Contractors Site Facilities

12.

CONTRACTORS SITE FACILITIES..............................................................2

12.1

GENERAL ......................................................................................................2

12.1.1 Scope
12.1.2 Related Parts and Sections

Page 1

2
2

12.2

CONTRACTORS SITE FACILITIES..............................................................2

12.2.1
12.2.2
12.2.3
12.2.4
12.2.5

Buildings
Site Fabrication Areas
Materials Storage Area
Power, Water, Lighting and Heating
Miscellaneous

12.3

PROJECT SIGN BOARD ...............................................................................3

12.3.1 Project Sign Board


12.4

2
2
2
2
3
3

ADVERTISING ...............................................................................................3

12.4.1 Photographs
12.4.2 Name Boards and Other Advertising

3
3

QCS

Section 1

Part 12

Contractors Site Facilities

12.

CONTRACTORS SITE FACILITIES

12.1

GENERAL

12.1.1

Scope

This Part specifies the requirements for the Contractors temporary site facilities.

12.1.2

Related Parts and Sections

Related Sections and Parts are as follows:

Page 2

This Section Part 9 Materials.

12.2

CONTRACTORS SITE FACILITIES

12.2.1

Buildings

The Contractor shall provide all offices, sheds, stores and other buildings necessary for him
to undertake all duties, obligations and activities associated with the construction of the
Works.

All buildings shall be supplied and maintained in good condition and shall be of neat
appearance.

The position of all the Contractors temporary site buildings shall be to the approval of the
Engineer.

The Contractor shall maintain an office at the Site for the duration of the Contract. This
office shall be open at all times during Site working hours.

Upon completion of the Contract, all temporary site buildings shall be removed and the area
occupied or otherwise affected by them reinstated to its original condition.

12.2.2

Site Fabrication Areas

The Contractor shall provide an area suitable for assembly and fabrication purposes.

Fabrication areas shall simulate factory conditions if required in the Project Documentation.

12.2.3

Materials Storage Area

The Contractor shall provide sufficient and appropriate materials storage areas. The
storage areas shall be suitable for the materials to be stored in them and shall offer
necessary protection where required.

The Contractor shall ensure that the storage areas comply with the relevant provisions of
Part 9 of this Section, Materials.

12.2.4

Power, Water, Lighting and Heating

The Contractor shall provide, maintain and subsequently remove temporary services for
power supply, water supply, lighting and heating.

QCS

Section 1

Part 12

Contractors Site Facilities

12.2.5

Miscellaneous

The Contractor shall provide, maintain and subsequently remove temporary roads, paths,
parking areas and refuse disposal areas. The area occupied by temporary roads, paths,
parking areas and refuse disposal areas or otherwise affected by them shall be restored to
their original condition on completion of the Contract.

12.3

PROJECT SIGN BOARD

12.3.1

Project Sign Board

The Contractor shall erect a temporary Project Sign Board in a position to be agreed with
the Engineer.

The Project Sign Board shall comply with the standard detail and shall be finished to the
approval of the Engineer

12.4

ADVERTISING

12.4.1

Photographs

The Contractor shall not use photographs or any details of his work in connection with the
Contract in any form of publicity or advertisement in any part of the world without having
first obtained the Engineers approval to its content and context.

12.4.2

Name Boards and Other Advertising

Details of any further sign boards other than as designed in Clause 12.3.1 or advertisements
that the Contractor may wish to erect on site shall be to the approval of the Engineer.
END OF PART