You are on page 1of 40

2014

Thesis: Compression Cooling Vs.


Absorption Cooling

Jos Slotema (0832917) Wu8

Mentor: Mr. van den Brink


Project cordinator: Mr. H. de Klerk
Company supervisor: Mr. S. de Leeuw
Department: Mechanical Engineering
Capelle aan den IJssel
5/13/2014

Prefix
This report was written as part of the graduation assignment, which is the conclusion of the Bachelor
of mechanical engineering study at Hogeschool Rotterdam.
The thesis is the result of a research to an existing compression cooling system with R134a refrigerant
and an absorption cooling system with R717 (Ammonia) refrigerant. To understand this report some
experience or knowledge of cooling systems is necessary.
The thesis was developed in consultation with my dual study supervisor and the lead engineer from
the mechanical department of Technip-EPG. The choice for the Energy Technology thesis fits well
with my interest for the cooling industry.
I want to thank Simon de Leeuw for giving me this opportunity, Johan van den Brink for the guidance,
Ms. Molt for the English check and specially Hein de Klerk for his corrections, patience and hours of
beer talk.
Cheers,
Jos Slotema
Rotterdam, May 2014

Jos Slotema

Graduation

Internship at Technip-EPG

Table Of Contents
Prefix ..................................................................................................................................................2
1.

Abstract ......................................................................................................................................4

2.

Project backgrounds....................................................................................................................5
2.1

Company .............................................................................................................................5

2.2

Client ...................................................................................................................................6

2.3

Situation ..............................................................................................................................6

2.4

Project .................................................................................................................................6

Existing cooling system................................................................................................................7


3.1

What are Fluoro-polymers / carbons. ..................................................................................7

3.2

Analysis of the existing cooling system including backup .....................................................7

3.3

Brine system ........................................................................................................................8

3.4

Connection between -30C and -45C system ......................................................................8

Calculations existing -30C R134a system ...................................................................................9


4.1

Log_P-h diagram R134a .......................................................................................................9

4.2

Evaporator ........................................................................................................................ 10

4.3

Compressor ....................................................................................................................... 11

4.4

Condenser ......................................................................................................................... 13

4.5

Hot Gas Bypass .................................................................................................................. 15

4.6

Economizer........................................................................................................................ 15

4.7

Energy balance .................................................................................................................. 16

4.8

Check Brine pump capacity ................................................................................................ 17

Explanation absorption cooling process..................................................................................... 18


5.1

LogP-h R717 ...................................................................................................................... 19

5.2

Calculations ....................................................................................................................... 20

Comparison both systems ......................................................................................................... 26

Conclusion ................................................................................................................................ 27

Recommendations .................................................................................................................... 27

References ................................................................................................................................ 28
9.1

Text References ................................................................................................................. 28

9.2

Figure References .............................................................................................................. 28

10

Appendices ........................................................................................................................... 29

Jos Slotema

Graduation

Internship at Technip-EPG

1. Abstract
For the production of Fluorocarbons a cooling system is necessary. The production plant at the
Dordrecht site is using the cooling system for multiple products. This cooling system is split up in a
primary and a secondary system. The primary system consist of a compression cooling system to cool
the brine in the secondary system. This system is a circulation system connected to the different
process users. The existing primary compression cooling system needs to be replaced due to aging
and reliability.
An economic comparison should be made for a new absorption cooler fed by waste heat versus a new
compression cooling system with comparable specifications. Which system is preferable after all
conditions are taken into consideration?
The existing -30C R134a refrigeration system at the DuPont site in Dordrecht has been analyzed.
Calculations have been made and compared with a new absorption cooling system equipped with R717
or ammonia refrigerant. The result is that if there is enough waste heat to generate the needed amount
of steam the absorption cooler is in operating conditions cheaper than the existing compression cooler.
After the results of comparing both systems the energy level of waste heat, necessary to operate the
absorption system, should be determined.
In this report the lubrication and the purge unit are not taken in to account for the efficiency of the
compression cooler. The lubrication for the rotating part is very important for especially the
compressor. For future calculations this must be taken into account.

Jos Slotema

Graduation

Internship at Technip-EPG

2. Project backgrounds
2.1

Company

Technip is a world leader in design, engineering, supply and construction of facilities in the oil & gas
and (petro) chemical industry. Technip-EPG is part of the umbrella organization Technip-Group which
also includes Technip Benelux BV in Zoetermeer. Technip Group is represented in 48 countries across
five continents and employs more than 30,000 people. The main business segments in which the
Technip-Group is active are: Subsea, Offshore and Onshore. Technip boasts a fleet of 34 vessels of
which five are now being built (1).
Technip-EPG
Technip-EPG was acquired by Technip-Group in July 2008 to strengthen Technip Benelux. At that time
the company EPG (Engineering Project Group) had 35 years of experience in designing plant
modifications such as modernization and capacity expansion. EPG has 2 locations: Capelle aan den
IJssel and s-Hertogenbosch. This multidisciplinary engineering company has 150 employees who work
on fixed or temporary contracts (2).
The market segments in which Technip-EPG is active:
1. Oil and Gas
2. (Petro) Chemicals
3. Energy and Water
4. Industry
5. Utility

To manage the projects, the project team is divided into the disciplines mentioned below, each with
their own specialties.

