You are on page 1of 12

Toledo

Refinery

Site Technical Practices

Alphabetical Index

EP 1-0-2

Page 1 of 12

November 2012

TITLE

EP

Revision

Number Number
480 Volt Prefabricated Switchracks ..................................................................................... EP 13-7-1
480 Volt Prefabricated Switchracks Data Sheet ............................................................. EP 13-7-1DS
A
Accessibility Requirements for Buildings Affected by the Americans with Disabilities Act .... EP 4-6-2
Accessories for Atmospheric Storage Tanks ......................................................................... EP 9-1-4
Actuators for FCCU Slide Valves ......................................................................................... EP 12-8-2
Actuators for FCCU Slide Valves Data Sheet ................................................................. EP 12-8-2DS
Actuators for Motor Operated Valves ................................................................................. EP 13-22-1
Actuators for Motor Operated Valves Data Sheet ......................................................... EP 13-22-1DS
Addition of Nozzles to Existing Pressure Vessels (Future Release)...................................... EP 7-3-4
Addition of Welded Internals to Existing Pressure Vessels (Future Release) ....................... EP 7-3-9
Adjustable Frequency Drives for Large Frame Induction (Medium Voltage) Motors,
300 HP & Larger ................................................................................................................. EP 13-26-2
Adjustable Frequency Drives for Large Frame Induction (Medium Voltage) Motors,
300 HP & Larger Data Sheet......................................................................................... EP 13-26-2DS
Adjustable Frequency Drives for Low Voltage Induction Motors
Below 500HP (Future Release).......................................................................................... EP 13-26-1
Adjustable Frequency Drives for Low Voltage Induction Motors
Below 500HP Data Sheet (Future Release) ................................................................. EP 13-26-1DS
Air Cooled Heat Exchangers .................................................................................................. EP 8-1-4
Air Cooled Heat Exchangers Data Sheet .......................................................................... EP 8-1-4DS
Air Cooled Heat Exchangers Inspection Checklist ...............................................................EP 8-1-4C
Alphabetical Index ................................................................................................................. EP 102
Amine Plants ...................................................................................................................... EP 10-1-14
Analyzer Shelters ................................................................................................................. EP 12-7-2
Annunciators (Future Release) ............................................................................................ EP 12-1-5
Atmospheric Storage Tank Foundation Monitoring, Repair and Retrofit ............................. EP 4-2-10
Atmospheric Storage Tank Foundation Monitoring, Repair and Retrofit Data Sheet ..... EP 4-2-10DS
Atmospheric Storage Tank Foundation Monitoring,
Repair and Retrofit Inspection Checklist ............................................................................ EP 4-2-10C
Atmospheric Storage Tank Lifting, Shell Relieving and Floating ........................................... EP 9-1-6
Atmospheric Storage Tanks ................................................................................................... EP 9-1-1
Atmospheric Storage Tanks Data Sheet ........................................................................... EP 9-1-1DS
Atmospheric Storage Tanks Inspection Checklist ................................................................ EP 9-1-1C
Auxiliary Structures for Operation and Maintenance ............................................................. EP 4-5-3
Axial Flow Compressors (Future Release) ........................................................................... EP 624
Axial Flow Compressors Data Sheet (Future Release) ...................................................EP 624DS
Axial Flow Compressors Inspection Checklist (Future Release) ....................................... EP 624C
B
Ball Valves ............................................................................................................................ EP 5-3-10
Ball Valves Data Sheet .................................................................................................... EP 5-3-10DS
Bimetal Thermometers ......................................................................................................... EP 12-1-8
Bolting Procedures for Flanged Connections......................................................................... EP 5-5-4
Bolting Procedures for Flanged Connections Installation Record........................................EP 5-5-4R
Butterfly Valves for Hydrocarbon Service ............................................................................ EP 5-3-11
Butterfly Valves for Hydrocarbon Service Data Sheet .................................................... EP 5-3-11DS
Butterfly Valves for Utility Service ........................................................................................ EP 5-3-12
Butterfly Valves for Utility Service Data Sheet ................................................................ EP 5-3-12DS

Maintained by E G Shaker Heights, OH

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.1
0.0
0.1
3.3
0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.1
0.0
0.1
0.3
0.0
0.0
0.0
0.0
0.0
0.0
1.1
0.0
0.0
0.0
0.0
0.0

