Following Rates are taken for the month of AUGUST 2008 (HYDERABAD)

Item

Rate

Units

Rate

Units

20 mm GAUGE METAL

635.40

Cum

18.00

Cft

40 mm GAUGE METAL

264.75

Cum

7.50

Cft

SAND

282.40

Cum

8.00

Cft

4400.00

Ton

220.00

Bag

1300.00

Cum

CEMENT
Bricks (2nd Class)

2.60

Each

MASON

250.00

Each

MAN MAZDOOR

150.00

Each

WOMEN MAZDOOR

120.00

Each

CRS Stone

520.00

Cum

Rough Stone

300.00

Cum

M10 CC 1:4:8 40mm guage


STD.QTY.
ITEM
0.92 40 mm GAUGE METAL
0.46 SAND
0.2 CEMENT
0.2 MASON
1.8 MAN MAZDOOR
1.4 WOMEN MAZDOOR
Others

UNIT RATE
264.75
282.40
4400.00
250.00
150.00
120.00

per cum
per cum
per MT
per head
per head
per head

QTY.RATE
243.57
129.90
880.00
50.00
270.00
168.00
41.16
1782.63

per cum

TOTAL in Rs.

QTY.RATE
584.57
141.20
1100.00
62.50
270.00
168.00
75.26
2401.52

per cum

UNIT RATE
635.40
282.40
4400.00
250.00
150.00
120.00
0.15
TOTAL in Rs.

QTY.RATE
584.57
129.90
1452.00
50.00
270.00
168.00
398.17
3052.64

per cum

UNIT RATE
635.40
282.40

QTY.RATE
584.57
129.90

10%
TOTAL in Rs.

M15 CC 1:3:6 20mm guage


STD.QTY.
ITEM
0.92 20 mm GAUGE METAL
0.5 SAND
0.25 CEMENT
0.25 MASON
1.8 MAN MAZDOOR
1.4 WOMEN MAZDOOR
Others

0.1

M15 CC 1:2:4 OPC


STD.QTY.
ITEM
0.92 20 mm GAUGE METAL
per cum
0.46 SAND
per cum
0.33 CEMENT
per MT
0.20 MASON
per head
1.8 MAN MAZDOOR
per head
1.4 WOMEN MAZDOOR
per head
Miscellaneous, water & Contrator PROFIT

RCC M20 1:1.5:3


STD.QTY.
ITEM
0.92 20 mm GAUGE METAL
0.46 SAND

UNIT RATE
635.40
282.40
4400.00
250.00
150.00
120.00

per cum
per cum
per MT
per head
per head
per head

per cum
per cum

0.4
0.4
2.1
3.5

CEMENT
MASON
MAN MAZDOOR
WOMEN MAZDOOR

per MT
per head
per head
per head

Miscellaneous, water & Contrator PROFIT

RCC M30 1:1:2


STD.QTY.
ITEM
0.92 20 mm GAUGE METAL
0.46 SAND
0.5 CEMENT
0.4 MASON
2.1 MAN MAZDOOR
3.5 WOMEN MAZDOOR

per cum
per cum
per MT
per head
per head
per head

Miscellaneous, water & Contrator PROFIT

CM 1:3
STD.QTY.

ITEM
1 SAND
per cum
0.48 CEMENT
per MT
1 LABOUR
per head
Miscellaneous, water & Contrator PROFIT

CM 1:4
STD.QTY.

ITEM
1 SAND
per cum
0.3625 CEMENT
per MT
1 LABOUR
per head
Miscellaneous, water & Contrator PROFIT

PLASTERING WITH CM (1:3)


STD.QTY.
ITEM
0.15 CM (1:3)
per cum
1.1 MASON
per head
0.5 MAN MAZDOOR
per head
1.1 WOMAN MAZDOOR
per head
Miscellaneous, water & Contrator PROFIT

RRS masonry in CM(1:4)


STD.QTY.
ITEM
0.6 RR Stone
per cum
0.5 Rough Stone
per cum
0.32 CM (1:4)
per cum
2.5 MASON
per head
1.4 MAN MAZDOOR
per head
1.4 WOMAN MAZDOOR
per head
Miscellaneous, water & Contrator PROFIT

4400.00
250.00
150.00
120.00
Vibration Charges
Mixing Charges
0.10
TOTAL in Rs.

1760.00
100.00
315.00
420.00
38.50
47.50
339.55
3735.02

UNIT RATE
635.40
282.40
4400.00
250.00
150.00
120.00
Vibration Charges
Mixing Charges
0.10
TOTAL in Rs.

QTY.RATE
584.57
129.90
2200.00
100.00
315.00
420.00
38.50
47.50
383.55
4219.02

per cum

UNIT RATE
282.40
4400.00
22.50
0.10
TOTAL in Rs.

QTY.RATE
282.40
2112.00
22.50
241.69
2658.59

per cum

UNIT RATE
282.40
4400.00
22.50
0.10
TOTAL in Rs.

QTY.RATE
282.40
1595.00
22.50
189.99
2089.89

per cum

UNIT RATE
2658.59
250.00
150.00
120.00
0.10
TOTAL in Rs.

QTY.RATE
398.79
275.00
75.00
132.00
88.08
968.87
per 10 sq.m.
973.86735

UNIT RATE
520.00
300.00
2089.89
250.00
150.00
120.00
0.10
TOTAL in Rs.

QTY.RATE
312.00
150.00
668.76
625.00
210.00
168.00
213.38
2347.14

per cum

per cum
per cum

per cum

Brick Masonry CM(1:4)

STD.QTY.
512
0.2
1.4
0.7
2.1

ITEM
Second Class Bricks
per each
CM (1:4)
per cum
MASON
per head
MAN MAZDOOR
per head
WOMEN MAZDOOR
per head
Miscellaneous, water & Contrator PROFIT

CM 1:6
STD.QTY.

ITEM
1 SAND
per cum
0.24 CEMENT
per MT
1 LABOUR
per head
Miscellaneous, water & Contrator PROFIT

CRS masonry in CM(1:6)


STD.QTY.
ITEM
0.6 RR Stone
per cum
0.5 Rough Stone
per cum
0.32 CM (1:6)
per cum
2.5 MASON
per head
1.4 MAN MAZDOOR
per head
1.4 WOMAN MAZDOOR
per head
Miscellaneous, water & Contrator PROFIT

Brick Masonry CM(1:6)


STD.QTY.
ITEM
512 Second Class Bricks
per each
0.2 CM (1:6)
per cum
1.4 MASON
per head
0.7 MAN MAZDOOR
per head
2.1 WOMEN MAZDOOR
per head
Miscellaneous, water & Contrator PROFIT

PLASTERING WITH CM (1:4)


STD.QTY.
ITEM
0.15 CM (1:4)
per cum
1.1 MASON
per head
0.5 MAN MAZDOOR
per head
1.1 WOMAN MAZDOOR
per head
Miscellaneous, water & Contrator PROFIT

UNIT RATE

TOTAL in Rs.

QTY.RATE
1331.20
417.98
350.00
105.00
252.00
245.62
2701.80

per cum

UNIT RATE
282.40
4400.00
22.50
0.10
TOTAL in Rs.