Project
HVAC (Heating Ventilation Air Conditioning)
Electrical & Instrument
Civil
Structural
Pipe stress
Process
Piping
Mechanical
Document Control

Jos Slotema

Graduation

Internship at Technip-EPG

2.2

Client

Du Pont de Nemours (Nederland) B.V. is part of the global E. I. Du Pont de Nemours and Company.
DuPont is a science-based products and services company. Founded in 1802, DuPont puts science to
work by creating sustainable solutions essential to a better, safer, healthier life for people everywhere.
Operating in more than 70 countries, DuPont offers a wide range of innovative products and services
for markets including agriculture and food; building and construction; communications; and
transportation.
The DuPont sites in the Netherlands are situated in Dordrecht, Breda and Landgraaf. DuPont
Netherlands employs approximately 950 people.
Dordrecht is one of the largest production sites of DuPont in Europe and it is the companys eldest site
in the Netherlands. The site is home to nine manufacturing plants where the synthetic resins Delrin
and Surlyn are made, the refrigerants Isceon and Suva and the Fluorocarbons Teflon and Viton.
The Teodur Powder Coatings sales organization and the DuPont Crop Protection marketing
organization are located in Dordrecht as well. The sales organization of Standox automotive
refinishing paints is located in Breda. The Landgraaf site manufactures filaments for the toothbrush
industry.
All production sites of DuPont in the Netherlands are certified according to ISO-9001 (quality) and ISO
14001 (environment).

2.3

Situation

The graduate student is working for the mechanical department of Technip-EPG Capelle aan den IJssel
as draftsman. During the project the student works solitary. Guidance is provided if necessary. The
mentor who is guiding this project works for the same department and keeps track of the planning and
the progress of the project.

2.4

Project

For the production of Fluorocarbons a cooling system is necessary. The production plant at the
Dordrecht site is using the cooling system for multiple products. This cooling system is split up in a
primary and a secondary system. The primary system consist of a compression cooling system to cool
the brine in the secondary system. This system is a circulation system connected to the different
process users. The existing primary compression cooling system needs to be replaced due to aging
and reliability. An economic comparison should be made for a new absorption cooler fed by waste
heat versus a new compression cooling system with comparable specifications. The following must be
taken into account:

Safety
Environment
Operational costs

Jos Slotema

Graduation

Internship at Technip-EPG

3 Existing cooling system


3.1

What are Fluoro-polymers / carbons.

Fluorocarbons are the result of the chemical connection between fluorine and carbon particles. This
gas is commonly used in Fluoropolymers, refrigerants, solvents and anesthetics. 1) A mixture of
fluorspar, hydrofluoric acid and chloroform (TFE tetrafluorethylene) is heated between 600 and 900C.
To remove any impurities the gas needs to be distilled. During the distillation process the gas is heated
and in a special distillation vessel which guide the heated gas thru a pipe system cooled by brine. The
purified gas condensates and is collected in storage vessels. To store this gas it needs to be at very low
temperature and pressure to maintain the liquid state of the material. TFE is colorless, odorless and
extremely flammable (4).
Fluoropolymers are the result of polymerized TFE. The polymerization process makes long strings of
the molecules in TFE. To initiate the polymerization process the TFE is guided to special drums
containing purified water and a small amount of initiators. When the TFE comes in contact with the
initiator the process is started. The strings of material are formed to grains of PTFE. The grains are
suspended in the water/initiator solution and will float on the surface. To increase the productivity the
drum is shaken to mix the water mixture with un-used TFE gas to the mixture. The chemical process is
producing heat that must be cooled by the brine system that flows thru the jacket of the drum. The
grains can be sold as bulk or molded into billets (5).

3.2

Analysis of the existing cooling system including backup

The cooling system used for the production of fluoro -polymers and carbons is divided into a primary
and a secondary system as shown in the Process Flow Diagram in figure 1.

Figure 1: PFD R134a -30C

The heat produced by the chemical polymerization processes needs to be absorbed and controlled by
the secondary cooling system (9). The different end users pump their heated cooling medium to a heat
exchanger which transfers the heat to the brine in the secondary cooling system (1). Because the
temperature of the brine is lower than the processed cooling medium the cooled brine extracts the
heat from the cooling medium which can be re-used by the end users.

