In April of 2014,the Troy City Council began conducting a series of hearings concerning the
oversight of both the Planning department and Building and Code in the Engineering
department. These hearings wereprecipitatedbythreeeventsthatweresignificantenoughto
warrantaformalinquirybytheCityCouncil.
The events in question were: the demolition and disposal activities occurringon and around
the King Fuelsbrownfield site in South Troy the August 2013 emergency demolition of 410
King Street and resulting public safety concerns and the use of the Troy City Code
department to place an eviction/evacuation notice on the doors of 51 3rd Street based on
politicaldiscussionsoccurringthere.
April 29, 2014 with testimony from Charles Casale, Anthony Dawson, Russ Reeves,
BarbaraTozzi
May8,2014withtestimonyfromFloraCarr,RyanPreston,JackHealy,MichaelCristo
May 28, 2014 with testimony from John Tirino, Dan Ditonno, Don Boyajian, Harry
Tutunjian
June 3, 2014 with testimony from Damon Dzembo, Jim Rivers, Barbara Tozzi, Mike
Hayner,TomGarrett
June 17, 2014 with testimony from Ben Brucato, Dave Sheeran, Bill Dunne, Andrew
Kreshik
September 11, 2014 with testimony from Ian Silverman, Peter Ryan, and Lou
Rosamilia
An appendix is also included with the speakers who were invited orcompelled to testify for
thesehearings.SeeAppendixB(ListofWitnesses).
While the Troy City Council makes no claim of criminal fault in any of these situations, the
absence of any such claimsshall notimplythatcriminalwrongdoing didnotoccur. Itisnoted
that other qualified agencies are conducting external investigationsinto the legality ofcertain
cityprocessesandanycriminalactivitysurroundingtheseevents.
Further, the CityCouncilsoughttogainanunderstandingoftheactivitiesthatultimatelyledto
the aforementioned events. TheCityCouncilperformed thisdutywiththegoalofencouraging
the administration to develop policies and procedures to rectify mistakes and prevent these
typesofactivitiesfromoccurringagain.
This report will be dividedinto three sections, each covering one of the major topicsdetailed
above, followed by a conclusion and appendix thatcontainsadditionalinformationrelevantto
thisreport.
The area in South Troy known as the King Fuels site has been mostly abandoned since the
King Fuels processing facilitieswere shut down andacquiredbyNationalGridoveradecade
ago. The site is divided into several parcels, one ofwhichis ownedandoperatedbytheTroy
Local Development Corporation (LDC). Much of this site is in need of remediation due to
toxic materials which are contained in the ground. It is classified as a brownfield area.
Current remediation efforts include the removal of abandoned buildings and a brownfield
cappingprogramunderthepurviewofNationalGrid.
On November 22, 2013, then City Engineer Russ Reeves notified the City of Troy of his
concerns over the LDCs management of the demolition of two buildings on this site. Mr.
Reeves was especially concerned by not having been provided withguidanceorengineering
siteplansconcerningthedemolitions,forreviewbyhimselforaqualifiedlicensedengineer.
The LDC and the King Fuels site project manager, Mr. Andrew Kreshik of the Troy Planning
Department, under the supervisionofPlanning CommissionerBillDunne,hiredtheconsulting
firmof Ryan Prestontoprepareanengineering reportoutliningtheproceduresforacontrolled
demolitiononthissite.
Mr. Prestons report and recommendations were then shared with the site contractor, PCS,
which is headedbyJohnTirino. Mr.TirinohiredlocaldemolitioncontractorDitonnoandSons
toperformthedemolitionoftheBenzolbuilding#5.
Ditonno and Sons performed the demolition of the former Benzol building in what has been
characterized as anuncontrolled demolitionduringtestimony bybothengineerswhoviewed
the demolition. Both Mr. Ditonno and Mr. Tirino confirmed that the engineering demolition
plans were not completely shared with the demolition contractor, and would not have been
followed by Mr. Ditonno even if theywere shared. Mr. Ditonno cited his priority to bring the
building downas quickly andcheaplyaspossible,andthattheengineeringplans,whichwere
In additiontothedemolitionoftheBenzolbuilding,otherstoragefacilitiesweredemolishedon
the site. Some of these demolitions were performed bythecontractorCharlesJ.R.Casale.
