RB211 START BLEED VALVES

Phil Milne
Technical Support Manager
Insert filename

Rolls-Royce data-strictly private

Start BOV History


As a result of the starting difficulties experienced by the Ind RB211-24-GT engine
standard with the phase II combustor. The Ind RB211-24-GT has a Trent 800 HPC,
which has a lower sub-idle stall line than the HPC used in the Ind RB211-24-G. This
could cause the HPC to stall when the 3 off HP3 starting bleed valves (SBOVs) closed
during the accel to idle resulting a failed start.

The solution to this problem was to change the material of the springs that are located
internal to the SBOVs so that a higher HP3 operating pressure was required to close
the valves. This had the result that the SBOVs closed later during the starting sequence
when the HPC has enough stall margin for the HP3 SBOVs to close without the HPC
stalling.

The existing bleed valves (LW17699) used on the Ind RB211-24-GT phase II engines
may be reworked through RRC facilities to the new standard of valve with Rolls-Royce
part number LW100165.
Insert filename

Rolls-Royce data-strictly private

RB 211 Bleed Valves.


Engine Type

Bleed Valve Part Numbers

3 off

3 off

Bleed Type

Start Bleed

Reworked
Start Bleed

RB211 24 G

LW17699

RB211 24 GT

LW17699

LW100169

1 off

2 off

Handling Bleed

Dunlop PN

IP Bleed

Dunlop PN

LW10425

AC65152

L913567

AC66768

LW10425

AC65152

L913567

AC66768

Insert filename

Rolls-Royce data-strictly private

Stage 1.
With the engine starting the HP3 control air pressure will increase closing the Start Bleed valves
gradually. Depending on the ambient these will close between 130 to 183 NDS, with higher ambient
conditions this will be near the 183 NDS.
Stage 2.
HP and IP bleeds have HP3 control air applied to them until 345 NDS when the ECS will initiate the
close command removing HP3 air allowing them to close. These valves will open on a decel at 337
NDS.
Figure 1 below shows HP3 Air at stage 1,

Figure 2 below shows HP3 Air at stage 2.

Insert filename

Rolls-Royce data-strictly private

Insert filename

Rolls-Royce data-strictly private

Starting Bleed Valves

HP Handling Bleed Valve

Insert filename

Rolls-Royce data-strictly private

Current Problem
z SBOV intermittently not working
correctly at various stages.
z Water drained from HP3 lines.
z Excessive condensation in HP3 line
during the highest humidity days is
believed to be the cause. Three sites
with same problem in same conditions.
z SBOV internal seals breaking up from
water locking.
Insert filename

Rolls-Royce data-strictly private

SBOV Damage

Insert filename

Rolls-Royce data-strictly private

Trial resolution
z Connect drain to lowest section of SBOV
HP3 line.
z Install needle valve to set required flow

Lockable Needle valve

To Atmosphere in the package floor


Insert filename

Rolls-Royce data-strictly private

10

RB211 HP3 Piping


HP3 Line Filter

HP3 line to SBOV

HP3 line to SBOV at lowest point