Jos Slotema

Graduation

Internship at Technip-EPG

8
The brine solution, is pumped (2) to the evaporator (34) to exchange the absorbed heat to the R134a
gas and is recirculated thru the secondary system. The R134a gas in the primary system is overheated
due to the low pressure and temperature difference of the R134a. The overheated gas is compressed
by a 4 stage compressor driven by an E-motor (5). To prevent an unnecessary stop of the compressor,
the compressed vapor can be redirected to the evaporator by the hot gas by-pass. The high pressure
Freon gas flows to the condenser (6) where the cooling water from the cooling tower rapidly cools
down the Freon gas. Condensation of the R134a is realized by the heat exchange in the condenser by
the cooling water from the cooling tower. The high pressure R134a liquid flows thru a pressure control
valve (7) where the flow remains equal but the pressure drops to a level where the Freon almost
evaporates and is transported into the evaporator where the cycle repeats.
To prevent a shutdown of the plant the cooling system is provided with a backup installation to
guaranty a continuous flow of cooling. This -45C system is fully separated from the main cooling
system except for the cooling water produced by the cooling tower Instead of R134a, as used in the 30C system. Freon 22is used in the -45C refrigeration system. The connection between both systems
is further explained in chapter 3.4 of this document.

3.3

Brine system

The secondary system is filled with a brine solution. Brine is a commonly used fluid used as a secondary
refrigerant in large refrigeration installations for the transport of thermal energy from one place to
another. This fluid is easily transported over longer distances and therefore suitable for the use of
cooling multiple process units. The used type of brine for this installation is Methylene Chloride. For
properties see figure 2 below.
Property
Boiling point
Freezing point
Vapor pressure at 25C
Viscosity
Specific heat
Thermal conductivity
Density

40
-97
57
0.70
1.13
0.19
1400

C
C
kPa
mPa-sec
kJ/kg.K
W/m.K
Kg/m

Figure 2: Properties Methylene Chloride

Because of the low temperature of -30C a normally used calcium chloride, natrium chloride or
water/glycol solution is not applicable due to freezing of the fluid. Methylene chloride should not be
used with aluminium or zinc and it will attack most rubber compounds and plastics. To make sure a
minimum of temperature is lost during transport the entire system is insulated to maintain the low
temperature.

3.4

Connection between -30C and -45C system

There are 5 different cooling systems present for the production facilities to cool all the necessary
operations. The -30C and -45C are both connected to the same brine system as previously described.
Both brine systems are connected with valves en piping spools. Both systems run simultaneously but
when one needs to shut down the other takes over to maintain a continuous brine flow. Both systems
have an electrical driven pump which acts as a backup pump for the other system. The complete
diagram with all the connections is found in appendix 1 of this document.

Jos Slotema

Graduation

Internship at Technip-EPG

4 Calculations existing -30C R134a system


In this chapter a closer look will be taken at the specific components of the -30C cooling system. For
further details of the components see appendix 2. The brine should be cooled from -30C to -23,5C.
To be able to analyze the system a Log_P-h diagram should be made.

4.1

Log_P-h diagram R134a

See figure 3 and appendix 3 for completed log_P-h diagram.

Figure 3: Log_P-h diagram -30C system

Step 1 2: Evaporator.
The heated brine evaporates the R134a till an overheated gas is realized. To make sure all the
refrigerant is evaporated the hot gas bypass from the end of the compressor feeds hot vapor at the
inlet of the evaporator. The high temperature will overheat the gas when necessary. When fluid enters
the compressor the rotors will be heavily damaged and the lubrication isnt effective enough to handle
the high speeds of the rotating parts. The enthalpy of the R134a at the inlet of the evaporator is 182
kJ/kg. The evaporation temperature is by pressure drops reduced to -33C so it is able to absorb lots
of heat from the secondary brine system. The pressure of the refrigerant at the outlet of the
evaporator is equal to the suction pressure at the inlet of the compressor. The enthalpy at this point is
385 kJ/kg. The temperature of the refrigerant is overheated by 10C to -23C by absorbing heat from
the brine system. This fully overheated gas is ready to enter the compressor.
Step 2 3: Compressor
The compressor compresses the overheated gas from the evaporator from 0,65 bar at the inlet to 7,3
bar in 4 different stages. The second and third stage are connected with the respectively High and Low
stage of the economizer. The gas produced due to pressure drops in the economizer is entering the
compressor at stage 2 and 3. This gas cools the gas from the previous stages of the compressor. This
helps the compressor increase his efficiency and also prevents the refrigerant from reaching the critical
temperature of 100.95C (3) from which the refrigerant is not able to condensate/recover any more.