Based on testimony given, Mr. Casale was not in contactwiththeEngineeringdepartmentor
Mr. Reeves in particular. His point of contact was Mr. Kreshik, and all decisionmaking
concerning processes and order for demolitions were run through him. Mr. Casale testified
that he and his demolition activity was within forty (40) feet of the natural gas line E20, but
since he was operating on private property, there was no requirement to contact National
Grid. He felt that their proximity to the natural gas line E20 did not require or suggest
communicationwithNationalGridtoadvisethemofthedemolitionactivity.
On April 17, 2014, National Grid crews were alerted to thediscoveryof demolitionprocesses
which were occurring on the King Fuels site. They arrived on the scene todiscover activity
consisting of serious construction and movement of demolition debris. This site is also a
location to a highpressure natural gas main E20 which feeds the city of Troy and other
surrounding communities with natural gas at a high pressure of 225 PSI (pounds per square
inch).
At the time of this discovery, National Grid immediately contacted the Mr. Reeves and
requestedthatthesitebeshutdownimmediatelyfromallactivity.
Mr. Jim Coffee, a representative from National Grid informed the city engineer that if this
natural gas linewerecompromised,itwouldproduceamassiveexplosionwithinthecitylimits
of Troy and it would result in fatalities in the immediate vicinity, and an extensive loss of
propertyintheSouthTroyarea.
In written testimony, Mr. David Zielinski, National Grids Director of NY Instrumentation and
Regulation, furtherdescribedthepotentialdamagetothesiteandcityasbeingcatastrophic.
Mr. Zielinski furthercomparedtheresultingdamagetothatofmilitaryordinancebeingfiredon
Firefighters would have no means of extinguishing the fires that were resulting due to the
intense radiant heat that would be spreading hundreds of feet from the epicenter of the
incident. Additionally, traffic patterns and daily life in the surrounding areas would be
disruptedaftersuchanincident.
Mr. Reeves immediately notified National Grid of his concerns. He then contacted Troy
Mayor Lou RosamiliaandDeputy Mayor Peter Ryan to summarize the conversationsthathe
had with National Grid. Specifically, he was concerned that the LDC and Cityof Troy staff
were performing engineering activities and demolition tasks without direct consultation with
the City of Troys Engineering department. As such, hisdepartment wouldbeunabletofulfill
itsresponsibilitytoensurelifesafetyandpersonalpropertysafetyatthesite.
Mr. Reeves subsequently tendered a letter of resignation on April 21st, 2014, citing his
concerns over a perceived lack of life safety issues with the City of Troys management,
culminating with this incident, and how it would potentially affect his license andinsurancein
hispositionastheCityEngineer.
Based on photographic and video evidence provided during the hearings and
testimony, it is apparent that this site is essentially an uncontrolled site where a
multitude of activities, including demolitions, heavy vehicle movement, and dumping
areoccurring.
This site, in its uncontrolled and unsecured nature, has been compromised due to
unwarranted traffic, transportation, trespass, and other nonsanctioned activity.
Proper communication, notification, and cooperation wasnotcoordinatedbetweenthe
various entities who had a needtoknow. Activities such as demolitions,which were
being conducted onthe site, were not properly communicated toallvested parties by
the City staff of the Troy LDC. These vested parties were in particular: Mr. Russ
Reeves and the Citys Engineering Department, National Grid, and site occupants
eLot.
Based on the testimony that was given, the recommendations and best practices of
engineers and engineering firms were callously and flagrantly disregarded by the
contractor,DitonnoandSons,whowasemployedtoconductthedemolitionprocess.
It is clear that both rubbleanddebris were moved in the days orweeks leading upto
April 17, 2014 on to the area that contains the highpressure naturalgas main. This
debris was placed there by heavy construction equipment with treads. Based on
conflicting testimony given during the hearings, it was not possible to determine the
originoftherubblethatwasplacedontopofthegasline.
Mr. Kreshiksuggestedthathisroleandpersonalqualificationsandexperiencegranted
him the ability to oversee engineering decisionmaking with regard to the demolition
activity on the LDC site. Itappearsthattherewasinsufficientconcernforsafetyanda
lack of professional engineering oversightbytheLDC. Suchoversightwouldtakeinto
account the potentialhazardsofdemolitionandtheintegrityofthehighpressuremain.