Toledo
Refinery

Site Technical Practices

Alphabetical Index

EP 1-0-2

Page 2 of 12

November 2012
TITLE

EP

Revision

Number Number
C
Cast Iron and Ductile Iron Gate Valves, Flanged Ends ......................................................... EP 5-3-4
Cast Iron and Ductile Iron Gate Valves, Flanged Ends Data Sheet ................................. EP 5-3-4DS
Catalytic Hydrodesulfurizers................................................................................................. EP 10-1-4
Catalytic Reformers .............................................................................................................. EP 10-1-3
Cathodic Protection for Heat Exchangers Anode Installation ............................................ EP 10-3-5
Cathodic Protection for Tank Bottoms ................................................................................. EP 10-3-6
CementLined Pipe and Fittings ............................................................................................ EP 5-9-3
Centrifugal Compressors....................................................................................................... EP 622
Centrifugal Compressors Data Sheet ..............................................................................EP 622DS
Centrifugal Compressors Inspection Checklist .................................................................. EP 622C
Centrifugal Fans in General Refinery Service ....................................................................... EP 661
Centrifugal Fans in General Refinery Service Data Sheet ...............................................EP 661DS
Centrifugal Fans in General Refinery Service Inspection Checklist (Future Release) ...... EP 661C
Centrifugal Pumps ................................................................................................................. EP 611
Centrifugal Pumps Data Sheet .........................................................................................EP 611DS
Centrifugal Pumps Inspection Checklist............................................................................. EP 611C
Chain Link Fence and Gates ................................................................................................ EP 4-10-1
Chain Link Fence and Gates Inspection Checklist.............................................................EP 4-10-1C
Check Valves.......................................................................................................................... EP 5-3-8
Check Valves Data Sheet ................................................................................................. EP 5-3-8DS
Color Coding for Material Identification ............................................................................... EP 15-1-5
Compact and Extended Body Gate and Globe Valves .......................................................... EP 5-3-6
Compact and Extended Body Gate and Globe Valves Data Sheet .................................. EP 5-3-6DS
Concrete Construction Inspection Checklist ........................................................................ EP 4-3-2C
Concrete Construction Requirements .................................................................................... EP 4-3-2
Concrete Design ..................................................................................................................... EP 4-3-1
Concrete Reinforcement Fabrication ..................................................................................... EP 4-3-3
Construction Rigging, Scaffolding and Requirements for Heavy Lifts ................................... EP 4-9-1
Containment Dikes for Storage Tanks and Spheres .............................................................. EP 9-5-1
Control Centers .................................................................................................................... EP 12-6-1
Control Systems ................................................................................................................... EP 12-1-1
Control Systems Data Sheet ........................................................................................... EP 12-1-1DS
Control Systems for Fired Heaters ....................................................................................... EP 12-4-2
Control Systems for Steam Generators ............................................................................... EP 12-4-1
Control Systems Installation ................................................................................................. EP 12-2-1
Control Valves, Actuators and Accessories ........................................................................ EP 5-3-17
Control Valves, Actuators and Accessories Data Sheet ................................................ EP 5-3-17DS
Cooling Towers ...................................................................................................................... EP 8-4-1
Cooling Towers Data Sheet .............................................................................................. EP 8-4-1DS
Cooling Towers Inspection Checklist (Future Release) .......................................................EP 8-4-1C
Corrosion Protection for Underground Piping ...................................................................... EP 10-3-3
Crude Units........................................................................................................................... EP 10-1-1
Cyclic Reformer Motor Operated Valves .............................................................................. EP 5-3-13
Cyclic Reformer Motor Operated Valves Data Sheet...................................................... EP 5-3-13DS
Cyclone Systems for Fluid Catalytic Cracking Units .............................................................. EP 7-2-3
Cyclone Systems for Fluid Catalytic Cracking Units Data Sheet ...................................... EP 7-2-3DS
Cylindrical Horizontal Atmospheric Storage Tanks (Future Release) .................................... EP 9-6-1

Maintained by E G Shaker Heights, OH

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.3
0.1
0.1
0.0
0.1
0.1
0.0
0.0
0.0
0.0
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Toledo
Refinery

Site Technical Practices

Alphabetical Index

EP 1-0-2

Page 3 of 12

November 2012
TITLE

EP

Revision

Number Number
D
Deaerating Feedwater Heater ................................................................................................ EP 8-3-2
Deaerating Feedwater Heater Data Sheet ........................................................................ EP 8-3-2DS
Delayed Cokers .................................................................................................................... EP 10-1-8
Design and Installation of Marine Vapor Recovery Systems (Future Release) ..................... EP 3-7-5
Design and Installation of NonMetallic Piping ...................................................................... EP 5-9-1
Design Criteria and Loads for Structures ............................................................................... EP 4-1-1
Deviations to Toledo Site Technical Practices ...................................................................... EP 113
Differential Pressure Instruments (Future Release) ........................................................... EP 12-1-12
Distributed Control Systems ................................................................................................. EP 12-3-1
Documentation Format Requirements ................................................................................... EP 2-5-2
Documentation Tables ........................................................................................................... EP 2-5-1
Double Flanged High Performance Rotary Valves for Hydrocarbon Service ...................... EP 5-3-20
Double Flanged High Performance Rotary Valves for
Hydrocarbon Service Data Sheet .................................................................................... EP 5-3-20DS
Double Pipe Heat Exchangers ............................................................................................... EP 8-1-5
Double Pipe Heat Exchangers Data Sheet ....................................................................... EP 8-1-5DS
Double Pipe Heat Exchangers Inspection Checklist ............................................................EP 8-1-5C
Drilled Caisson Foundations .................................................................................................. EP 4-2-6
Drilled Caisson Foundations Inspection Checklist ...............................................................EP 4-2-6C
Dry Steam-Air Decoking Systems .......................................................................................... EP 8-2-4
E
Earthwork ............................................................................................................................... EP 4-2-2
Earthwork Inspection Checklist. ................................................................................ EP 4-2-2C
Electrical Bus Duct 480 Volt and Higher ............................................................................ EP 13-24-1
Electrical Bus Duct 480 Volt and Higher Data Sheet ................................................... EP 13-24-1DS
Electrical Detail Design and Construction Practice .............................................................. EP 13-2-1
Electrical Equipment Inspection and Testing ....................................................................... EP 13-2-2
Electrical Equipment Inspection and Testing Forms (Future Release) ................................ EP 13-2-3
Electrical Equipment Shelters ............................................................................................ EP 13-16-1
Electrical Equipment Shelters Data Sheet .................................................................... EP 13-16-1DS
Electrical Standards for Lighting (Future Release) ............................................................ EP 13-20-1
Electrical Standards for Packaged Equipment ................................................................... EP 13-13-1
Electrical Standards for Packaged Equipment Data Sheet ........................................... EP 13-13-1DS
Electrical Tracing ................................................................................................................ EP 13-12-1
Electrical Tracing Data Sheet ........................................................................................ EP 13-12-1DS
Emergency Isolation .............................................................................................................. EP 3-3-1
Emergency Safety Shower and Eye Wash ..................................................................... EST 16-15-1
Equipment Grounding Details ............................................................................................ EP 13-15-1
Evaluation and Repair of Foundations ................................................................................. EP 4-2-11
Evaluation and Repair of Foundations Data Sheet ........................................................ EP 4-2-11DS
Evaluation of Equipment in AES Service (Future Release) ................................................. EP 10-4-1
Evaluation of Equipment in Hydrogen Service (Future Release) ......................................... EP 10-4-2
Evaluation, Repair, and Modification of Concrete Structures ................................................ EP 4-3-4
Evaluation, Repair, and Modification of Concrete Structures Data Sheet ........................ EP 4-3-4DS
Explanation and Use of Toledo Site Technical Practices (STP) Control Procedure.............EP 111
Export Protection and Packaging of Equipment................................................................... EP 14-1-5