Jos Slotema

Graduation

Internship at Technip-EPG

10

Step 3 4: Condenser
The gas heated by compression leaves the compressor at 72C and enters the condenser. The cooling
water from the cooling towers which are pumped thru the tubes of the heat exchanger, absorbs the
heat from the gas flowing thru the shell side. To make sure all the gas is condensed the R134a is 3C
sub cooled.
Step 4 1: Economizer/Choke Valve
The high pressure R134a liquid is flowing in to the first high pressure stage of the economizer. The
pressure drop will partially evaporate the R134a condensate. The pressure drops from 7,3 bar to 3 bar
(Step 4 4). The evaporated R134a flows to the inlet of the third compressor stage. The Condensate
is then guided to the second low pressure stage of the economizer by a level control valve. The
pressure drops from 3 to 1,6 bar and the gas flows to the 2nd stage of the compressor (Step 4 4).
The last stage is the choke valve where the pressure drops to 0,75 bar (Step 4 1). The temperature
at this point of the cycle is -33C and enters the evaporator to repeat the entire process.

4.2

Evaporator

The chiller used in the -30C cooling system is a shell and tube heat exchanger fabricated by Johnson
Hunt. During normal operation the evaporator absorbs 1880 kW heat from the brine system.

Figure 4: Evaporator -30C cooling system.

The absorbed energy from the brine system is 1880 kW (kJ/s).


is 385-182= 203 kJ/kg. The formula used for calculating the mass-flow is:

( ) = ( ) (\)

1880
= 203 = 9.26 / = 33.34 ton/h

Jos Slotema

Graduation

Internship at Technip-EPG

11

4.3

Compressor

The compressor used in the closed circuit R134a refrigeration system is powered by an electric motor
thru a gearbox. See figure 5 for layout. To prevent excessive wear of the compressor and its
components the lubrication is closely monitored and controlled.

Figure 5: Compressor, engine and gear box assembly -30C cooling system.

The Compressor uses 4 stages to compress the overheated gas from the evaporator from 0,65 bar to
7,3 bar. See appendix 3 for the Log_P-h diagram. Each vane as seen in figure 6 is specifically shaped
to increase the pressure at each stage.

Figure 6: Inside compressor rotor assembly.

Jos Slotema

Graduation

Internship at Technip-EPG

12

Figure 7: Connections of the compressor

The first compressor stage is connected to the outlet of the evaporator and takes in the overheated
gas at -23C. The calculated flow of the vapor is 9,26 kg/s as determined in chapter 4.2 of this
document. The enthalpy is 392 kJ/kg at the end of this stage and the pressure 1,22 bar. At the end of
the first stage is the released gas from the low pressure side of the economizer added to the gas
from the first stage. This realizes a temperature drop of +/- 7C, see figure 3.
Compression ratio for the first stage is:
1.22
= 1.877
0.65
The second stage compresses the new gas mixture to 2,45 bar. At the end of the stage the vaporized
refrigerant from the high pressure stage of the economizer is added to the mixture. The temperature
drop of the total mixture is +/- 9C for this stage of the compression, see figure 3.
Compression ratio for the second stage is:
2.45
= 2.008
1.22
The third and fourth stages is straight forward with no additional input.
Compression ratio for the third stage is:
4.3
= 1.755
2.45
Compression ratio for the second stage is:
7.3
= 1.697
4.3

Jos Slotema

Graduation

Internship at Technip-EPG

13
The power consumption of the compressor is calculated with the compressor specifications in
Appendix 2.
Following formula is used:
= 3
= 6600
= 114 .
= 0.89
3 is used because a three phase power supply is used.
= 6600 114 0.89 3
= 1160
The efficiency of the compressor is calculated by dividing the input by the output of the compressor.
=

Pout is 1120 kW according specifications in Appendix 2.


=

1120
= 0.96
1160

4.4

Condenser

The condenser should be able to condensate all the compressed vapor which leaves the compressor.
To make sure there is no vapor left the refrigerant is sub cooled 3C. the water from the cooling towers
is led thru the tubes of the heat exchanger (Shell/Tube type). The gas is fed into the topside of the
condenser in the center shell part. The condensed refrigerant falls to the bottom of the shell. The
temperature difference of the cooling water between the inlet and the outlet of the condenser is 4.7C.

Figure 8: Condensor -30C cooling system

Jos Slotema

Graduation

Internship at Technip-EPG

14
To make the condenser more efficient a two passes system is used. This means that the cooling water
in the tubes enters in the bottom half of the exchanger redirected thru top part of the condenser. See
figure 9.

Figure 9: Inside Condenser during maintenance.

To calculate the mass-flow of refrigerant thru the condenser the needed capacity from the
specifications is used, see Appendix 2. The enthalpy is derived from the Log_P-h diagram in appendix
3.
The formula used for calculating the mass-flow of the refrigerant is:

( ) = ( ) (\)

= 3000
=
= 438 235
= 203

3000
203

= 14.78 / = 53.2 ton/h

Cooling water consumption

=
= 3000

= 4.18 Specific heat of water at 44C (6)


= 7
Assumed temperature drop
3000

=
= 102
4.18 7

102
3600 = 367.200 /

Density of water at 44C = 990 kg/m (6)


376.200/990 = 371 m/h

Jos Slotema

Graduation

Internship at Technip-EPG

15

Figure 10: Cooling water towers used on the plantsite.

