You are on page 1of 5

BIO--DATA

1.
2.

:
:

Chief Electrician/Sr, Electrician

7.
8.

Post applied for


Full Name (BLOCK
LETTERS)
Fathers Name
a) Date of Birth
b) Age
a) Nationality
b) Religion
a) Passport No.
b) Place of Issue
c) Date of Issue & Expiry
Languages Known
a) Permanent Address

:
:
:
:
:
:
:
:
:
:

8b.
9
10.
11.

E mail;
Contac NOEducation Qualification
Technical Qualification

:
:
:
:

(Late) Sadananda Maji


16th February, 1965
47years
Indian
Hindu
F 8467638
Muscat
05/03/2007 to 04/03/2017
English, Hindi & Bengali.Arbeic.
Vill. Khariberia,, P.O. Doro Kashipur,
P.S. Sutahata, Dist. Purba Midnapore.
Pin Code 721658 (W.B.) INDIA.
stapankumarmaji@gmail.com
0091-8695240314
Madhyamic Passed. in 1983.
a)Electrical Supervisor Certificate
Part 1, 2, 11, 4, 7a, 7b and
Electrician Two years Diploma,
A.T.I. (Cal) on 1985.
b) One year N.C.T.V.T. (Electrician)
at R.D.A.T. Calcutta on 1987.
c) Industrial Electronic Control at
A.T.I. Madras on 1993.
d) Low Voltage Switch Gear
maintenance at L & T Luck now
on 1995.
e) Gas Turbine Power Plant
Maintenance (Alsthoms, France)
f) Computer awareness with
knowledge of Microsoft.
g) Good written and oral
communication skill in English.

3.
4.
5.
6.

TAPAN KUMAR MAJI

EXPERIENCE:--

Total Near About 24 YEARS.


Oil refinery( India).Gas power Plant (Sharjah)-- Exp-15 years.
OIL Field Drilling & Heavy Wok over Dept. Experience.

Experience 9 years.
OVERSEAS :1) Wilayat Key Energy L L C.
Heavy Work over Dept,
P o box- Muscat, Oman
Under Occidental, Oman
PostSr, Rig Electrician.
From28/05/2012 to Running.
2) ABAN OFFSHORE PTE LTD.
Post-Sr,Rig Electrician
Mumbai. India
From- 15/01/2010 to 15/03/2012.

Total Exp9 Months and Running.

Total Experience 2 years.

4) M B Petroleum Services L L C.
Drilling .&Heavy Woke over Dept,
Post- Rig Electrician./ Sr, Electrician
P o box-695. P C-112. OMAN.
Under Petroleum Development Oman (PDO).
From-17.03.2003 to 01.12.2009 Running

Total Experience- 6 Years.


4) Sharjh Electricity & Water Authority, Sharjah, UAE.
Gas Power & Diesel Power Station.
Post- Electrical Technician .
From- 02/12/1997 To 31/01/2003.
Total Experience5 Years.

INDIA:1). Indian Oil Corporation Ltd. (Oil Refinery). HALDIA, (WB), INDIA.
a) Post-- Electrical Technician.
From01/07/1994 To 01/12/1997.
b) Post- Company Training as a Electrician.
From- 06/10/1986 To 05/10/1987.
Total Experience-- 5Years.

2) Central Staff Training & Research Institute, Calcutta, WB, India.


Post- Maintenance Electrician.
From- 17/07/1990 To 30/06/1994.
Total Experience-- 4 Years.
3) Telecom Factory, Kharagpore, WB, India.
Post- Electrician / ( Asst, Operative Electric Melting Control).
From- 23/03/1988 To 16/07/1990.
Total Experience2.6 Years.