Maintained by E G Shaker Heights, OH

0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.1
0.0
0.0
0.1
0.0
0.0
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.0
0.0

Toledo
Refinery

Site Technical Practices

Alphabetical Index

EP 1-0-2

Page 4 of 12

November 2012
TITLE

EP

Revision

Number Number
F
Fabric Expansion Joints ......................................................................................................... EP 5-4-2
Fabric Expansion Joints Data Sheet ................................................................................. EP 5-4-2DS
FCC Units ............................................................................................................................. EP 10-1-5
FCCU Slide Valves ............................................................................................................... EP 5-3-19
FCCU Slide Valves Data Sheet....................................................................................... EP 5-3-19DS
FCCU Slide Valves Inspection Checklist ........................................................................... EP 5-3-19C
Field Installation of Strip Lining to Existing Pressure Vessels (Future Release) .................. EP 7-3-8
Field Installation of Weld Overlay to Existing Pressure Vessels (Future Release) ................ EP 7-3-7
Field Storage and Installation of Rotating Equipment ...........................................................EP 681
Fire Hydrant and Monitor Fire Hydrants ............................................................................ EST 16-1-1
Fire Hydrant Underground Isolation Watch Valve ............................................................. EST 16-2-1
Fire Protection ....................................................................................................................... EP 3-5-1
Fire Protection of Docks and Wharves (Future Release) ...................................................... EP 3-5-6
Fire Protection Shields for Wafer Valves ............................................................................. EP 11-2-2
Fire Protection Systems, Valves, Strainers and Devices ................................................ EST 16-13-1
Fire Resistant Instrument Cable ......................................................................................... EP 12-1-26
Fire Water U/G Isolation Valves with Trench Adapters ..................................................... EST 16-3-1
Fire Water U/G Isolation Valves with Post Indicators ....................................................... EST 16-4-1
Fire Water U/G Drain Valves ............................................................................................. EST 16-5-1
Fired Heater Refractory ........................................................................................................ EP 11-1-2
Fired Heater Refractory Data Sheet ................................................................................ EP 11-1-2DS
Fired Heater Refractory Inspection Checklist..................................................................... EP 11-1-2C
Fired Heaters .......................................................................................................................... EP 8-2-1
Fired Heaters Data Sheet.................................................................................................. EP 8-2-1DS
Fired Heaters Inspection Checklist ...................................................................................... EP 8-2-1C
Fireproofing .......................................................................................................................... EP 11-2-1
Firewater Systems .................................................................................................................. EP 3-5-2
Fixed Water Spray Fire Protection Systems ......................................................................... EP 3-5-3
Flanges, Gaskets and Bolting ................................................................................................ EP 5-2-2
Flexible Metal Hoses .............................................................................................................. EP 5-4-4
Flexible Metal Hoses Data Sheet ...................................................................................... EP 5-4-4DS
Flue Gas Block and Bypass Valves ..................................................................................... EP 5-3-18
Flue Gas Block and Bypass Valves Data Sheet ............................................................. EP 5-3-18DS
Flue Gas Block and Bypass Valves Inspection Checklist ..................................................EP 5-3-18C
Foam Fire Protection Systems .............................................................................................. EP 3-5-4
Foundation Types and Selection Criteria ............................................................................... EP 4-2-1
Foundations for Atmospheric Storage Tanks ......................................................................... EP 4-2-7
Foundations for Atmospheric Storage Tanks Inspection Checklist......................................EP 4-2-7C
Fractionating Tray and Tower Packing .................................................................................. EP 7-2-2
Fractionating Tray and Tower Packing Data Sheet .......................................................... EP 7-2-2DS
G
Gage Glasses ..................................................................................................................... EP 12-1-18
Gage Glasses Data Sheet............................................................................................. EP 12-1-18DS
Galvanized Coatings ............................................................................................................ EP 10-3-8
Gate Valves ............................................................................................................................ EP 5-3-3
Gate Valves Data Sheet .................................................................................................... EP 5-3-3DS
General Piping Design ........................................................................................................... EP 5-1-1
General Purpose Lube Oil Systems ...................................................................................... EP 692

Maintained by E G Shaker Heights, OH

0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.0
0.0
1.0
1.0
1.0
0.0
0.0
1.0
0.0
1.0
1.0
1.0
0.0
0.0
0.1
1.3
1.0
0.1
1.0
0.0
0.0
0.2
2.0
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Toledo
Refinery