4.5

Hot Gas Bypass

If the process cooling demand is, for whatever reasons low, the compressed refrigerant from the
compressor is let thru the hot gas bypass. This controlled piping system feeds the refrigerant back
to the evaporator to avoid shut down of the compressor. The maximum flow thru the hot gas
bypass is as much as the flow during normal operation. By regulating the feed to the evaporator it
is not necessary for the compressor to start and stop when the demand is low. It also makes sure
the compressed R134a is overheated. = 14.78 / .

4.6

Economizer

The economizer used in this system is a horizontal vessel vertically divided in two separate parts. The
total volume of the vessel is 7,8 m and is also used as storage for the refrigerant. The entire system
contains 6200 kg R134a, according specs see appendix 2.

Figure 11: Schematic drawing of the economizer with connections.

Jos Slotema

Graduation

Internship at Technip-EPG

16

The economizer used in the -30C system uses the earlier explained 2 stages to:

Cool the condensed refrigerant from the condenser.


Cool the compressed gas in the compressor.
Increase the enthalpy of the evaporator.
Large volume is a buffer for un-used refrigerant.

The mass flow of refrigerant vapor fed to the compressor is:


= . .
= 14.78 9.26
= 5.52/
The enthalpy gained by the use of the economizer:
4 4"
= 235 182
= 53 /
Figure 12: Closeup Log_P-h diagram

4.7

Energy balance

Energy balance

IN

OUT

Evaporator
Compressor
Condenser

1880 kW 1120 kW 3000 kW

COP:
To calculate the Coefficient Of Performance of the compression cooler the following formula is used:

Jos Slotema

385182

= 438385 = 3.8

Graduation

Internship at Technip-EPG

17

4.8

Check Brine pump capacity

The brine pump is situated before the evaporator of the refrigeration system. The following
calculations are only applicable for the brine system connected to the -30C refrigeration system.
To calculate the brine flow the following formula is used:
=
According process data is the temperature difference of the brine 6,5C between the inlet and the
outlet of the evaporator of the refrigeration system.
The specific heat and the density of the brine is derived from Figure 2 in chapter 3.3 of this document.

= 1.13

= 6.5
1880

=
= 256
1.13 6.5

= 1880

Pump specifications are given in the unit m/h.


256 3600 = 921600 /
Divided by the density of 1400 kg/m gives:
921600
= 658 /
1400
According to pump specifications in appendix 4 the maximum capacity of the pump is 795 m/h.
658 < 795
The brine pump has enough capacity to circulate the brine through the system.

Jos Slotema

Graduation

Internship at Technip-EPG

18

5 Explanation absorption cooling process


The compression cooling system will be compared with a single stage absorption cooling system. The
low pressure part of this system is almost identical with the compression type cooler. To compare both
systems the absorption cooler will be able to extract the same amount of energy from the heated
process brine flow. The calculations for the absorption cooler will be done with the refrigerant R717
which is in fact ammonia (NH3). This refrigerant is at 1 bar (atmospheric pressure) liquid at a
temperature of -33C. Therefore is no additional vacuum needed to reach the desired temperature to
cool the brine-flow. During the process NH3 is mixed with water and will the different evaporation
temperature and pressure used to separate the water and the refrigerant. The amount of NH3 vapor
that can be absorbed by the water gets bigger by increased pressure and lowers by the increase of
temperature.

Figure 13: PFD Absorption cooler

The heated process brine enters the evaporator where it evaporates the refrigerant. The refrigerant is
at this stage fully saturated and flows to the absorber. In the absorber the gas is mixed with weak
liquor from the generator. The mix is cooled down by the cooling water from the cooling towers and
the refrigerant will condense. The mixture is now called strong liquor due to the higher concentrate of
refrigerant. In the chapter absorber of this document will the mixing and the strong and weak values
be explained. The strong liquor is then pumped thru a heat exchanger. The cold strong liquor is pre
heated by the heated weak liquor from the generator. This pre heating makes sure that there is less
energy from the steam powered generator needed to evaporate the refrigerant due to a smaller
temperature difference. The pre heated strong liquor flows after this stage into the generator. The
generator uses steam to heat the strong liquor till the biggest part of the refrigerant is evaporated. The
rest of the refrigerant still mixed with water flows thru the previous described heat exchanger and to
the absorber. The evaporated refrigerant is now entering the condenser. The condenser cools down
the refrigerant till it is entirely condensed and at a liquid state but at high pressure. A part of the

Jos Slotema

Graduation

Internship at Technip-EPG

19
condensate is then led into the generator again and is called reflux. This part will help the generator
to create a constant flow of evaporated refrigerant delivering to the condenser. The rest of the
condensate flows thru a choke valve where the pressure is dropped till atmospheric pressure and
repeats the entire process again. See figure 13 and appendix 9 for the process flow diagram.

