation modification work


requested by Mr. Hasan.

normal

6/6/2013

Sizing and fabrication of trays for oil collection in NG


system.

urgent

6/6/2013

Drain provided for condectivity and turbidity meter at


ACW pump against notification# 690000739.

normal

6/6/2013

Scaffolding erection in work shop for lighting repairing


requested by Mr. Faizan.

7/6/2013

Shaft Run out check and machining work for UF feed


pump#1 requested by Mr.Faizan.

normal

7/6/2013

Scaffolding removal and erection at WT plant for leak


fixing requested by Mr. Faizan.

normal

7/6/2013

Grease drum shifting with fork lifter from BQPS 1 store


requested by Raza electrical.

urgent

7/6/2013

Swaping of valve actuator at ST back washing system


requested by Tariq electrical.

urgent

7/6/2013 Fabrication of hand rail for FF systm pipe cross overs


against notification # 680000276.
HRSG#2 sealing air fan foundation modification work
7/6/2013
requested by Mr. Hasan.

urgent
normal

7/6/2013

Fabrication of trays for oil collection in NG system


requested by Mr. Asif.

7/6/2013

Wall painting work at BQPS II main gate requested by Mr.


urgent
Arsalan.

7/6/2013

Fabrication of plateform for OCCW auto back wash filter


isolating valves against Notification #690000643.

urgent

normal

7/6/2013 Machining of OCCW pump wear ring.

normal

7/6/2013 work shop house keeping and machines cleaning.

normal

8/6/2013 Fabrication of hand rail for FF systm pipe cross overs


against notification # 680000276.
HRSG#2 sealing air fan foundation modification work
8/6/2013
requested by Mr. Hasan.

urgent
normal

8/6/2013

Fabrication of trays for oil collection in NG system


requested by Mr. Asif.

urgent

8/6/2013

Fabrication of plateform for OCCW auto back wash filter


isolating valves against Notification #690000643.

normal

8/6/2013 work shop house keeping and machines cleaning.


Scaffolding removal and shifting in garag from BQPS II
8/6/2013
main gate requested by Mr. Arsalan.
8/6/2013

Dismentalling/removal of UF feed pump #1&3 suction


bowl requested by Mr. Faizan.

8/6/2013 Making UF pump shaft key requested by Mr. Faizan.

normal
urgent
normal
urgent

8/6/2013

Support for HRSG sealing air fan removal requested by


Masroor.

urgent

8/6/2013

UF feed pump suction bowl foundation supports welding


requested by Mr. Faizan.

urgent

6/11/2013 Fabrication and painting of hand rail for FF systm pipe


urgent
cross overs against notification # 680000276.
6/11/2013 work shop house keeping and machines cleaning.
normal
Increasing of holes for OCCW pump motor foundation bolt
6/11/2013
urgent
requested by Mr. Asad.
6/11/2013

Support for rigging and crane operation at OCCW pump


requested by Mr.Asad.

urgent

6/11/2013

Machining work for removal of inner PVC pipe requested


by Mr. Faizan.

urgent

6/11/2013 Drilling in MS plate requested by Mr. Faizan.


6/11/2013

Scaffolding arrangement at NG station for cleaning work


requested by Mr. Murtaza.

Material arrangement/segrigation and house keeping


behind warehouse/work shop.
6/11/2013 Painting work in rigging tools container.
6/11/2013 All cranes and hoist operational check.
Fabrication of pipe clamp for ST OCCW system requested
6/11/2013
by Mr. Nasir Jamal.
6/11/2013

6/11/2013

Cooler cleaning skid fabrication against notification #


680000277.

6/12/2013 Installation of pipe cross overs after fabrication of hand


rail for FF systm against notification # 680000276.
6/12/2013 work shop house keeping and machines cleaning.

urgent
urgent
urgent
normal
normal
urgent
urgent
normal
normal

6/12/2013 Painting work in rigging tools container.

normal

6/12/2013 Assembling of OCCW pump support in work shop.

normal

6/12/2013 Sleeve making with lathe machine for OCCW pump.

urgent

Modification work in CW pump cooling water system


against
notification# 680000268.
6/12/2013 Cutting of extra barrier pipe at BQPS II main gate.
6/12/2013 Shifting of submersible pump ST to BQPS 1.
6/12/2013

normal
urgent
urgent

6/12/2013 shifting of OCCW pump electric motor ST to work shop.

urgent

6/12/2013 Erection of scaffolding at HRSG#3 latching valve.

urgent

6/13/2013 work shop house keeping and machines cleaning.

normal

6/13/2013 Sleeve making with lathe machine for OCCW pump.

urgent

Modification work in CW pump cooling water system


against
notification# 680000268.

normal

6/13/2013 Erection of scaffolding at HRSG#2 &3 latching valve.

urgent

6/13/2013

6/13/2013

scaffolding removal from ware house after completion of


normal
electrical work.

6/13/2013 Rigging support for 88BT motor installation.

urgent

6/13/2013
6/13/2013
6/13/2013
6/13/2013
6/13/2013
6/13/2013

Scaffolding arrangement at UF filter for cleaning.


urgent
Clamp fixing at FRP for leak fixing.
normal
Fabrication of tray with drain point for ST section.
urgent
Submersible pump casing(cast iron) repairing.
urgent
Polishing and finalizing of OCCW parts.
normal
Scaffolding arrangement at CW Pump house.
urgent
Gas cylinder trolley shifting from BQPS 1 for OCCW pump
6/13/2013
urgent
motor coupling hub heating.
6/13/2013 Motor loading for repairing work.
normal
6/14/2013 Sleeve making with lathe machine for OCCW pump.
6/14/2013

scaffolding removal from work shop after completion of


electrical work.

6/14/2013 Erection of scaffolding at ACW pump.

urgent
normal
urgent

6/14/2013 Shifting of concrete slabe with fork lifter for civil section. normal
Support for OCCW pump motor dismentalling in work
shop.
6/14/2013 Fabrication of Blind flange for 88 BT fan.
6/14/2013

urgent
urgent

6/14/2013

Fabrication of plateform for OCCW auto back wash filter


isolating valves against Notification #690000643.

normal

6/14/2013 Erection of scaffolding at HRSG#2 &3 latching valve.

urgent

6/14/2013 Cable drum and tanks loading in truck.

urgent

6/14/2013 Rigging and crane operating work at CW station.

normal

6/15/2013 Rigging and crane operating work at CW station.

normal

6/15/2013 Shifting of container at BQPS-II container yard


6/17/2013 work shop house keeping and machines cleaning.

normal
normal

6/17/2013 scaffolding removal from GT#1.

normal

6/17/2013
6/17/2013
6/17/2013
6/17/2013

urgent
normal
urgent
normal

Erection of scaffolding at ACW pump.


Rigging and crane operating work at CW station.
Installation of 88 BT fan at GT#1.
Manufacturing of gland pushers for OCW pump.

6/17/2013 Modification/fabrication work at GT#1.


Erection of scaffolding at FF pump house for O/H crane
PMs.
6/17/2013 Fabrication of pipe spool for GT section.
Fabrication of angle iron supports for FF system O/H
6/17/2013
crane.
6/17/2013 Painting work at NG station.
6/17/2013

urgent
normal
urgent
normal
normal

6/17/2013 Fabrication of pulling arrangments for ACW pump.

urgent

6/18/2013 work shop house keeping and machines cleaning.

normal

6/18/2013 Rigging and crane operating work at CW station.

normal

6/18/2013 Removal of 88 BT fan and motor for repairing at GT#1.

urgent

6/18/2013 Manufacturing of gland pushers for OCW pump.

normal

6/18/2013 Fabrication/support for ACW pump overhauling.

normal

6/18/2013

Fabrication of on line drain arrangement for NG CCW heat


normal
exchanger.

6/18/2013

Scaffolding clamp servicing and material keeping in


garage.

normal

6/18/2013 Scaffolding arrangement at hypo chloride plant for HVAC. urgent


6/19/2013 work shop house keeping and machines cleaning.
6/19/2013 Rigging and crane operating work at CW station.
6/19/2013 Manufacturing of gland pushers for OCW pump.

normal
normal
normal

6/19/2013

Fabrication of on line drain arrangement for NG CCW heat


normal
exchanger.

6/19/2013

Scaffolding clamp servicing and material keeping in


garage.

normal

6/19/2013 Scaffolding arrangement at HRSG#1 latching valve.

normal

6/19/2013 Fabrication/support for ACW pump overhauling.

normal

Fabrication/installation of plateform for OCCW auto back


6/19/2013 wash filter isolating valves against Notification
#690000643.

normal

Fabrication of plate form for NG CCCW heat exchanger


against notification# 690002989.
6/24/2013 Rigging and crane operating work at CW station.
6/19/2013

normal
normal

6/24/2013 Material shifting admin building to batching plant.

normal

6/24/2013 Fabrication/support for ACW pump overhauling.


6/24/2013 installation of OCCW pump.

normal
normal

6/24/2013 Fabrication of lifting clamps/special tools for OCW pumps. normal


6/24/2013

Removal of scaffolding from RO plant and hypo chl plant.

normal

6/24/2013 Installation of scaffolding at NG CR for HVAC.


ACW pump casing pipe shifting with fork lifter for send
6/24/2013
blasting.

urgent

6/25/2013 Material shifting admin building to batching plant.

normal

urgent

6/25/2013 Fabrication of lifting clamps/special tools for OCW pumps. normal


6/25/2013

ACW pump casing pipe shifting with fork lifter after send
urgent
blasting.

6/25/2013 Gas cylinders and trolly shifting upto BQPS 1.

urgent

6/25/2013 Fabrication of trays for NG station.

urgent

6/25/2013 Modificationin HRSG sealing air fan.

normal

6/25/2013 Scaffolding/access provide at ST condenser pit.


unloading of expanssion bellow at CW Pump station and
6/25/2013
behind ware house.

urgent

6/26/2013 Material shifting admin building to batching plant.

normal

urgent

6/26/2013 Fabrication of lifting clamps/special tools for OCW pumps. normal


6/26/2013 Modificationin HRSG sealing air fan.

normal

6/26/2013 scafflolding arrangement for safety sign board.

normal

6/26/2013 scafflolding arrangement for at CW intake for electrical.

urgent

6/26/2013 Gas cylinders taking after refilling from fine gas.


6/26/2013 Lube oil drum shifting from GT to scrape yard.
Material shifting site office container to behind work
7/1/2013
shop.

urgent
urgent

7/1/2013 Rigging and crane operating work at CW station.

normal
normal

7/1/2013 Welding/repairing/special tool making work at CW pump. urgent


7/1/2013 Tools making for lathe and shaper machine.

normal

7/1/2013 CW Pump O/H crane nut & bolts cleaning and greasing.

normal

7/1/2013

Machining of OCCW pump parts as requested by Mr.