Site Technical Practices

Alphabetical Index

EP 1-0-2

Page 5 of 12

November 2012
TITLE

EP

Revision

Number Number
General Purpose Lube Oil Systems Data Sheet ..............................................................EP 692DS
General Purpose Steam Turbines ......................................................................................... EP 631
General Purpose Steam Turbines Data Sheet.................................................................EP 631DS
General Purpose Steam Turbines Inspection Checklist .................................................... EP 631C
General Requirements for Buildings ...................................................................................... EP 4-6-1
General Requirements for Buildings Inspection Checklist ...................................................EP 4-6-1C
Globe Valves .......................................................................................................................... EP 5-3-5
Globe Valves Data Sheet .................................................................................................. EP 5-3-5DS
Grouting and Baseplates for Structural Steel and Equipment ............................................... EP 4-2-9
Grouting and Baseplates for Structural Steel and Equipment Inspection Checklist ............EP 4-2-9C
H
H2 SO4 Alkylation Units ..................................................................................................... EP 10-1-12
Heavy Fuel Oil Systems ......................................................................................................... EP 8-2-5
Heavy Wall and Special Service Pressure Vessels ............................................................... EP 7-1-3
HF Alkylation Units Phillips.............................................................................................. EP 10-1-10
HF Alkylation Units UOP ................................................................................................. EP 10-1-11
High Voltage Oil, Vacuum, and SF6 Outdoor Circuit Breakers 13.8 KV and Above ......... EP 13-21-1
High Voltage Oil, Vacuum, and SF6 Outdoor Circuit Breakers
13.8 KV and Above Data Sheet .................................................................................... EP 13-21-1DS
Hot Taps ................................................................................................................................. EP 5-7-1
Hot Taps Data Sheet ......................................................................................................... EP 5-7-1DS
Hydrocrackers ...................................................................................................................... EP 10-1-9
Hydrogen Plants ................................................................................................................. EP 10-1-16
I
Induction Motor Repair ...................................................................................................... EP 13-23-1
Induction Motor Repair Data Sheet .............................................................................. EP 13-23-1DS
Induction Motors Above 200 HP........................................................................................... EP 13-3-2
Induction Motors Above 200 HP Data Sheet .................................................................. EP 13-3-2DS
Induction Motors NEMA Frame ............................................................................................ EP 13-3-1
Induction Motors NEMA Frame 1/2 to 200 HP Explosion Proof ......................................... EP 13-3-4
Induction Motors NEMA Frame 1/2 to 200 HP Explosion Proof Data Sheet .................. EP 13-3-4DS
Induction Motors NEMA Frame Data Sheet .................................................................... EP 13-3-1DS
InPlant Inspection of Existing Boilers ................................................................................. EP 15-4-5
InPlant Inspection of Existing Fired Heaters ...................................................................... EP 15-4-6
InPlant Inspection of Existing Piping Systems .................................................................. EP 15-4-2
InPlant Inspection of Existing Pressure Vessels ................................................................ EP 15-4-3
InPlant Inspection of Existing Rotating Equipment (Future Release) ...............................EP 6101
InPlant Inspection of Existing Stacks (Future Release) ..................................................... EP 15-4-8
InPlant Inspection of Existing Tankage .............................................................................. EP 15-4-4
InPlant Inspection of Pressure Relief Valves ..................................................................... EP 15-4-9
InPlant Inspection of Refractories ...................................................................................... EP 15-4-7
InPlant NonDestructive Examination (NDE) (Future Release) ........................................ EP 15-2-1
Inspection, Repair, Alteration, Rerating and Fitness for
Service of InService Piping Systems ................................................................................. EP 5-11-2
Installation of Repair Patches and Sleeves .......................................................................... EP 5-11-4
Instrument Cable ................................................................................................................ EP 12-1-25
Instrument Enclosures .......................................................................................................... EP 12-1-3
Instrument Enclosures Data Sheet ................................................................................. EP 12-1-3DS

Maintained by E G Shaker Heights, OH

0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Toledo
Refinery

Site Technical Practices

Alphabetical Index

EP 1-0-2

Page 6 of 12

November 2012
TITLE

EP

Revision

Number Number
Instrumentation for Above Ground Storage Tanks............................................................... EP 12-9-1
Insulation Application - Piping .............................................................................................. EP 11-3-2
Insulation Application - Tanks and Spheres ......................................................................... EP 11-3-4
Insulation Application - Tanks and Spheres Data Sheet ................................................. EP 11-3-4DS
Insulation Application - Vessels and Equipment .................................................................. EP 11-3-3

0.0
2.1
0.0
0.0
1.0

Insulation Design .................................................................................................................. EP 11-3-1


Insulation of Flanged Joints and Valves in Hot Service ....................................................... EP 11-3-6
Integrity Guidelines for Pipelines (Future Release).............................................................. EP 5-11-1
Internal Insulating and Refractory Linings ............................................................................ EP 11-1-1
Internal Insulating and Refractory Linings Data Sheet .................................................... EP 11-1-1DS
Internal Insulating and Refractory Linings Inspection Checklist.........................................EP 11-1-1C
Internal Lining and Resin Repair .......................................................................................... EP 10-3-7
Isomerization Units ............................................................................................................. EP 10-1-17
L
Level Capacitance Type ..................................................................................................... EP 12-1-17
Level Capacitance Type Data Sheet ............................................................................. EP 12-1-17DS
Level Displacers ................................................................................................................. EP 12-1-16
Level Displacers Data Sheet ......................................................................................... EP 12-1-16DS
Life Assessment of Fired Heater Tubes (Future Release) ..................................................... EP 8-2-6
Low Pressure Storage Tanks ................................................................................................. EP 9-2-1
Low Pressure Storage Tanks Data Sheet ......................................................................... EP 9-2-1DS
Low Pressure Storage Tanks Inspection Checklist ..............................................................EP 9-2-1C
Low Voltage Automatic Transfer Switches ......................................................................... EP 13-19-1
Low Voltage Automatic Transfer Switches Data Sheet ................................................ EP 13-19-1DS
Low Voltage Switchgear ....................................................................................................... EP 13-5-1
Low Voltage Switchgear Data Sheet ............................................................................... EP 13-5-1DS
LPG Installations (Future Release) ........................................................................................ EP 3-6-1
M
Magnetic Flowmeters ......................................................................................................... EP 12-1-13
Magnetic Flowmeters Data Sheet ................................................................................. EP 12-1-13DS
Material Hardness Requirements ......................................................................................... EP 10-2-3
Material Requirements for Aggressive Environmental Services .......................................... EP 10-2-1
Material Requirements for Aggressive Environmental Services Data Sheet .................. EP 10-2-1DS
Medium Voltage Metal Enclosed Switches (ME Switches) ................................................ EP 13-25-1
Medium Voltage Metal Enclosed Switches (ME Switches) Data Sheet ........................ EP 13-25-1DS
Medium Voltage Motor Controllers ....................................................................................... EP 13-6-1
Medium Voltage Motor Controllers Data Sheet............................................................... EP 13-6-1DS
Medium Voltage Vacuum Switchgear .................................................................................. EP 13-5-2
Medium Voltage Vacuum Switchgear Data Sheet .......................................................... EP 13-5-2DS
Metal Expansion Joints .......................................................................................................... EP 5-4-1
Metal Expansion Joints Data Sheet .................................................................................. EP 5-4-1DS
Metal Expansion Joints Inspection Checklist ....................................................................... EP 5-4-1C
Metal Lining and Cladding ...................................................................................................... EP 7-1-6
Microfilming Contract Drawings.............................................................................................. EP 2-2-1
Motor Connection Drawings ............................................................................................... EP 13-14-1
Motor Control Centers 600 Volt Class .................................................................................. EP 13-6-2
Motor Control Centers 600 Volt Class Data Sheet.......................................................... EP 13-6-2DS