QTY.RATE
282.40
1056.00
22.50
136.09
1496.99

per cum

UNIT RATE
520.00
300.00
1496.99
250.00
150.00
120.00
0.10
TOTAL in Rs.

QTY.RATE
312.00
150.00
479.04
625.00
210.00
168.00
194.40
2138.44

per cum

UNIT RATE

TOTAL in Rs.

QTY.RATE
1331.20
299.40
350.00
105.00
252.00
233.76
2571.36

per cum

UNIT RATE
2089.89
250.00
150.00
120.00
0.10
TOTAL in Rs.

QTY.RATE
313.48
275.00
75.00
132.00
79.55
875.03

per 10 sq.m.

2.60
2089.89
250.00
150.00
120.00
0.10

2.60
1496.99
250.00
150.00
120.00
0.10

Amit Rates
Cft

18.00

Cft

10.00

Cft

8.00
205.00
2.30
250.00
130.00
100.00
520.00
400

Granular Bedding
Diameter of
the Pipe(m)
0.2
0.25
0.3
0.4
0.45
0.5
0.7
1

Thickness(m)
Width(m)
0.7
0.75
0.8
0.9
0.95
1
1.2
1.5

Thickness(m) haunch(m)
0.1
0.1
0.1
0.125
0.1
0.15
0.1
0.2
0.11
0.225
0.13
0.25
0.18
0.35
0.25
0.5

Cost of
20mm stone

Vol of
bedding

635.40
635.40
635.40
635.40
635.40
635.40
635.40
635.40

0.070
0.075
0.080
0.090
0.107
0.125
0.210
0.375

Vol of
Haunch
0.070
0.094
0.120
0.180
0.214
0.250
0.420
0.750

Vol of
pipe
0.016
0.025
0.035
0.063
0.080
0.098
0.193
0.393

PCC Bedding
Diameter of
the Pipe(m)
0.25
0.3
0.35
0.4
0.45
0.5
0.6
0.7
0.9
1

Width(m)
0.45
0.5
0.55
0.6
0.65
0.7
0.8
0.9
1.13
1.25

Thickness(m)
Thickness(m) haunch(m)
0.1
0.06
0.1
0.08
0.1
0.09
0.1
0.10
0.11
0.11
0.13
0.13
0.15
0.15
0.18
0.18
0.23
0.23
0.25
0.25

Cost of CC
M15
3052.64
3052.64
3052.64
3052.64
3052.64
3052.64
3052.64
3052.64
3052.64
3052.64

Vol of
bedding
0.045
0.050
0.055
0.060
0.073
0.088
0.120
0.158
0.253
0.313

Vol of
Haunch
0.028
0.038
0.048
0.060
0.073
0.088
0.120
0.158
0.253
0.313

Vol of
pipe
0.025
0.035
0.048
0.063
0.080
0.098
0.141
0.193
0.318
0.393

Vol of
bedding

Total Cost

0.132
0.156
0.182
0.239
0.281
0.326
0.534
0.929

84
99
116
152
178
207
339
590

Vol of
bedding

Total Cost

0.061
0.070
0.079
0.089
0.106
0.126
0.169
0.219
0.347
0.429

185.7
213.1
241.3
270.3
325.0
384.3
516.7
667.7
1059.5
1308.1

3.140
0.016
0.025
0.035
0.063
0.079
0.098
0.192
0.393

300

4500

529.5

D A

Construction of sewer man hole for 500mm dia >1.2M & upto 1.5M depth.
1.8
0.225
0.9
0.6
0.5
0.4
1.2
1
0.3
1.5
0.9
0.02
0.2
0.2
0.25
0.25

Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
0.57 Cum

Rate
1782.63

1.00

0.3034 Cum
0.382 Cum
0.0786 Cum

2401.52

1.00

1.13 Cum

2701.80

1.00

1.13 Cum

2347.14

1.00

4) Plastering with CM (1:3) on the outer face 20mm thick


22/7x1.5x0.02

0.09 Sqm

97.39

1.00

5) Plastering with CM (1:3) on the inner face 20mm thick


22/7x0.9x0.02

0.06 Sqm

97.39

1.00

6) RCC M20 over BM wall


22/7x1.2x0.2x0.2

0.15 Cum

3735.02

1.00

7) PCC M20 250mm thick


22/7x1.2x0.25x0.25

0.24 Cum

3735.02

1.00

1) Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (1.8)2 x 0.225
2) PCC M15 for benching and Channel portion
22/7/4x(0.9)^2x0.6
Deduct for pipes:22/7/4x(0.5)2x0.4
3) Cement brick masonry with
CM(1:4)prop for barrel wall.
22/7x1.2x1x0.3
With RR Masonry CM(1:4)

solid

cement

bricks

in

Per

8) Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

9)

45.36
6.55
3.74
17.53
17.53

Kg
Kg
Kg
Kg
Kg

36.00

1.00

SFRC manhole frame and cover


SFRC rungs

D A

Construction of sewer man hole for 500mm dia >0.9M & upto 1.2M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall

1.8
0.225
0.9
0.6
0.5
0.4
1.2
0.75
0.3
1.5
0.9
0.02
0.2
0.2
0.25
0.25

1) Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (1.8)2 x 0.225
2) PCC M15 for benching and Channel portion
22/7/4x(0.9)^2x0.6
Deduct for pipes:22/7/4x(0.5)2x0.4
3) Cement brick masonry with
CM(1:4)prop
for barrel wall.
22/7x1.2x0.75x0.3
With RR Masonry CM(1:4)

solid

cement

bricks

4) Plastering with CM (1:3) on the outer face 20mm thick

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
Rate
Per
0.573 Cum
1782.63
1

0.3034 Cum
0.382 Cum
0.0786 Cum

2401.52

in 0.8483 Cum

2701.80

0.8483 Cum

2347.14

0.0943 Sqm

97.38674

22/7x1.5x0.02
5) Plastering with CM (1:3) on the inner face 20mm thick
22/7x0.9x0.02

0.0566 Sqm

97.38674

6) RCC M20 over BM wall


22/7x1.2x0.2x0.2

0.1508 Cum

3735.02

7) PCC M20 250mm thick


22/7x1.2x0.25x0.25

0.2357 Cum

3735.02

36

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

9)

SFRC manhole frame and cover


SFRC rungs

45.361
6.552
3.744
17.532
17.532

Kg
Kg
Kg
Kg
Kg

D A

Construction of sewer man hole for 500mm dia >1.5M & upto 1.65M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
Per
Cum

Amount
1021.44

1)

Cum

728.61

2)

Cum

3056.06

3)

Cum
2654.9
Sqm

Cement brick masonry with solid cement bricks in


CM(1:4)prop for barrel wall.
22/7x1.2x1.2x0.3
With RR Masonry CM(1:4)

9.18

4)

Sqm

5.51

5)

Cum

563.30

6)

Plastering with CM (1:3) on the outer face 20mm thick


22/7x1.5x0.02
Formula to be cheek up
Plastering with CM (1:3) on the inner face 20mm thick
22/7x0.9x0.02
Plastering area in the ,botteom,top & sides of top to be consider
RCC M20 over BM wall
22/7x1.2x0.2x0.2

Cum

880.16

7)

Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (1.8)2 x 0.225

PCC M15 for benching and Channel portion


22/7/4x(0.9)^2x0.6
Deduct for pipes:22/7/4x(0.5)2x0.4

PCC M20 250mm thick


22/7x1.2x0.25x0.25

Kg

1632.99

No

1200
360

9056.1

8)

9)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

SFRC manhole frame and cover


SFRC rungs
10 20 Guage HDPE / Polythieen sheet

9457.24

D A

2M depth.

