You are on page 1of 3

QUALITY CONTROL SHEET

RESIN FLOORING INSTALLATION


This QC sheet covers Sureshield, Industrial Terrazzite, Nuthane, Supascreed, Surechem VE, Terratuff and linings based on Situclad and Fibreclene.
The sheet should be completed for each section of work and this form provided to the client.. It is used in conjunction with the surface condition and
mix control sheet.

JOB:

SITE NAME:
ADDRESS:
OWNER:
BUILDER:

RESIN Floors

NUPLEX CONTRACTOR:
FOREMAN ON JOB:

This sheet covers


floor section:
PRODUCT:

(Approves stages)
(Describe area)

DATE STARTED:
DATE COMPLETED:
MATERIAL NAME(S):

Batch number

Flooring Colour:

Surface finish specification: (eg non-slip)

BRIEF DESCRIPTION OF FLOOR CONSTRUCTION (EG: CONCRETE, (old, new), Metal, etc

DESCRIBE SURFACE PREPARATION SYSTEM: eg Water-blasting, followed by Shot-blasting grinding


etc or combination:

Describe floor wall junctions and capping and treatments undertaken:

Confirm all cracks and joints are identified and repaired:


All details are available on www.nuplexconstruction.co.nz / Resin flooring.

Resin Flooring QC Sheet

April 2008

APPROVALS
STAGE:
Shotblasting / surface preparation company:
Name and date of preparation undertaken

DATE:

SIGNED:
BY preparation company

Describe surface condition prior to application.


Moisture content, Floor temperature, weather
conditions, other contaminations.
Date concrete poured:
Date floor protected from weather:
Sign acceptance of floor or
note details to main
contractor.

Sign off that the flooring mix and apply chart has
be used completed and filed.
( this system records air and floor temperatures and
humiditys as well as individual mixes)

Mix ratios understood and recorded:


OPTION: Ventilation: must the space be ventilated?
Describe:
1. Priming: confirm
2. Topping application: confirm
Finish / smooth / non-slip etc. confirm
3. Topcoat: confirm
Coves and Drains: Are the areas prepared? Is a slope
to drains installed?
Are the drains to falls?:
Describe resin system in drains
Wall DETAILS:
Describe cove cap and coving strip usage
Machinery footing details.
FLASHINGS: Is the flooring correctly flashed up &
behind claddings ?
Penetrations must be sealed appropriately as per
details. Confirm
Protection sheets applied.(if applicable)
FINAL JOB APPROVAL (for this section):
Date
SITE DAMAGE: Record
COPIES ON COMPLETION:

Flooring contractor Principal

File
Builder
Client

Comment on contract:

Nuplex staff site visit (if applicable)

Date:

Name:

Are digital photos retained?

Flooring area drawing.


Nuplex resin Floors

Draw in diagrammatic form the floor and coves installed.


Mark coves and drains including the direction of falls in floors to drains.
Mark and problems or defects found or occurring.

Nuplex resin Floors