Solangi.

urgent

7/1/2013 Fabrication of matal rack in work shop.

normal

7/1/2013 Modification in HRSG sealing air fan.


Material shifting site office container to behind work
7/2/2013
shop.

normal
normal

7/2/2013 Welding/repairing/special tool making work at CW pump. urgent


7/2/2013 Tools making for lathe and shaper machine.

normal

7/2/2013 Fabrication of matal rack in work shop.

normal

7/2/2013 Modification in HRSG sealing air fan.

normal

7/2/2013 Material shifting admin building to batching plant.

normal

7/2/2013 scafflolding arrangement for safety sign board.

normal

7/4/2013 Material shifting admin building to batching plant.

normal

7/4/2013

House keeping and material arrangement in Work shop,


garage and behind work shop.

urgent

7/4/2013 Fixing of TBS cover.

urgent

7/4/2013 Scaffolding erection at HRSG#3 for electrical section.

urgent

7/4/2013

Fabreication and thread making in pipe spool for OCW


pump.

urgent

7/4/2013 Checker plate cutting in work shop for civil section.

urgent

7/4/2013 Scaffolding erection at RO plant.

urgent

7/8/2013

urgent

Installation of 88BT fan at GT#3.


Scaffolding arrangement in load tunnel at GT#3 for I&C
7/8/2013
section.
7/8/2013 Heating of parts in ST debris filter.
7/8/2013 Fittings making in work shop for I&C section.
7/8/2013 HRSG#3 valve repairing.

7/8/2013

support for debris filter parts removal and scaffolding


removal.

urgent
urgent
urgent
urgent

urgent

7/8/2013 dismentalling of 88BT fan removal.


metalic rack fabrication in work shop for electrical
7/8/2013
section.

urgent

7/8/2013 Removal of 88BT fan and motor for electrical section.

normal

7/11/2013 Material shifting admin building to china yard for civil


section.

urgent

7/11/2013 Scaffolding and support for cleaning of debris filter.

urgent

7/11/2013 Drilling work for I&C section in work shop.

urgent

7/11/2013 Hopuse keeping in work shop.

normal

7/11/2013 Arrangement of rigging container.

normal

normal

Support for dismentalling of debris filter parts in work


shop.

normal

7/22/2013 Scaffolding removal and shifting work shop to garage.

normal

7/22/2013 Dabris filter shaft repairing in work shop.

urgent

7/11/2013

7/22/2013

Scaffolding erection at ST condenser drain pit for


electrical section.

urgent

7/22/2013 Cable drum shifting BQPS 1 yard to ST for electrical.

urgent

7/22/2013 Gas cylinder shifting for HVAC section.

urgent

7/22/2013 scaffolding pipe cleaning and painting.


7/22/2013 Work shop house keeping and machines cleaning.
7/22/2013 Support for rigging at GT#1 expansion tank.

normal
normal
urgent

23/7/2013
1

Dirty oil drum shifting GT to scrape yard.

urgent

Dabris filter shaft repairing in work shop.

urgent

Scaffolding erection at HRSG # 1 for leak fixing/valve


installation.

urgent

Leak fixing and valve installation at HRSG# 1.

urgent

Leak fixing at blowdown line for HRSG# 3.

urgent

HRSG# 3 sealing air fan motor shifting/istallaion for


electrical.

urgent

25/7/2013
1

Dabris filter shaft repairing in work shop.

urgent

Rigging support at OCCW pump inspection.


Scaffolding erection at HRSG#1 for drain line
modification work.

urgent

3
4
5
6
7

Removal of MOV from condenser drain pit for electrical


section.
Modification work at HRSG#1 drain line.
GT#1 and 2 PEECC door lock repairing against
notification # 690003610 & 690003609

urgent
urgent
urgent
urgent

Breaket fabrication for lighiting at ST condenser drain pit. urgent

12/8/2013
1

Work shop house keeping and machines cleaning.

normal

Mnufacturing of gland pusher for OCCW pump.

urgent

Removal of broken bolt and threading in ERD pump shaft. urgent

Fabricatin of shaft keys for OCCW pump.


urgent
Removal of tresh rack roller from shaft by heating in work
urgent
shop and site.
Machining of tresh rack roller shaft.
urgent

Support for BFPump dismentalling at HRSG#1.

urgent

8
9
10
11

Support for ACW pump motor removal and cooler


dismentalling.
ACW pump parts polishing.
Making stud/puller for ACW pump motor.
Metalic box shifting with fork lifter behind work shop to
HRSG#1 for BF pump parts keeping.

urgent
urgent
urgent
urgent

15/8/2013
1

Work shop house keeping and machines cleaning.

normal

Manufacturing of temprature monitoring equipment for


I&C.

urgent

Support for BFPump dismentalling in work shop.

urgent

Support for ACW pump motor removal and cooler


dismentalling.

urgent

Pump shifting CW intake to RO plant with fork lifter.

urgent

Making puller/studs for electrical.

urgent

21/8/2013
1

Work shop house keeping and machines cleaning.

normal

Fabrication of clamps for CW pump shaft holding.

urgent

Support for BFPump dismentalling in work shop.

urgent

4
5

Support in RO plant for repairing work.


Fabrication of plat form for foam fire hydrant.
Coordination for CW pump motor cooler repairing from
BQPS 1 work shop.
MOV shifting and installation in ST condenser pit.
Diesel filling in fork lifter.
PVC pipe and fitting machining work.

urgent
normal

6
7
8
9

urgent
urgent
normal
urgent

23/8/2013
1

Work shop house keeping and machines cleaning.

normal

Fabrication of pump foundations for GT section.

normal

Support for BFPump dismentalling in work shop.

urgent

4
5

Tresh rack pins machining work for chinese.


OCCW pump shifting and installation.

urgent
urgent

Scaffolding and rigging work at ACW pump for electrical. urgent

Manufacturing of check nuts 2 Nos. for OCCW pump


shaft.

urgent

26/8/2013
1

Work shop house keeping and machines cleaning.

2
3

Fabrication of pump foundations for GT section.


normal
Making plastic covers for work shop machines.
normal
Pump shaft shifting BQPS 1 to CW pump station with fork
normal
lifter.

normal

Fabraication of pit covers with gratings for civil section.

urgent

Chain block servicing.

normal

Making arrangement for thermo couple for I&C section.

urgent

Repairing/modification of OCCW pump cooling water line. urgent

purchasing of work shop material from market.

normal

29/8/2013
1

Work shop house keeping and machines cleaning.

normal

Fabrication of gas cylinder trolley.

normal

Making hole in lighting pole for electrical section.

urgent

urgent

6
7

unloading of material boxes for store section.


Material shifting with fork lifter from CW pump area to
scrape yard.
Lube oil drum shifting BQPS 1 to ware house.
Wooden boxes shifting BQPS1 to ware house.

Diesel filling in fork lifter from PSO pump Port Qasim.

normal

chain block and scaffolding joint servicing.


Rigging work at CW pump.
Maching of PVC pipe and fitings for GT section.

normal
urgent
urgent

9
10
11

urgent
urgent
normal

30/8/2013
1

Work shop house keeping and machines cleaning.

normal

Making hole in lighting pole for electrical section.

urgent

Diesel filling in fork lifter from PSO pump Port Qasim.

normal

chain block and scaffolding joint servicing.

normal

Fabrication of gas cylinder trolley.

normal

Installation of MOV at HRSG#2.

urgent

Fabrication of ventilator for 32 KV cable trench.

urgent

Fabrication of plateform for foam hydrant operation.

urgent

9
10

31/8/2013
1

Work shop house keeping and machines cleaning.

normal

chain block and scaffolding joint servicing.

normal

Fabrication of gas cylinder trolley.

normal

Fabrication of ventilator for 32 KV cable trench.

urgent

Fabrication of plateform for foam hydrant operation.

urgent

6
7

unloading of material boxes for store section.


Repairing work at RO plant.

urgent
urgent

Scaffolding erection at ST condenser for painting work.

urgent

Fabrication and installation of breaket for I&C.

normal

Shifting of ST genrator bearing in work shop for HE.

normal

10

4/9/2013
Oil drum and waste container shifting to scrap yard from
intake area
5 qty chain block repairing
Boiler feed pump dismantling support
Boiler feed pump special tool fabrication for impeller
GIS duct tunnel ventilator fabrication (#3) completed
and installed
Intake channel motor cover removing crane and rigging
UPVC valve alteration on lathe
Trolley wheel plate fabrication under progress
Clarifier pump suction bowl weld repair in progress

5/9/2013
Rigging help at intake to dismantle ST CW pump parts.
Rigging and welding support to dismantle HRSG HP Feed
pump.

Shifting of waste oil drums from site office to scrap yard


and back
Fabrication of Ventilator cover #4 for GIS trench.
Fabrication of attendance machine cover
Arrangement of rigging tools in container
Arrangement of brazing for ST CW pump cooler

6/9/2013
1

Work shop house keeping and machines cleaning.

normal

Rigging and crane operation work at CW pump station.

normal

Trolley wheel making with lathe machine.

normal

chain block servicing.

normal

Run out check in BQPS 1 work shop for BFPump shaft.

normal

BFPump shaft shifting in BQPS 1 for run out checking.

normal

Fabrication of hand punch machine shed.

urgent

Modification in ventilator for 132 KV cable duct.

urgent

CW Pump motor cooler repairing from out side work shop. urgent

17/9/2013

5
6

Work shop house keeping and machines


normal
cleaning/lubrication.
Scaffolding material shifting and erection at dabris filter B
normal
for I&C.
Fabrication of safety railing for CW pump area.
urgent
Shifting and installation of suction bowl and stand for ST
urgent
section after repairing.
Installation of blow down pump.
urgent
Shipment unloading for HE at site office.
urgent

Making pipe nipple and fitting for ST section.

urgent

Fabrication of Gas cylinder trolley.

normal

1
2
3
4

9
10

Planing/material collection for new pipe line laying for GT


normal
section.
Crane operation work at CW pump station.
normal

18/9/2013

3
4
5

Work shop house keeping and machines


cleaning/lubrication.
Scaffolding material shifting and erection at RO primary
filter replacement.
Fabrication of safety railing for CW pump area.
Diesel filling in fork lifter.
Servicing of fork lifter.

Covering of opening at ST lube oil system.

urgent

Fabrication of puller for HRSG sealing air fan removal.

urgent

Modification in piping for HVAC section.

urgent

Fabrication of gas cylinder trolley.

normal

Fabrication of safety railing for CW pump area.