1.0
1.0
0.0
0.0
0.0
0.1
0.0
0.0

Maintained by E G Shaker Heights, OH

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.0
1.0
0.1
0.0
0.0
0.0
0.0
0.0

Toledo
Refinery

Site Technical Practices

Alphabetical Index

EP 1-0-2

Page 7 of 12

November 2012
TITLE

EP

Revision

Number Number
N
Naphtha Pretreaters ............................................................................................................. EP 10-1-2
NEMA 3R, 4X, 4/7 Combination Motor Starters and Circuit Breakers with Enclosure ....... EP 13-7-2
NEMA 3R, 4X, 4/7 Combination Motor Starters and
Circuit Breakers with Enclosure Data Sheet ................................................................... EP 13-7-2DS
Neutral Grounding Resistors .............................................................................................. EP 13-10-1
Neutral Grounding Resistors Data Sheet ...................................................................... EP 13-10-1DS
Numerical Index .................................................................................................................... EP 101
O
Oil Mist Lubrication Systems Construction......................................................................... EP 694
Oil Mist Lubrication Systems Design .................................................................................. EP 693
OnLine Analyzers ............................................................................................................... EP 12-7-1
OnLine Analyzers Data Sheet ....................................................................................... EP 12-7-1DS
OnStream Leak Repairs of Piping Components ................................................................ EP 5-11-3
OnStream Leak Repairs of Piping Components Data Sheet ........................................ EP 5-11-3DS
Orifice Plates and Flanges (Future Release) .................................................................... EP 12-1-11
Oscillating Fire Monitor ...................................................................................................... EST 16-8-1
P
Packaged Integrally Geared Centrifugal Air Compressors ...................................................EP 623
Packaged Integrally Geared Centrifugal Air Compressors Data Sheet ...........................EP 623DS
Packaged Integrally Geared Centrifugal Air Compressors Inspection Checklist ............... EP 623C
Packaged Watertube Boilers .................................................................................................. EP 8-3-1
Packaged Watertube Boilers Data Sheet .......................................................................... EP 8-3-1DS
Packaged Watertube Boilers Inspection Checklist (Future Release) ..................................EP 8-3-1C
Painting................................................................................................................................. EP 10-3-1
Pile Foundations ..................................................................................................................... EP 4-2-4
Pile Foundations Inspection Checklist ................................................................................. EP 4-2-4C
Piping and Design of Manual Sampling Systems .................................................................. EP 5-8-1
Piping Erection and Testing ................................................................................................... EP 5-5-3
Piping Fabrication ................................................................................................................... EP 5-5-1
Piping Fabrication Inspection Checklist ............................................................................... EP 5-5-1C
Piping for Atmospheric and Low Pressure Storage Tanks .................................................... EP 5-6-1
Piping for Fired Heaters ......................................................................................................... EP 5-6-3
Piping for Instruments ............................................................................................................ EP 5-6-5
Piping for Pressure Relief Systems ........................................................................................ EP 5-6-4
Piping for Rotating Equipment................................................................................................ EP 5-6-2
Piping Layout .......................................................................................................................... EP 5-1-2
Piping Standards .................................................................................................................... EP 5-2-3
Piping Standards Database Format ....................................................................................... EP 5-2-5
Piping Stress Analysis and Supports ..................................................................................... EP 5-1-3
Piping System Line Numbering .............................................................................................. EP 5-1-5
Plant Layout ........................................................................................................................... EP 3-2-1
Plant Manuals ......................................................................................................................... EP 2-4-1
PlasticLined Metallic Pipe..................................................................................................... EP 5-9-2
Plate and Frame Heat Exchangers ........................................................................................ EP 8-1-7
Plate and Frame Heat Exchangers Data Sheet ................................................................ EP 8-1-7DS
Plate and Frame Heat Exchangers Inspection Checklist (Future Release) .........................EP 8-1-7C
Plug Valves............................................................................................................................. EP 5-3-9

Maintained by E G Shaker Heights, OH

0.0
0.0
0.0
0.0
0.0
3.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.0
0.0
0.0
0.1
0.0
0.0
0.0
0.3
0.0
0.1
0.0
0.1
0.1
0.1
0.0
1.0
0.0
1.0
0.0
0.0
0.3
0.0
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Toledo
Refinery

Site Technical Practices

Alphabetical Index

EP 1-0-2

Page 8 of 12

November 2012
TITLE

EP

Revision

Number Number
Plug Valves Data Sheet .................................................................................................... EP 5-3-9DS
Pneumatic Actuators for Rotary Block Valves ...................................................................... EP 12-8-1
Pneumatic Actuators for Rotary Block Valves Data Sheet ............................................. EP 12-8-1DS
Portable Fire Extinguishers .............................................................................................. EST 16-10-1
Portable Water Thief ........................................................................................................ EST 16-11-1
Positive Displacement Flowmeters .................................................................................... EP 12-1-15
Positive Displacement Flowmeters Data Sheet ............................................................ EP 12-1-15DS
Positive Materials Identification (PMl) .................................................................................. EP 15-1-4
Post Weld Heat Treatment of Existing Pressure Vessels (Future Release) .......................... EP 7-3-6

0.0
0.0
0.0
1.0
1.0
0.0
0.0
0.0
0.0

Power Cable 5 KV and Above .............................................................................................. EP 13-8-2