Had the demolitions compromised the natural gas supply which feeds tens of
thousands of residents, serious injuries as well as loss of the gas supply couldhave
resulted.
Based on testimony given by Mayor Rosamilia and Deputy Mayor Peter Ryan, they
were not aware of demolition activities and general activities that were being
conductedbyMr.DunneandhisLDCstaffconcerningtheKingFuelssite.
The City of Troy, as the authority having jurisdiction over building permits and
demolition permits, must create and enforce a demolition approval policy. Thispolicy
must include the Engineering department to review and approve all demolition
activities commencingon properties located within the citylimitsofTroy,regardlessof
ownership.
The City of Troy, as the authority having jurisdiction should not grant demolition
permits to general contractors or landowners unless they develop and provide a
qualified engineering demolition and sitesafety plan. This plan must be submitted to
the City for approval and must be subsequently shared with, and agreed upon, by
contractorsandsubcontractors.
Demolition permits should only be granted when general contractors have indicated
that they are hiring demolition subcontractors who meet the City's approval and are
qualified in the type of demolition to be performed, as specified in the engineering
documents. Furthermore, the general contractor and site owner/manager must take
precautions to validate and supervise the demolition contractors work. The general
contractor and/or owner should receive a written commitment fromthesubcontractors
as to the understanding and acceptance of an agreedupon engineering plan for
demolitionactivities.
Once a demolition contractor has been listed with a negative rating, the only
remediation method to be removed from this list is to have the Engineering or Code
departmentwitnessasubsequentdemolitionwheretheydemonstratebothappropriate
knowledge and responsibility toadheretoa predeterminedengineeringplan. Allcosts
associated with the Citys supervision will be borne by the subcontractor for thetime
and expense associated with a City employee witnessing the reapproval demolition
activity.
The City of Troy should not grant demolition or construction permits on hazardous
sites that are not secured. The Troy Local Development Corporation should take
action to properly secure the site, such as the erection of a perimeter fence.
Alternatively, the LDC may secure the site by means of video and surveillance or
regularpatrolstothesitetoensurethatunwarrantedactivityisnotoccurringthere.
Better oversight and communication between the Mayors office and its direct reports
must be established, especially in the instances where City of Troy employees are
also acting in an official capacity on outside agencies such as the Troy LDC. The
administration should insist on free flowing information between all parties with a
needtoknow in the subject matter.
Specifically, effective and thorough
communication, information sharing, and collaboration must be fostered and
encouraged between the members of the Planning department and the Engineering
and Code department concerning matters of this nature. This must be instilled from
thetopdown,startingwiththeMayorsoffice.
The City of Troy should appreciate that the situation was averted only through good
fortune and potentially good timing. However, a much larger catastrophecouldhave
occurred. The Mayors office should take serious and swift action to rectify this
immediately by following the outlined security solutions and processimprovements,or
thesiteshouldbeshutdowncompletely.
The building at 410 King Street was purchased by local attorney Donald Boyajian in
December, 2009. Mr. Boyajian already owned 2 King Street, having inherited it from his
uncle. That building, which was previously known as American Food Market, would
eventually become a restaurant Troy Bombers Burrito Bar. He later purchased1218King
Street,withplanstoeventuallyredevelopthatentirestripofKingStreet.
The structure at 410 King Street sat vacant and in disrepair for the next three and a half
years following its purchase. The City issued several code citations to Mr. Boyajian in the
years prior to the demolition. The citations ordered him to either repair the structure, or to
demolish it. The building was not properly secured, and mischievous persons wouldbreak
intothebuildingregularly.Thesebreakinswouldoftenrequirepoliceinvolvement.
In 2012, the Troy Fire Department began training personnel in a new program that would
assess over 500 vacant buildings in the city and place red X placardson buildings that are
deemed too dangerous to be entered by firefighters. The buildinginspections began in the
springof2013.