5.1

LogP-h R717

For support of the calculations with the absorption cooler a log_P-h diagram must be made. Because
this system does not already exists a few realistic assumptions must be made. See figure 14 for
details.
4

1
v

Figure 14: Log_P-h R717 (ammonia, NH3) Refrigerant

Step 1 2: Evaporator.
In the evaporator the process brine heat is absorbed and evaporates the R717. A correction must be
made at the start point of the evaporator the value is derived from figure 14. This correction is used
with values below 0C. The difference in enthalpy between 0C and -40C is 180 kJ/kg (8). This difference
must be subtracted from the value of the condensate after the condenser. This brings the start value
for the evaporator to:
1 = 1 180
1 = 408 180
1 = 228 /
The enthalpy when fully saturated =1417 kJ/kg at 1 bar and -33C.
Step 2 3: Generator + Absorber
For this step the assumption is made that the temperature of the vapor must be at least 165C when
it enters the condenser. The next assumption is that the temperature at the exit of the condenser is
44C. The line derived with these values gives an enthalpy of 1829 kJ/kg at 17.3 bar.
Step 3 4: Condenser
At the exit of the condenser at the assumed temperature of 44C the enthalpy is 408 kJ/kg.
Step 4 1: Choke valve and correction
The pressure is relieved of the condensate.

Jos Slotema

Graduation

Internship at Technip-EPG

20

5.2

Calculations

All calculations in this chapter are according the book: Kents Mechanical Engineers Handbook,
Power Volume by J. Kenneth Salisbury 12th edition. All Imperial units are converted into Metric units
and used in the formulas (8).
Evaporator
The evaporator must be able to absorb 1880 kW heat from the brine system.

Figure 15: Schematic drawing evaporator absorption cool system.

To calculate the mass-flow of R717 refrigerant the following formula is used:

( ) = ( ) (\)

=
= 1417 228
= 1189 /
3 =

1880
1189

= 1.58 / = 5.69 ton/h

Absorber
The absorber mixes the weak liquor and the condensed refrigerant by condensing the refrigerant
with cooling water. The amount of strong liquid is calculated in this chapter. The percentages are
derived from the table in appendix 5.
(S) Strong liquor = 26% NH3 dissolved in water (74%H2O)
(W) Weak liquor = 15% NH3 dissolved in water (85% H2O)
3 + =
The formula for the mixing point is:
S 0.74 = W 0.85
S = 1.149 W
Figure 16: Schematic drawing absorber
absorption cool system.

Jos Slotema

Graduation

Internship at Technip-EPG

21
3 + = 1.149
1.149 =
0.149 = 1.58
=

1.58
= 10.6 /
0.149

This result is filled in in the formula for the mixing point to calculate the flow of strong liquor.
S 0.74 = W 0.85
S 0.74 = 10.6 0.85
S=

9.01
= 12.18 /
0.74

The capacity to condense the flow of vaporized refrigerant is calculated with the following formula:
=
= 1.58 /
= = 1490 405 = 1085 /
= 1.58 1085 = 1714

To calculate the needed amount of cooling water to condensate the refrigerant, the following
formula is used:
=
Rewritten for mass flow

=
= 1714

= 4,18 Specific heat of water at 44C (6)


= 7
Assumed temperature drop
1714

=
= 58,6
4.18 7

58,6

3600 = 210.881 /

Density of water at 44C = 990 kg/m

(6)

210.881/990 = 213 m/h

Jos Slotema

Graduation

Internship at Technip-EPG

22
Pump
To calculate the needed capacity of the pump the following formula is used:
=

= 17.3 = 1730000 /
= estimated efficiency of 0,75
= 2 + 3
Figure 17: Absorption cooler pump

3 = 681.9 /`at -33C (7)


2 = 1000 /`
3 12.18 = 26% 3 = 12.18 0.26 = 3.17

3
= 0.00464

2 12.18 = 74% 2 = 12.18 0.74 = 9.01

3
= 0.009

= 0.009 + 0.00464 = 0.0136


=

0.0136 1730000
0.75

= 31,37

Jos Slotema

Graduation

Internship at Technip-EPG

23
Generator
The strong liquor is pre heated in the heat exchanger by the weak liquor. After evaporation is a part of
the refrigerant sent back as reflux. So there are 2 inputs and 3 outputs with different temperatures.

Figure 18: Schematic drawing generator absorption cool system.