Power Cable 5 KV and Above Data Sheet ...................................................................... EP 13-8-2DS
Power Conditioners (Future Release) ................................................................................ EP 13-18-1
Power System Design Practices .......................................................................................... EP 13-1-1
Power Transformers ............................................................................................................. EP 13-4-1
Power Transformers Data Sheet ..................................................................................... EP 13-4-1DS
Precommission Cleaning of Rotating Equipment Piping and Steam ...................................................
Generating Equipment ......................................................................................................... EP 14-1-4
Preparation of Equipment for Long Term Storage ............................................................... EP 14-1-2
Pressure and Differential Pressure Transmitters ............................................................... EP 12-1-10
Pressure and Differential Pressure Transmitters Data Sheet ....................................... EP 12-1-10DS
Pressure Gauges ............................................................................................................... EP 12-1-19
Pressure Gauges Data Sheet ....................................................................................... EP 12-1-19DS
Pressure Relief Valves ......................................................................................................... EP 5-3-14
Pressure Relief Valves Data Sheet ................................................................................. EP 5-3-14DS
Pressure Relieving Systems .................................................................................................. EP 3-7-1
Pressure Storage Spheres ..................................................................................................... EP 9-4-1
Pressure Switches .............................................................................................................. EP 12-1-20
Pressure Switches Data Sheet...................................................................................... EP 12-1-20DS
Pressure Vessel Details ......................................................................................................... EP 7-1-7
Pressure Vessel Internals ...................................................................................................... EP 7-2-1
Pressure Vessel Internals Weld and Cleanliness Acceptance Criteria .................................. EP 7-2-4
Pressure Vessels ................................................................................................................... EP 7-1-1
Pressure Vessels Data Sheet ........................................................................................... EP 7-1-1DS
Pressure Vessels for Non-Process Services ......................................................................... EP 7-1-2
Pressure Vessels Inspection Checklist ................................................................................ EP 7-1-1C
Primary Temperature Element Assemblies .......................................................................... EP 12-1-6
Primary Temperature Element Assemblies Data Sheet ................................................. EP 12-1-6DS
Principles and Practices for Inspection and Testing of InPlant Refinery Equipment ......... EP 15-4-1
Procedures for the Use of Inspection Checklists (Future Release) ..................................... EP 15-1-6
Process Buildings (Future Release) ....................................................................................... EP 3-4-1
Programmable Control Equipment ....................................................................................... EP 12-5-1
Protective Coatings for Heat Exchangers ............................................................................ EP 10-3-4
Protective Instrumentation Systems ................................................................................... EP 12-10-1
Q
QA/QC Procedures for Commodity Purchases .................................................................... EP 15-5-1
QA/QC Procedures for Fasteners ........................................................................................ EP 15-5-6
QA/QC Procedures for Fittings............................................................................................. EP 15-5-3

0.0
0.0
0.0
0.0
0.0
0.0

Maintained by E G Shaker Heights, OH

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.1
0.1
0.0
0.0
1.0
0.0
0.0
0.0
0.0
0.1
0.0
0.0
0.0

Toledo
Refinery

Site Technical Practices

Alphabetical Index

EP 1-0-2

Page 9 of 12

November 2012
TITLE

EP

Revision

Number Number
QA/QC Procedures for Gaskets ........................................................................................... EP 15-5-5
QA/QC Procedures for Pipe and Tubing .............................................................................. EP 15-5-2
QA/QC Procedures for Valves ............................................................................................ EP 15-5-4
QA/QC Procedures for Welding Consumables .................................................................... EP 15-5-7
Quality Assurance for the Manufacturer of Refinery Equipment .......................................... EP 15-1-2
R
Receiver Instruments ........................................................................................................... EP 12-1-4
Receiver Instruments Data Sheet ................................................................................... EP 12-1-4DS
Reciprocating Compressors .................................................................................................. EP 621
Reciprocating Compressors Data Sheet ..........................................................................EP 621DS

0.0
0.0
0.0
0.0
0.0

Reciprocating Compressors Inspection Checklist .............................................................. EP 621C


Recommissioning Equipment After Storage ........................................................................ EP 14-1-3
Referenced Source Addresses ............................................................................................. EP 103
Register of Pressure Relieving Systems ................................................................................ EP 3-7-3
Reinforced Concrete Foundations ......................................................................................... EP 4-2-3
Relief Disposal Systems......................................................................................................... EP 3-7-2
Removable/Reusable Insulation .......................................................................................... EP 11-3-5
Repair to Existing Pressure Vessel Shells (Future Release) ................................................. EP 7-3-5
Repairs and Alterations to Flanges ........................................................................................ EP 7-3-3
Repairs, Alterations and Fitness for Service of Pressure Vessels (Future Release) ............. EP 7-3-2
Requirements for Blast Resistant Buildings and Structures .................................................. EP 4-1-2
Requirements For CAD Drawings .......................................................................................... EP 2-3-1
Requirements for Packaged Equipment and Units .............................................................. EP 14-2-1
Rerating of Pressure Vessels ................................................................................................. EP 7-3-1
Revisions/Additions/Deletions to Toledo Site Technical Practices .......................................EP 112
Roadways and Paving ............................................................................................................ EP 4-4-1
Roadways and Paving Inspection Checklist ........................................................................ EP 4-4-1C
Rotating Equipment Installation Record ............................................................................. EP 681R
Rupture Disk Devices ........................................................................................................... EP 5-3-15
Rupture Disk Devices Data Sheet ................................................................................... EP 5-3-15DS
S
S & LP Philosophy (Future Release) .................................................................................... EP 3-1-1
Saturate Gas Plants ........................................................................................................... EP 10-1-13
Section 1 Table of Contents .................................................................................................. EP 100
Section 10 Table of Contents .............................................................................................. EP 1000
Section 11 Table of Contents ............................................................................................... EP 11-0-0
Section 12 Table of Contents ............................................................................................... EP 12-0-0
Section 13 Table of Contents ............................................................................................... EP 13-0-0
Section 14 Table of Contents ............................................................................................... EP 14-0-0
Section 15 Table of Contents ............................................................................................... EP 15-0-0
Section 16 Table of Contents ............................................................................................... EP 16-0-0
Section 2 Table of Contents ................................................................................................... EP 2-0-0
Section 3 Table of Contents ................................................................................................... EP 3-0-0
Section 4 Table of Contents ................................................................................................... EP 4-0-0
Section 5 Table of Contents .................................................................................................. EP 500
Section 6 Table of Contents .................................................................................................. EP 600
Section 7 Table of Contents ................................................................................................... EP 7-0-0

