Professional Documents
Culture Documents
BTC-PSA2
Client:
Inspected By:
Abdallah Abdeldayem
Date of
Inspection:
20/5/2013
System Tag:
System 24
Date
Commissioned:
2005
Work Order
Number:
Inspection
Routine:
System
Description:
Date of
Previous
Vessel
C6E4E
C6P0E
Tank
102
103
C6E4E ( 100/-24)
C6P0E ( 65 /- 29)
BP AZ SPU
Location / Area
Code:
B12C-SYS24
External Visual
Inspection
Crude oil
N/A
Previous Report
No.:
N/A
Pig Trap
H. Exch
Other
Line No.:
WKP012-B12C-2013-VI
Piping System
Piping
Process Service:
Fuel Gas
Material Specification:
C6E4E
C6P0E
A106 GR B
API 5L GRB
Auxiliary Equipment:
Heat Traced:
P t 2.
2 Li
it ti
(hi hli ht areas with
ith no CVI , no access, etc)
t )
Part
Limitations
(highlight
No limitation for external inspection
BTC-PSA2
Client:
Inspected By:
Abdallah Abdeldayem
Date of
Inspection:
20/5/2013
System Tag:
System 24
Date
Commissioned:
2005
Work Order
Number:
Inspection
Routine:
System
Description:
Date of
Previous
BP AZ SPU
Location / Area
Code:
B12C-SYS24
External Visual
Inspection
Crude oil
N/A
Previous Report
No.:
Line No.:
WKP012-B12C-2013-VI
Piping System
N/A
Part 17 Recommendations
1- Perform local coating repairs to corrosion under insulation of flange of valve no HV-24118 ( see part 4 )
2- Repair the damaged insulation of line no. 3''-PL-24-107-C6E4E-HT ( see part 4 )
3- Wrap Soil / Air interface areas of 42'' inlet and outlet main lines of the cited station ( see part 5 )
4- Clean the accumulated brids droppings which are found on piping at MOL's and strainers areas ( see part 4 )
Current MMS 60
PM Freq
(Month):
N/A
Ref RBIA
Process:
Inspector's name:
(Print)
Inspector's name:
(Sign)
Senior Inspector Engineer
name: (Print)
Senior Inspector Engineer
name: (Sign)
Next Inspection due date from output
from RBIA :
None
Date:
Date:
AttachedPhotosofCrudeOilSystemAtPSA2Station
1
Corrosionunderinsulation
4
Insulationdamagedatfeature67ofline3''PL24107C6E4EHT
6
AttachedPhotosofCrudeOilSystemAtPSA2Station
8
S/Ainterfaceareasofmaininletandoutletlinesarenotwraped
Deadend
25-09-2002
Attach. 1
F24660/F24760
10
P24600
BOOSTER PUMP
CAPACITY : 200 3
m /hr.
CAPACITY : 200 3
m /hr.
168A1H.DW G
1"x2"
THERMAL
PSV
24660
SET AT
83 barg
C1E4E
2"
C6E4E
HV-571048
LO, FB
1"-PL-24-316-C6E4E-HT
83 barg
2"
1"-PL-24-213-C6E4E-HT
HV-241191
8"
PG
PIT
24600
1"
8"-PL-24-314-C6E4E-HT
LO, FB
C03
1"
HV-241111
8"x6"
DBB
3/4"
DBB
8"x6"
HV-241197
NOTE 8
8"x6"
8"x6"
NOTE 8
DET. 2
3"
USD
SSD
B12C-PR-PID-00006-SHT002
ESD
DBB
DET 9
VENDOR
2"-DX-57-123-C1E4E-HT
1"x2"
2"-DX-57-100-C6E4E-HT
HV-572046
2"
NC
C1E4E
2"-DX-57-106-C1E4E-HT
C6E4E
2"
HV-561012
2"-DH-56-216-C6E4E-HT
2"NC
2"-DX-57-105-C1E4E-HT
2"
HV-562031
C6E4E
HV-572045
2"-DH-56-085-C6E4E-HT
2"
2"-DX-57-104-C1E4E-HT
2"-DH-56-084-C6E4E-HT
4"-DH-56-086-F1E0Y
TO SCRAPER RECEIVER
8"
MOV
HV-242188
NC
2"
8"
8"
HV-242187
HV-561031