First the reflux must be determined. According to appendix 5 the minimum amount of reflux ratio is
0,7. To make the value is not at the bare minimum an assumed safety factor of 1,2 is applied. This
makes the reflux ratio 0,7*1.2= 0,84. This means that 84% of the high pressure condensate is
redirected to the generator.
The next step is to calculate the temperature of the strong liquor at the inlet of the compressor. The
assumed temperature of 165C is still present in the weak liquor that flows into the heat exchanger
point 1 on figure 18. The insert temperature of the weak liquor in the generator at point 2 is assumed
45C. The entrance temperature of the strong liquor in the heat exchanger is assumed 35C at point 3.
The temperature at point 4 is calculated as follows:
=
=
= 10.6 /
= 165 45 = 120C
= 12.1 /
= 35
Filled in in the formula gives:
10.6 120 = 12.1 ( 35)

Jos Slotema

Graduation

Internship at Technip-EPG

24
1272
+ 35 =
12.1
= 140C
Condenser
To calculate the needed cooling capacity for the condenser the mass-flow of NH3 at the exit of the
condenser must be determined.
85% reflux is what enters the generator and 1,58 kg/s is what enters the evaporator. So 100% NH3 l
at the exit of the condenser 3 is :1,58*1.85 =2.92 kg/s.

Figure 19: Schematic drawing Condenser absorption cool system.

To calculate the needed cooling capacity the following formula is used:

( ) = ( ) (\)

= 44C (See figure 20)


= (1490.8 405.7) = 1085.1 /
= 2.92 1085.1
= 2.92 1085.1
= 3,17

Figure 20: Saturation table R717 at 44

To calculate the needed amount of cooling water to condensate the refrigerant, the following
formula is used:
=
Rewritten for mass flow

Jos Slotema

Graduation

Internship at Technip-EPG

25

= 3170
= 4.18

Specific heat of water at 44C (6)

= 7
Assumed temperature drop
3170

=
= 108
4.18 7

108

3600 = 390.020 /

Density of water at 44C = 990 kg/m

(6)

390.020/990 = 394 m/h


Steam consumption
To calculate the steam consumption in the generator a separation is made between the capacities IN
and OUT. The generator is in fact a kind of heat exchanger so the formula used is:
=

35

45
3 44

+ ( ) = ( ) + (3 ) +
The values for the weak and strong liquor are derived from appendix 5 in kJ/kg
+ 5626.5 = 7155 + 366 + 3170
= 7155 + 366 + 3170 5626.5
= 5065
The amount of steam necessary for evaporating in the generator is calculated with the following
formula:
=
To derive the enthalpy specific for steam at 165C the enthalpy for gas and liquid is derived from the
table in appendix 6.
= 5065
= = 2762 697 = 2065 /
=

5065
=
= 2,45 /
2065

Total steam consumption = 8,8 ton/h

Jos Slotema

Graduation

Internship at Technip-EPG

26

6 Comparison both systems


The price of a full year of operation is calculated to compare both systems. The prices are estimated
and the year counts 365 days. The values are in operating condition that means without startup
Cost
Unit
Cooling water 1000 m
E- Power
kWh
Steam
ton

Consumption
Cooling water
E-Power

33
0,17
18

Compression cooler
hour
year
371 m/h 3249960 m
1160 kW 10,161.600 kWh
Total

Consumption
Cooling water
E-Power
Steam

107.248
1.727.472
1.834.720

Absorption cooler
hour
year
607 m/h
5.317.320
31,37 kW
274.801
8820 kg
77.263.200
Total

175.471
46.716
1.390.737
1.612.924

With a difference of 221.796 the absorption cooler is cheaper in operational costs.


The environmental load of the absorption system is bigger due to toxic NH3 levels.
Maintenance costs are much lower for the absorption cooler because there are fewer rotating parts
that need close monitoring of wear tear and lubrication

Jos Slotema

Graduation

Internship at Technip-EPG

27

7 Conclusion
The Absorption cool system is during a year of 365 days 221.769 cheaper in operational costs than
the compression cooler. The price for the steam used by the generator is only acceptable if the steam
can be derived from waste heat from the chemical process.

8 Recommendations
In this report the lubrication and the purge unit are not taken in to account for the efficiency of the
compression cooler. The lubrication for the rotating part is very important for especially the
compressor. For future calculations this must be taken into account.
The available waste heat should be calculated.
The prices used to calculate the operational costs are estimated. For more accurate results the actual
prices need to be used. Unfortunately I did not had access to these prices.
Other absorption refrigerants can be calculated for use in the cooling system.
Multiple stage absorption coolers can be calculated.
If the absorption cooler is installed proper steps should be taken to prevent the refrigerant to spill in
the environment due to high toxic levels. The operators must be instructed properly for the use of the
absorption system.
Maintenance costs are a big factor in the total costs of the systems so they can be calculated to be
more accurate.

