TESTING & COMMISSIONING CHECK LIST FOR CHILLER


(KIM TRA & NGHIM THU CHILLER )
Project:
Tn d n:
Contractor:
Nh Thu:
Client :
Ch u t

Ref No.:
S tham chiu:
Contract package:
Gi thu:
Project Management:
T vn QLDA:

QA-F-VN-PCM-T&C_Checklist_For_Chiller
-Rev A

ARCHETYPE

Description of item(s):
(M t hng mc)
According to Drawing No.:
(Da theo bng v s):
Owners Inspection Report
(Bin bn kim tra ca Ch u t)
Equipment
No.:

Water cooled
chiller

Date:

Model:
WSC087MAT57F

Manufacturer of chiller:

Time:
(Ngy)

(Gi)

Electrical Characteristic (V/Phase/Hz): 400V /


3 / 50Hz
Outdoor temperature:

System name:
Measurement item

Design value

Good Not
good

(0C)

(0C)

Good Not
good

(0C)

(0C)

Good Not
good

(Bar)

(Bar)

(Bar)

(Bar)

(l/s)

Chilled water input


temperature
Chilled water output
temperature

( Refer to result
report water
balancing)

Good Not
good

(0C)

(0C)

Good Not
good

(0C)

(0C)

Good Not
good

(Bar)

(Bar)

(Bar)

(Bar)

(l/s)

Cooling water input


temperature
Cooling water output
temperature

QA-F-VN-PCM-T&C_Checklist_For_Chiller - Rev A

Remark
s

Good Not
good
Good Not
good

(l/s)

Cooling water volume

Cooling water input


pressure
Cooling water output
pressure

( Refer to result
report water
balancing)

Judgment

(l/s)

Chilled water flow

Chilled water input


pressure
Chilled water output
pressure

Measurement
value

Good Not
good
Good Not
good

Page 1/2

(V)

383/380/379

(V)

Good Not
good

(A)

521/564/504

(A)

Good Not
good

Oil
pressure

(KPa)

765

(KPa)

Good Not
good

High
pressure

(KPa)

(KPa)

Good Not
good

Low
pressure

(KPa)

(KPa)

Good Not
good

(KW)

Good Not
good

Operation voltage

380/50/3P

Operation current

Compressor

(KW)

Cooling capacity

Operation check
Checked point

Check

Remarks

Motor insulation to earth (mega test)

Good

Not good

Cooling water pump and chilled water pump


interlock

Good

Not good

Existence of unusual noise

Good

Not good

Existence of unusual vibration

Good

Not good

Owners Superviser comment ( kin i din Ch u t):

Note (Ghi ch):

Your submission for approval is subject to following conditions: (n trnh ph duyt c kt qu


nh sau):
Approved
(Chp thun)
Not approved as noted
(Khng chp thun vi ghi ch sau)

Approved on condition as noted


(Chp thun vi iu kin ghi ch sau)
Amend and resubmit
(Sa v trnh li)

Note (Ghi ch): Accepting the T & C works in this inspection SHALL not relieve the contractors responsibilities from his contract
agreements. /Vic chp nhn kit qu kim tra vn hnh v th nghim trong bin bn nghim thu ny s khng lm gim
trch nhim ca nh thu theo nhng iu khon rng buc trong hp ng.

Contractor
(Nh thu):

Project Management
Consultant
(T vn Qun L D
n):

Client's Representatives
(i din Ch u t):

Signature (Ch k):

Signature (Ch k):

Signature (Ch k):

Name (Tn):_______________

Name (Tn):_______________

Name (Tn):_______________

Position (Chc v):__________

Position (Chc v):__________

Position (Chc v):__________

Date (Ngy):_______________

Date (Ngy):_______________

Date (Ngy):_______________

QA-F-VN-PCM-T&C_Checklist_For_Chiller - Rev A

Page 2/2