You are on page 1of 12

Estimate

Fire fighting water tank


S.NO.

PARTICULARS

Unit

Qty

1.

Excavation

Cum

85.16

2.

PCC 1:3:6

Cum

2.60

3.

RCC in raft/ walls M-25

Cum

28.60

4.

Water proofing/ Kota tanking

Sft

2065.12

5.

Reinforcement

Kg

3684.96

6.

Shuttering

Sft

2025.50

7.

3" IPS flooring

Sft

167.50
(A)

PUMP ROOM
S.NO.

PARTICULARS

Unit

Qty

1.

Excavation

Cum

108.34

2.

PCC 1:3:6

Cum

3.21

3.

RCC in raft/ walls

Cum

26.25

4.

Water proofing

Sft

1226.23

5.

Reinforcement

Kg

3760.28

6.

Shuttering

Sft

2182.70

7.

115mm thk. Brick work

Sft

720.00

8.

Cement plaster in side

Sft

910.00

9.

Making gola around platfarm

Rft

35.84

10 .

3" IPS flooring

Sft

209.00
(B)

WATER TANK
S.NO.

PARTICULARS

Unit

Qty

1.

Excavation

Cum

29.13

2.

PCC 1:3:6

Cum

0.89

3.

RCC in raft/ walls

Cum

8.44

4.

Water proofing

Sft

514.75

5.

Reinforcement

Kg

1520.32

6.

Shuttering

Sft

872.25

7.

3" IPS flooring

Sft

42.75
(C)

Total of ( A+B+C)

###

Rate

Amount Rs.

375.00

31934.26

5800.00

15086.90

7600.00

217349.12

150.00

309768.00

76.00

280056.68

50.00

101275.00

75

12562.50

Total

968,032.47

Rate

Amount Rs.

375.00

40628.80

5800.00

18625.60

7600.00

199481.96

150.00

183933.75

76.00

285781.29

50.00

109135.00

85

61200.00

30

27300.00

30

1075.20

75

15675.00

Total

942,836.59

Rate

Amount Rs.

375.00

10924.88

5800.00

5161.31

7600.00

64115.31

150.00

77212.50

76.00

115544.50

50.00

43612.50

75

3206.25

Total

319,777.24

MEASUREMENT SHEETS
Fire fighting water tank

S.NO.
1.

PARTICULARS
Excavation

2.

PCC 1:3:6

3.

RCC in raft/ walls


raft
Extra for footing
Extra for corners
walls
Extra for corners
slab

4.

Water proofing
under raft
Out side RCC wall
in side of tank walls
floor

5.

Reinforcement
Raft 10 dia 100c/c , Double jaal 58x2=116
36x2=72
add L= 116x2
72x2
walls 10dia vertical bars 150c/c
add L= 275x2
Horizontal= 24x2
add O.lap= 48x7
Slab 10 dia , Double jaal 58x2=116
36x2=72
add L= 116x2
72x2
add for corner 10dia 24x8
add for chairs & spacers

No.

MEASUREMENTS
L
1
19

19

1
2
3
1
1
2
3
2
1

19
19
7
17.5
10
19
10
0.5
19

1
2
2
2
4
1

19
19
11.5
16.75
10
16.75

116
72
232
144
275
550
48
336
116
72
232
144
192
50

11.5
19
1
1
14.34
1
140
2.5
11.5
19
1
1
1.5
3

6.

7.

Shuttering
walls

slab

4
2
4
1

19
11.5
10
19

3" IPS flooring

16.75

PUMP ROOM
1.

Excavation

20.75

2.

PCC 1:3:6

20.75

3.

RCC in raft/ walls


raft
Extra for footing

1
2
2
2
2
1
1
1

20.75
20.75
13
20.75
11
20.75
7
6

1
2
2

20.75
20.75
13

86
54
172
144
385
770
48

13
19
1
1
14.34
1
68

walls
slab
platfarm for pump

4.

5.

Water proofing
under raft
Out side RCC wall

Reinforcement
Raft 12 dia 150c/c , Double jaal 43x2
27x2
add L= 86x2
54x2
walls 10dia vertical bars 150c/c
add L= 385x2
Horizontal= 24x2

add O.lap= 48x4


Slab 12 dia , Double jaal 63x2=116
40x2
add L= 126x2
80x2
add for chairs & spacers

6.

Shuttering
walls
slab

192
126
80
232
144
50

2.5
13
20.75
1
1
3

4
4
1

20.75
13
20.75

7.

115mm thk. Brick work

2
2

19
11

8.

