Mockingbird Bridge

Pre-Bid Meeting
3/31/2011

MOCKINGBIRD BRIDGE

REDLINE BRIDGE
Cantilever Abutment

Note: Images are not


from DART tunnels.

Prefabricated truss bridge


Installation over DART Redline
Track
Ultralight approach structure

MOCKINGBIRD BRIDGE : REDLINE BRIDGE

DART TRACKS

MOCKINGBIRD BRIDGE

MOCKINGBIRD BRIDGE : BURIED UTILITIES

DART AGREEMENT TERMS


Equivalent Load Limits over Tunnel

MOCKINGBIRD BRIDGE LOAD LIMITS OVER DART TUNNEL

DART AGREEMENT TERMS


Equivalent Load Limits at Retaining
Wall & Portal
MOCKINGBIRD BRIDGE : LOAD LIMITS AT DART RETAINING WALL

DART AGREEMENT TERMS


Equivalent Load Limits at Redline
Retaining Wall
MOCKINGBIRD BRIDGE : LOAD LIMITS REDLINE BRIDGE

DART AGREEMENT TERMS

TRAFFIC CONTROL - CLOSURES

Load Limits apply to temporary props

Mockingbird Station Exit & parking


spaces

Limited window for work over recessed


tracks (Catenary lines de-energized)

Palomar hotel service drive


Lane closures during non-peak hours

MOCKINGBIRD BRIDGE : TEMPORARY PROPS & TRAFFIC CONTROL

ULTRALIGHT FILL APPROACH


STRUCTURES
Over-excavation to 6 ft below grade
Expanded Polystyrene Fill (EPS)
1 ft Thick concrete deck & corner blocks

Cementitious wall coating

MOCKINGBIRD BRIDGE : ULTRALIGHT APPROACH STRUCTURES EPS

10

ULTRALIGHT FILL APPROACH


STRUCTURES
Redline Bridge West side
220 LF / max 5ft height
Mockingbird Bridge
North Approach 170 LF
South Approach 415 LF
Height varies to 17 ft max

MOCKINGBIRD BRIDGE : ULTRALIGHT APPROACH STRUCTURES REDLINE BRIDGE

11

MOCKINGBIRD BRIDGE

12

MOCKINGBIRD BRIDGE

13

MOCKINGBIRD BRIDGE

14

MOCKINGBIRD BRIDGE

15

MOCKINGBIRD BRIDGE

16

Design Concept
Structural System
Standard rolled sections (W12)
Precast deck panels

(no formwork over roadway)


Cables (locked coil)
Micropiles

Kit of Parts
Offsite Prefabrication
Minimize On Site Work
Maximize Fabrication Efficiency

MOCKINGBIRD BRIDGE

17

ELEVATION

DART TRACKS

PLAN
MOCKINGBIRD BRIDGE : KEY PLAN & ELEVATION

18

Back
Stays

ELEVATION

Bumper

PLAN
MOCKINGBIRD BRIDGE : BRIDGE GEOMETRY

TOWER
19

86 Micropiles, bond zone


20-feet long
Shallow rock (14-feet)
Nominal capacity:
540 kips (T) and
622 kips (C)
Tension piles prestressed
Compression piles: 9 5/8
dia. casing

Small equipment
Minimized noise and
vibration
MOCKINGBIRD BRIDGE : MICROPILES

20

Offset from micropile


footing
Buried beam
Concrete Sub-base
Guided disk bearings

Back walls (placed last)

Top of
Unweathered
Rock

MOCKINGBIRD BRIDGE : ABUTMENTS

21

Steel Pipe API 5LX-56


Standard section
36OD x 1.25 th.
Plates ASTM A709 HPS GR70
Single crane pick

Inclined, stabilized with backstays


Approx. 98 feet

Concrete-Filled Tube

Approx. 77

MOCKINGBIRD BRIDGE : TOWERS

22

Pour
Backs

Adjustable
Anchors

Concrete
Sub-base
Top of
Unweathered
Rock

MOCKINGBIRD BRIDGE : TOWER BASE

23

MOCKINGBIRD BRIDGE : TOWER ANCHOR HEAD

24

TYPICAL SECTION

Edge Girders & Floorbeams W12 Sections


Slab composite with floorbeams only
Edge Girders Designed Non-Composite
Lateral Loads taken in Vierendeel Action
Weak Axis Bending of the Beam
Slab Diaphragm Action

FRAMING DETAIL

Floorbeam to Girder Full Moment


Connections Throughout
Temporary props to be designed by others

MOCKINGBIRD BRIDGE : SUPERSTRUCTURE

25

Girder Splice
(Typ.)