Construction of sewer man hole for 500mm dia


Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
Cum

Amount
1021.44

1)

Cum

728.61

2)

Cum

2292.04

3)

Cement brick masonry with solid cement bricks in


CM(1:4)prop
for barrel wall.
22/7x1.2x0.45x0.3
With RR Masonry CM(1:4)

9.18

4)

Plastering with CM (1:3) on the outer face 20mm thick

Cum
1991.2
Sqm

Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (1.8)2 x 0.225

PCC M15 for benching and Channel portion


22/7/4x(0.9)^2x0.6
Deduct for pipes:22/7/4x(0.5)2x0.4

22/7x1.5x0.02
Sqm

5.51

5)

Plastering with CM (1:3) on the inner face 20mm thick


22/7x0.9x0.02

Cum

563.30

6)

RCC M20 over BM wall


22/7x1.2x0.2x0.2

Cum

880.16

7)

PCC M20 250mm thick


22/7x1.2x0.25x0.25

Kg

1632.99

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

No

1200.00
288.00

9)

SFRC manhole frame and cover


SFRC rungs

8320.4

8621.22

D A

>1.5M & upto 1.65M depth.


1.8
0.225
0.9
0.6
0.5
0.4
1.2
1.2
0.3
1.5
0.9
0.02
0.2
0.2
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
0.57 Cum

Rate
1782.63

Per
1.00 Cum

Amount
1021.44

0.30 Cum
0.38 Cum
0.08 Cum

2401.52

1.00 Cum

728.61

1.36 Cum

2701.80

1.00 Cum

3667.27

1.36 Cum

2347.14

ce 20mm thick

5.66 Sqm

97.39

1.00 Cum
3185.88
1.00 Sqm

550.78

ce 20mm thick

3.39 Sqm

97.39

1.00 Sqm

330.47

& sides of top to be consider


0.15 Cum

3735.02

1.00 Cum

563.30

0.24 Cum

3735.02

1.00 Cum

880.16

cement bricks in

45.36
6.55
3.74
17.53
17.53

Kg
Kg
Kg
Kg
Kg

36.00

1.00 Kg

1632.99

No

3.24 sQm

D A

1200
396
10 To beverified
32.4
10489.6 11003.41

wer man hole for 500mm dia upto 0.9M depth.


1.8
0.225
0.9
0.6
0.5
0.4
1.2
0.45
0.3
1.5
0.9
0.02
0.2
0.2
0.25
0.25

cement bricks in

ce 20mm thick

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
0.6

Cum

0.3
0.4
0.1

Cum
Cum
Cum

0.5

Rate
Per
1782.63

1 Cum

Amount
1021.437

2401.52

1 Cum

728.613

Cum

2701.80

1 Cum

1375.225

0.5

Cum

2347.14

0.1

Sqm

97.3867

1 Cum
1194.7
1 Sqm
9.179674

ce 20mm thick

0.1

Sqm

97.3867

1 Sqm

5.507804

0.2

Cum

3735.02

1 Cum

563.3007

0.2

Cum

3735.02

1 Cum

880.1573

45.4
6.55
3.74
17.53
17.53

Kg
Kg
Kg
Kg
Kg

1 Kg

1632.986

No

1200
216

36

7451.9 7632.406

D A

Construction of sewer man hole for 600mm dia >2.3M & upto 2.5M depth.
2.2
0.225
1.2
0.7
0.6
0.4
1.55
2.05
0.325
1.9
1.2
0.02
0.2
0.2
0.25
0.25

Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
0.86 Cum

Rate
1782.63

Per
1.00

0.6791 Cum
0.7923 Cum
0.1132 Cum

2401.52

1.00

3.24 Cum

2701.80

1.00

3.24 Cum

2347.14

1.00

4) Plastering with CM (1:3) on the outer face 20mm thick


22/7x1.9x0.02

0.12 Sqm

97.39

1.00

5) Plastering with CM (1:3) on the inner face 20mm thick


22/7x1.2x0.02

0.08 Sqm

97.39

1.00

6) RCC M20 over BM wall


22/7x1.55x0.2x0.2

0.19 Cum

3735.02

1.00

7) PCC M20 250mm thick


22/7x1.55x0.25x0.25

0.30 Cum

3735.02

1.00

1) Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (2.2)2 x 0.225
2) PCC M15 for benching and Channel portion
22/7/4x(1.2)^2x0.7
Deduct for pipes:22/7/4x(0.6)2x0.4
3) Cement brick masonry with
CM(1:4)prop for barrel wall.
22/7x1.55x2.05x0.325
With RR Masonry CM(1:4)

solid

cement

bricks

in

8) Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

9)

108.65
6.55
17.09
42.50
42.50

Kg
Kg
Kg
Kg
Kg

45.00

1.00

SFRC manhole frame and cover


SFRC rungs

D A

Construction of sewer man hole for 600mm dia >1.7M & upto 2.0M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall

2.2
0.225
1.2
0.7
0.6
0.4
1.55
1.55
0.325
1.9
1.2
0.02
0.2
0.2
0.25
0.25

1) Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (2.2)2 x 0.225
2) PCC M15 for benching and Channel portion
22/7/4x(1.2)^2x0.7
Deduct for pipes:22/7/4x(0.6)2x0.4
3) Cement brick masonry with
CM(1:4)prop
for barrel wall.
22/7x1.55x1.55x0.325
With RR Masonry CM(1:4)

solid

cement

bricks

4) Plastering with CM (1:3) on the outer face 20mm thick

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
Rate
Per
0.856 Cum
1782.63
1

0.6791 Cum
0.7923 Cum
0.1132 Cum

2401.52

in 2.4533 Cum

2701.80

2.4533 Cum

2347.14

0.1194 Sqm

97.38674

22/7x1.9x0.02
UPVC Pipe in M15 arrangement has to be considered
0.0754 Sqm
5) Plastering with CM (1:3) on the inner face 20mm thick
22/7x1.2x0.02
Plastering area in the ,botteom,top & sides of top to be consider
0.1948 Cum
6) RCC M20 over BM wall
22/7x1.55x0.2x0.2
7) PCC M20 250mm thick
22/7x1.55x0.25x0.25

0.3044 Cum

8) Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

108.65
6.552
17.088
42.505
42.505

9)

SFRC manhole frame and cover


SFRC rungs

Kg
Kg
Kg
Kg
Kg

97.38674

3735.02

3735.02

36

D A

Construction of sewer man hole for 600mm dia >2.0M & upto 2.3M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall

2.2
0.225
1.2
0.7
0.6
0.4
1.55
1.85
0.325
1.9
1.2
0.02
0.2
0.2
0.25
0.25

Per
Cum

Amount
1525.85

1)

Cum

1630.89

2)

Cum

8766.53

3)

Cement brick masonry with solid cement bricks in


CM(1:4)prop for barrel wall.
22/7x1.55x1.85x0.325
With RR Masonry CM(1:4)

11.63

4)

Plastering with CM (1:3) on the outer face 20mm thick


22/7x1.9x0.02

Sqm

7.34

5)

Plastering with CM (1:3) on the inner face 20mm thick


22/7x1.2x0.02

Cum

727.60

6)

RCC M20 over BM wall


22/7x1.55x0.2x0.2

Cum

1136.87

7)

PCC M20 250mm thick


22/7x1.55x0.25x0.25

Cum
7615.8
Sqm

Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (2.2)2 x 0.225

PCC M15 for benching and Channel portion


22/7/4x(1.2)^2x0.7
Deduct for pipes:22/7/4x(0.6)2x0.4

Kg

4889.25

No

1200
600

19345

8)

9)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

SFRC manhole frame and cover


SFRC rungs

20495.95

D A

0M depth.