Cement plaster in side

2
2
1

19
11
19

floor

9.

Making gola around platfarm

2
2
2
2

7
2.67
6
2.25

10 .

3" IPS flooring

19

WATER TANK
1.

Excavation

11.5

2.

PCC 1:3:6

11.5

3.

RCC in raft/ walls


raft
Extra for footing
walls

1
1
2
2
1

11.5
18
10.5
4.5
10.5

slab

4.

Water proofing
under raft
Out side RCC wall

1
2
2
2
2
1

11.5
10.5
5.5
9.5
4.5
9.5

70
40
140
80
130
260
48
96
70
40
140
80
30

13
19
1
1
13.75
1
32
2.5
13
19
1
1
3

slab

4
4
1

10.5
4.5
10.5

3" IPS flooring

9.5

in side of tank walls


floor

5.

6.

7.

Reinforcement
Raft 10 dia , Double jaal 35x2
20x2
add L= 70x2
40x2
walls 10dia vertical bars 150c/c
add L= 130x2
Horizontal= 24x2
add O.lap= 48x2
Slab 10 dia , Double jaal 35x2
20x2
add L= 70x2
40x2
add for chairs & spacers

Shuttering
walls

ETS
ank

MEASUREMENTS
B
11.5

REMARK
S

H
13.75
Total

QTY
3004.38 Cft
85.16 Cum

0.42

91.77 Cft
2.60 Cum

0.75
0.75
0.75
0.5
0.5
11.5
11.5
11.5
0.67

163.88
64.13
35.44
4.38
2.50
327.75
258.75
5.75
146.40
1008.96
28.60 Cum

11.5
Total

11.5
2.25
2.25
0.5
0.5
0.75
0.75
0.5
11.5
Total

11.5
13.67
13.67
11.5
11.5
10
Total

218.50
519.46
314.41
385.25
460.00
167.50
2065.12 Sft

1334.00
1368.00
232.00
144.00
3943.50
550.00
6720.00
840.00
1334.00
1368.00
232.00
144.00
288.00
150.00

18647.50
5685.21 Rmt
3509.48 Kg
175.47
3684.96 Kg

Total
add 5% westage
G.Total
13
13
13
11.5
Total
10

988.00
299.00
520.00
218.50
2025.50 Sft
167.50 Sft

13

14.17
Total

3822.36 Cft
108.34 Cum

13

0.42

113.30 Cft
3.21 Cum

0.75
0.75
0.75
12.5
12.5
0.67
1
1

202.31
70.03
43.88
259.38
137.50
180.73
18.69
13.50
926.02
26.25 Cum

Total

13
2.25
2.25
0.5
0.5
13
2.67
2.25
Total

13
14.17
14.17

269.75
588.06
368.42
1226.23 Sft

Total

340.85
312.80
52.44
43.90
1683.20
234.76
995.12

0.89
0.89
0.89
0.89
0.62
0.62
0.62

303.36
278.40
46.67
39.07
1039.04
144.91
614.29

146.34
499.39
506.10
70.73
43.90
45.73

0.62
0.89
0.89
0.89
0.89
0.62

Total
add 5% westage
G.Total

14.17
14.17
13
Total

456.00
264.00
720.00 Sft

12
12
10
Total

456.00
264.00
190.00
910.00 Sft

Total

14.00
5.34
12.00
4.50
35.84 Rft

11

209.00 Sft

13.75
Total

1027.81 Cft
29.13 Cum

0.42

31.40 Cft
0.89 Cum

6.5
Total

6.5
2.25
0.5
0.5
5.5

1176.11
736.84
269.75
2182.70 Sft

12
12
Total

6.5

90.34
444.46
450.43
62.95
39.07
28.23
3581.22 Kg
179.06
3760.28 Kg

0.75
0.75
11.5
11.5
0.67

56.06
30.38
120.75
51.75
38.69
297.63

Total

8.44 Cum

6.5
13.75
13.75
11.5
11.5
4.5

74.75
288.75
151.25
218.50
103.50
42.75
514.75 Sft

Total

277.44
231.71
42.68
24.39
544.97
79.27
468.29
73.17
277.44
231.71
42.68
24.39
27.44

0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62

Total
add 5% westage
G.Total

13.75
13.75
4.5
Total
4.5

171.26
143.03
26.35
15.06
336.41
48.93
289.08
45.17
171.26
143.03
26.35
15.06
16.94
1447.93 Kg
72.40
1520.32 Kg

577.50
247.50
47.25
872.25 Sft
42.75 Sft

You might also like