0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.0
0.1
0.0
0.0
0.0

Maintained by E G Shaker Heights, OH

0.0
0.0
0.0
0.0

0.0
0.0

Toledo
Refinery

Site Technical Practices

Alphabetical Index

EP 1-0-2

Page 10 of 12

November 2012
TITLE

EP

Revision

Number Number
Section 8 Table of Contents ................................................................................................... EP 8-0-0
Section 9 Table of Contents ................................................................................................... EP 9-0-0
Selection of Piping Components and Materials ..................................................................... EP 5-2-1
Selection of Recorders (Future Release) ............................................................................. EP 12-1-7
Self Acting Temperature Regulators (Future Release) ..................................................... EP 12-1-27
Self Operated Pressure Regulating Valves (Future Release) ........................................... EP 12-1-21
Sewer Systems ...................................................................................................................... EP 4-8-1
Sewer Systems Inspection Checklist ................................................................................... EP 4-8-1C
Sheet Piling ............................................................................................................................ EP 4-2-5
Shop Inspection and Testing of New Refinery Equipment ................................................... EP 15-1-1
Side Entering Mixers ............................................................................................................. EP 641
Side Entering Mixers Data Sheet .....................................................................................EP 641DS
Side Entering Mixers Inspection Checklist (Future Release) ............................................. EP 641C
Site Inspection & Testing of New Instrumentation ............................................................... EP 12-2-2
Site Inspection, Testing and PreCommissioning of New Refinery .....................................................
Equipment (Future Release) ................................................................................................ EP 15-1-3
Site Technical Practices Format Guidelines .......................................................................... EP 2-1-1
Solenoid Valves .................................................................................................................. EP 12-1-22
Solenoid Valves Data Sheet.......................................................................................... EP 12-1-22DS
Sootblowers ............................................................................................................................ EP 8-2-2
Sour Water Strippers .......................................................................................................... EP 10-1-18
Special Purpose Gears ......................................................................................................... EP 651
Special Purpose Gears Data Sheet .................................................................................EP 651DS
Special Purpose Gears Inspection Checklist ..................................................................... EP 651C
Special Purpose Lube/Seal Oil Systems............................................................................... EP 691
Special Purpose Lube/Seal Oil Systems Data Sheet ......................................................EP 691DS
Special Purpose Lube/Seal Oil Systems Inspection Checklist .......................................... EP 691C
Special Purpose Steam Turbines .......................................................................................... EP 632
Special Purpose Steam Turbines Data Sheet..................................................................EP 632DS
Special Purpose Steam Turbines Inspection Checklist ..................................................... EP 632C
Special Requirements for Rotating Equipment ..................................................................... EP 671
Special Sewer Systems.......................................................................................................... EP 4-8-3
Spiral Heat Exchangers .......................................................................................................... EP 8-1-6
Spiral Heat Exchangers Data Sheet ................................................................................. EP 8-1-6DS
Spiral Heat Exchangers Inspection Checklist (Future Release) ..........................................EP 8-1-6C
Standard Piping Supports (Future Release) .......................................................................... EP 5-1-4
Statically Cast Steel and Alloy Return Bends and Tube Supports for Fired Heaters .......... EP 10-2-4
Statically Cast Steel and Alloy Return Bends and Tube Supports for
Fired Heaters Inspection Checklist .................................................................................... EP 10-2-4C
Station Monitor ................................................................................................................... EST 16-7-1
Stationary Batteries and Battery Chargers ........................................................................... EP 13-9-1
Stationary Batteries and Battery Chargers Data Sheet .................................................. EP 13-9-1DS
Steam Piping .......................................................................................................................... EP 5-6-6
Steam Tracing ........................................................................................................................ EP 5-6-8
Steam Traps ........................................................................................................................... EP 5-6-7
Steel Stacks............................................................................................................................ EP 4-7-1
Steel Stacks Inspection Checklist ........................................................................................ EP 4-7-1C
Storage Tank Fire Protection ........................................................................................... EST 16-14-1

Maintained by E G Shaker Heights, OH

0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.0
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
1.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
1.0