EXPERIENCE / KNOWLEDGE
Working on jack up 5Th generation with various equipment such as Wartsila engines / Leroy Somers
gens, Nov cyber chair, TDS HPS 1000, VFD Vacon water cooled. All equipment is controlled by various
Siemens plc sever based for Cyber chair controlling all the rig function for drilling. Monitoring of the
engines, generators and all auxiliaries motors, pumps are monitored through the SCADA program.
Instrumentation is a part of the cyber chair , all auxiliaries tanks are monitored through tank gauging
system display panels. More auxiliaries equipment such as Favelle cranes, mooring winches, jack up
legs motors, fixation and automation with independent plc, hydraulic fixation system ,bridge racker,
cherry pickup etc Perform all the maintenance tasks, recording, and requisitions through AMOS on
line application
1. Knowledge of Jackup Cyber-based rigs.
2. Checking the lighting system, all indicator lighting on panel and checking all motor for abnormal sound
and heating.
3. Bentec Equipment,Ross Hill .N.O.V.-> L.E.R. Amphion, Drawworks (A.D.S),
4. Check the load on generator and record them.
5. Check all extension cable recepticle, portable light, fans, grinder and rectify the problem if any.
6. Weekly check of all battery water level and specific gravity. Good house keeping.
7. Worked on AC /DC motor, starter and control, changing of motor bearing.
8. Cyber chair BENTEC and SIEMENS VFD as AC drives for all drilling equipments.
9. Maintenance and routine check of helideck aviation lights. Rewiring of cables and laying of cable trays.
10. Assisting the chief electrician. Maintenance check of gensets.Maintenance and fault finding of motor
bearing. Routine check of electrical gadgets.
11.VFD brake registors maintenance, opening, cleaning and take MEG & Registance
12. Filling pot water for VFD cooling system in LER/PCR.
13. Supplying power to third party equipments - 480Volts
14. Weekly Monthly and Annual PMS of all electrical equipments.
15. Topdrive draw works, Cleaning of motors and filters and greasing.
16. Rig equipped with GE 1000 HP D C motors for D/W,MUD PUMP & ROATARY , Kato generators driven
by caterpillar 399 engines, I P S control system, s c r from I D M,GE m cc centre. Top drive from VARCO
TDS-9, 10 11, control with bentec VFD, instrumentation from MD TOTCO
17. Repair all types of electrical equipments including replacing of motor bearing (eg. Grinder, drill machine
etc.)
18. Checking all the filter and cleaning accordingly (eg. A/C and Blower).

Equipments: BENTEC Equipments: MCC Controls; Generators Control; SCR Drawworks Control; SCR Mud
Pump Control ; E.S.D. HVAC; A.D.S. &Anti-collision System; Mud Watch System, Kato Generator & Leroy
Somer; Engine CAT3512; DC motor GE752 D.M.R.
ICPE Actel & Upetrom equipments: SCR Siemens, Generators control.
OILWELL 1000HP SCR Bentec Top Drive Canrig 900HP 3 x Cat 3508B Mud Pump OILWELL 1000HP

Work Done:I have been working different plant in Electrical Maintenance & project.
1) Alternator:- Generating Voltage is 11kv ( Althems made), capacity-40 MVA, Mark- 6, Gas
turbine generator with associated excitation system, generator control and protection system.
Emergency generator, 33kv/11kv/6.6kv/415 volt power distribution system, and associated SF-6
switchgear, oil circuit breaker, air circuit breaker, UPS/ battery charger, Electrical intergraded
control system, Also Multilink protection systematic ,power generations system including
protection, regulation, synchronization and excitation.
2) Thermal Generator ( Up to 6.6kv) in same way are doing.
3) Diesel Generator- Capacity ( 2MVA, 650KVA), It is emergency power generation unite, and Hill
area two power station, power generation system including protection, regulation,
synchronization, excitation.
4) Switching devices.
5) Equipment control namely; programmable logic control (PLC),and Thirsted control (SCR),
6) Protection really and devices.
7) UPS/ Battery Charger,
8) Battery- 130 DC volt,
9) Any type of trouble scooting in plant.
10) Control panel.
11) Bus Bar
12) Load sharing/ Load shedding system.
13) Oil desalting.
14) CT/ PT.
15) Electrical drawing- Control and single lay out drawing.
16) Cable up to 33kv/11kv/6.6kv/415volt,end termination both side and protection.
17) Lighting of plant, switch board and Hazardous.
18) Pump House. Starter 1) Star Delta (Automatic), 2) DOL starter, Pump Motor,
19) Sub station:- 33KV/11KV/6.6KV/415Volt,assocotaed with protection and misreading devices,
MCC,PCC, power distribution system.

20) Switchgear:- Electrical switchgear in the from of Motor control center, variable speed drives,
switchboard portion really, Bus Bar differentional. Automatic transfer,
Different Voltage ratting-33kv-SF-6, 11kv- Oil circuitbreaker,6.6kv-OCB/ ACB,415v-ACB,Stand
by/ Normal power system .Preventive/ Schedule Mint,
21) Transformer:- Power transformer,33kv/11kv/6.6kv/415volt, Oil testing, Insulation testing,
Alarms/ Control Protection and operation, Preventive/ Schedule Mint,
22) Motor;- HT/ LT motor ( 6.6kv/ 415volt), Capacity-255kw(HT). LT- 185KW ( LT). skater, Circuit
breaker, Cubicle, Fuses, Control Wring, Isolator, Cable MCC to Motor,
23) Work Shop:-- Over head crane, Slip ring motor, Dram control Starter, Main hoist, Toolbar
Motor, Compressor, Drill m/c, Grinding m/c, Shaping m/c, Welding m/copier connection,
Compressor, Lighting,
I solemnly declare that statements made by me in this from are correct to best of my knowledge and
belief.
Thanking You,
Yours faithfully.
Date-- 03/02/2013

TAPAN KUMAR MAJI

You might also like