Contents
Load Evaluation
Assessment Guidelines
Supply Arrangements
Plant
l Rooms
Rising Mains
Electrical Distribution
Load Evaluation
Tenant supply
pp y energy
gy consumed by
y each
tenant; monitored by separate energy meter
Landlord
L dl d supply:
l
Non-essential supply:
pp y pplumbing
g and drainage,
g
passenger lifts, air-conditioning plant, public
g
g
lighting
Essential supply: fire protection/detection system,
firemanss lifts, essential lighting, PABX system,
fireman
building management system, important computer
room
Load Evaluation
Objectives
Ensure loading demands are estimated accurately
What happens if they are under-estimated?
What happens if they are over-estimated?
Important factors
Load Evaluation
Preliminary stage
Estimate total loading so as to:
Plan the transformer (Tx) & main switch room
Apply to power company for supply
Detail design
g stage
g
Update the estimate w/ more accurate info
Detail design e.g. protective device & circuiting
Load Evaluation
Load evaluation by power company
Architect/Engineer/Developer submit application
For typical categories, planning engineer of power
p y assesses the load estimation usingg the
company
database Load Assessment Programme (LAST)
Compare the declared load with assessed load
If declared load > assessed load, justification is needed
Assessment Guidelines
General
Usable floor area (UFA)
Follow Building (Planning) Regulations
Development
p
information
Floor area usage, public services, any special loads
Standard load estimation sheet (see handouts)
Public services
Assessed independently
Public lighting,
g
g, lift,, water pump,
p p, fire services,, lobbyy air
conditioning
Minimum design
g load capacities
p
for lighting
g
g and small p
power
requirement for various types of building
Building type
Office
School
30
Residential building
30
Hospital
25
Hotel
25
Church
15
Assessment Guidelines
After diversity maximum demand (ADMD)
Load densities derived by dividing the aggregate
l d by
load
b the
h corresponding
di UFA or fl
flat nos.
yp
cases;; for special
p
situation,,
Cover most typical
designer/planning engineer may exercise his own
discretion to adjust the load estimates
* ADMD is for planning supply Tx capacity, it
may not be suitable for designing customer raising
mains and lateral mains
Assessment Guidelines
Load assessment data ((see tables in handouts))
Assessment Guidelines
Load assessment forms
For central air conditioning load
For general development
Supply Arrangements
Three types of incoming supply
Low voltage cable supply
When the demand is low (< 240 kVA or < 400 A, 3phase) & nearby network has adequate capacity
Normally, a 4-core aluminum LV cable of 400 A
11 kV iincoming
i direct
di
supply
l
When load is extremely high and/or security of supply
is desirable; require HV switch room
Supply Arrangements
LV interconnection
With two 11 kV feeders
To enhance reliability
Supply Arrangements
Three situations for transformer (Tx) location:
Ground-floor (G/F) Tx room
Basement Tx room
Upper floor Tx room
Supply Arrangements
General requirements
q
for transformer ((Tx)) room
Supply Arrangements
Additional requirements for B/F Tx room
No oil-filled type Tx
A separate & independent staircase to G/F
Also a protected lobby
Supply Arrangements
Additional requirements for upper floor Tx
room
Accessible from a public area (e.g. car park)
Also a p
protected lobbyy
Plant Rooms
Major
j equipment
q p
in Tx rooms
Power transformer(s) [@ max. 1500 kVA]
11 kV switchgear
it h
(ring
( i main
i unit,
it RMU)
Other equipment
q p
((see layout
y
drawings)
g)
LV switchboard
LV capacitor bank
Battery & charger
Marshalling boxes
Meter panel
Plant Rooms
Civil works for Tx room
Structural framework
Cable trenches
Transformer plinth
Steel/stainless steel door
Painting of internal walls and ceilings
Provision and sealing of sleeves for incoming
cables
Plant Rooms
Buildingg services installations for Tx room
Fluorescent fittings
S k t outlets
Socket
tl t
Lighting switch
MCB (miniature circuit breaker) distribution board
p
with MCB
completed
Fire protection/detection system
Ventilation system
Gas leakage alarm system (for SF6 transformer)
Equipotential bonding and earthing conductor
Plant Rooms
Outdoor transformer
Fencing
No forced mechanical ventilation
Floor at 150 mm above ground level
Warning signs
Plant Rooms
Submission/Approval procedure
Architectural drawings: location, layout, sections
Electrical main schematic diagram
Estimated max.
max electrical demand
Plant Rooms
Main Switch Room: major considerations
Position
Access
Dimensions
Working space
Routing of outgoing circuits
No other services
Ventilation & illumination
Plant Rooms
Main switchboard
Rising Mains
Distribute electricity throughout the building
3-phase 4-wire tee-off for buildings > 4 floors
Separate riser earthing conductor
Metering arrangements (e.g.
(e g multiple tenants)
Switching and isolating
Source:
HECs Guide
to Connection
of Supply
Source:
HECs Guide
to Connection
of Supply
Source:
HECs Guide
to Connection
of Supply
Rising Mains
Design
g factors
Electrical Distribution
General requirements of cable system
Routing & installation
Workmanship: support, spacing, bending, etc.
Passing through walls & floors
Types of cable
PVC insulated
PVC sheathed non
non-armoured
armoured
Armoured or metallic-sheathed cable
R = red phase
Y = yellow phase
B = blue phase
N = neutrall
D = di
diameter
t off cables
bl
Design
g & installation of LV single-core
g
cables to minimise
electromagnetic interference
Source: HECs Guide to Connection of Supply
R = red phase
Y = yellow phase
B = blue phase
N = neutral
D = diameter of cables
Design
g & installation of LV single-core
g
cables to minimise
electromagnetic interference
Source: HECs Guide to Connection of Supply
Electrical Distribution
Busbar trunking installation
Vertical
Horizontal
Components
Busbar casing
Expansion unit
Feeder unit
Tap-off unit
Source:
HECs Guide
to Connection
of Supply
Electrical Distribution
Wiring installation enclosure: requirements
Enclosures as protective conductors
Support of enclosures
Fire barrier
Types of systems
Steel conduit
Steel trunking
Plastic or PVC conduit or trunking
Electrical Distribution
Factors affecting the choice of wiring system
Cable Type
General Use
Surface wiring
Conduit wiring
- Concealed
- Surface
Office,
Private hosing;
Factory;
Plant
l room
Wiring in trunking
Sub-main/laternal main
distribution
Risers in
communal
installation
Flameproof
p
cable
Mineral-insulated cables
Petrol station,,
Flammable areas