Crane operation work at CW pump for TBS roller
replacement.

urgent

1
2

10
11
12

Installation of safety railing at CW pump station.

normal
normal
urgent
normal
normal

urgent
normal

19/9/2013
1
2
3

Fabrication of safety railing for CW pump area.


urgent
Heating of fan and Fabrication of puller for HRSG sealing
urgent
air fan removal.
Crane operation work at CW pump for TBS roller
replacement.

urgent

Shifting and Installation of safety railing at CW pump


station.
Lifting gears inspection by third party.
Cable tray and other material shifting behind work shop
to BQPS 1 yard with fork lifter.

normal

Making tool holders for lathe and shaper machines.

normal

Machining work for HRSG BFPump discharge MOV.

urgent

Scaffolding removal and shifting in garage after RO


primary filter replacement.

urgent

4
5
6

10

20/9/2013

urgent
urgent

1
2

Work shop house keeping and machines


cleaning/lubrication.
Scaffolding material shifting and erection at Air
compressor storage tank for painting work.

normal
normal

Fabrication of pipe clamps for leak fixing for CW pump


area.

urgent

Scaffolding material shifting and erection in Air


compressor room for light replacement.

normal

Fabrication of plateform for NG OCCW HX isolating


valves.

normal

Fabricatin of pipe spool for sbmersible pump for GT


section.

urgent

Cable tray and other material shifting behind work shop


to BQPS 1 yard with fork lifter for electrical section.

urgent

Making tool holders for lathe and shaper machines.

normal

PVC welding work for submersible pump suction line for


GT section.

urgent

10

TBS maintenance support and ACW pump motor bearing


urgent
inspection support.

23/9/2013
1
2
3

Working on TBS
Removal of scaffolding from N2 station, air tank
Fabrication of railing for CW dam board

24/9/2013
1
2
3

Working on TBS
Support to E&P for painting
loading trolley fabrication

Shifting of scafolding material for electrical job in WTP

25/9/2013
Support to E&P for painting in GT hall
Hrsg 1,2 Hoist top testing
ST Tool shifting site office to workshop back side
I&C box shifting chiness yard to site office
Cable shifting site office to chines yard
Scaffolding shift to WTP
Truck unloading
CW Drain modification
Repair leakage
GT1 earthing line weld
GT trolley fabrication

Pipe spacer for CW pump


Reducer Spool fabrication and weld
Trolley Fabrication
WTP Hypo dosing pump area scafolding

29/9/2013
Erection of scaffolding at WTP
Fabrication of racks for electrical container

1/10/2013
Fabrication of hole punch
Fabrication of hinges for H2 gate
Fabrication of hinges for H2 gate
Fabrication of tray for electrical container
Fabrication of plateform for water cooler
Fabrication of drain header for RO
H2 main gate repair
Blow down impeller buildup
Housekeeping at workshop
Scafolding at RO

2/10/2013
Housekeeping at workshop
Fabrication of spool for GT CCCW pit
Welding fabrication of drain header for RO
Fabrication of hole punch
Repair of valve nozzel

8/10/2013
1

Blow down pump parts repairing/machining.

normal

Removal of broken bolts from pump casing.

urgent

Fabrication of pipe spools for GT CCCW wystem.

normal

Fabrication work at CW pump station.

normal

5
6
7

T bolts grinding for scaffolding clamps.


Fork lifter send to BQPS 1 for motor shifting work.
Work shop house keeping, machines cleaning and
lubrication work.

normal
urgent
normal

Scaffolding errection at primary RO #2 for filter


replacement.

urgent

Welding work at CCCW out let valve GT#2.

urgent

HRSG#1 sealing air fan removal.

urgent

10

10/10/2013
1

Blow down pump parts repairing/machining.


Work shop house keeping, machines cleaning and
lubrication work.

normal

Fabrication of pipe spools for GT CCCW wystem.

normal

Fabrication work at CW pump station.

normal

Repairing of ST main vacuum pump orifice flange.

urgent

Shifting of coolers CW intake to ware house with fork


lifter.

normal

Removal of sealing air fan from HRSG#1 to work shop.

urgent

Cable drum shifting with fork lifter.

urgent

Heating, drilling and taping work on inst.air tank PSV.

urgent

10

Scaffolding erection at GT#2 air intake house for hoist


inspection.

normal

11

Scaffolding erection at water treatment plant for light


maintenance work.

urgent

12

Removal of hoist for maintenance from GT#2 air intake


house.

normal

13

Shifting of motores in work shop.

normal

14

Removal and shifting of scaffolding up to garage from


PRO filter.

normal

normal

Notification Opening WO openining date

WO Closing date

man power deployed


adnan
aslam+tanveer

time
2 hrs
4 hrs

status/cause of unattended work


done
done

ahmed hussain+
naeem+ adnan

8 hrs

in progress

ramzan

8 hrs

in progress

sakhi dad+ shaukat+


rahib

8 hrs

done

aslam+tanveer
shaukat

4 hrs
1/2 hr

in progress
done

shaukat

1 hr

done

aslam+tanveer

1 hr

done

rustam

4 hrs

done

shaukat
waqar+ rahib
waqar+ rahib

8 hrs
4 hrs
4 hrs

done
done
done

tanveer+ahmed
hussain+ naeem
rahib+ waqar
shaukat

8 hrs
8 hrs
8 hrs

inprogress
done
done

shaukat

1 hr

done

sakhi dad+ waqar+


rustam

2 hrs

done

aslam+ tanveer

4 hrs

in progress/work stop due to emergency


work on HRSG#2 Sealing fan.

ahmed hussain+
naeem+ adnan

8 hrs

in progress

tanveer

8 hrs

in progress

aslam
rustam+ contractor

1 hr
8 hrs

done
waiting for power supply

sakhi dad+ waqar+


rustam

3 hrs

done

ahmed hussain+
naeem+ adnan

4 hrs

done

ramzan

12 hrs

inprogress

tanveer+aslam

12 hrs

in progress

sakhi dad+ rahib


rustam+ contractor
rustam+ contractor

4 hrs
8 hrs
8 hrs

done
waiting for power supply
done

ahmed hussain+
naeem+ waqar
waqar

12 hrs
4 hrs

inprogress
done

sakhi dad+ waqar+


rahib

inprogress

sakhi dad

1 hr

done

sakhi dad

1/2 hr

done

sakhi dad+waqar+rahib 1/2 hr

done

sakhi dad+waqar+rahib

inprogress

sakhi
dad+waqar+rustam

1 hr

done

sakhi dad+waqar

2 hrs

done

sakhi dad+rustam

2 hrs

done

naeem+rahib

4 hrs

No Work due to system not isolated

shaukat
shaukat

2 hrs
1/2 hr

done
done

tanveer

12 hrs

in progress

ahmed hussain+ waqar 4 hrs


sakhi dad+ waqar
3 hrs

No Work due to power supply not


available
in progress

adnan
shaukat+ waqar
rustam+ contractor

done
done
waiting for power supply

8 hrs
1 hr
8 hrs

work stop due to emergency work on


HRSG#2 Sealing fan.

aslam+ tanveer
tanveer

2 hrs

done

shaukat

2 hrs

done

ahmed hussain+ naeem 7 hrs

in progress

shaukat
adnan

4 hrs
2 hrs

done
done

sakhi dad+ shaukat+


rahib

4 hrs

done
no work / wait for go head

tanveer+naeem+adnan 8 hrs

done

ahmed hussain+ naeem hrs

in progress

aslam+tanveer
sakhi dad+ rahib

8 hrs
4 hrs

done
in progress

shaukat
shaukat

1 hr
1 hr

done
done

ahmed hussain+ waqar


contractor

No Work due to power supply not


available
waiting for power supply

aslam+ tanveer
ramzan
ramzan
adnan

1 hr
5 hrs
2 hrs

work stop due to emergency work on


HRSG#2 Sealing fan.
done
in progress
done

ahmed hussain+
Naeem
sakhi dad+ rahib

8 hrs
2 hrs

inprogress
inprogress

aslam+ tanveer

1 hr

visited the site and decide to back fill


the sand, informed to civil.

ahmed hussain+
waqar+naeem

No Work due to power supply not


available

aslam+ tanveer

Riggers not availabe for shifting of


material/plateform.

ramzan

shezore not available

shaukat

1 hr

done

shaukat

8 hrs

inprogress

sakhi dad+
rahib+waqar+ramzan+
adnan
8 hrs

inprogress

aslam+ sunawwer

4 hrs

done

ramzan

5 hrs

in progress

sakhi dad+
shaukat+waqa+rahib

4 hrs

done

aslam+ tanveer
shaukat+rahib

8 hrs
1 hrs

done
done

ahmed hussain+
Naeem

8 hrs

inprogress

shaukat

2 hrs

in progress

waqar+ rahib+ rahib

6 hrs

in progress

sakhi dad+ shaukat


shaukat
shaukat

8 hrs
1/2 hr
1/2 hr

in progress
done
done

shaukat

2 hrs

done

naeem+ahmed hussain 8 hrs


ramzan
12hrs

done
in progress

shaukat

2 hrs

in progress

ramzan+ waqar
sakhi dad+ rustam

8 hrs
12 hrs

in progress
in progress

naeem + ahmed
hussain

6 hrs

done

shaukat

1 hr

done

aslam+tanveer+
shaukat+

8 hrs

in progress

shaukat

2 hrs

done

shaukat

in progress

sakhi dad+ rustam


+rahib

8 hrs

done

aslam+tanveer+
shaukat+ naeem+
sakhi dad+ ahmed
hussain+ adnan+
waqar

12 hrs

in progress

shaukat

2 hrs

done

waqar+rahib+tanveer
ramzan

3 hrs
12hrs

done
in progress

rustam+contractor

8 hrs

in progress

waqar+rahib+tanveer+
aslam+ sakhi dad+
shaukat+ ahmed
6 hrs
hussain+ naeem+
sunawwer+ adnan

done

ramzan

12hrs

in progress

rustam+contractor

8 hrs

in progress

rahib+ waqar+ shaukat 2 hrs

done

rahib+ waqar+ shaukat 2 hrs

done

sakhi dad+tanveer

done

2 hrs

sunawwer+ sakhi dad

waiting/stand by

WORKSHOP TEAM

done

WORKSHOP TEAM

done

aslam+ tanveer+rahib+
8 hrs
ramzan

done

shaukat+ rahib

4 hrs

in progress/lifter stuck in sand due to


rain.