Construction of sewer man hole for 600mm dia


Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall

2.2
0.225
1.2
0.7
0.6
0.4
1.55
1.25
0.325
1.9
1.2
0.02
0.2
0.2
0.25
0.25

Cum

Amount
1525.85013

1)

Cum

1630.8851

2)

Cum

6628.35042

3)

Cum
5758.3
Sqm
11.6275866

Cement brick masonry with solid cement bricks in


CM(1:4)prop
for barrel wall.
22/7x1.55x1.25x0.325
With RR Masonry CM(1:4)

4)

Plastering with CM (1:3) on the outer face 20mm thick

Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (2.2)2 x 0.225

PCC M15 for benching and Channel portion


22/7/4x(1.2)^2x0.7
Deduct for pipes:22/7/4x(0.6)2x0.4

22/7x1.9x0.02
Sqm

7.34373891

5)

Plastering with CM (1:3) on the inner face 20mm thick


22/7x1.2x0.02

Cum

727.59668

6)

RCC M20 over BM wall


22/7x1.55x0.2x0.2

Cum

1136.86981

7)

PCC M20 250mm thick


22/7x1.55x0.25x0.25

Kg

3911.39827

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

No

1200
480

16390 17259.9217

9)

SFRC manhole frame and cover


SFRC rungs

D A

upto 2.3M depth.


m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
0.86 Cum

Rate
1782.63

Per
1.00 Cum

Amount
1525.85

0.6791 Cum
0.79229 Cum
0.113184 Cum

2401.52

1.00 Cum

1630.89

2.93 Cum

2701.80

1.00 Cum

7911.26

2.93 Cum

2347.14

0.12 Sqm

97.39

1.00 Cum
6872.78
1.00 Sqm

0.08 Sqm

97.39

1.00 Sqm

7.34

0.19 Cum

3735.02

1.00 Cum

727.60

0.30 Cum

3735.02

1.00 Cum

1136.87

11.63

108.65
6.55
17.09
42.50
42.50

Kg
Kg
Kg
Kg
Kg

36.00

1.00 Kg

3911.40

No

1200
552

17576.3 18614.83

hole for 600mm dia upto 1.7M depth.


m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
0.9

Cum

0.7
0.8
0.1

Cum
Cum
Cum

2.0

Rate
Per
1782.63

1 Cum

Amount
1525.85

2401.52

1 Cum

1630.885

Cum

2701.80

1 Cum

5345.444

2.0

Cum

2347.14

0.1

Sqm

97.3867

1 Cum
4643.77
1 Sqm
11.62759

0.1

Sqm

97.3867

1 Sqm

7.343739

0.2

Cum

3735.02

1 Cum

727.5967

0.3

Cum

3735.02

1 Cum

1136.87

108.6
6.6
17.1
42.5
42.5

Kg
Kg
Kg
Kg
Kg

36

1 Kg

3911.398

No

1200
408

15203.3 15905.02

D A

Construction of sewer man hole for 600mm dia >4.5M & upto 5.0M depth.
2.7
0.3
1.5
0.7
0.6
0.4
1.95
4.55
0.366
2.4
1.5
0.02
0.2
0.2
0.25
0.25

Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
1.72 Cum

Rate
1782.63

Per
1.00

1.1248 Cum
1.238 Cum
0.1132 Cum

2401.52

1.00

10.20 Cum

2701.80

1.00

10.20 Cum

2347.14

1.00

4) Plastering with CM (1:3) on the outer face 20mm thick


22/7x2.4x0.02

0.15 Sqm

97.39

1.00

5) Plastering with CM (1:3) on the inner face 20mm thick


22/7x1.5x0.02

0.09 Sqm

97.39

1.00

6) RCC M20 over BM wall


22/7x1.95x0.2x0.2

0.25 Cum

3735.02

1.00

7) PCC M20 250mm thick


22/7x1.95x0.25x0.25

0.38 Cum

3735.02

1.00

1) Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (2.7)2 x 0.3
2) PCC M15 for benching and Channel portion
22/7/4x(2.4)^2x0.7
Deduct for pipes:22/7/4x(0.6)2x0.4
3) Cement brick masonry with
CM(1:4)prop for barrel wall.
22/7x1.95x4.55x0.366
With RR Masonry CM(1:4)

solid

cement

bricks

in

8) Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

9)

129.79
6.55
21.36
28.05
73.82

Kg
Kg
Kg
Kg
Kg

36.00

1.00

SFRC manhole frame and cover


SFRC rungs

D A

Construction of sewer man hole for 600mm dia >3.5M & upto 4.0M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall

2.7
0.3
1.5
0.7
0.6
0.4
1.95
3.55
0.366
2.4
1.5
0.02
0.2
0.2
0.25
0.25

1) Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (2.7)2 x 0.3
2) PCC M15 for benching and Channel portion
22/7/4x(2.4)^2x0.7
Deduct for pipes:22/7/4x(0.6)2x0.4
3) Cement brick masonry with
CM(1:4)prop
for barrel wall.
22/7x1.95x3.55x0.366
With RR Masonry CM(1:4)

solid

cement

bricks

4) Plastering with CM (1:3) on the outer face 20mm thick

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
Rate
Per
1.719 Cum
1782.63
1

1.1248 Cum
1.238 Cum
0.1132 Cum

2401.52

in 7.9607 Cum

2701.80

7.9607 Cum

2347.14

0.1508 Sqm

97.38674

22/7x2.4x0.02
5) Plastering with CM (1:3) on the inner face 20mm thick
22/7x1.5x0.02

0.0943 Sqm

97.38674

6) RCC M20 over BM wall


22/7x1.95x0.2x0.2

0.2451 Cum

3735.02

7) PCC M20 250mm thick


22/7x1.95x0.25x0.25

0.3829 Cum

3735.02

36

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

9)

SFRC manhole frame and cover


SFRC rungs

129.79
6.552
21.36
28.052
73.824

D A

Kg
Kg
Kg
Kg
Kg

Construction of sewer man hole for 600mm dia >2.6M & upto 3.0M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
1) Laying of PCC(1:4:8) prop using 40mm metal
22/7 / 4 x (2.7)2 x 0.3

2.7
0.3
1.5
0.7
0.6
0.4
1.95
2.55
0.366
2.4
1.5
0.02
0.2
0.2
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
Rate
Per
1.719 Cum
1782.63
1

