You are on page 1of 17

BILL OF QUANTITIES FOR THE PROPOSE RESIDENCE OF Mr. & Mrs.

P.V.M. GUNAWARDANA AT BLOCK NO 3, RICHMOND HILL, GALLE


NO
A

DESCRIPTION

UNIT

QTY

RATE

AMOUNT

EXCAVATION & EARTH WORK

Site Preparation
Clear site including grubbing up all small trees not
A/01 exceeding 2' 0" mid girth, bushes and remove all
debris from site

Item

A/02 Excavate reduced level up to make up levels

Cube

45.00

750.00

33,750.00

Cube

7.50

850.00

6,375.00

Cube

0.20

850.00

170.00

Excavation
Excavate trench for wall foundation not exceeding 5'
A/03
0" deep, in any material met with except in rock
A/04 Ditto do in column foundation do

15,000.00

A/05

Approved dry hard earth filling under floor well


rammed and consolidated

Cube

2.00

1,100.00

2,200.00

A/06

Approved dry hard earth filling in 9" thick layer in


making up level under well rammed and consolidated

Sqr

9.50

825.00

7,837.50

A/07 Ditto 3" thick do do

Sqr

0.75

450.00

337.50

Damp proof course compricing two coats of hot tar


A/08 blinded with sand on and 3/4" thick cement and sand
1:3 screed on rubble foundation

Sqr

2.75

2,750.00

7,562.50

Total carried to summary


B

73,232.50

CONCRETE WORK

Plain concrete
Mass concrete 1:3:6(1") in 2" thick blinding layer
B/01
under wall foundation

Sqr

4.90

3,750.00

18,375.00

B/02 Diito do under column foundation

Sqr

0.25

3,750.00

937.50

B/03 Diito in 3" thick ground floor slab

Sqr

10.25

3,750.00

38,437.50

Cube
Cube

1.75
1.50

27,500.00
27,500.00

48,125.00
41,250.00

Sqr

0.85

11,500.00

9,775.00

Reinfoced concrete
B/04 Ditto do in columns up to D.P.C. level
B/05 Ditto do in columns from ground floor to first floor
3" thick reinforced cement concrete 1:2:4(3/4") work
B/06 top with and including 3/8" dia tor steel at 6" centres
in both way and formwok

Page 1 of 17

BILL OF QUANTITIES FOR THE PROPOSE RESIDENCE OF Mr. & Mrs.


P.V.M. GUNAWARDANA AT BLOCK NO 3, RICHMOND HILL, GALLE
NO

DESCRIPTION

UNIT

QTY

RATE

AMOUNT

Reinforced cement concrete 1:2:4(3/4") lintels size


6"*9" with and including 4 nos 1/2" dia tor steel bars
B/07
and 1/4" dia mild steel stirrups at 6" centres with and
including necessary form work

Lft

85.00

300.00

25,500.00

B/08 Ditto do lintels size 6"*6" do


Ditto do lintels size 4"*4" do

Lft
Lft

45.00
40.00

250.00
200.00

11,250.00
8,000.00

Sqr
Sqr

2.80
1.00

7,000.00
7,000.00

19,600.00
7,000.00

Sqr

1.50

7,000.00

10,500.00

Cwt
Cwt
Cwt
Cwt

12.50
1.50
5.00
6.00

8,000.00
8,000.00
8,000.00
8,000.00

100,000.00
12,000.00
40,000.00
48,000.00

Lft

240.00

125.00

30,000.00

Lft

70.00

55.00

3,850.00

Sawn form work


B/09 Sawn form work in wall foundation
B/10 Ditto do but column up to D.P.C. level
Ditto do but columns from ground level to first floor
B/11
level
Reinforcement
Cold worked high yeild steel bar reinforcement in
column and wall foundation
B/12
B/13
B/14
B/15

3/8" dia in wall foundation


3/8" dia in column up to D.P.C. level
1/2" dia in column
1/4"dia in column and wall foundation

Ditto do 3" thick pad on 6" thick block wall with and
B/16 including 2 No 3/8" dia tor steel and 1/4" dia m.s.
stirrups at 9" centres
Ditto do 3" thick pad on 4" thick wall
0
Total carried to summary
C

C/01
C/02
C/03
C/04

MASONRY WORK

Block work and Rubblework


6" thick block work in cement and sand 1:5 in wall in
ground floor to roof level
4" thick block work do
4" thick block wall in cement sand 1:5 under work
top
Rubble work in cement and sand 1:5 in wall
foundation

C/05 Ditto do in rubble steps


C/06

472,600.00

3" thick brick paved ramp cement and sand 1:8 on


compacted earth in around the building

Page 2 of 17

Sqr

20.65

12,500.00

258,125.00

Sqr

6.75

10,750.00

72,562.50

Sqr

0.50

10,750.00

5,375.00

Cube

15.50

9,000.00

139,500.00

Cube

4.00

9,000.00

36,000.00

Sqr

3.90

5,500.00

21,450.00

BILL OF QUANTITIES FOR THE PROPOSE RESIDENCE OF Mr. & Mrs.