rustam+ sakhi dad

8 hrs

in progress

shaukat+ rahib

due to heavy rain work stoped

sunawwer
work shop team

2 hrs

in progress
done

shaukat

1 hr

done

rahib
shaukat

in progress
2 hrs

naeem
ramzan
rustam+ sakhi
dad+aslam

done
in progress

12hrs

in progress

8 hrs

in progress

aslam+ ahmed hussain 2 hrs

done

tanveer+ rahib

done

2 hrs

ahmed hussain

in progress

shaukat

2 hrs

done

shaukat

4 hrs

done

shaukat

2 hrs

done

work shop team


waqar+ rahib

2 hrs
8 hrs

done
in progress

ramzan

12hrs

in progress

naeem+ tanveer+
sunawwer + adnan

8 hrs

in progress

rustam+ sakhi dad+


aslam+sunawwer+
adnan

8 hrs

in progress

ahmed hussain+
tanveer

8 hrs

in progress

shaukat+ waqar+
rahib+ naeem+ ahmed 6 hrs
hussain

in progress

work shop team


waqar+ rahib

2 hrs
2 hrs

done
in progress

ramzan

12hrs

in progress

naeem+ tanveer

3 hrs

done

rustam+ sakhi dad+


aslam+sunawwer+
adnan

8 hrs

in progress

ahmed hussain+
tanveer

8 hrs

done

shaukat+ waqar+
rahib+ naeem+ ahmed 6 hrs
hussain

in progress

work shop team

done

2 hrs

shaukat+ waqar+
rahib+ tanveer+ naeem
ramzan

waiting for LWP


12hrs

in progress

shaukat+waqar+ rahib 6 hrs

in progress

shaukat

2 hrs

done

shaukat

1 hr

done

aslam+sunnawer

2 hrs

done

rustam+ sakhi dad+


aslam+ adnan+
naeem+ tanveer

8 hrs

in progress

adnan

8 hrs

done

shaukat+ waqar+
rahib+ tanveer+ naeem
sakhi dad+ waqar+
rahib
waqar+ rahib
aslam+ tanveer

waiting for LWP


2 hrs

material shifted waiting for PTW

4 hrs
4 hrs

in progress
Prepare metalic plate for repairing

2 hrs

done

sakhi dad

1 hr

done

sakhi dad

1 hr

done

naeem+tanveer

3 hrs

in progress

naeem+ tanveer

8 hrs

done

sakhi dad+ waqar

8hrs

in progress

shaukat+ rahib+
ramzan+tanveer+
ahmed hussain

8hrs

in progress

shaukat

1 hr

done

sakhi dad+ waqar

3 hrs

done

aslam

1 hr

done

sunawwer+ adnan

8 hrs

done

ahmed hussain

in progress

aslam+ ahmed hussain

in progress

rahib+ ramzan+ adnan 2 hrs

done

rustam+ sakhi dad+


aslam+ adnan+
naeem+ tanveer

8 hrs

in progress

adnan

8 hrs

done

sunawwer

1 hr

done

sunawwer

4 hrs

done

shaukat+waqar

in progress

shaukat+waqar

2 hrs

done

sakhi dad

1 hr

done

shaukat+waqar

4 hrs

done

tanveer+ naeem

12 hrs

done

aslam+ ahmed hussain 8 hrs

in progress

work shop team

done

8 hrs

sakhi dad+ shaukat


+waqar
tanveer+ naeem

in progress
in progress

tanveer+ naeem
tanveer+ ahmed
hussain
shaukat + adnan

in progress

naeem

1 hr

done

naeem+ adnan

3 hrs

done

shaukat+ rustam
sakhi dad+ shaukat
+waqar

4 hrs

done

8 hrs

done

aslam+tanveer
+ahmed hussain

8 hrs

done

sakhi dad+ waqar+


farman

8 hrs

in progress

shaukat + adeel

8 hrs

in progress

shaukat
ramzan

3 hrs
12 hrs

in progress
in progress

tanveer+ aslam

3 hrs

done

sunawwer+ adnan

8 hrs

done

adnan+naeem+tanveer
+aslam+waqar
2 hrs
+shaukat

in progress

5 hrs

in progress

shaukat + adeel+raheel 5 hrs

in progress

ramzan

12 hrs

in progress

aslam+naeem

8 hrs

in progress

waqar+ shaukat

1 hr

done

sakhi dad naeem+


tanveer

4 hrs

in progress

Rustam+contractor

sakhi dad +waqar+


shaukat
adnan
Rustam+contractor

in progress
8 hrs

in progress

8 hrs

in progress

ramzan

10 hrs

in progress

sakhi dad

4 hrs

in progress

sunawwer+ adnan

8 hrs

done

shaukat+waqar+ rahib 4 hrs

in progress

Ahmed hussain+
naeem+aslam+
tanveer

8 hrs

in progress

aslam+ naeem

2 hrs

done

ramzan

2 hrs

done

shaukat+waqar+ rahib 3 hrs

in progress

6 hrs
shaukat+waqar+ rahib
ramzan
10 hrs

in progress

sakhi dad +rustam

4 hrs

in progress

Ahmed hussain+
naeem+aslam+
tanveer

8 hrs

in progress

tanveer+ naeem+ sakhi


8 hrs
dad

in progress

done

2 hrs

in progress

sunawwer

3 hr

done

aslam+ahmed
hussain+ sunawwer+
sakhi dad+ rustam

2 hr

done

sunawwer

2 hr

done

shaukat+waqar+ rahib

Tanveer

in progress

sakhi dad + waqar+


rahib

2 hrs

in progress

rustam

2 hrs

done

rahib
waqar+ rahib

in progress
6 hrs

in progress

sakhi dad +rustam

8 hrs

in progress

Ahmed hussain+
naeem+aslam+
tanveer

8 hrs

done

adnan

8hrs

in progress

sakhi dad +rustam+


waqar

4 hrs

done

tanveer

2 hrs

in progress

naeem+ ahmed hussain 1 hr

done

sakhi dad

1/2 hr

done

sakhi dad

1/2 hr

done
Hold, due to shortage of manpower.