On Friday, August 2, 2013, Chief Garrett ordered Chief McMahon to begin placarding the
worst buildings, which in his opinion were 410 King Street, as well as 2139 and 2141 5th
Avenue. The placarding would actually beginon thefollowingMonday,witharoundforty(40)
buildings being targeted for the placard. On Sunday, August 4, 2013, City Engineer Russ
Reeves began a oneweek vacation. As such, he would not be in the area for the start of
placardingoranyotheractionsbeingtakenwithrespecttothesebuildings.
The buildings at 2139 and 2141 5th Avenue wereadjacent properties located at the rear of
the parking lot area behind 410 King Street. These propertieswere previously listed on the
Citys surplus property disposal list for sale to the public. In various testimony given, these
5th Avenuepropertieswerevaluableforany developmentonthissiteinboththeirproximityto
410KingStreetandtheiraccessto5thAvenuefromthebackoftheparkinglot.
Both buildings burned in February of 2014, were suspected of arson by the Fire Chief, and
were subsequently demolished. Flora Carr of Bethel Baptist Church testified that, after the
fires and subsequent demolition, her church attempted to purchase these properties for use
as additional parking. Both parcelsweresubsequently removedfromthesurpluspropertylist
on February 12, 2014 by the Mayors office. On March 7th, 2014, the administration
communicated with Bethel Baptist Church erroneously, stating that their bid offer was not
acceptedbytheCityCouncil.
Based on testimony given, Mr. Boyajian flagrantly disregarded and ignored repeated
directivesincitationsbytheCitytoeitherrepairordemolishtheproperties.
Mr. Boyajians refusal to comply with these instructions from Code, while saving him
the expense of repair, remediation, and permitting, allowed the building to fall into
furtherdisrepair.
Mr. Boyajian failed to properly secure the premises at 410 King Street, as the Fire
Chief indicated that the building was not properly boarded up. In addition, the City
failedtoenforcethisrequirementappropriately.
Mr. Boyajian had adesire to demolish 410 King Street and other attachedproperties
as part of his plans to commercially develop that area years prior to the actual
emergencydemolition.
Mr. Boyajian made multiple attempts with the previous administration and City
Engineer Russ Reeves tohave the building razed through an emergencydeclaration,
butwastoldtofollowthestandardprocedurefordemolitioneachtime.
Mr. Boyajian, as well as multiple city officials, was aware that the building contained
asbestos.
Mr. Boyajian contacted multiple contractors to receive quotes for demolition and
asbestosabatement.
Mr. Boyajian benefited financially by avoiding the expense associated with asbestos
abatement. Further savings were realized by avoidingthetimeconsumingprocessof
obtainingpermitsandPlanningapprovalforaproperandlawfuldemolition.
A proper and orderly demolitionis,in the opinion of this Council,a safer and smarter
way to remove a building, rather than an emergency demolition, which lacks the
planning and review ofa standarddemolition. Theapparentdiminishedlevelofpublic
safety during an emergency demolition directly contradicts the Fire Chiefsclaimthat
publicsafetywastheprimaryreasonforthisdemolition.
The building at 410 King Street was not in imminent danger of collapse nor an
immediate threat to public safety. The standard demolition process, including
asbestos abatement, could and should have been utilized, rather than an emergency
declaration.
The demolition of 410 King Street produced a debris cloud that was atleast partially
contaminatedwithasbestos.
Based on testimony given, asbestos fibers can remain airborne for days after being
disturbed.
Public safety was put at risk when the public was allowedtocongregateinthevicinity
of the demolition, in the absence of any air quality monitoring. It is highly likely that
membersofthepublicinhaledasbestoscontaminatedair.
Public safety was additionally put at risk when patrons at the adjacent Bombers
restaurantwerenotevacuatedpriortodemolition.
The contractor utilized for demolition was unaware of whom he should maintain
contact with during the demolition process. Additionally, the contractor made
assumptions regarding the Citys role in providing public safety support (curious
bystanders, patrons, pedestrians, nearby businesses), as he had no official contact
personwithintheCity.
The demolition contractor had concerns for the safety of his machineoperator should
an unforeseen collapse of the adjacent wall of Bombersoccur during the demolition
activities.
The FireChiefdidnotconsultwithanengineerpriortoorderingthisdemolition,nordid
the Fire Chief consult with any city officials regarding a possible evacuation of
Bombers.