P.V.M. GUNAWARDANA AT BLOCK NO 3, RICHMOND HILL, GALLE
NO

DESCRIPTION

UNIT

Total carried to summary


D

QTY

RATE

AMOUNT

533,012.50

ROOFCOVERING AND ROOF PLUMBING

Corrugated asbastos cement sheeting on and


D/01 including class 1 timber wall plate, beam ridge plate,
rafters and secondary purlins

Sqr

18.73

14,000.00

262,220.00

Calicut pattern ridge tile joint and point in cement,


lime and sand 1:1:5

L.ft

49.00

65.00

3,185.00

L.ft

95.00

190.00

18,050.00

No

12.00

200.00

2,400.00

Lft

105.00

210.00

22,050.00

No
No

12.00
6.00

200.00
200.00

2,400.00
1,200.00

D/02

3 1/2" dia PVC rain water down pipe fixed to wall


with and including PVC brackets at 2' 0" centres
D/04 Extra for elbow
D/03

Square type PVC eaves gutter fixed with and


D/05 including gutter brackets at 2' 0" centres and gutter
joints
D/06 Extra for end caps
D/07 Extra for running head to suit 3 1/2" dia down pipes
Total carried to summary
E

311,505.00

CARPENTRY AND JOINERY

Door type D 1 size 3' 6"*8' 6" high over all


consisting of 4"*3" class 1 timber door frame, 1 1/4"
thick flush panelled door sashes, trellies work at 7' 0"
E/01
level and including one and half pair heavy quality
brass oxidized hinges, two no 12" and 6" barrel bolts,
mortice lock with and including painting

No

1.00

23,500.00

23,500.00

Door type D 1 size 3' 6" * 8' 6" high over all
E/02 consisting of 4" * 3" class 1 timber door frame, 1
1/4" thick plywood door sash and including do

No

5.00

13,000.00

65,000.00

Door type D 1 size 2' 3" * 7' 0" high over all
consisting of 4" * 2" class 1 timber door frame with 1
E/03 1/4" thick Marine Plywood door sash and including
one and pair heavy quality brass oxidized butt hinges
and two no 6" long barrel bolts with painting

No

2.00

14,750.00

29,500.00

Page 3 of 17

BILL OF QUANTITIES FOR THE PROPOSE RESIDENCE OF Mr. & Mrs.


P.V.M. GUNAWARDANA AT BLOCK NO 3, RICHMOND HILL, GALLE
NO

DESCRIPTION

UNIT

QTY

RATE

AMOUNT

Window type W 1 size 6' 0"* 8' 6" high over all
consisting of 4" * 3" class 1 timber frame, transome,
mullions, 1" thick glazed 2 No casements with clear
E/04
glass pans and 3 pair butt hinges, 2 No casements
stays 2No casements fastners, 4No 6" long barrel
bolts and painting

No

3.00

25,500.00

76,500.00

E/05 Window type W 2 size 6' 0"* 5' 0" high do

No

4.00

18,500.00

74,000.00

E/06 Window type W 3 size 2' 3"* 5' 6" do

No

2.00

9,800.00

19,600.00

E/07 Window type W 4 size 4' 0"* 5' 0" do

No

1.00

15,250.00

15,250.00

E/08 Fan light type F size 2' 3" * 3' 6" do

No

2.00

6,500.00

13,000.00

Lft

242.00

325.00

78,650.00

E/09

9" * 3/4" thick valance board fixed to rafters with


painting
Total carried to summary

395,000.00

PLUMBING AND DRAINAGE WORK


Cold water installation
( PVC pipe 1000 )

F/01
F/02
F/03
F/04
F/05
F/06
F/07
F/08
F/09
F/10

1/2" dia PVC Pope chased / fixed wall and lay in


trench
"Extra over " elbow
"Extra over " tee
"Extra over " valve socket
Extra over " fouset socket
3/4" dia PVC pipe lay in trench and chased on block
wall
" Extra over " elbow
" Extra over " tee
" Extra over " 3/4" - 1/2" reducing tee
" Extra over " 3/4" - 1/2" reducing socket

Lft

30.00

14.00

420.00

No
No
No
No

6.00
2.00
9.00
5.00

12.00
13.00
13.00
14.00

72.00
26.00
117.00
70.00

Lft

28.00

22.00

616.00

No
No
No
No

2.00
4.00
1.00
1.00

15.00
17.00
22.00
13.00

30.00
68.00
22.00
13.00

No
No
No

16.00
1.00
3.00

30.00
50.00
65.00

480.00
50.00
195.00
-

Waste water installtion

( PVC pipe type 400 )


F/11 1 1/2" pipe lay trench or chased in wall
F/12 " Extra over " tee
F/13 " Extra over " elbow
Soil and vent

(PVC pipe type 400 )

Page 4 of 17

BILL OF QUANTITIES FOR THE PROPOSE RESIDENCE OF Mr. & Mrs.