sakhi dad
+rustam+rahib

4 hrs

done

rustam+ rahib

4 hrs

done

adnan

8hrs

in progress

sakhi dad +rustam+


rahib

4 hrs

done

tanveer

12 hrs

in progress

sakhi dad+ rustam

1/2 hr

done

sakhi dad

1/2 hr

done

aslam+ ahmed hussain 8 hrs

in progress

sunawwer+munawwer+
4 hrs
adnan

in progress

sunawwer+munawwer+
4 hrs
adnan
sakhi dad+ rahib
1 hr

done
done

aslam+ ahmed hussain 1 hr

done

sakhi dad+ shaukat+


waqar+ rahib
sakhi dad+ shaukat+
rustam

4 hrs

in progress

2 hrs

done

adnan

8hrs

in progress

shaukat

1/2 hr

done

tanveer

8 hrs

in progress

shaukat

1 hr

done

shaukat

4 hrs

in progress

sunawwer+munawwer

8 hrs

in progress

shaukat

1/2 hr

done

sunawwer

5 hrs

done

aslam+ ahmed hussain 2 hrs

done

sakhi dad

1 hr

done

2 hrs

done

8 hrs

in progress

sakhi dad+ rahib+


waqar
rustam+ contractor
rustam

in progress

adnan

8hrs

in progress

tanveer+aslam

8 hrs

in progress

shaukat

8 hrs

in progress

sunawwer+munawwer

8 hrs

in progress

shaukat

1/2 hr

done

aslam

2 hrs

done

rahib+waqar

5 hrs

in progress

rahib+waqar

1 hr

done

sakhi dad

8 hrs

in progress

munawwer

2 hrs

done

Ahmed hussain

8 hrs

in progress

aslam+ tanveer
aslam+ tanveer

4 hrs
4 hrs

in progress
done

sunawwer+ munawwer 8 hrs

in progress

sakhi dad

in progress

8 hrs

sunawwer+ munawwer 1 hr

done

adnan

in progress

8hrs

rahib+waqar+ shaukat 8 hrs

in progress

rustam+ rahib

3 hrs

done

tanveer

8 hrs

in progress

Ahmed hussain
+tanveer+ aslam

8 hrs

in progress

aslam+ tanveer

2 hrs

done

sunawwer+ adnan

6 hrs

done

rahib+ waqar

3 hrs

done

sakhi dad

8 hrs

done

rustam+ waqar+ rahib 5 hrs

in progress

adnan

in progress

8hrs

rahib+waqar+ shaukat 8 hrs

in progress

aslam+ tanveer

2 hrs

done

sunawwer+ adnan

2 hrs

in progress

sakhi dad+ rahib+


waqar

3 hrs

done

adnan

8hrs

in progress

shaukat

5 hrs

in progress

sunawwer+ adnan

4 hrs

in progress

shaukat

3 hrs

done

sakhi dad+ waqar+


rahib

1 hr

done

sakhi dad+ waqar+


rahib

in progress

sunawwer+ adnan

2 hrs

done

sunawwer+ adnan

2 hrs

in progress

sunawwer+tanveer

4 hrs

done

rustam+ waqar+ rahib


sakhi dad+ rahib+
waqar
aslam+ tanveer

in progress
1 hr

done

4 hrs

done

rustam+ waqar

in progress

adnan

8hrs

in progress

shaukat

5 hrs

in progress

shaukat+ rahib

8 hrs

in progress

Ahmed hussain+
tanveer

4 hrs

in progress

ramzan

8 hrs

in progress

sakhi dad
sunawwer+ adnan
Ahmed hussain+
tanveer

in progress
4 hrs

in progress

4 hrs

done

shaukat

in progress

tanveer+ ahmed
hussain

3 hrs

in progress

munawwer

5 hrs

in progress

rustam+ contractor

5 hrs

done

shaukat

2 hrs

done

shaukat+rustam

2 hrs

done

sakhi dad+ rahib+


8 hrs
shaukat+ imtiaz+ owais

done

sakhi dad+ rahib

2 hrs

done

sunawwer+munawwer

6 hrs

in progress

munawwer+tanveer+
rustam

2 hrs

in progress

tanveer + ahmed
hussain

4 hrs

done

aslam+ tanveer+
ahmed
hussain+munawwer

8 hrs

in progress

sunawwer+tanveer+
rustam+aslam

8 hrs

in progress

aslam+ tanveer+
ahmed hussain+
munawwer

8 hrs

done

sunawwer+munawwer

2 hrs

in progress

shaukat

8 hrs

in progress

rustam+ contractor
sakhi dad+ rahib+
waqar

8 hrs

in progress

6 hrs

done

3 hrs

done

ahmed hussain+ aslam 3 hrs

done

sakhi dad+ rahib+


waqar

2 hrs

done

aslam

2 hrs

done

shaukat

6 hrs

in progress

tanveer+naeem+rahib 8 hrs

in progress

sakhi dad+ waqar

2 hrs

done

sakhi dad+ waqar

2 hrs

done

munawwer+ahmed
hussain+ aslam

sakhi dad+ waqar

1 hr

aslam+ ahmed hussain 8 hrs


sunawwer+munawwer+
4 hrs
adnan
rustam+ contractor
8 hrs

done
in progress
done
in progress

adnan

8hrs

in progress

shaukat

1/2 hr

done

munawwer
munawwer

3 hrs
1 hr

done
in progress

shaukat

1 hr

done

shaukat

1 hr

done

tanveer+aslam+waqar 4 hrs

in progress

shaukat+sakhi dad+
rahib

6 hrs

in progress

shaukat+sakhi dad+
rahib

2 hrs

done

ahmed hussain+naeem 8 hrs

in progress

sakhi dad+
waqar+shaukat

2 hrs

done

rustam+ contractor+
ramzan

8 hrs

in progress

adnan

8hrs

in progress

tanveer+aslam

6 hrs

in progress

sunawwer+munawwer+
8 hrs
adnan

in progress

tanveer+aslam

1 hr

done

aslam

3 hrs

done

shaukat+sakhi dad+
waqar

4 hrs

in progress

aslam+

2 hrs

done

ahmed hussain+naeem 8 hrs

in progress

sakhi dad+ waqar+


shaukat

2 hrs

done

rustam+ contractor+
ramzan

8 hrs

in progress

sakhi dad+ waqar+


shaukat

2 hrs

done

tanveer+aslam

6 hrs

in progress

sunawwer+munawwer

8 hrs

in progress

rustam + sakhi dad+


waqar

4 hrs

in progress

rustam+ sakhi dad

1/2 hr

done

ramzan

6 hrs

in progress

shaukat

1 hr

done

tanveer+naeem

8 hrs

in progress

rustam+ sakhi
dad+shaukat+ rahib

2 hr

done

Ramzan

8 hrs

in progress

sakhi dad+ rahib+


shaukat

2 hrs

done

shaukat

1 hr

done

adnan

8hrs

in progress

ahmed hussain+ aslam 8 hrs

in progress

adnan+ munawwer

1 hr

done

sunawwer+munawwer

8 hrs

in progress

aslam

waiting for PTW

aslam+ ahmed hussain 1 hr

done
shortage of manpower

sakhi dad+shaukat+
rahib+ waqar+3 civil
helpers

8 hrs

in progress

ramzan

8 hrs

in progress

aslam+ ahmed hussain 2 hrs

in progress

aslam+ ahmed hussain 4 hrs

done
hold by end user

adnan

4 hrs

in progress

sunawwer+munawwer+
8 hrs
adnan

in progress

aslam

in progress

8 hrs

shortage of manpower
sakhi dad+shaukat+
rahib+ waqar+3 civil
helpers
ramzan

shortage of manpower
8 hrs

in progress

naeem+ ahmed hussain


8 hrs
+ tanveer

in progress

sakhi dad+shaukat+
rahib+ waqar

3 hrs

done

sakhi dad+shaukat+
rahib

2 hrs

done

shaukat

2 hrs

done

rustam+ waqar

8 hrs

in progress

munawwer+ adnan

1 hr

done

sakhi dad+shaukat+
rahib

2 hrs

done

shaukat+ tanveer+
rahib

1 hr

done

shaukat

1/2 hr

done

naeem

1/2 hr

done

naeem

2 hrs

done
hold by end user

adnan

4 hrs

in progress

sunawwer+munawwer+
8 hrs
adnan

in progress
shortage of manpower

sakhi dad+shaukat+
rahib+3 civil helpers

8 hrs

in progress

ramzan

8 hrs

in progress

naeem+ ahmed hussain


8 hrs
+ tanveer

in progress

rustam+ waqar

7 hrs

in progress

aslam+naeem

8 hrs

in progress

shaukat

1/2 hr

done

aslam+tanveer

2 hrs

in progress

rustam+ waqar

1 hr

done
hold by end user

adnan

4 hrs

in progress

sunawwer+munawwer+
8 hrs
adnan

in progress
shortage of manpower

sakhi dad+shaukat+
rahib+3 civil helpers

shortage of manpower

ramzan

Hold due to emergency work on


HRSG#2 flue gas duct repairing

naeem+ ahmed hussain


+ tanveer

Hold due to emergency work on


HRSG#2 flue gas duct repairing

rustam

12 hrs

in progress
Hold due to emergency work on
HRSG#2 flue gas duct repairing

aslam+naeem
sakhi dad+shaukat+
rahib+Waqar

12 hrs

done

aslam+naeem+
tanveer+ ahmed
hussain

12 hrs

done

8 hrs

done

8 hrs

in progress

welder
sunawwer

hold by end user


adnan

4 hrs

in progress

sunawwer+munawwer+
8 hrs
adnan

in progress
shortage of manpower

sakhi dad+shaukat+
rahib+3 civil helpers

8 hrs

in progress

ramzan

12 hrs

in progress

naeem+ ahmed
hussain+ tanveer

12 hrs

in progress

rustam+waqar

12 hrs

in progress

naeem+ aslam

8 hrs

in progress

shaukat

2 hrs

done

shaukat

6 hrs

in progress

tanveer

3 hrs

in progress

aslam

4 hrs

in progress

sunawwer+munawwer+ 8 hrs
adnan

in progress
hold by end user

adnan

4 hrs

in progress

sunawwer+munawwer+
8 hrs
adnan

in progress
shortage of manpower

ramzan

8 hrs

in progress

naeem+ ahmed
hussain+ tanveer

8 hrs

in progress

rustam+waqar+shaukat
12 hrs
+ sakhi dad

in progress

naeem+ aslam

done

4 hrs

sunawwer+munawwer+ 8 hrs
adnan
shaukat+sakhi
3 hrs
dad+rahib

in progress

aslam+tanveer

2 hrs

done

ahmed hussain

2 hrs

done

shaukat+sakhi
dad+rahib

2 hrs

done

done

hold by end user


adnan

4 hrs

in progress

sunawwer+munawwer+
8 hrs
adnan

in progress
shortage of manpower

ramzan

8 hrs

in progress

naeem+ ahmed
hussain+ tanveer +
sakhi dad+ shaukat+
rahib

8 hrs

in progress

naeem+ tanveer

2 hrs

in progress

sunawwer+munawwer+ 8 hrs
adnan

in progress

sakhi dad+ sunawwar+


4 hrs
naeem+ tanveer

in progress

shaukat

1 hr

done

shaukat

1/2 hr

done

muawar

4 hrs

done
hold by end user

adnan

4 hrs

in progress

sunawwer+munawwer+
8 hrs
adnan

in progress
shortage of manpower

ramzan

8 hrs

in progress

naeem+ tanveer

2 hrs

in progress

sunawwer+munawwer+
adnan+aslam+ ahmed 5 hrs
hussain
sakhi dad+ rahib+
3 hrs
rustam+ waqar
rustam+ rahib

done
done
in progress

munawer

2 hrs

done

sakhi dad+ rahib

3 hrs

done

tanveer

4 hrs

done

shaukat

4 hrs

in progress
shortage of manpower

aslam

1/2 hrs

done
hold by end user

adnan

4 hrs

in progress

sunawwer+munawwer+
8 hrs
adnan

in progress
shortage of manpower

ramzan

8 hrs

in progress

sakhi dad+
rustam+shaukat

5 hrs

done

aslam+ tanveer

3 hrs

hold due to emergency work on CW


intake area.

naeem+ ahmed hussain 8 hrs

in progress

aslam+ tanveer

No work

3 hrs

sunawwer+munawwer+
3 hrs
adnan

done

sunawwer+munawwer+
1 hr
adnan

done

naeem+ ahmed hussain

inspection and plan for tomorrow

sakhi dad+
3 hrs
rahib+shaukat+ waqar

done

sakhi dad+
1 hr
rahib+shaukat+ waqar

done

shaukat+ rahib+ waqar 2 hrs

done
hold by end user

adnan

4 hrs

in progress

waqar+
rustam+shaukat

4 hrs

done

naeem+ ahmed hussain 2 hrs

in progress

naeem+ ahmed hussain 8 hrs

shop fabrication completed installation


work on hold due to othe jobs

aslam+ tanveer

in progress

8 hrs

sakhi dad+rahib+
8 hrs
naeem+ ahmed hussain

done

rahib+shaukat+ waqar 2 hrs

done

shaukat+ rahib+ waqar 2 hrs

done

munawar+ adnan

done

4 hrs

shaukat

1 hrs

done

tanveer

2 hrs

done
hold by end user

adnan

4 hrs

in progress

naeem+ ahmed hussain 8 hrs

shop fabrication completed installation


work on hold due to othe jobs

aslam+ tanveer

6 hrs

done

rahib+shaukat+ waqar 2 hrs

done

tanveer

2 hrs

done

shaukat

3 hrs

done

shaukat

1/2 hr

done

shaukat

1/2 hr

done

shaukat+rahib
sakhi dad+
waqar+rustam

1 hr

done

3 hrs

done

4 hrs

in progress

sakhi dad+ waqar+


rahib

sunawwer+munawar+a
4 hrs
dnan

done

sunawwer+munawar+a
4 hrs
dnan

in progress

rustam

4 hrs

in progress

Shokat
Shokat
Sanower

6 hrs
3 hrs
3 hrs

in progress
in progress
in progress

tanveer+naeem

8 hrs

done

ahmed hussain+ aslam 4 hrs

in progress

ramzan

in progress

8 hrs

shaukat+ sakhi dad+


rahib+ waqar

5 hrs

in progress

adnan

8 hrs

done

sakhi dad+ rahib+


shaukat+ waqar

3 hrs

done

sunawwar+
munawwer+ adnan

8 hrs

in progress

rustam+ contractor

8 hrs

done

shaukat

1 hr

done

shaukat

1 hr

done

tanveer+aslam

4 hrs

in progress

aslam+tanveer

3 hrs

done

ahmed hussain+ naeem 8 hrs

in progress

sunawwar+
munawwer+ adnan

3 hrs

done

sakhi dad+ rahib+


shaukat

3 hrs

in progress

sunawwar+
munawwer+ adnan

5 hrs

in progress

rustam+ contractor

8 hrs

in progress

tanveer+aslam

4 hrs

in progress

aslam+tanveer

5 hrs

done

shaukat

1 hr

in progress

sakhi dad+ rahib+


shaukat

4 hrs

in progress

sakhi dad+ rahib+


shaukat

1 hr

done

shaukat+ tanveer

1 hr

in progress

shaukat

1/2 hr

done

aslam+tanveer+sakhi
dad+ waqar+ rahib+
rustam

6 hrs

in progress (2 out of 5 completed)

sakhi dad+ waqar+


rahib

2 hrs

done

sakhi dad+ waqar+


rahib

2 hrs

in progress

ahmed hussain+ naeem 4 hrs

in progress

Sunawwar+munawar

in progress

8 hrs

tanveer

waiting for removal of motor.