The Fire Chief lacks the credentials of a certified professional engineer, and is
therefore not as wellequipped to make evaluations on the structural integrity of a
buildingastheCityEngineer.
The Fire Chief ultimately assumes responsibility for all aspects of Incident Command
intheabsenceoftheCityEngineer.
In theabsenceoftheCityEngineer,theresponsibilityto maintainproperandadequate
public safety during Incident Command rests with the Fire Chief, and any failure to
upholdthesepublicsafetystandardsshouldresultinappropriatediscipline.
The Mayor failed to hold the Fire Chief accountable for the breaches inpublic safety
duringthedemolitionof410KingStreetunderIncidentCommand.
Prior to and during the hearings, the Council suggested that the administration
evaluate current demolition practices and make the necessary changes to laws and
procedures to avoid such lapses in public safety in the future. To date, thishas not
occurred.
The Council proffers the following recommendations as a result of its investigation into the
demolitionof410KingStreet:
Evacuation of areas surrounding a demolition site: One goal that was shared by
all participants at our hearings was ensuring the safety of the public atalltimes. The
simplest way to achieve this goal is to keep the public away from any site of
demolition. At no time should public safety be jeopardized for the sake of
convenience, expedience, or revenue. If there is a question as to whether or not the
public should be evacuated from a nearby residence orbusiness,wesuggestthatthe
Cityalwayserronthesideofcautionbyevacuatingthepremises.
Improving the demolition process: During the hearings on the King Street
demolition, theCouncilsuggestedthatthe administrationrevisitthecurrentprocedures
An incident that occurred at Kokopellis Club at 124 4th Street in Troy received widespread
media coverage. Public concerns developed around opposing views about the incident,
managementof1244thStreet,andthepoliceresponse.
Unruliness and physical confrontation continued inside and outside of 124 4th Street, with
actions including the activation of a fire extinguisher, a garbage receptacle being thrown
through the rear window of a police vehicle, injuries sustained to six police officers and
several patrons, and the eventual arrests of five persons for disorderly conduct, civil
disobedience and/or resisting arrest. Of note, the Troy Police Department had concerns
about this establishment and the planned event. Preparations included moving the Mobile
CommandCentertoanearbylocation.
After the incident, the owner released video files from sixteen securitycamerastothemedia,
the Troy PD, and City Council President Wiltshire. The local television media broadcast the
altercation inside 124 4th Street and the use of force on weekend news shows. On Monday,
the Mayor issued a message to the media supporting the necessary use of force.
Subsequently, a news conference, including presentation of video of mayhem outside of
Kokopellis,wasconductedbytheadministration.
Certain community members had expressed concern about police use of force prior to the
Kokopellis incident and had opposing views. The African American Pastoral Alliance
submitted a statement of concerns regarding the Troy police to the Department of Justice
citing this incident and several other cases. Reverend Willie Bacote of the Missing Link
Church called for a March Against Police Brutality on February 4, 2014, to conclude at the
previously scheduled Public Safety Committee meeting of the City Council. A group of
citizensintendedtogatherat513rdStreettoplanthemarch.
events and discussions. These often reflect collective interests and concerns about the
environment, social justice, and empowerment. One tenant, Ben Brucato, provided support
for Reverend Bacote in expressing concerns about use of force by police. As a PhD
candidate at Rensselaer Polytechnic Institute, his area of research is communitypolice
relations.
A notice forbidding continued use of 51 3rd Street under penalty of fine or imprisonment was
posted on theentry door on Friday, January 31, 2014 atapproximately 11:00am by the Troy
Building Code Department. Mr. Ben Brucato, a tenant at 51 3rd Street, contacted Robert
Doherty, District 4Councilman,atapproximately4:00pm,lodgingacomplaintthatthisposting
wasaretaliatoryactbytheCitybecauseheissupportingtheupcomingmarch.
Mr. Doherty immediately made a telephone request to Ms. Kathleen Cassidy, Administrative
Assistant in the Mayors office, that the posting be removed to avoid the appearance of
retaliation and a violation of citizen rights that would embarrass the Mayor. She sought
help from Ian Silverman, Corporation Counsel, who gave the direction not to honor the
request. Mr. Doherty then sought assistance from Mr. Dunne, the Troy Planning
Commissioner and was told, If the Building Code Department has a concern about not
having a C of O [Certificate of Occupancy] or safety concern, the eviction notice would
remain.