2) PCC M15 for benching and Channel portion


22/7/4x(2.4)^2x0.7
Deduct for pipes:22/7/4x(0.6)2x0.4

1.1248 Cum
1.238 Cum
0.1132 Cum

2401.52

in 5.7182 Cum

2701.80

5.7182 Cum

2347.14

4) Plastering with CM (1:3) on the outer face 20mm thick


22/7x2.4x0.02

0.1508 Sqm

97.38674

5) Plastering with CM (1:3) on the inner face 20mm thick


22/7x1.5x0.02

0.0943 Sqm

97.38674

6) RCC M20 over BM wall


22/7x1.95x0.2x0.2

0.2451 Cum

3735.02

7) PCC M20 250mm thick


22/7x1.95x0.25x0.25

0.3829 Cum

3735.02

36

3) Cement brick masonry with


CM(1:4)prop
for barrel wall.
22/7x1.95x2.55x0.366
With RR Masonry CM(1:4)

solid

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

9)

SFRC manhole frame and cover


SFRC rungs

cement

bricks

129.79
6.552
21.36
28.052
73.824

Kg
Kg
Kg
Kg
Kg

D A

Construction of sewer man hole for 600mm dia >4.0M & upto 4.5M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall

2.7
0.3
1.5
0.7
0.6
0.4
1.95
4.05
0.366
2.4
1.5
0.02
0.2
0.2
0.25
0.25

Per
Cum

Amount
3064.31

1)

Cum

2701.15

2)

Cum

27566.76

3)

Cement brick masonry with solid cement bricks in


CM(1:4)prop for barrel wall.
22/7x1.95x4.05x0.366
With RR Masonry CM(1:4)

14.69

4)

Plastering with CM (1:3) on the outer face 20mm thick


22/7x2.4x0.02

Sqm

9.18

5)

Plastering with CM (1:3) on the inner face 20mm thick


22/7x1.5x0.02

Cum

915.36

6)

RCC M20 over BM wall


22/7x1.95x0.2x0.2

Cum

1430.26

7)

PCC M20 250mm thick


22/7x1.95x0.25x0.25

Cum
23948
Sqm

Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (2.7)2 x 0.3

PCC M15 for benching and Channel portion


22/7/4x(2.4)^2x0.7
Deduct for pipes:22/7/4x(0.6)2x0.4

Kg

4672.38

No

1200
1200

39156

8)

9)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

SFRC manhole frame and cover


SFRC rungs

42774.09

D A

M depth.

Construction of sewer man hole for 600mm dia >3.0M


Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall

2.7
0.3
1.5
0.7
0.6
0.4
1.95
3.05
0.366
2.4
1.5
0.02
0.2
0.2
0.25
0.25

Cum

Amount
3064.3106

1)

Cum

2701.15344

2)

Cum

21508.135

3)

Cum
18685
Sqm 14.6874778

Cement brick masonry with solid cement bricks in


CM(1:4)prop for barrel wall.
22/7x1.95x3.05x0.366
With RR Masonry CM(1:4)

4)

Plastering with CM (1:3) on the outer face 20mm thick

Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (2.7)2 x 0.3

PCC M15 for benching and Channel portion


22/7/4x(2.4)^2x0.7
Deduct for pipes:22/7/4x(0.6)2x0.4

22/7x2.4x0.02
Sqm

9.17967364

5)

Plastering with CM (1:3) on the inner face 20mm thick


22/7x1.5x0.02

Cum

915.363565

6)

RCC M20 over BM wall


22/7x1.95x0.2x0.2

Cum

1430.25557

7)

PCC M20 250mm thick


22/7x1.95x0.25x0.25

Kg

4672.37549

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

No

1200
960

9)

SFRC manhole frame and cover


SFRC rungs

33652 36475.4608
D A

M depth.

Construction of sewer man hole for 600mm dia up


Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
Cum

Amount
3064.3106

1)

Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (2.7)2 x 0.3

2.7
0.3
1.5
0.7
0.6
0.4
1.95
2.15
0.366
2.4
1.5
0.02
0.2
0.2
0.25
0.25

Cum

2701.15344

Cum

15449.5054

3)

Cum
13422
Sqm 14.6874778

Cement brick masonry with solid cement bricks in


CM(1:4)prop for barrel wall.
22/7x1.95x2.15x0.366
With RR Masonry CM(1:4)

4)

Plastering with CM (1:3) on the outer face 20mm thick


22/7x2.4x0.02

Sqm

9.17967364

5)

Plastering with CM (1:3) on the inner face 20mm thick


22/7x1.5x0.02

Cum

915.363565

6)

RCC M20 over BM wall


22/7x1.95x0.2x0.2

Cum

1430.25557

7)

PCC M20 250mm thick


22/7x1.95x0.25x0.25

Kg

4672.37549

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

No

1200
720

9)

SFRC manhole frame and cover


SFRC rungs

28149 30176.8312

2)

PCC M15 for benching and Channel portion


22/7/4x(2.4)^2x0.7
Deduct for pipes:22/7/4x(0.6)2x0.4

D A

upto 4.5M depth.


m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
1.72 Cum

Rate
1782.63

Per
1.00 Cum

Amount
3064.31

1.12477 Cum
1.23795 Cum
0.113184 Cum

2401.52

1.00 Cum

2701.15

9.08 Cum

2701.80

1.00 Cum

24537.45

9.08 Cum

2347.14

0.15 Sqm

97.39

1.00 Cum
21316.5
1.00 Sqm

0.09 Sqm

97.39

1.00 Sqm

9.18

0.25 Cum

3735.02

1.00 Cum

915.36

0.38 Cum

3735.02

1.00 Cum

1430.26

14.69

129.79
6.55
21.36
28.05
73.82

Kg
Kg
Kg
Kg
Kg

36.00

1.00 Kg

4672.38

No

1200
1080

36403.8 39624.78

for 600mm dia >3.0M & upto 3.5M depth.


m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
1.7

Cum

1.1
1.2
0.1

Cum
Cum
Cum

6.8

Rate
Per
1782.63

1 Cum

Amount
3064.311

2401.52

1 Cum

2701.153

Cum

2701.80

1 Cum

18478.82

6.8

Cum

2347.14

0.2

Sqm

97.3867

1 Cum
16053.2
1 Sqm
14.68748

0.1

Sqm

97.3867

1 Sqm

9.179674

0.2

Cum

3735.02

1 Cum

915.3636

0.4

Cum

3735.02

1 Cum

1430.256

1 Kg

4672.375

No

1200
840

129.8
6.6
21.4
28.1
73.8

Kg
Kg
Kg
Kg
Kg

36

30900.5 33326.15
A

hole for 600mm dia upto 2.6M depth.


m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
1.71898 Cum

Rate
Per
1782.63

1 Cum

Amount
3064.311

1.12477 Cum
1.23795 Cum
0.113184 Cum

2401.52

1 Cum

2701.153

4.82126 Cum

2701.80

1 Cum

13026.05

4.82126 Cum

2347.14

0.15082 Sqm

97.3867

1 Cum
11316.2
1 Sqm
14.68748

0.09426 Sqm

97.3867

1 Sqm

9.179674

0.24508 Cum

3735.02

1 Cum

915.3636

0.38293 Cum

3735.02

1 Cum

1430.256

1 Kg

4672.375

No

1200
624

129.788
6.552
21.36
28.0518
73.8244

Kg
Kg
Kg
Kg
Kg

36

25947.5 27657.38

D A

Construction of sewer man hole for 600mm dia >5.5M & upto 6.0M depth.
3
0.3
1.5
0.7
0.6
0.4
2.1
5.55
0.425
2.7
1.5
0.02
0.2
0.2
0.25
0.25

Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
2.12 Cum

Rate
1782.63

1.00

1.1248 Cum
1.238 Cum
0.1132 Cum

2401.52

1.00

15.56 Cum

2701.80

1.00

15.56 Cum

2347.14

1.00

4) Plastering with CM (1:3) on the outer face 20mm thick


22/7x2.7x0.02

0.17 Sqm

97.39

1.00

5) Plastering with CM (1:3) on the inner face 20mm thick


22/7x1.5x0.02

0.09 Sqm

97.39

1.00

6) RCC M20 over BM wall


22/7x2.1x0.2x0.2

0.26 Cum

3735.02

1.00

7) PCC M20 250mm thick


22/7x2.1x0.25x0.25

0.41 Cum

3735.02

1.00

1) Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (3)2 x 0.3
2) PCC M15 for benching and Channel portion
22/7/4x(1.5)^2x0.7
Deduct for pipes:22/7/4x(0.6)2x0.4
3) Cement brick masonry with
CM(1:4)prop for barrel wall.
22/7x2.1x5.55x0.425
With RR Masonry CM(1:4)

solid

cement

bricks

in

Per

8) Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

9)

163.31
10.42
27.77
42.08
83.05

Kg
Kg
Kg
Kg
Kg

36.00

1.00

SFRC manhole frame and cover


SFRC rungs

D A

Construction of sewer man hole for 600mm dia upto 5.10M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall

3
0.3
1.5
0.7
0.6
0.4
2.1
4.65
0.425
2.7
1.5
0.02
0.2
0.2
0.25
0.25

1) Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (3)2 x 0.3
2) PCC M15 for benching and Channel portion
22/7/4x(1.5)^2x0.7
Deduct for pipes:22/7/4x(0.6)2x0.4
3) Cement brick masonry with
CM(1:4)prop
for barrel wall.
22/7x2.1x4.65x0.425
With RR Masonry CM(1:4)

solid

cement

bricks

4) Plastering with CM (1:3) on the outer face 20mm thick

in

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
Rate
Per
2.1222 Cum
1782.63
1

1.1248 Cum
1.238 Cum
0.1132 Cum

2401.52

13.04 Cum

2701.80

13.04 Cum

2347.14

0.1697 Sqm

97.38674

22/7x2.7x0.02
5) Plastering with CM (1:3) on the inner face 20mm thick
22/7x1.5x0.02

0.0943 Sqm

97.38674

6) RCC M20 over BM wall


22/7x2.1x0.2x0.2

0.2639 Cum

3735.02

7) PCC M20 250mm thick


22/7x2.1x0.25x0.25

0.4124 Cum

3735.02

36

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

9)

SFRC manhole frame and cover


SFRC rungs

163.31
10.416
27.768
42.078
83.052

Kg
Kg
Kg
Kg
Kg

D A

Construction of sewer man hole for 600mm dia >5.10M & upto 5.5M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
Per
Cum

Amount
3783.10

1)

Cum

2701.15

2)

Cum

42049.41

3)

Cement brick masonry with solid cement bricks in


CM(1:4)prop for barrel wall.
22/7x2.1x5.05x0.425
With RR Masonry CM(1:4)

16.52

4)

Plastering with CM (1:3) on the outer face 20mm thick


22/7x2.7x0.02

Sqm

9.18

5)

Plastering with CM (1:3) on the inner face 20mm thick


22/7x1.5x0.02

Cum

985.78

6)

RCC M20 over BM wall


22/7x2.1x0.2x0.2

Cum

1540.28

7)

PCC M20 250mm thick


22/7x2.1x0.25x0.25

Cum
36529.74
Sqm

Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (3)2 x 0.3

PCC M15 for benching and Channel portion


22/7/4x(1.5)^2x0.7
Deduct for pipes:22/7/4x(0.6)2x0.4

Kg

5879.31

No

1200
1440
54085

59604.73

depth.

Cum

Amount
3783.09951

Cum

2701.15344

Cum

35230.5871

Cum
30606
Sqm
16.5234126

8)

9)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

SFRC manhole frame and cover


SFRC rungs

Sqm

9.17967364

Cum

985.776147

Cum

1540.27523

Kg

5879.3094

No

1200
1224

47945.32 52569.9039

D A

>5.10M & upto 5.5M depth.


3
0.3
1.5
0.7
0.6
0.4
2.1
5.05
0.425
2.7
1.5
0.02
0.2
0.2
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
2.12 Cum

Rate
1782.63

Per
1.00 Cum

Amount
3783.10

1.12477 Cum
1.23795 Cum
0.113184 Cum

2401.52

1.00 Cum

2701.15

14.16 Cum

2701.80

1.00 Cum

38261.18

14.16 Cum

2347.14

ce 20mm thick

0.17 Sqm

97.39

1.00 Cum
33238.8
1.00 Sqm

ce 20mm thick

0.09 Sqm

97.39

1.00 Sqm

9.18

0.26 Cum

3735.02

1.00 Cum

985.78

0.41 Cum

3735.02

1.00 Cum

1540.28

cement bricks in

16.52

163.31
10.42
27.77
42.08
83.05

Kg
Kg
Kg
Kg
Kg

36.00

1.00 Kg

5879.31

No

1200
1320

50674.1

55696.49

D A

Construction of sewer man hole for 700mm dia >3.0M & upto 3.5M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the RCC M20 wall
thickness of the wall
Diameter of the outer RCC wall
Diameter of the inner RCC wall
For the PCC above wall width
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
1) Laying of RCC M20 for foundation
22/7 / 4 x (1.9)2 x 0.3
Reinforcement
Longitudinal stirrups at T&B
Circunferential reinforcement at T&B
2) PCC M15 for benching and Channel portion
22/7/4x(1.4)^2x0.8
Deduct for pipes:22/7/4x(0.7)2x0.4
3) RCC M20 for the wall
22/7x1.55x3.05x0.15
Reinforcement
circumferential Reinforcement
Longitudinal Stirrups

1.9
0.3
1.4
0.8
0.7
0.4
1.55
3.05
0.15
1.7
1.4
1.65
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Rate
3735.02

1.00

36

1.0784 Cum
1.2324 Cum
0.1541 Cum

2401.52

1.00

2.23 Cum

3735.02

1.00

36.00

1.00

Qty
0.85 Cum
129.77 Kg
56.916 Kg
72.857 Kg

84.94 Kg
39.74
45.20

Per

6) RCC M20 over BM wall


22/7x1.65x0.2x0.25

0.26 Cum

3735.02

1.00

7) PCC M20 250mm thick


22/7x1.65x0.25x0.25

0.32 Cum

3735.02

1.00

36.00

1.00

8) Reinforcement
Weight of longitudinal stirrups

85.24 Kg
10.42 Kg

Weight of extra longitudinal stirrups


Weight of circumferential reinforcement

9)

11.90 Kg
26.49 Kg
36.43 Kg

SFRC manhole frame and cover


SFRC rungs

D A

Construction of sewer man hole for 1000mm dia >3.0M & upto 3.5M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the RCC M20 wall
thickness of the wall
Diameter of the outer RCC wall
Diameter of the inner RCC wall
For the PCC above wall width
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
1)