P.V.M. GUNAWARDANA AT BLOCK NO 3, RICHMOND HILL, GALLE
NO

DESCRIPTION

UNIT

F/14 4" dia pipe laid in trench including excavation


F/15 Ditto do fixed to wall
F/16 " Extra over " elbow

QTY

RATE

AMOUNT

Lft
Lft
No

35.00
nil
1.00

125.00
115.00
350.00

4,375.00

No
No
No
No

1.00
3.00
3.00
6.00

40.00
360.00
300.00
400.00

40.00
1,080.00
900.00
2,400.00

Low level water closet with and including "P" or "S"


F/21 trap and low level flushing cistern including all
accessories

No

2.00

8,500.00

17,000.00

Approved type pedestal wash basing with tap and


including all accessories

No

1.00

5,500.00

5,500.00

waste water man hole size 1' 6" * 1' 6" * 1' 6" deep
F/23 mass concrete base and 9" thick brick wall, 3/4" thick
plaster and 2" thick cover slab

No

1.00

4,500.00

4,500.00

F/24 Sewer man hole size 2' 0" * 2' 0" * 2' 0" deep
F/25 Allow for construction of septic tank
F/26 Allow for construction of Soakage pit

No
Item
Item

2.00

6,000.00

12,000.00
45,000.00
35,000.00

350.00

Ancillaries
All fittings are approved type brass chromium plated as
per specifications

F/17
F/18
F/19
F/20

F/22

Shower rose
1/2" dia bid tap
1/2" dia stop tap
3/4" dia stop tap

Total carried to summary


G

130,324.00

WALL FINISHERS, PAVING AND TILING

3/4" thick cement lime and sand (1:1:5) plaster


G/01 finished smooth with neat lime internally in ground
3/4" thick cement lime and sand (1:1:5) finished semi
G/02 floor
rough in external wall up roof level
3/4" thick cement and sand (1:3) plinth plaster finish
G/03
smooth with neat cement

Sqr
Sqr

28.00
22.00

3,500.00
3,650.00

98,000.00
80,300.00

Sqr

3.20

3,700.00

11,840.00

6" * 6" ceramic wall tiling on and 1/2" thick cement


G/06 and sand 1:3 screeded backing including joint and
point in coloured cement

Sqr

0.85

18,500.00

15,725.00

G/07 Ditto on work top


G/08 8" * 8" non slip ceramic floor on and do

Sqr
Sqr

0.50
0.50

18,500.00
18,500.00

9,250.00
9,250.00

G/09 8" * 8" pressed cement tile flooring do

Sqr

0.35

9,750.00

3,412.50

Page 5 of 17

BILL OF QUANTITIES FOR THE PROPOSE RESIDENCE OF Mr. & Mrs.


P.V.M. GUNAWARDANA AT BLOCK NO 3, RICHMOND HILL, GALLE
NO

DESCRIPTION

UNIT

Total carried to summary


H

QTY

RATE

AMOUNT

227,777.50

PAINTING
E - PAINTING
External
Prepare and apply two coats of approved colour of
C.I.C

m2

3.00

360.00

m2

83.00

350.00

Internal
Prepare and apply one coat approved wall primer
and two

m2

128.00

300.00

coats of approved colour


of C.I.C pantalets
emulsion range
or equivalent
Ceiling Finishes
Prepare and apply one coat approved wall primer
and two

m2

65.00

340.00

1,080.00

Deluxe weather shield range or equivalent to plinth.


Prepare and apply one coat of approved wall primer
and two

29,050.00

coats of approved colour of C.I.C Deluxe weather


shield
range or equivalent.

coats of approved colour


emulsion range
or equivalent

of C.I.C

38,400.00

22,100.00

pantalets

Total carried to summary

Page 6 of 17

90,630.00

BILL OF QUANTITIES FOR THE PROPOSE RESIDENCE OF Mr. & Mrs.


