CONTRACT AGREEMENT FOR THE PROPOSED CONSTRUCTION OF

A RESIDENTIAL BUILDING
This agreement dated .. March, 2015 between Mr. Dasappan (party)
S/o.

Mr.

Coimbatore

.,
District

No,

641015.

and

B.Sureshkumar,

(contractor)

S/o. N. Bujingagowder (late), M/s. BSK CONSTRUCTIONS, No.114/651A,


V.K.K Menon Road, New Sidhapudur, Coimbatore - 641044. For the construction of
first floor Residence building at viscose park. Coimbatore.

Party Signature

Contractor Signature

SPECIFICATION OF WORKS FOR RESIDETIAL BUILDING


1. STRUCTURE FRAMED STRUCTURE, Regular Individual column connected
by roof beam and column taken till roof.
2. ROOF Reinforced cement concrete roof of required thickness of M20 grade
concrete and Fe 500 grade of steel
3. SUPER STRUCTURE: With good quality tested load bearing 9 thick Chamber
brick/ Fly ash brick for outer main walls, Partition walls & parapet wall 4.5 thick brick
work with plastering.
4. LOFT SIDES & SHELFES One loft slab & shelf in Kitchen and one loft & Wall
Shelf in each bed room.
5. JOINERIES:
DOORS:
a. Entrance door with Kerala teak wood frames and teak wood shutter finished
with malamine mat polish.
b. All the other doors with country wood (sall) frames flush door shutters with
one coat of primer and two coat of synthetic enamel paint finish.
c. Bath room doors are P.V.C door.
M.D: 36x 7 0- 1 No, FD: 33x70- 2Nos, PVC D: 26x70- 2Nos.
WINDOWS & VENTILATOR:
All the windows with country wood (sall) frames and shutters with 4 mm plain
glass and 10 mm square rod grills.
W: 60x 40 1 No, W1: 40x40- 2Nos, W1: 30x40- 1No,
KW: 30x 30 - 1 No, V: 26x20- 2Nos.
6. FLOORING:
Vitrified tiles of size 600mmx600mm of Premium quality Rate@48/sft (design
agreed with house owner) will be provided with skirting of 3 height.
Kitchen: Counter top will be laid with 20mm granite with Stainless steel (2 x 2)
with drain board sink with glazed tile upto 40 Rate @ 35/sft from the counter
top.
Bathroom: Antiskid Ceramic tile of 300mmx300mm for flooring Rare@35/sft &
Glazed wall tile upto 70 Rate@30/sft
Terrace & Portico:
Terrace: Terrace will be finished with ellis pattern flooring.
Portico: Portico will be finished with cement flooring.

Party Signature

Contractor Signature

7. PAINTING: Internal walls finish with one coat of priming and one coat of emulsion
paint. External walls one coat of exterior primer and one coat exterior emulsion paint.
8. PLUMBING : Sintex water tank with 1000 ltrs- 1 nos, Waste pipe line with PVC
pipes, (Un plasticized Poly Vynial Coated )Water line cold water UPVC pipe and CPVC
( Chlorinated Poly Vynial coated )pipes for hot water.
9. TOILET FITTINGS & FIXTURES: Sanitary fittings with parryware make white
colour, Indian closet / Wash basin, Taps, with CP fittings. (Basic model)
10. ELECTRICAL: E.Fab cables with GM switches with separate MCBS for each
room, the details of electrical provision given below.
Others:
Hooks for hanging Thooli in both bed room
Hooks for hanging Unjal in Living room
ELECTRICAL PROVISION DETAILS
1. Living room

2.

Kitchen

3. Each Toilet
4.

Wall light - 2 Nos


Chandilier Light - 1 No
Ceiling Fan - 2 Nos
6A Plug point - 4 Nos
Telephone/Intercom point - 1 No
Television point - 1 No
Holder - 2 Nos
Wall Light 1 Nos
Exhaust fan 1 No
Holder - 1 No
6A plug point - 2 Nos
16 A Plug point - 2 Nos
Holder 1 Nos
32A plug point - 1 No ( Heater)

Wall light -1 nos


Holder Light - 1 Nos ( 2 way switch)
Night Lamp - 1 No
Ceiling Fan - 1 No(2 way switch)
6 A Plug point Individual - 3Nos

Bed Rooms

5. Portico
- Wall light -1 nos
- Holder Light - 1 Nos ( 2 way switch)
UPS Wiring will be provided

Party Signature

Contractor Signature

QUOTATION
Sl.No

Description of works

Quantity

Rate

Unit

Amount

785.00

1250.00

Sq.ft

9,81,250.00

FIRST FLOOR
1. Residential Building Works
Less : Existing parapet wall

(-)20,000.00

Total

9,61,250.00

(Rupees Nine Lakhs Sixty One Thousand Two Hundred and Fifty Only)
PAYMENT SCHEDULE
Sl.No

Work Details

Amount

First Floor
1. Advance payment

3,00,000.00

2. Up to lintel level

2,00,000.00

3. Up to Roof level

3,00,000.00

4. Up to Inner Plastering

1,00,000.00

5. Up to outer plastering/
Final finishing

61,250.00

Total

9,61,250.00

Following Branded materials to be used at site.


S.No

Make / Brand

Rate/ per

1. Chamber bricks/ Fly


ash brick

Brick / Other Equalent


brand

Rs.5.50/No

2.
Cement
3. R.C.C roof Concrete

JSW/Equilent
Manual Concrete

Rs.400/bag
Within the rate

4.

Material

TMT Steel

JSW / Equalent ISI TMT


Bars to be used
5.
Sand
Tiruchi
6. Blue metals - 20mm Periyakuile
40mm
7.
Wood
Kerala Teak
Sall wood

Party Signature

Rs.45/Kg
Rs.5500/Unit
Rs.2200/ Unit
Rs.3500/cft
Rs. 1800/cft

Contractor Signature

GENERAL TERMS AND CONDITIONS


Water and Electricity will be provide by you free of cost at site during construction
period
Corporation building plan approval works and E.B works like main service connection
service provided - chargable
Material store room & Accommodation for workers will be provided by you during the
construction period.
If any non tendered or Extra works will be charged in separate bill.
All the keys will be hand over after the completion of project & Final settlement.
PAYMENTS: As per our payment schedule.
TAXES: Inclusive of all taxes
PROJECT DURATION: 4 5 (F.F) Months from date of work starts.

Party Signature

Witness:

1.

2.

Contractor Signature