naeem+ ahmed hussain 4 hrs

in progress

Aslam+ tanveer

2 hrs

done

sakhi dad+ waqar+


rahib

4 hrs

done

Sunawwar+munawar+a
4 hrs
dnan

done

sakhi dad+ waqar+


rahib+ shaukat

5 hrs

in progress

shaukat

2 hrs

done

sakhi dad+ waqar

3 hrs

done

tanveer+

8 hrs

in progress (4 out of 5 completed)

tanveer

waiting for removal of motor.

naeem+ ahmed hussain 8 hrs

done

ramzan

in progress

8 hrs

ahmed hussain+ naeem 4 hrs


Sunawwar+munawar+a
4 hrs
dnan
adnan
3 hrs

Hold due to othe jobs


done
done

tanveer+aslam

8 hrs

in progress

tanveer

waiting for removal of motor.

naeem+ ahmed hussain 8 hrs

done

ahmed hussain+ naeem 4 hrs

Hold due to othe jobs

adnan
sakhi dad+ shaukat+
rahib+ rizwan

3 hrs

done

8 hrs

in progress

waqar

8 hrs

done

munawar+ adnan

6 hrs

done

ahmed hussain+ naeem 3 hrs

done

tanveer

4hrs

in progress

8 hrs

in progress

3 hrs

done

4 hrs

done

rustam+ rahib+ sakhi


dad

2 hrs

done

sunawwar+
munawwer+ adnan

3 hrs

done

sunawwar+
munawwer+ adnan

1 hr

done

waqar

2 hrs

done

6 hrs

done

8 hrs
6 hrs

in progress
done

aslam+ tanveer

3 hrs

done

tanveer+aslam

5 hrs

done

rustam+ shaukat+
rahib

4 hrs

done

3 hrs

done

naeem+ahmed
hussain+ ramzan
adnan
sunawwar+
munawwer+ adnan

sakhi dad+ waqar+


rahib
ramzan
rustam+ contractor

adnan

ramzan
sunawwer+ adnan+
sakhi dad

8 hrs

in progress

8 hrs

in progress

munawer

8 hrs

in progress

ahmed hussain+ naeem 8 hrs

in progress

aslam + sakhi dad


shaukat

2 hrs
2 hrs

done
done

shaukat+rutam

1 hr

done

2 hrs

in progress

3 hrs

done

8 hrs

in progress

ahmed hussain+ naeem 8 hrs

in progress

sakhi dad+ shaukat+


rahib

4 hrs

in progress

sakhi dad+ shaukat+


rahib

2 hrs

done

3 hrs

done

3
3
3
2
8
2

hrs
hrs
hrs
hrs
hrs
hrs

in progress
done
done
done
done
done

rahib+ tanveer

2 hrs

in progress

rustam+ sakhi dad

1/2 hr

done

munawer

8 hrs

in progress

sakhi dad+ shaukat+


rahib+waqar

2 hrs

done

sakhi dad+ shaukat+


rahib+waqar

4 hrs

in progress

shaukat

1 hr

done

rustam+ sakhi dad

4 hrs

in progress

tanveer+ aslam

8 hrs

in progress

sakhi dad+ shaukat+


rahib
adnan
munawer+adnan

sakhi dad+ rahib+


rustam
shaukat
tanveer+ ramzan
aslam + tanveer
aslam + tanveer
sunawwer
shaukat

naeem+ ahmed hussain 8 hrs


sakhi dad+ shaukat+
rahib
shaukat
rustam+ sakhi dad+
waqar
rustam+ sakhi dad+
waqar
Shokat
adnan
sakhi dad+ shaukat+
rahib
shaukat+waqar
rustam+ waqar
sakhi dad+ rahib
tanveer+ munawwer
aslam+ tanveer+
adnan
sakhi dad+ shaukat+
rahib
tanveer+ adnan
sakhi dad+ adnan

in progress

4 hrs

done

3 hrs

in progress
in progress
in progress

4 hrs
3 hrs

Done
done

2 hrs

done

4
8
4
4

in progress
in progress
done
in progress

hrs
hrs
hrs
hrs

4 hrs

done

2 hrs

done

2 hrs

done

2 hrs

done

ramzan
8 hrs
aslam+naeem+ ahmed
8 hrs
hussain
adnan
3 hrs
rustam+ sakhi
8 hrs
dad+shaukat

in progress

waqar

4 hrs

done

munawwer+ adnan

8 hrs

in progress

aslam+ ahmed hussain 8 hrs

in progress

tnaveer+adnan

8 hrs

in progress

waqar

4 hrs

in progress

sakhi dad+ waqar

2 hrs

done

adnan
rustam+ sakhi dad
munawwer+ adnan

3 hrs
8 hrs
8 hrs

done
in progress
in progress

in progress
done
in progress

tnaveer+aslam

4 hrs

done

waqar+rahib

4 hrs

in progress

shaukat+ waqar+ rahib 6 hrs

done

aslam+ ahmed hussain 4 hrs

in progress

sunawwer+naeem+
tanveer

done

4 hrs

ahmed hussain+ aslam 4 hrs

in progress

rustam+ sakhi dad

8 hrs

in progress

shaukat+ rahib

8 hrs

in progress

naeem+ tanveer
waqar+ rustam

8 hrs
4 hrs

in progress
in progress

aslam+ ahmed
hussain+ sunawwer+
munawwer+ adnan

8 hrs

in progress

rahib+ asif+ adnan

4 hrs

done

rahib

2 hrs

done

shaukat

3 hrs

done

shaukat

4 hrs

in progress

aslam+ ahmed
hussain+ sunawwer+
munawwer+ adnan

8 hrs

in progress

shaukat

4 hrs

done

shaukat+ rahib+
tanveer

2 hrs

done

tanveer+ naeem+ asif

4 hrs

in progress

tanveer+ naeem+ asif

4 hrs

in progress

rahib+waqar
rustam+waqar+
shaukat+ asif

2 hrs

done

4 hrs

done

shaukat+rahib

8 hrs

in progress

ahmed hussain+
8 hrs
sunawwer+ munawwer

in progress

tanveer+ naeem

in progress

4 hrs

sakhi dad+ waqar+ asif 8 hrs

done

waqar+ asif

2 hrs

in progress

sunawwer
shaukat+rahib

3 hrs
2 hrs

done
done

waqar+ asif

8 hrs

in progress

rustam+ sakhi dad+


athar

8hrs

in progress

ahmed hussain+naeem 8 hrs

in progress

munawwer+ adnan

4 hrs

in progress

contractor

8 hrs

in progress

munawwer+ adnan

4 hrs

done

8 hrs

in progress

8 hrs

in progress

4 hrs

in progress

ahmed hussain+naeem 8 hrs

in progress

abdul Hadi + danish+


rahib
tanveer+ aslam
waqar+ asif

munawwer+ adnan
abdul Hadi + danish+
rahib
tanveer

8 hrs

in progress

8 hrs

in progress

8 hrs

in progress

shaukat+rahib

8 hrs

in progress

sakhi dad+ waqar+ asif 4 hrs

done

shaukat

8 hrs

in progress

sunawwer+
munawwer+ aslam+
naeem+ tanveer+
ahmed hussain

8 hrs

in progress

rustam+ rahib

2 hrs

done

sakhi dad+ adnan+ asif 8 hrs

done

ahmed hussain+
naeem+ munawer

3 hrs

ahmed hussain+
1 hr
naeem+ munawer
rahib+ shaukat
4 hrs
sunawwer+sakhi dad+
8 hrs
rustam+ adnan

done
done
in progress

shaukat+ rahib+ asif

3 hrs

done

ahmed hussain
sunawwer+ aslam+
aslam+ sunawwer+
tanveer

4 hrs
3 hrs

in progress
done

4 hrs

in progress

ahmed hussain+
shaukat+ asif+
naeem+ sakhi dad+
waqar

8 hrs

done

sunawwer

2 hrs

in progress

tanveer+naeem

6 hrs

in progress

sunawwer+ shaukat+
tanveer+ asif

3 hrs

done

shaukat

3 hrs

done

aslam+ naeem+
tanveer+ sakhi dad+
asif

5 hrs

done

munawar+ adnan
2 hrs
waqar+ rahib+ adnan+
3 hrs
shaukat

done
in progress

waqar+ rahib+ adnan+


2 hrs
shaukat

in progress

aslam+ naeem+
tanveer

2 hrs

in progress

sakhi dad+ shaukat+


waqar+ rahib

2 hrs

done

munawwer+
sunawwar+ tanveer+
naeem

7 hrs

in progress

sakhi dad+ shaukat+


asif

7 hrs

done

shaukat

1 hr

done

shaukat

1 hr

done

asif
adnan
rahib+ waqar

7 hrs
7 hrs
4 hrs

in progress
in progress
done

sakhi dad

1 hr

done

munawwer+ sunawwar 7 hrs

in progress

sakhi dad+
rahib+waqar

7 hrs

done

tanveer+ ahmed
hussain+asif

5 hrs

done

tanveer+ ahmed
hussain+asif

2 hrs

done

waqar+ rahib

2 hrs

done

munawwer+ sunawwar 7 hrs

in progress

sakhi dad+ asif

3 hrs

done

rahib+ shaukat

2 hrs

done

sakhi dad+ rahib+ asif


1 hr
+ shaukat
naeem+ tanveer
7 hrs
shaukat

3 hrs

done
done
done

ahmed hussain+ adnan 7 hrs

in progress

waqar+asif

2 hrs

done

4 hrs

done

munawwer

2 hrs

done

sunawwer

2 hrs

done

aslam+ tanveer+ waqar 4 hrs

done

munawwer

2 hrs

in progress

sakhi dad+ asif+aslam 4 hrs

in progress

munawer+sunawwer

sakhi dad+
asif+aslam+ waqar
tanveer+ munawer
aslam+ tanveer

4 hrs

in progress

2 hrs
2 hrs

done
done

sakhi dad+ asif

1 hr

done

adnan

4 hrs

done

Munawwer

4 hrs

in progress

sakhi dad+
asif+aslam+adnan

8 hrs

in progress

waqar

8 hrs

in progress

sakhi dad

1 hr

done

aslam+munawar

2 hrs

done

adnan

4 hrs

done

ahmed hussain+ naeem 4 hrs

in progress

sunawwer+ ahmed
hussain+sakhi dad+
naeem

8 hrs

in progress

waqar
tanveer+ naeem

8 hrs
8 hrs

in progress
in progress

aslam+ adnan

8 hrs

in progress

shaukat+ rahib+ asif


shaukat
munawar

6 hrs
1 hr
4 hrs

done
done
done

shaukat+tanveer+rahib
4 hrs
+ahmed hussain
tanveer+ naeem

done

Munawwer+ ahmed
hussain+sakhi dad+
naeem+rahib

8 hrs

in progress

munawwer+ adnan
rahib+ rustam

8 hrs
3 hrs

done
in progress

rusatam+ rahib+ waqar

in progress

in progress

munawwer+ adnan

4 hrs

done

2 hrs

done

2 hrs
4 hrs

in progress
in progress

sakhi dad

3 hrs

done

naeem+ rahib

6 hrs

in progress

waqar+ asif

6 hrs

in progress

munawar+ adnan

3 hrs

done

munawar+ adnan

2 hrs

done

sunawwar+ aslam

8 hrs

in progress

adnan

8 hrs

done

aslam+ ahmed
hussain+ munawwer

8 hrs

in progress

adnan+ rahib+ asif+


waqar
naeem+ rahib
munawar+ adnan

tanveer+naeem+adnan 6 hrs

done

shaukat

3 hrs

done

shaukat

3 hrs

done

shaukat
shaukat

2 hrs
1 hr

done
done

shaukat

1 hr

done

sakhi dad+ asif


rustam+ rahib
sunawwer

8 hrs
8 hrs
4 hrs

in progress
in progress
done

adnan+shaukat+rahib+
asif+naeem+
1 hr
sunawwer+ tanveer
tanveer+naeem+adnan 4 hrs