P.V.M. GUNAWARDANA AT BLOCK NO 3, RICHMOND HILL, GALLE
NO

DESCRIPTION

UNIT

QTY

RATE

AMOUNT

ELECTRICAL INSTALLATION

J/01
J/02
J/03
J/04

Supplied and fixed wall bracket with wiring


Do pendant lamp
Do 13 Amp socket outlets
Do 5 Amp do
Consumer unit 4 way SPN complete unit with 30A
J/05
isolator with circuit breaker
J/06 2" dia G.I. Earth pipe
Total carried to summary

No
No
No
No

18.00
12.00
2.00
10.00

1,200.00
1,100.00
1,350.00
1,150.00

21,600.00
13,200.00
2,700.00
11,500.00

No

1.00

8,500.00

8,500.00

No

1.00

1,100.00

2,500.00

60,000.00

METAL WORK
1" * 1" steel square tube vertical and 3/4" * 3/4"
K/01 square tube in other members with 3" * 1" timber
Lft
28.00
510.00
Will
be
done
in
later
handrail. ( rate to include for welding cost, painting )

Total carried to summary

Page 7 of 17

BILL OF QUANTITIES FOR THE PROPOSE RESIDENCE OF Mr. &


Mrs. P.V.M. GUNAWARDANA AT BLOCK NO 3, RICHMOND HILL,
GALLE

SUMMARY OF THE PROJECT


A

EXCAVATION & EARTH WORK

73,232.50

CONCRETE WORK

472,600.00

MASONRY WORK ..

533,012.50

ROOF COVERING AND ROOF PLUMBING

311,505.00

CARPENTRY AND JOINERY .

395,000.00

PLUMBING AND DRAINAGE WORK

130,324.00

WALL FINISHES, PAVING AND TILING

227,777.50

PAINTING ( Will be done in later )

90,630.00

ELECTRICAL INSTALLATION

60,000.00

METAL WORK ( Will be done in later )

TOTAL CONSTRUCTION COST


..

2,294,081.50

RUPEES TWO MILLION, TWO HUNDRED THREE THOUSAND FOUR HUNDRED FIFTY ONE
AND CENTS FIFTY ONLY.

MATERIAL LIST
House Type - L
Number of bed Rooms - 03
Number of floors - 01
total Cost :Rs. 1,492,311.00
Floor Area :Sqft 1078
ITEM

UNIT

QUANTITY

Cement

Cwt

Sand

Cubes

Bricks

Nos

1365

Block Work 6"

Nos

2420

Block Work 4"

Nos

800

Rubble

Cubes

20

Slaked Lime

Cwt

66

Metal 3/4"

Cubes

Metal 1"

Cubes

Asbastos Sheet 8' * 3'

Nos

85

Ridge Tile

Nos

37

Class 1 Timber 4"

Cuft

68

Emulsion Paint

Gal

13

Door Type D 1

No.

Door Type D 2

No.

Door Type D 3

No.

Window Type W 1

No.

Window Type W 2

No.

Window Type W 3

No.

Window Type W 4

No.

Fan Light

No.

Valance Board

Lft.

242

Skilled Labour

Days

157

Unskilled Labour

Days

212

176
11

Excavation (Lump Sum)


Plumbing & Drainage (Lump Sum)
Finishes (Lump Sum)
Electrical (Lump Sum)
Lump Sum Allowed for Other Items
Note:
* Labour Charges are included in Lump Sum allowed for Plumbing & Drainage, Finishes & Electrical

* Mason, Carpenter & Painter are included in Skilled Labour

Columns
Beam

14
198

Foundation
9" wall
4 1/2 wall

398
283
42

9" wall
4 1/2 wall

163
12

Bed Room
Passage
Living
Dining
Pantry
Kitchen
Store
Garage
Front Varandha
Rear Varandha
Toilet 1
Toilet 2

279
26.5
212
246
90
92.997
37.5
150
124.5
48
42
17.5
1365.997

Staircase

105

13

Bed room
Launge
Toilet 1
Balcony

336
262.5
42
136.5
777

23

9b open
fw1
fw2
d1
d2
d3
w1
w2
w3
w4
w5

56
31.875
31.875
22.75
22
22
14
18
9
19

23.5
14.5

Gf
56
1
1
1
2
4
1
2
1
1
1

1.13

UF

1.00
2.00
1.00
1.00
1.00

13.82

w6
w7
w8
w9
f1
fg stair

30
40
30
8
10.5
12

1.00

1.00
1.00
2.00

12
8.00
9.50
9.50
8.00
8.00
8.00
9.00
9.00
5.50
5.50

8.00
9.50
9.50
16.00
40.00
24.00
18.00
18.00
11.00
11.00

9
area
56
56
31.875
31.875

4
area

45.5
88
22
28
18
9
19

44.00
18.00
9.00
19.00

22.00

5.75
6.00
6.00
3.00
5.00
4.50

17.25
3.00
10.00
9.00
216.25

60
0
0
0
10.5
0
286.25

133.5

30.00
8.00
10.50
24.00
162.5
22

ESTIMATE FOR
for

IMPROVEMENT
OF
PREMISES BELONGING
TO
MR. N.A. ARIYASENA
NO 89/2
PALLEKANDA PARA
WALASMULLA

You might also like