Laying of RCC M20 for foundation


22/7 / 4 x (2.25)2 x 0.3
Reinforcement
Longitudinal stirrups at T&B
Circunferential reinforcement at T&B

2)

2.25
0.3
1.75
1.1
1
0.4
1.9
3.05
0.15
2.05
1.75
2
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
Rate
Per
1.1937 Cum
3735.02
1
193.16 Kg
81.344 Kg
111.82 Kg

36

PCC M15 for benching and Channel portion


22/7/4x(1.75)^2x1.1
Deduct for pipes:22/7/4x(1)2x0.4

2.3334 Cum
2.6478 Cum
0.3144 Cum

2401.52

3)

2.7312 Cum

3735.02

36

RCC M20 for the wall


22/7x1.9x3.05x0.15
Reinforcement
circumferential Reinforcement

102.64 Kg
47.922

Longitudinal Stirrups

54.717

6)

RCC M20 over BM wall


22/7x2x0.2x0.25

0.3142 Cum

3735.02

7)

PCC M20 250mm thick


22/7x2x0.25x0.25

0.3928 Cum

3735.02

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

98.196
10.416
11.904
31.948
43.928

36

9)

SFRC manhole frame and cover


SFRC rungs

Kg
Kg
Kg
Kg
Kg

D A

Construction of sewer man hole for 700mm dia >2.5M & upto 3.0M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the RCC M20 wall
thickness of the wall
Diameter of the outer RCC wall
Diameter of the inner RCC wall
For the PCC above wall width
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
Per
Cum

Amount
3179.39

Kg

4671.82

Cum

2589.79

Cum

8321.89

kg

3057.88

1)

Laying of RCC M20 for foundation


22/7 / 4 x (1.9)2 x 0.3
Reinforcement
Longitudinal stirrups at T&B
Circunferential reinforcement at T&B

2)

PCC M15 for benching and Channel portion


22/7/4x(1.4)^2x0.8
Deduct for pipes:22/7/4x(0.7)2x0.4
3)

RCC M20 for the wall


22/7x1.55x2.55x0.15
Reinforcement
circumferential Reinforcement
Longitudinal Stirrups

Cum

968.17

6)

RCC M20 over BM wall


22/7x1.65x0.2x0.25

Cum

1210.22

7)

PCC M20 250mm thick


22/7x1.65x0.25x0.25

Kg

3068.70

8)

Reinforcement
Weight of longitudinal stirrups

Weight of extra longitudinal stirrups


Weight of circumferential reinforcement

No

1200
840
29107.85

3.5M depth.

Cum

Amount
4458.63

Kg

6953.81

Cum

5603.81

Cum

10201.02

kg

3695.00

9)

SFRC manhole frame and cover


SFRC rungs

Cum

1173.54

Cum

1466.93

Kg

3535.06

No

1200.00
840.00
39127.8069

D A

>2.5M & upto 3.0M depth.


1.9
0.3
1.4
0.8
0.7
0.4
1.55
2.55
0.15
1.7
1.4
1.65
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
0.85 Cum
129.773 Kg
56.916 Kg
72.8567 Kg

Rate
3735.02
36

Per
1.00 Cum
1 Kg

Amount
3179.39
4671.8171

1.07839 Cum
1.23245 Cum
0.15406 Cum

2401.52

1.00 Cum

2589.79

1.86 Cum

3735.02

1.00 Cum

6957.64

1.00 kg

3057.88

84.94 Kg
39.74
45.20

36.00

0.26 Cum

3735.02

1.00 Cum

968.17

0.32 Cum

3735.02

1.00 Cum

1210.22

1.00 Kg

3068.70

85.24 Kg
10.42 Kg

36.00

11.90 Kg
26.49 Kg
36.43 Kg
No

1200
720
27623.60

D A

Construction of sewer man hole for 700mm dia >5.5M & upto 6.0M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the RCC M20 wall
thickness of the wall
Diameter of the outer RCC wall
Diameter of the inner RCC wall
For the PCC above wall width
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
1) Laying of RCC M20 for foundation
22/7 / 4 x (1.9)2 x 0.3
Reinforcement
Longitudinal stirrups at T&B
Circunferential reinforcement at T&B
2) PCC M15 for benching and Channel portion
22/7/4x(1.4)^2x0.8
Deduct for pipes:22/7/4x(0.7)2x0.4
3) RCC M20 for the wall
22/7x1.55x5.55x0.15
Reinforcement
circumferential Reinforcement
Longitudinal Stirrups

1.9
0.3
1.4
0.8
0.7
0.4
1.55
5.55
0.15
1.7
1.4
1.65
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Rate
3735.02

1.00

36

1.0784 Cum
1.2324 Cum
0.1541 Cum

2401.52

1.00

4.05 Cum

3735.02

1.00

36.00

1.00

Qty
0.85 Cum
190.02 Kg
56.916 Kg
133.11 Kg

84.94 Kg
39.74
45.20

Per

6) RCC M20 over BM wall


22/7x1.65x0.2x0.25

0.26 Cum

3735.02

1.00

7) PCC M20 250mm thick


22/7x1.65x0.25x0.25

0.32 Cum

3735.02

1.00

36.00

1.00

8) Reinforcement
Weight of longitudinal stirrups

85.24 Kg
10.42 Kg

Weight of extra longitudinal stirrups


Weight of circumferential reinforcement

9)

11.90 Kg
26.49 Kg
36.43 Kg

SFRC manhole frame and cover


SFRC rungs

Construction of sewer man hole for 700mm dia >4.5M & upto 5.0M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the RCC M20 wall
thickness of the wall
Diameter of the outer RCC wall
Diameter of the inner RCC wall
For the PCC above wall width
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
1)

Laying of RCC M20 for foundation


22/7 / 4 x (1.9)2 x 0.3
Reinforcement
Longitudinal stirrups at T&B
Circunferential reinforcement at T&B

2)

1.9
0.3
1.4
0.8
0.7
0.4
1.55
4.55
0.15
1.7
1.4
1.65
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
Rate
Per
0.8512 Cum
3735.02
1
190.02 Kg
56.916 Kg
133.11 Kg

36

PCC M15 for benching and Channel portion


22/7/4x(1.4)^2x0.8
Deduct for pipes:22/7/4x(0.7)2x0.4

1.0784 Cum
1.2324 Cum
0.1541 Cum

2401.52

3)

3.3238 Cum

3735.02

36

RCC M20 for the wall


22/7x1.55x4.55x0.15
Reinforcement
circumferential Reinforcement

84.941 Kg
39.74

Longitudinal Stirrups

45.201

6)

RCC M20 over BM wall


22/7x1.65x0.2x0.25

0.2592 Cum

3735.02

7)

PCC M20 250mm thick


22/7x1.65x0.25x0.25

0.324 Cum

3735.02

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

36

9)

SFRC manhole frame and cover


SFRC rungs

85.242
10.416
11.904
26.493
36.428

D A

Kg
Kg
Kg
Kg
Kg

Construction of sewer man hole for 700mm dia >3.6M & upto 4.0M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the RCC M20 wall
thickness of the wall
Diameter of the outer RCC wall
Diameter of the inner RCC wall
For the PCC above wall width
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
1)