Edge Girders &


Floorbeams
12 WF Sections
FRAMING PLAN

W12x106 Girders

W12 x 53 Floorbm
Horizontal curvature:
Edge Girders rolled the
easy way R = 1491ft and
R = 1509ft
FRAMING PLAN
Girder
Splice

Temporary
Prop

No vertical camber
required
End Cuts & Splice
Geometry to
Accommodate Profile

Variable Depth Haunch


@ Floorbeams

ELEVATION
MOCKINGBIRD BRIDGE : SUPERSTRUCTURE FRAMING

26

FIXED DISK BEARING

Bumper

MOCKINGBIRD BRIDGE : TOWER BUMPER DETAILS

27

Anchorage Fin Plate Weldment


Bolted Connection At Floorbeam Locations
Combined Floorbeam Connection Plate Cable
Anchorage

MOCKINGBIRD BRIDGE : CABLE ANCHORAGE CONNECTIONS

28

36 Precast Panels 15-8 wide by 11-2 + hairpins


Conventional Reinforcement (No Post-tensioning)
Composite with Floor Beams
Transverse Cast in Place Closure Pours

MOCKINGBIRD BRIDGE : DECK CONSTRUCTION PRECAST PANELS

29

MOCKINGBIRD BRIDGE : BRIDGE RAILING

30

Lighted Rail
MOCKINGBIRD BRIDGE : GUARDRAIL DETAILS

31

Install Micropiles
Place Foundations
Pre-stress tension piles

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

32

Erect temporary props


Erect tower steel
Install back-stays

Inject Self-Consolidating Concrete


Adjust back-stays & survey towers

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

33

Single-pick superstructure erection


Girder splices adjacent to props
Longest section 62-6
Minimize roadway closures
Identical Operation to falsework erection
MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

34

Steel superstructure supported by temporary props

Install Cables to a predetermined length

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

35

Cable installation with a come-along

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

36

Continue cable installation

Steel framing is gradually lifted off the temporary props

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

37

Install stay cables at Tower 4

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

38

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

39

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

40

Install stay cables at Tower 3

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

41

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

42

Install final cables


Survey steel profile & tower alignment

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

43

Place precast panels


Survey steel profile & tower alignment
Adjust cable forces

Place panel closure pours

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

44

Remove temporary props


Install bridge railing
Install lighting & utilities

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

45

Place Pour-back at back-stay anchor plates


Install abutment back-walls
Install compression seals

MOCKINGBIRD BRIDGE : SUGGESTED CONSTRUCTION STAGING

46

CONDITION SURVEYS (SP599Y)


Tunnels, Tunnel Portal,
Retaining Walls

Note: Images are not


from DART tunnels.

Limits refer to B-99 to B-101

Pre-construction, postconstruction, intermediate


condition survey requirements.
Relevant Codes & Standards
Anticipated equipment
Inspector qualifications

MOCKINGBIRD BRIDGE : CONDITION SURVEYS

47

CONDITION SURVEYS (SP599Y)


Tunnels, Tunnel Portal,
Retaining Walls
Limits

Pre-construction, postconstruction, intermediate


condition survey requirements.
Relevant Codes & Standards
Anticipated equipment
Inspector qualifications

MOCKINGBIRD BRIDGE : CONDITION SURVEYS

48

INSTRUMENTATION &
MONITORING (SP599X)
Instruments: types,
locations, purpose
Accessibility issues
Baseline readings
Alert & limiting levels

Monitoring frequency
Reporting

MOCKINGBIRD BRIDGE : INSTRUMENTATION AND MONITORING

49

DART Interface
DART Contact:
DART input to design process
DART approval of
Instrumentation & Monitoring
Work Plan
Night time access (during
non-service hours) only.

DART requirements (e.g.,


security clearances, safety
training, etc.) covered in
upcoming addendum.

MOCKINGBIRD BRIDGE : DART INTERFACE

50

Contractor Qualifications
Submit with bids:
Complex Bridge (2 in past 5 years)

Cable Stays & Connections


Micropiles & Ground Anchors (5 in 5
years)
Steel Fabricator (AISC certified shop,
AWS D1.5 certified welders)
Tunnel Lead Inspector (10 years
experience)

MOCKINGBIRD BRIDGE

51

Forthcoming Addendum
Qualifications Submittal with Bid
Erection Engineering
By Contractor

DART Special Provisions


Coordination
Safety Training
Security Clearance

MOCKINGBIRD BRIDGE

52

Forthcoming Addendum
Qualifications Submittal with Bid

Questions

Erection Engineering
By Contractor

DART Special Provisions


Coordination
Safety Training
Security Clearance

MOCKINGBIRD BRIDGE

53