Jos Slotema

Graduation

Internship at Technip-EPG

28

References
9.1

Text References

1) Site TP Group, http://www.technip.com/en/about-us/company-profile/technip-glance


2) Site TPEPG, http://www.epg.nl/organisatie/index.php
3) Site Dupont NL,
http://www2.dupont.com/Dordrecht_Plant_Site/nl_NL/sites_products/ddt/dordrecht.html
4) Fluorocarbons information site, http://en.wikipedia.org/wiki/Fluorocarbon
5) Teflon information site, http://www.madehow.com/Volume-7/Teflon.html
6) Water properties, Information site, http://www.engineeringtoolbox.com/water-thermalproperties-d_162.html
7) Log_P-h diagram R717, Appendix 7
8) Kents Mechanical Engineers Handbook, Power Volume by J. Kenneth Salisbury 12th edition
chapter 11 Absorption refrigeration, John Wiley & Sons Inc.

9.2

Figure References

Figure 1: PFD R134a -30C, Screenshot appendix 8, By J.Slotema


Figure 2: Properties Methylene Chloride, http://www.inchem.org/documents/pims/chemical
/pim343.htm
Figure 3: Log_P-h diagram -30C system, CoolPack program, Microsoft Word, by J.Slotema
Figure 4: Evaporator -30C system, Picture site visit 3-4-2014
Figure 5: Compressor, engine and gearbox assembly -30C system, picture site visit 3-4-2014
Figure 6: Inside compressor rotor assembly, Picture Maintenance 23-9-2009
Figure 7: Connections of the compressor, Appendix 10, Bentley MicroStation, by J.Slotema
Figure 8: Condenser -30C system, Picture site visit 3-4-2014
Figure 9: Inside Condenser during maintenance, Picture Maintenance 23-9-2009
Figure 10: Cooling water towers used on the plantsite, picture site visit 3-4-2014
Figure 11: Schematic drawing of the economizer with connections, Appendix 10, Bentley
MicroStation, by J.Slotema
Figure 12: Close-up Log_P-h diagram, Appendix 3, by J.Slotema
Figure 13: PFD Absorption cooler, Appendix 9, Bentley MicroStation, by J.Slotema
Figure 14: Log_P-h R717 refrigerant, Appendix 7,CoolPack program, Microsoft Word, by
J.Slotema
Figure 15: Schematic drawing evaporator absorption cooling system, Appendix 9
Figure 16: Schematic drawing absorber absorption cooling system, Appendix 9
Figure 17: Schematic drawing pump absorption cooling system, Appendix 9
Figure 18: Schematic drawing pump generator cooling system, Appendix 9
Figure 19: Schematic drawing pump condenser cooling system, Appendix 9
Figure 20: Saturation table R717 at 44C, screenshot CoolPack program

Jos Slotema

Graduation

Internship at Technip-EPG

29

10 Appendices
Appendix 1: Routing diagram between cooling systems.................. 30
Appendix 2: Component description -30C cooler.. 31-32
Appendix 3: Log_P-h diagram -30C cooler.. 33
Appendix 4: Brine circulation pump specifications.. 34
Appendix 5: Aqua Ammonia chart.. 35
Appendix 6: Steam Saturation table.. 36
Appendix 7: Log_P-h R717................. 37
Appendix 8: PFD Compression cooler ... 38
Appendix 9: PFD Absorption cooler................. 39
Appendix 10: PFD Compressor, Economizer .... 40

Jos Slotema

Graduation

Internship at Technip-EPG

30
Appendix 1: Routing diagram between cooling systems.
Information obtained from site visit 3-4-2014, Drawing DuPont.

Jos Slotema

Graduation

Internship at Technip-EPG

31
Appendix 2: Component description -30C cooler.
Information obtained from site visit 3-4-2014

Jos Slotema

Graduation

Internship at Technip-EPG

32

Jos Slotema

Graduation

Internship at Technip-EPG

33
Appendix 3: Log_P-h diagram -30C cooler.
CoolPack program, Microsoft Word and Excel

Jos Slotema

Graduation

Internship at Technip-EPG

34
Appendix 4: Brine circulation pump specifications.
Information obtained from site visit 3-4-2014

Jos Slotema

Graduation

Internship at Technip-EPG

35
Appendix 5: Aqua Ammonia chart.
Kents Mechanical Engineers Handbook, Power Volume by J. Kenneth Salisbury 12th edition, figure 19
page 11-32

Jos Slotema

Graduation

Internship at Technip-EPG

36
Appendix 6: Steam Saturation table
http://www.stoommachine.info/tabel.html

Jos Slotema

Graduation

Internship at Technip-EPG

37
Appendix 7: Log_P-h R717
CoolPack program, Microsoft Word and Excel

Jos Slotema

Graduation

Internship at Technip-EPG

38
Appendix 8: PFD Compression cooler
Bentley MicroStation, By J.Slotema

Jos Slotema

Graduation

Internship at Technip-EPG

39
Appendix 9: PFD Absorption cooler
Bentley MicroStation, By J.Slotema

Jos Slotema

Graduation

Internship at Technip-EPG

40
Appendix 10: PFD Compressor, Economizer
Bentley MicroStation, By J.Slotema

Jos Slotema

Graduation

Internship at Technip-EPG