Toledo
Refinery

Site Technical Practices

Alphabetical Index

EP 1-0-2

Page 11 of 12

November 2012
TITLE

EP

Revision

Number Number
Strainers for Rotating and Other Equipment .......................................................................... EP 5-4-5
Structural Steel ....................................................................................................................... EP 4-5-1
Structural Steel Construction.................................................................................................. EP 4-5-2
Structural Steel Construction Inspection Checklist ..............................................................EP 4-5-2C
Sulfur Plants ....................................................................................................................... EP 10-1-15
Supplemental Fabrication Requirements for Jacketed Piping ............................................... EP 5-5-5
Supplemental Material Requirements for Metallic Materials ................................................ EP 10-2-2
Supplemental Requirements for ASME Code Section 1 Piping............................................. EP 5-5-8
Supplemental Requirements for Atmospheric and Low Pressure Storage Tanks ................. EP 9-3-1
Supplemental Requirements for Control Systems ............................................................... EP 12-1-2
Supplemental Requirements for Drawings - CAD Drawing Title Blocks ................................ EP 2-3-2
Supplemental Requirements for Electrical Drawings ............................................................. EP 2-3-4
Supplemental Requirements for Expansion Joints ................................................................ EP 5-4-3
Supplemental Requirements for Fabricated Piping ............................................................... EP 5-5-6
Supplemental Requirements for P&ID, PFD and Instrumental Loop Drawings ..................... EP 2-3-3
Supplemental Requirements for Pipe and Piping Components ............................................. EP 5-2-4
Supplemental Requirements for Piping in Gaseous Oxygen Service .................................. EP 5-10-3
Supplemental Requirements for Piping in HFService (Phillips) ......................................... EP 5-10-1
Supplemental Requirements for Piping in HFService (UOP)............................................. EP 5-10-2
Supplemental Requirements for Piping Isometric Drawings .................................................. EP 2-3-6
Supplemental Requirements for Plot Plan Drawings ............................................................. EP 2-3-5
Supplemental Requirements for Pneumatic Testing of New Piping Systems ....................... EP 5-5-7
Supplemental Requirements for Pressure Vessels ............................................................... EP 7-1-4
Supplemental Requirements for Refractory (Future Release) ............................................. EP 11-1-3
Supplemental Requirements for Valves ............................................................................... EP 5-3-21
Supplemental Requirements for Valves Inspection Checklist............................................EP 5-3-21C
Support Structures and Foundations for Heavy Machinery ................................................... EP 4-2-8
Surge Control Systems ...................................................................................................... EP 12-1-23
Synchronous Motors ............................................................................................................ EP 13-3-3
Synchronous Motors Data Sheet .................................................................................... EP 13-3-3DS
T
Tank Inspection, Repair, Alteration, Fitness for Service and Reconstruction ........................ EP 9-1-5
Tank Overpressure Protection (Future Release) ................................................................... EP 3-7-6
Tank Roof Seals ..................................................................................................................... EP 9-1-3
Tank Roof Seals Inspection Checklist .................................................................................. EP 9-1-3C
TCC Units ............................................................................................................................. EP 10-1-6
TEMA Shell and Tube Heat Exchangers ............................................................................... EP 8-1-1
TEMA Shell and Tube Heat Exchangers Data Sheet ....................................................... EP 8-1-1DS
TEMA Shell and Tube Heat Exchangers for Non-Process Services ..................................... EP 8-1-2
TEMA Shell and Tube Heat Exchangers Inspection Checklist ............................................EP 8-1-1C
Testing of Fire Pumps Both Fixed and Mobile ....................................................................... EP 3-5-5
Testing of Protective Instrumentation Systems .................................................................. EP 12-10-2
Testing, Inspection and Maintenance of Fire Protection Equipment ..................................... EP 3-5-7
Thermocouples and Thermowells (Future Release) ............................................................ EP 12-1-9
ThreeWay Valves for Tandem PRV Installations (Future Release) ................................... EP 5-3-16
TieIns .................................................................................................................................... EP 5-7-2
TieIns Data Sheet ............................................................................................................ EP 5-7-2DS
Training, Qualifying and Certifying Personnel for Inspection and

Maintained by E G Shaker Heights, OH

0.0
01
0.0
0.1
0.0
0.0
1.0
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.0
0.1
0.0
0.0
0.1
0.0
0.1
0.0
0.1
0.0
0.0
0.0
0.0
0.0

Toledo
Refinery

Site Technical Practices

Alphabetical Index

EP 1-0-2

Page 12 of 12

November 2012
TITLE

EP

Revision

Number Number
Testing of Refinery Equipment ............................................................................................. EP 15-3-1
Transportable Portable Foam/Water Monitors ................................................................. EST 16-12-1
Tube Bundle Replacement ..................................................................................................... EP 8-1-3
Tube Material and Selection................................................................................................... EP 8-1-9
Tube-to-Tubesheet Joints ...................................................................................................... EP 8-1-8
Turbine Flowmeters ............................................................................................................ EP 12-1-14
Turbine Flowmeters Data Sheet.................................................................................... EP 12-1-14DS
Typical Sewer Details ............................................................................................................. EP 4-8-2
U
Ultra Hydrants .................................................................................................................... EST 16-6-1
Uninterruptible Power Supply ............................................................................................. EP 13-17-1
Uninterruptible Power Supply Data Sheet ..................................................................... EP 13-17-1DS
Unit Hose Reel with Portable Monitor and Dry Hose Stations ........................................... EST 16-9-1
Unsaturate Gas Plants ......................................................................................................... EP 10-1-7
Use of Protective Instrumentation in Pressure Relieving Systems ........................................ EP 3-7-4
V
Valve Data Sheet ................................................................................................................... EP 5-3-2
Valve Design and Selection Criteria ....................................................................................... EP 5-3-1
Valve Inspection and Testing ............................................................................................... EP 5-3-24
Valve Inspection and Testing Checklist ............................................................................. EP 5-3-24C
Valve Packing ....................................................................................................................... EP 5-3-23
Valve Reconditioning Control Valves (Future Release) ..................................................... EP 5-11-8
Valve Reconditioning FCCU Slide Valves (Future Release) ............................................. EP 5-11-7
Valve ReconditioningGate, Globe, Check, Ball and Plug Valves (Future Release) .......... EP 5-11-5
Valve ReconditioningPressure Relief Valves (Future Release) ......................................... EP 5-11-6
Vibration Monitors .............................................................................................................. EP 12-1-24
W
Welding Requirements for Atmospheric Storage Tanks ........................................................ EP 9-1-2
Welding Requirements for Piping ........................................................................................... EP 5-5-2
Welding Requirements for Pressure Vessels ......................................................................... EP 7-1-5
Wet Steam-Air Decoking Systems ......................................................................................... EP 8-2-3
Winterization ......................................................................................................................... EP 14-1-1
Wire and Cable 600V and Below ......................................................................................... EP 13-8-1
Wire and Cable 600V and Below Data Sheet ................................................................. EP 13-8-1DS

Maintained by E G Shaker Heights, OH

0.0
1.0
0.0
0.0
0.0
0.0
0.0
0.0
1.0
0.0
0.0
1.0
0.0
0.0
0.0
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.2
1.1
0.0
0.1
0.0
0.0

You might also like