Early in the morning of Friday, January 31, 2014, Mr. Dunne read onTroySpin, a
political blog of Jim Franco, that persons planning theMarchAgainstPoliceBrutality
were using 51 3rd Street for planning meetings. While at workthatmorningandinhis
capacity as Planning Commissioner, Mr. Dunne discussed 51 3rd Street with Dave
Sheeran, Code Supervisor. Mr. Sheerandispatched MattMcGrath,aCodeInspector,
whopostedtheeviction/evacuationnoticeonthedoorat11:00am.
It is commonforTroybuildingsnottohaveaCertificateofOccupancy. ACertificateof
Occupancy is obtained if there is a reason to acquire it, such as a sale or building
project permit request. 513rd Street has been under the ownership ofMr. Vamos for
thirteen years, during which he was never informed by the City of the need for a
CertificateofOccupancy.
The owner of the building had no involvement or knowledgeof his tenants actionsor
interests in police functions. Several months after the posting was in place,
Commissioner Dunne suggested to both the owner and Troy Architectural Program
(TAP), a local architectural planning and design group, that they collaborate on a
submission of a building plan to gain a Certificate of Occupancy. This was done,
acceptedbyPlanning,andthematterwasresolved.
The eviction/evacuation notice placed on 51 3rd Street was the result of efforts to
retaliate against and suppress persons exercising their right to peaceably assemble.
This retaliation was spearheaded by Commissioner Dunne and abetted by other
administrationofficials.
The eviction/evacuation notice for the premises was wrong, as it targeted the entire
building. The only codeconcernwasthefirstfloormeetingspace. Itremainedposted
for at least threemonths,althoughtheCode SupervisormadeitcleartoDeputyMayor
PeterRyanthatitcouldberemoved,asthepurposeofpostingwasachieved.
Mr. Ben Brucato is a doctoralstudent at RPI in Science & Technology Studies and a
tenant at 51 3rd Street. His area of interest is critical criminology and technology
studies. Mr. Brucato participatedin discussion of police/community relations that led
to him to support a March Against Police Brutality on February 4, 2014. He was
labeled public enemynumber one on local talk radio. Mr. Brucato said he received
threats from a person he did notknow while pumping gas. Hisfamily leftTroyforfive
weeksfearingfortheirsafety.
Our enforcement and regulatory processes must be objective and based on verified
information discovered in routine operational fashionortheresultofspecialreviewsor
actions authorizedbysupervisorypersonnel. Ifnotfromroutinescheduledinspections
or activities, actions should originate from identified, verified, and reliable sources.
This would include verification of anonymous reportings. Thisisessentialtominimize
CityliabilityorinappropriateuseofCityresources.
The departments and functions of Troy City Government must be insulated from
directions and assignments arbitrarily originating from personal, political, orother any
purpose other than the welldefined services of City administration and function.
Ongoing monitoring of work activities in supervision and oversight is required at all
levels, but is especially important for managerial and higher level personnel. Strict
adherence to organizational management structures and reporting lines will assist in
preventing arbitrary or nonauthorized directions to subordinate level staff by higher
levelpersonsotherthanadirectsupervisor.
Regulatory oradministrativerequeststocitizenscouldandshouldbecommunicatedin
a routine manner by mail. Evictions and evacuation notices should only be used in
support of legal processes addressing verified and known safety concerns.
Developing standard, less startling posting notices, in addition to eviction notices,
wouldbewelcomedbytheCodeDepartment.
Part V Conclusion
Overall, the hearings proved to be a useful tool to gain insight into the activities, direction,
policies, and procedures of the administrative branch of government for which the Mayors
office is responsible. It appears that many department heads take it upon themselves to
stretch the authorities and powers that they feel the City Charter and/or City Code has
provided to them. While this might allow them to do their jobs in an easy and more
streamlined manner,it lacks properchecks and balances, sometimesevenavoidingasimple
notificationtosuperiors.