done
done

shaukat

1 hr

done

sakhi dad+ asif


aslam+ adnan+
sunawwer
sakhi dad+ asif

5 hrs

in progress

8 hrs

in progress

3 hrs

in progress

tanveer+rahib

4 hrs

in progress

ahmed hussain+ naeem 8 hrs

in progress

adnan+shaukat+rahib+
asif+naeem+
1
sunawwer+ tanveer
sakhi dad+ asif
5
aslam+ adnan+
8
sunawwer
tanveer+rahib
4
ahmed hussain+
8
naeem+
shaukat
2
aslam+ adnan+
4
shaukat+ sakhi dad+
2
rahib+ asif
naeem+ tanveer
3
shaukat+ sakhi dad+
3
rahib+ asif

hr

done

hrs

in progress

hrs

in progress

hrs

in progress

hrs

in progress

hrs
hrs

done
in progress

hrs

done

hrs

done

hrs

done

adnan+shaukat+rahib+
asif+naeem+
1 hr
sunawwer+ tanveer

done

rustam+sakhi
dad+waqar

6 hrs

done

sunawwer+ munawar+
8 hrs
adnan

done

sakhi dad+ rahib+ asif 3 hrs

in progress

sunawwer+

3 hrs

done

shaukat

3 hrs

done

tariq+ tanveer+ naeem 4 hrs

done

tariq+ tanveer+ naeem 4 hrs

in progress

aslam

6 hrs

done

munawar+owais

4 hrs

in progress

sakhi dad+ waqar+


4
shaukat
tariq+ naeem
8
sakhi dad+ waqar+
4
shaukat
shaukat
2
shaukat
1
munawar+aslam+ahme
4
d hussain

hrs

in progress

hrs

in progress

hrs

done

hrs
hr

done
done

hrs

done

aslam+ahmed
hussain+sunawwar

4 hrs

in progress

tanveer

8 hrs

in progress

rustam

8 hrs

done

munawar+owais

4 hrs

in progress

4 hrs

in progress

8 hrs
2 hrs
2 hrs

in progress
done
done

6 hrs

done

tanveer+rahib+ ahmed
2 hrs
hussain+sunawwer

done

aslam+ ahmed hussain 4 hrs

done

aslam+ ahmed
hussain+sunawwer+aw 6 hrs
ais

done

sakhi dad+ waqar+


shaukat
tariq+ naeem
shaukat
shaukat
tanveer+rahib+ owais

tariq+ naeem
rustam+ rahib+ sakhi
dad+ asif

8 hrs

in progress

6 hrs

in progress

rustam+ rahib+ sakhi


dad+ asif

2 hrs

done

tariq+ naeem

8 hrs

in progress

ahmed hussain+aslam

6 hrs

done

rustam+ waqar

6 hrs

in progress

rustam+ waqar+ sakhi


2 hrs
dad+shaukat
sakhi dad
6 hrs

done
done

shaukat

6 hrs

in progress

munawar

6 hrs

in progress

munawar

2 hrs

done

sakhi dad+ shaukat+


waqar

2 hrs

done

munawar+owais

4 hrs

in progress

sakhi dad+ waqar+


shaukat+rahib

4 hrs

in progress

tariq+ naeem

8 hrs

in progress

sakhi dad+ waqar+


shaukat+rahib

4 hrs

in progress

tanveer+ naeem

8 hrs

in progress

aslam+ ahmed hussain 6 hrs

done

shaukat

2 hrs

in progress

sunawwer+munawar+o
8 hrs
wais

in progress

aslam+ ahmed hussain 1 hr

done

rustam+ waqar

in progress

Rustam
Rustam
Shoukat
Shoukat
Shoukat
Shoukat
Shoukat
Aslam+owais
Aslam+owais
Aslam+owais
Naem+owais

8 hrs

Naem+owais
Tanveer+Ahmed+naem
+owais
Tanveer+Ahmed+naem
+owais
Sakhidad+waqar+rahib

Munawer
Munawer
Munawer
Tanveer+Ahmed+naem
+owais+Aslam
Tanveer+Ahmed+naem
+owais+Aslam
Tanveer+Ahmed+naem
+owais+Aslam
Tanveer+Ahmed+naem
+owais+Aslam
naem+Aslam
Sakhidad+waqar+rahib
Sakhidad+waqar+rahib

munawer+sunawwer+o
8 hrs
wais

in progress

naeem+tanveer+sunaw
3 hrs
wer

done

ahmed
hussain+naeem+tanve 8 hrs
er

in progress

tariq

in progress

8 hrs

sakhi dad+ waqar


shaukat

4 hrs
4 hrs

done
done

owais

2 hrs

done

sakhi dad+ waqar+


rahib

4 hrs

done

naeem+tanveer+owais 3 hrs

done

sakhi dad+ waqar+


rahib

1 hr

done

sunawwer+owais

8 hrs

in progress

owais

2 hrs

done

aslam+naeem+tanveer 8 hrs

in progress

tariq+aslam

8 hrs

in progress

naeem+owais+tanveer 5 hrs

in progress

shaukat

2 hrs

done

shaukat

2 hrs

in progress

shaukat

1 hr

done

ahmed
hussain+sunawwer+wa 8 hrs
qas

done

sakhi dad+ waqar+


rahib

3 hrs

done

sakhi dad+ waqar+


rahib+shaukat

3 hrs

done

rustam+sakhi dad+
waqar

4 hrs

in progress

rustam+sakhi dad+
waqar

1 hr

done

sakhi dad+ rahib+


waqar+shaukat

2 hrs

done

S.No
4/1/2014
4/1/2014
4/1/2014
4/2/2014
4/2/2014
4/3/2014
4/24/2014

Job Description
TBS WINDOW FABRICATION AND WELDNING
scafolding at ST, RO and NG
Cable shifting
scafolding at ST, GT and ST Condensor Pit
Auto Backwash filter shaft machining
Repair Main gate of BQPSII
Oil drum shifting at CW intake
ST condensor pit platform grating fabrication
Check Post Folding installtion

Nature

Notification Opening WO openining date

WO Closing date

man power deployed

time

status/cause of unattended work

Comp
Comp
I/P
Comp

S. No Tasks
1 Fill water chiller system
2 Check water leakage
3 Check pump and bearing noise
4 Check chiller water temp.
5 Check chiller compressor
6 Check suction pressure
7 Check Discharge pressure
8 Check oil pressure
9 Check condenser fan motor
10 Check gas leakage
11 Check compressor oil level
12 Check water treatment HVAC
13 Check MRV system
14 Check miscellaneous HVAC

Material Code

Coalescer Filter
Description

UOM

10081716

GT; filter pad for coalescer filter

Each

Material Code

Description

UOM

10044240

Pre Filter: AmairPlast GT, Class: G-4

SET

Pre Filter

Pre Filter
Material Code

Description

UOM

10044242

HE Filter: DuraVee XL98G, Class: F-9

SET

Current Stock

GT

Date

1
2
3

Thursday, May 03, 2012


Friday, May 04, 2012

Current Stock
4,239

1
2
3

Current Stock
6,038

1
2
3

Saturday, May 05, 2012

Date
Thursday, May 03, 2012
Friday, May 04, 2012
Saturday, May 05, 2012

Date
Thursday, May 03, 2012
Friday, May 04, 2012
Saturday, May 05, 2012

Quantity
360
360
360
Quantity
1
1
1
Quantity
1
1
1

Date
Monday, June 04, 2012
Saturday, June 02, 2012
Monday, June 11, 2012

Date
Friday, July 06, 2012
Wednesday, July 18, 2012
Saturday, July 14, 2012

Date
Thursday, December 06, 2012
Monday, December 03, 2012
Friday, November 23, 2012

Quantity
360
360
360

Date
Monday, July 02, 2012
Tuesday, July 03, 2012
Thursday, July 05, 2012

Quantity
1
1
1

Date
Saturday, November 03, 2012

Quantity
1
1
1

Date
Sunday, April 14, 2013

Monday, December 03, 2012


Tuesday, November 20, 2012

Saturday, March 30, 2013


Friday, December 28, 2012

Quantity
360
360
360

Date
Wednesday, August 08, 2012
Saturday, August 18, 2012
Monday, August 06, 2012

Quantity
360
360
360

Quantity
1
1
1

Date
Monday, January 21, 2013
Saturday, January 26, 2013
Thursday, January 24, 2013

Quantity
1
1
1

Quantity
1
1
1

Date

Quantity

Sunday, March 31, 2013

Date
Saturday, October 06, 2012
Wednesday, November 14, 2012
Tuesday, September 25, 2012

Quantity
360
360
360

Date
Wednesday, March 27, 2013

Quantity
1
1
Saturday, March 09, 2013
1
Monday, March 18, 2013
Date

Quantity

Date
Tuesday, November 20, 2012
Wednesday, December 26, 2012
Thursday, November 01, 2012

Date
Friday, July 05, 2013
Friday, May 17, 2013

Quantity
360
360
360
Quantity
1
1

Date
Monday, December 31, 2012
Saturday, February 02, 2013
Friday, November 30, 2012

Date

Sunday, July 07, 2013


Date

Quantity

Date

Quantity
360
360
360

Date

Monday, December 24, 2012

Quantity
360
360
360

Quantity

Date

Quantity

Date

Quantity

Monday, February 25, 2013


Friday, March 15, 2013

1
Quantity

Date

Tuesday, February 12, 2013

Quantity
360
360
360

Wednesday, July 10, 2013


Thursday, April 11, 2013

Quantity
360
360
360

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Wednesday, April 24, 2013


Monday, April 29, 2013

Date
Saturday, June 22, 2013

Date

Quantity

Date

Quantity

Saturday, October 05, 2013


Saturday, May 25, 2013

360
360

Sunday, July 07, 2013

360

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Monday, October 07, 2013

360

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Material Code
402749
402748
402754
402755
10045739
402756
402752
10045740
402750
402751
402746
402747
10083919
10083861