HV-241159
2"-DX-57-103-C6E4E-HT
2"
CONTRACTOR
8"
HV-571045
24600
24600
HV-571050
2"-DX-57-101-C6E4E-HT
1"
2"
HV-242192
TRIM : PL-24-325-C6E4E-HT
HV-242191
F24760
HV-241114
TS
HV-572048
LO, FB
8"-PL-24-106-C6E4E-HT
24600
B12C-PR-PID-00001
HV-241032
6"x8"
2"
C6E4E
MOV
1"
C1E4E
8"
FIT
009
022
RS
1"-PL-24-317-C6E4E-HT
02/06/05-11:13-SHAFQAT-G:\JI
-168\FACI
LI
TI
ES\B12C\PROCESS\AS-BUI
LT\PI
D\BTC002-B12C-PR-PI
D-00006-SHT001.dwg
LO FB
8"
HV-241160
RS
SP
HV-241301
NOTE 2, 7, 13, 17
DBB
3/4"
P24600
HV-241110
HV-241115
1"
DBB
3/4"
3/4"
SET AT
83 barg
HV-241109
HV-241190
THERMAL
DBB
HV-571046
2"
DBB
3/4"
HV-241189
1"x2"
24600
DET. 2
SP
FIT
NOTE 11
PG
8"-PL-24-105-C6E4E-HT
C1E4E
4"-DH-56-091-F1E0Y
4"-DH-56-087-F1E0Y
2"-DX-57-102-C1E4E-HT
2"-DX-57-131-C1E4E-HT
AG
AG
AG
BG
BG
BG
100
B12C-PR-PID-00023
C1E4E
AG/LOT
C1E4E
AG/LOT
C1E4E
AG/LOT
C1E4E
AG/LOT
C1E4E
AG/LOT
F1E0Y
BG
F1E0Y
BG
F1E0Y
BG
F1E0Y
BG
F1E0Y
BG
4"x2"
4"x2"
4"x2"
4"x2"
4"x2"
4"x2"
1
100
B12C-PR-PID-00023
BTC003-B000-PR-PID-00001
BTC003-B000-PR-PID-00002
BTC003-B000-PR-PID-00005
BTC003-B000-PR-PID-00006
BTC003-B000-PR-PID-00007
BTC003-B000-PR-PID-00008
BTC003-B000-PR-PID-00009
BTC003-B000-PR-PID-00010
DRAWING NO.
DRAWING TITLE
REFERENCE DRAWINGS
NOTES CONTD:
15. NO TWO CLOSED DRAINS ARE TO BE OPERATED SIMULTANEOUSLY.
16. FOR ACTUAL ROUTING OF DRAINS REFER PIPING UNDERGROUND DRAWINGS.
AS BUILT
NOTES:
1. ALL EQUIPMENT, INSTRUMENTS, LINE AND VALVE NUMBERS ARE TO BE PREFIXED BY B12C.
CLIENT :
XXXX
.
AND ABOVE TO BE ROUTED TO OPEN DRAIN HEADER VIA THE NEAREST TUNDISH.
11. MECHANICAL INTERLOCK BETWEEN SCRAPER TRAP DOOR AND ISOLATION VALVES.
PETROFAC
INTERNATIONAL L
.
Z01
REV
3
13-10-05
DATE
AS BUILT
SPN
DESCRIPTION
AV
VT/BP
.
BTC
:N A
LANG. CODE
DRAWING NUMBER :
SHEET NO.
REV
001/002
Z01
CONTRACTOR JOB NO
: JI-168
BTC002-B12C-PR-PID-00006-Sht001
: A1
CLASS:
TD.
12. PROVIDE HIGH POINT VENT AND LOW POINT DRAIN TO ALL ABOVE GROUND LINES.
7. FOR THE PUMP SEAL FLUSHING DETAILS, REFER TO DRAWING No.- BTC003-B000-PR-PID-00011.
SPIE
Spie Capag s.a.
13. ROUTE BASE PLATE DRAIN TO OPEN DRAIN SYSTEM (LINE No. 2"-DH-56-340-C1E4E).
CONT.
.
.
EPC
DBB
PIT
24600
3/4"
HV-241188
PSV
24760
C1E4E
HV-241195
FI
24600
24600
C6E4E
FO
USD
24600
NOTE 14
PAHH
24600
DBB
1"
LO, FB
HV-241192
8"
HV-241187
3"
F24660
B12C-PR-PID-00001
HV-241196
TRIM : PL-24-324-C6E4E-HT
2"
PI
24600
1"
FB
FIC
24600
HV-241199
4"
B12C-PR-PID-00001
3"
HV-241194
HV-571031
LO
PDIT
4"x3"
4"x3"
4"
4"-PL-24-313-C6E4E-HT
C6E4E
24660
NOTE 14
C1E4E
1"
FV
24600
SET AT
HV-241198
THERMAL
PSV
24600
HV-241193
PDI
24660
1"x2"
10
Attach. 2
87
86
85
84
83
82
81
80
76
75
80
77
74
73b
79
71
72a
70
69
68
67
66
65
64
Attach. 3
25
27
24
DEAD LEG
26
22
19
28
23
18
21
20
17
15
14
16
13
11
12
09
10
07
08
06
05
04
01
03
02
Ref. photo 7
This suction had been
removed and blind flange
was installed