The City Council, in its effort to conduct these hearings, was often thwarted whenfollowing
proper procedure to provide notice and plan the meeting logistics. This was accomplished
through scheduling/delay tactics, a mayoral veto on a meeting resolution, and subpoena
requirements. This of course may lead to the reasonable inference that information was
being deliberately hidden or manufactured in order to sell a story or bolster a certain
testimony.
Ultimately, due to the tremendous amount of inconsistencies given within the various
testimonies, it was impossible for the City Council to identify a clear path to responsibilityof
any particular individual or set of individuals. Moreover, we uncovered a systemic and
integral set of failures and patterns that have led to the threeeventswhichwerethetopics of
the hearings. The first step toward improving processes and avoiding recurrences of these
breachesinpublicsafetyistheadmissionandacknowledgmentofmistakes.
At the time of this writing, there have not been any substantive policy changes or official
decrees from the administration concerning the above situations and root causes. The
phrase, No harm, nofoul,shouldnotbeusedasanexcuseforchoosingtoignorefailuresor
gaps in processes that could have led to catastrophic outcomes. Normalizing exceptions is
not a process improvement method, and will most likely result in negative if not tragic
consequences.
It is our sincere hope that through revisions to internal policies, the City Charter, and City
Code, improvements will be made to prevent these types of situations from occurring inthe
future. The citizens,taxpayers, business owners, and visitors to the City Of Troy deserveto
enjoy a safe, fair, and just community. It is paramountthatconsiderationsforallmembersof
the community are taken as the number one priority over the few who mayhave access or
connectionstoCityHall.
Part VI Appendix
A. Online Resources
Additionalinformation,includinghearingtranscripts,audio,andpresentationmaterialscanbe
foundatthefollowingURL:
http://troycitycouncil.com/docs/demo_hearings/
B. List of Witnesses
Thetablebelowcontainsthefulllistofwitnesseswhoprovidedsworntestimonyduringthe
seriesofhearings.TheTitlecolumncontainstheindividualstitleatthetimeofthehearings,
withanunderlinedtitlesignifyingapastorpresentemployeeoftheCityofTroy.
Name
TitleorPosition
Dateof
Testimony
RelevantTestimony
CharlesCasale
Demolitioncontractor
4/29/2014
KingFuels
TonyDawson
eLotrepresentative
4/29/2014
KingFuels
RussReeves
FormerCityEngineer
4/29/2014
KingFuels,KingStreet
BarbTozzi
AssistanttoCityEngineer
4/29/2014
6/3/2014
KingFuels,KingStreet
FloraCarr
BethelBaptistChurch
5/8/2014
KingStreet
RyanPreston
ConsultingEngineerforTLDC
5/8/2014
KingFuels
JackHealy
ConsultingEngineerforCity
5/8/2014
KingStreet
MichaelCristo
Demolitioncontractor
5/8/2014
KingStreet
JohnTirino
PCSprojectmanager
5/28/2014
KingFuels
DanDitonno
Demolitioncontractor
5/28/2014
KingFuels
DonBoyajian
OwnerofKingStreet
properties
5/28/2014
KingStreet
HarryTutunjian
FormerMayorofTroy
5/28/2014
KingStreet
DamonDzembo
OwnerofTroyBombers
6/3/2014
KingStreet
JimRivers
CivilEngineer(retired)
6/3/2014
KingStreet
MikeHayner
SupervisorofStreets
6/3/2014
KingStreet
TomGarrett
FireChief
6/3/2014
KingStreet
BenBrucato
Residentof513rdStreet
6/17/2014
513rdStreet
DaveSheeran
CodeEnforcementOfficer
6/17/2014
513rdStreet
BillDunne
PlanningCommissionerand
TLDCchairman
6/17/2014
KingFuels,King
Street,
513rdStreet
AndrewKreshik
AssistantPlannerandTLDC
projectmanager
6/17/2014
KingFuels
IanSilverman
CorporationCounsel
9/11/2014
KingFuels,King
Street,513rdStreet
PeterRyan
DeputyMayor
9/11/2014
KingFuels,King
Street,513rdStreet
LouRosamilia
Mayor
9/11/2014
KingFuels,King
Street,513rdStreet