Filters
Description
Filter; GAS DUPLEX COALESCING FILTER
Filter; GAS SUPPLY FILTER
Filter; HYDRAULIC ; FUEL GAS SRV
Filter; HYDRAULIC ; FUEL GAS GCV
Filter; Air, GT, Atomizing Air, Main
Filter; HYDRAULIC ; IGV CONTROLLER ASMBY
Filter;MAIN HYDRAULIC OIL SUPPLY FILTER
FILTER; HYDRAULIC, GT, JACKING OIL
Filter; HYDRAULIC SUPPLY FILTER
Filter; LIQUID FUEL FILTERS
Filter; Main lube oil filter
Filter; OIL MIST ELIMINATOR COALESCER
GT;BYPASS-FUEL OIL FILTER 315A2660P001
GT;HYDR SUPPLY FILTER 91449953P001

Lube oil
Material Code
Description
OIL; SHELL TURBO CC-32
20000967

Date

14/04/2013

Date
27/04/2013
Date

Heat Exchanger Record

22/7/2013

Quantity

Date

Quantity

9/16/2013

1-A

Quantity
2

Date
7/18/2013

In service
OCW Inlet temp.
OCW Outlet temp
CCW Inlet temp
CCW Outlet temp

B
31
37
44
33

Date

Quantity

Quantity
2

Date

Quantity

Date

In service
OCW Inlet temp.
OCW Outlet temp
CCW Inlet temp
CCW Outlet temp

25/7/2013

31
38
44
35

Date

Date

Date
27/7/2013

Quantity

Quantity

In service
OCW Inlet temp.
OCW Outlet temp
CCW Inlet temp
CCW Outlet temp

Date

Date

Quantity

Quantity

Date
32
41
29/7/2013
42
34

Date

Date

In service
OCW Inlet temp.
OCW Outlet temp
CCW Inlet temp
CCW Outlet temp

Quantity

Quantity

B
32
37
42
34

Date

Date

Quantity

Quantity

Date

Date

Quantity

Quantity

Date

Date

Quantity

Quantity

Date

Date

Quantity

Quantity

Date

Date

Quantity

Quantity

Date

Date

Quantity

Quantity

Date

Date

Quantity

Quantity

Date

Date

Quantity

Quantity

Date

Date

Quantity

Quantity

Date

Date

Quantity

Quantity

Date

Date

Quantity

Quantity

Material Code

Filters
Description

402749
402748
402754
402755
10045739
402756
402752
10045740
402750
402751
402746
402747
10083919
10083861

Filter; GAS DUPLEX COALESCING FILTER


Filter; GAS SUPPLY FILTER
Filter; HYDRAULIC ; FUEL GAS SRV
Filter; HYDRAULIC ; FUEL GAS GCV
Filter; Air, GT, Atomizing Air, Main
Filter; HYDRAULIC ; IGV CONTROLLER ASMBY
Filter;MAIN HYDRAULIC OIL SUPPLY FILTER
FILTER; HYDRAULIC, GT, JACKING OIL
Filter; HYDRAULIC SUPPLY FILTER
Filter; LIQUID FUEL FILTERS
Filter; Main lube oil filter
Filter; OIL MIST ELIMINATOR COALESCER
GT;BYPASS-FUEL OIL FILTER 315A2660P001
GT;HYDR SUPPLY FILTER 91449953P001
Lube oil

20000967

OIL; SHELL TURBO CC-32

Date

26/04/2013
23/04/2013

25/07/2013

27/04/2013
Date

Heat Exchanger Record

22/7/2013

Quantity

Date

Quantity

Date

Quantity

Date

In service
OCW Inlet temp.
OCW Outlet temp
CCW Inlet temp
CCW Outlet temp

Date

2
2

10

2
In service
OCW Inlet temp
OCW Outlet temp
CCW Inlet temp
CCW Outlet temp

24/07/2013
B

2
Date

32
40
25/7/2013
43
34

31
40
27/7/2013
44
34

Quantity

Date

Quantity

Date

Quantity

In service
OCW Inlet temp.
OCW Outlet temp
CCW Inlet temp
CCW Outlet temp

Date

In service
OCW Inlet temp.
OCW Outlet temp
CCW Inlet temp
CCW Outlet temp

32
41
29/7/2013
43
34

32
40
42
34

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Filters
Material Code
402749
402748
402754
402755
10045739
402756
402752
10045740
402750
402751
402746
402747
10083919
10083861

Description

UOM

Filter; GAS DUPLEX COALESCING FILTER


Filter; GAS SUPPLY FILTER
Filter; HYDRAULIC ; FUEL GAS SRV
Filter; HYDRAULIC ; FUEL GAS GCV
Filter; Air, GT, Atomizing Air, Main
Filter; HYDRAULIC ; IGV CONTROLLER ASMBY
Filter;MAIN HYDRAULIC OIL SUPPLY FILTER
FILTER; HYDRAULIC, GT, JACKING OIL
Filter; HYDRAULIC SUPPLY FILTER
Filter; LIQUID FUEL FILTERS
Filter; Main lube oil filter
Filter; OIL MIST ELIMINATOR COALESCER
GT;BYPASS-FUEL OIL FILTER 315A2660P001
GT;HYDR SUPPLY FILTER 91449953P001

Lube oil
Material Code
Description
OIL; SHELL TURBO CC-32
20000967

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

UOM
Drum

Heat Exchanger Record

cord

Current Stock
0
0
0
0
0
3
4
4
0
4
0
0
0
0

Current Stock
13

Date

Quantity

4/26/2013
4/23/2013

2
2

8/23/2013

1(B)

Quantity
2

Date
7/10/2013

Quantity
4

In service
OCW Inlet temp
OCW outlet temp
CCW Inlet temp
CCW outlet temp

Date

Date
4/27/2013
Date
22/7/2013

Date

Quantity

30
45
25/7/2013
42
33

Date

Quantity

Date
7/18/2013

Quantity
3

In service
OCW Inlet temp.
OCW Outlet temp
CCW Inlet temp
CCW Outlet temp

Date

Quantity

Date

Date

Quantity

Date

Date

31
Gauge faulty
27/7/2013
44
34

In service
OCW Inlet temp.
OCW Outlet temp
CCW Inlet temp
CCW Outlet temp

B
32
Gauge faulty
43
32

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Date
29/7/2013

In service
OCW Inlet temp.
OCW Outlet temp
CCW Inlet temp
CCW Outlet temp

B
30
Gauge faulty
42
32

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Quantity

Date

Quantity

Date

Quantity

Air Compressor Filter and Oil Summary


Instrument
UOM
Air Compressor
Current S
#1
2000
Oil Filter Each
0 23-Apr-12 from HE
Air Filter Each
0 23-Apr-12 from HE
Oil separatEach
0
Oil
Drum
0

4000
Running HRS
6000
8-Sep-12 from HE
8-Sep-12 from HE

Instrument Air Compressor #2


2000
Oil Filter
23-Apr-12 from HE
Air Filter
23-Apr-12 from HE
Oil separator element
Oil

4000
Running HRS
6000
27-Jun-12 from HE
27-Jun-12 from HE

Service Air Compressor #1


Oil Filter Each
0
Air Filter Each
0
Oil separatEach
0
Oil
Drum
0

2000
Aug-12 from HE
Aug-12 from HE

4000
Running 6000
HRS
22-Jan-13 from HE 12-Sep-13
22-Jan-13 cleaned 12-Sep-13
12-Sep-13
22-Jan-13 from HE 12-Sep-13

2000
17-Apr-12 from HE
17-Apr-12 from HE

4000
Running 6000
HRS
Oct-12 from HE
Oct-12 from HE

Service Air Compressor #2


Oil Filter
Air Filter
Oil separator element
Oil

8000
11-Sep-13
11-Sep-13
11-Sep-13
11-Sep-13

10000

12000

14000

16000

18000

8000
9-Sep-13
9-Sep-13
9-Sep-13
9-Sep-13

10000

12000

14000

16000

18000

8000

10000

12000

14000

16000

18000

8000
14-Sep-13
14-Sep-13
14-Sep-13
14-Sep-13

10000

12000

14000

16000

18000

20000

20000

20000

20000

Filters
Description

Material Code
10039361

10046904

Filter Element 1104 Filter

each

Oil Station Spare;Oil Filter Core

each

Lube oil
Description

Material Code
20000961
20000961
20000961

UOM

OIL; SHELL TURBO T-46


OIL; SHELL TURBO T-46
OIL; SHELL TURBO T-46

UOM
drum

Heat Exchanger Record

ecord

Current Stock

Date

46

A
B

NG1
NG2
NG3

Current Stock
36

NGC-1
NGC-2
NGC-3

Date
8/16/2013
8/16/2013

Date
22/7/2013

Quantity

Quantity
2
2

In service
OCW Inlet temp
OCW outlet temp
CCW Inlet temp
CCW outlet temp

Date
30
37
52

25/7/2013

Date

Quantity
8/16/2013
8/16/2013

In service
OCW Inlet temp
OCW outlet temp
CCW Inlet temp
CCW outlet temp

2
2

Date
30
38
27/7/2013
43
48

In service
OCW Inlet temp
OCW outlet temp
CCW Inlet temp
CCW outlet temp

A
30
39
43
49

BSDG Filters
Description

Material Code
10039099
10039098
10039097
10039100

Air Filter M2500S-AF


Fuel Filter M2500S-FF
Oil Filter M2500S-OF
Oil-water Separator M2500S-OW

Material Code
10039104
Air Filter P1500P-AF
10039103
10039102
10039105

EDG Filters
Description

Fuel Filter P1500P-FF


Oil Filter P1500P-OF
Oil-water Separator P1500P-OW

Lube oil
Material Code
Description
Oil; BSDG EDG;Shell Rimula 4X
20001274

UOM
each
each
each
each

UOM
each
each
each
each

UOM
drum

Current Stock

Date

Quantity Date

Quantity

Date

Quantity

Date

Date

Quantity Date

Quantity

Date

Quantity

Date

Date

Quantity

5
5
10
23

Current Stock
10
10
10
15

Current Stock
0

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Date

Quantity

Quantity

Date

Quantity

Material Code
402745
402744
402742
402743

Filter;
Filter;
Filter;
Filter;

Filters
Description
Activated Carbon Filter
Dust Refining Filter : ZLF-6/10
High Effeciency Oil Eliminator
Precise Filter : ZAL-12/10

UOM
EA
EA
EA
EA

Current Stock
0
10
10
10

Date

Quantity