CURRENT
WASTEWATER RATES
5
WASTEWATER: current
Appendix 7.7.1
WASTEWATER: current
Appendix 7.7.1
PROPOSED
WASTEWATER RATES
8
WASTEWATER: proposed
WASTEWATER: proposed
Table 4-7
Table 4-6
Table 4-9
10
WASTEWATER: proposed
Proposed Wastewater
Capital Improvement &
Replacement Program1
Fiscal Year
2017
2018
2019
2020
Total 4 Year Program
1Planning,
projects.
Program Level2
$332,511,688
$347,297,471
$373,664,090
$439,398,796
$1,492,872,045
Table 4-7
11
WASTEWATER: proposed
1
2
Table 4-8
12
Total Bonds FY2004-2020
WASTEWATER: proposed
Proposed FY17-20
Wastewater Projects
598
Wastewater Planning,
Design, &
Construction Projects
226
Wastewater
Construction Projects
39
Sanitary Sewer
Overflows (SSOs)
removed1
24
1One
CSO will be removed during this rate cycle, in addition to the design
and planning for future removals. The Green Infrastructure (Rainscaping)
program is also designed to alleviate CSOs to the Mississippi.
13
WASTEWATER: proposed
Proposed FY17-20
Wastewater
Projects
Appendix 7.2.2
14
WASTEWATER: proposed
[projected]
[projected]
Total
$169 M
$178 M
$176 M
$180 M
$186 M
$193 M
% Change
N/A
5.4 %
-1.2 %
2.1 %
3.5 %
3.6 %
Table 4-6
15
WASTEWATER: proposed
Proposed Wastewater
Operations & Maintenance
60,000
Manholes Inspected1
6,000
Manhole
Rehabilitations
12%
1,600
Miles of sewer
inspected with CCTV
3,814
360
Miles of sewer
rehabilitation
16
WASTEWATER: proposed
Fiscal Year
Monthly Bill
$ Change
% Change
FY162
$ 40.72
$ 4.73
13.1 %
FY17
$ 44.72
$ 4.00
9.8 %
FY18
$ 49.56
$ 4.84
10.8 %
FY19
$ 54.91
$ 5.35
10.8 %
FY20
$ 60.86
$ 5.95
10.8 %
1based
2already
ES-4
17
WASTEWATER: proposed
18
CURRENT STORMWATER
SERVICE
19
STORMWATER: current
Current Stormwater
Service & Funding Overview
MSD assumed stormwater management generally inside of
I-270 in 1954, and took over the stormwater management
for the remainder of our service area in St. Louis County in
1989
Stormwater service has differed dramatically among parts
of the service area due to differences in funding for
stormwater system maintenance and system improvement
Stormwater is currently funded through a combined fee and
tax system
Three zones of stormwater funding overlap in MSDs service
area
20
STORMWATER: current
21
STORMWATER: current
Stormwater Tax
2014 Total Tax Levy:
$10,211,630
($0.0682/$100)
Service Level:
PLUS:
22
STORMWATER: current
Taxing Sub-districts
Service Level:
PLUS
23
STORMWATER: current
Current Stormwater
Services & Funding
24
1for
STORMWATER: current
1for
2for
25
STORMWATER: current
Stormwater Regulatory
Compliance Activities
MSD ensures compliance with all
local, state, and federal
stormwater regulations, including:
Plan Review and Permitting
Complaint Investigation and Data
Collection
Emergency Response in critical
health and safety situations
26
STORMWATER: current
1154 Miles of
Creeks in Red
Area
2638
BMPs/Basins in
Red Area
Currently funded
27
STORMWATER: current
1362.99 Miles of
Storm Sewers in
the Red Area
Currently not
funded
28
STORMWATER SERVICE
29
STORMWATER: proposed
Stormwater Revenue
Proposal
Key Financial Components
4-year Operations & Maintenance
cost of $90.8M1
6-year $97.6M Capital program2
1
2
30
STORMWATER: proposed
31
STORMWATER: proposed
Proposed Stormwater
Operating Costs
FY16
FY17
FY18
FY19
FY20
[projected]
Total
$16.0
$20.7
$23.7
$22.8
$23.5
M
M
M
M
M
% Change
6.3%
30.0%
14.5%
-3.9%
3.1%
Table 5-2
32
STORMWATER: proposed
Proposed FY17-20
Stormwater Projects
Green Area:
Yellow Area:
Projects: 64
Cost: $24,968,200
Projects: 47
Cost: $17,450,000
Red Area:
Projects: 59
Cost: $7,485,000
Appendix 7.5.2
33
STORMWATER: proposed
Proposed Stormwater
Revenue Structure
Type of Charge
Current
Proposed
$0.05-0.10
$0
$0.0682
$0
$0.0197
$0.0197
N/A
$0.100
$0.01970.1879
$0.1197
$.24
$0
$.18
$0
$.18-.24
$0
Total Tax
Total Fees
Table 5-1
34
STORMWATER: proposed
Current
Tax Rate
Avg. Annual
Cost1
$.0197 +
$.0682 +
$.10 (up to)
$61.67/year
Proposed $.10
-$19.75/year
Total
$41.92/year
$.1197
Table ES-6
35
STORMWATER: proposed
Avg.
Annual
Cost1
Current
$.0197 +
$.0682
$12.50/year
Proposed
$.10
+$3.60/year
Total
$.1197
$16.10/year
Table ES-6
36
STORMWATER: proposed
Avg.
Annual
Cost1
Current
$0.0197
$10.52/ye
ar
Proposed
$0.10
+$50.08/
year
Total
$.1197
$60.60/ye
ar
Table ES-6
37
WASTEWATER + STORMWATER
38
Total Proposed
Annual Customer Cost
Single-Family Residential
Proposed Average
Annual Cost1
Total Annual
Cost
Percent
Change
Total Annual
Cost
Percent
Change
FY16
$522.54
N/A
$522.54
N/A
FY17
$577.92
+10.6%
$577.92
+10.6%
FY18
$636.00
+10.0%
$926.88
+60.4%
FY19
$700.20
+10.0%
$1,042.80
+12.5%
FY20
$771.60
+9.2%
$1,193.40
+14.4%
1Table
39
Total Proposed
Annual Customer Cost
Low-Income Residential
Proposed Average
Annual Cost1
Total Annual
Cost
Percent
Change
Percent
Change
FY16
$261.83
N/A
$261.83
N/A
FY17
$283.77
+8.4%
$283.77
+8.4%
FY18
$312.81
+10.2%
$458.25
+61.5%
FY19
$344.97
+10.3%
$516.21
+12.6%
FY20
$380.61
+10.3%
$591.57
+14.6%
1Table
40
WASTEWATER + STORMWATER
41
WASTEWATER + STORMWATER
Rate Commission
Formal Comments
To submit formal comments to the
Rate Commission for consideration in
their process, please address to:
Email: jfenton@stlmsd.com
Mail: 2350 Market Street, St. Louis MO 63103
Intervener Application
Available at www.stlmsd.com/RateCommission
Deadline: March 20
42