Laying of RCC M20 for foundation


22/7 / 4 x (1.9)2 x 0.3
Reinforcement
Longitudinal stirrups at T&B

1.9
0.3
1.4
0.8
0.7
0.4
1.55
3.55
0.15
1.7
1.4
1.65
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
Rate
Per
0.8512 Cum
3735.02
1
190.02 Kg
56.916 Kg

36

Circunferential reinforcement at T&B


2)

133.11 Kg

PCC M15 for benching and Channel portion


22/7/4x(1.4)^2x0.8
Deduct for pipes:22/7/4x(0.7)2x0.4

1.0784 Cum
1.2324 Cum
0.1541 Cum

2401.52

3)

RCC M20 for the wall


22/7x1.55x3.55x0.15
Reinforcement
circumferential Reinforcement
Longitudinal Stirrups

2.5933 Cum

3735.02

36

6)

RCC M20 over BM wall


22/7x1.65x0.2x0.25

0.2592 Cum

3735.02

7)

PCC M20 250mm thick


22/7x1.65x0.25x0.25

0.324 Cum

3735.02

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

36

9)

SFRC manhole frame and cover


SFRC rungs

84.941 Kg
39.74
45.201

85.242
10.416
11.904
26.493
36.428

Kg
Kg
Kg
Kg
Kg

D A

Construction of sewer man hole for 700mm dia >5.0M & upto 5.5M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the RCC M20 wall
thickness of the wall
Diameter of the outer RCC wall
Diameter of the inner RCC wall
For the PCC above wall width
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
Per
Cum

Amount
3179.39

Kg

6840.85

Cum

2589.79

Cum

15143.11

kg

1)

Laying of RCC M20 for foundation


22/7 / 4 x (1.9)2 x 0.3
Reinforcement
Longitudinal stirrups at T&B
Circunferential reinforcement at T&B

2)

PCC M15 for benching and Channel portion


22/7/4x(1.4)^2x0.8
Deduct for pipes:22/7/4x(0.7)2x0.4
3)

RCC M20 for the wall


22/7x1.55x5.05x0.15
Reinforcement
circumferential Reinforcement
Longitudinal Stirrups

3057.88

Cum

968.17

6)

RCC M20 over BM wall


22/7x1.65x0.2x0.25

Cum

1210.22

7)

PCC M20 250mm thick


22/7x1.65x0.25x0.25

Kg

3068.70

8)

Reinforcement
Weight of longitudinal stirrups

Weight of extra longitudinal stirrups


Weight of circumferential reinforcement

No

1200
1440

9)

SFRC manhole frame and cover


SFRC rungs

38698.10

D A

.0M depth.

Construction of sewer man hole for 700mm dia >


Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the RCC M20 wall
thickness of the wall
Diameter of the outer RCC wall
Diameter of the inner RCC wall
For the PCC above wall width
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall

Cum

Amount
3179.39027

Kg

6840.85277

Cum

2589.78513

2)

Cum

12414.6184

3)

kg

3057.87658

1)

Laying of RCC M20 for foundation


22/7 / 4 x (1.9)2 x 0.3
Reinforcement
Longitudinal stirrups at T&B
Circunferential reinforcement at T&B

PCC M15 for benching and Channel portion


22/7/4x(1.4)^2x0.8
Deduct for pipes:22/7/4x(0.7)2x0.4
RCC M20 for the wall
22/7x1.55x4.05x0.15
Reinforcement
circumferential Reinforcement

Longitudinal Stirrups
Cum

968.173002

6)

RCC M20 over BM wall


22/7x1.65x0.2x0.25

Cum

1210.21625

7)

PCC M20 250mm thick


22/7x1.65x0.25x0.25

Kg

3068.70091

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

No

1200
1200

9)

SFRC manhole frame and cover


SFRC rungs

35729.6133

.0M depth.

Cum

Amount
3179.39027

Kg

6840.85277

Cum

2589.78513

Cum

9686.13081

kg

3057.87658

Cum

968.173002

Cum

1210.21625

Kg

3068.70091

No

1200
960
32761.1257

D A

>5.0M & upto 5.5M depth.


1.9
0.3
1.4
0.8
0.7
0.4
1.55
5.05
0.15
1.7
1.4
1.65
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
0.85 Cum
190.024 Kg
56.916 Kg
133.108 Kg

Rate
3735.02
36

Per
1.00 Cum
1 Kg

Amount
3179.39
6840.8528

1.07839 Cum
1.23245 Cum
0.15406 Cum

2401.52

1.00 Cum

2589.79

3.69 Cum

3735.02

1.00 Cum

13778.86

84.94 Kg
39.74
45.20

36.00

1.00 kg

3057.88

0.26 Cum

3735.02

1.00 Cum

968.17

0.32 Cum

3735.02

1.00 Cum

1210.22

1.00 Kg

3068.70

85.24 Kg
10.42 Kg

36.00

11.90 Kg
26.49 Kg
36.43 Kg
No

1200
1320
37213.86

D A

man hole for 700mm dia >4.0M & upto 4.5M depth.
1.9
0.3
1.4
0.8
0.7
0.4
1.55
4.05
0.15
1.7
1.4
1.65
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
0.85124 Cum
190.024 Kg
56.916 Kg
133.108 Kg

Rate
Per
3735.02
36

1 Cum

Amount
3179.3903

1 Kg

6840.8528

1.07839 Cum
1.23245 Cum
0.15406 Cum

2401.52

1 Cum

2589.7851

2.95859 Cum

3735.02

1 Cum

11050.375

1 kg

3057.8766

84.941 Kg
39.74

36

45.201
0.25922 Cum

3735.02

1 Cum

968.173

0.32402 Cum

3735.02

1 Cum

1210.2163

1 Kg

3068.7009

No

1200
1080

85.2417
10.416
11.904
26.4933
36.4283

Kg
Kg
Kg
Kg
Kg

36

34245.369

RCC NP4 pipes(as per KK Spun Quotation)


S.No

1
2
3
4
5
6
7
8
9
10
11
12
13

Diameter
(mm)
NP4
200
250
300
350
400
450
500
600
700
900
1000
2000
NP2
600

Basic Rate

CST @ 2%
2%

350
475
900
1400
1600
1800
2100
2500
3100
4000
4500
25000

7
9.5
18
28
32
36
42
50
62
80
90
500

1400

28

L,L,J
Unloading
,escallation
Damages 2% Total
3%
@ 20%
20%
3%
2%
70
10.5
7.0
445
95
14.25
9.5
603
180
27
18.0 1143
280
42
28.0 1778
320
48
32.0 2032
360
54
36.0 2286
420
63
42.0 2667
500
75
50.0 3175
600
93
62.0 3917
700
120
80.0 4980
800
135
90.0 5615
2000
750
500.0 28750
0
0.0
0
280
42
28.0 1778

1.2700
1.2700
1.2700
1.2700
1.2700
1.2700
1.2700
1.2700
1.2635
1.2450
1.2478
1.1500
#DIV/0!
1.2700

1500 1187.133

D A

Construction of sewer man hole for 1000mm dia >5.0M & upto 5.5M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the RCC M20 wall
thickness of the wall
Diameter of the outer RCC wall
Diameter of the inner RCC wall
For the PCC above wall width
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
1) Laying of RCC M20 for foundation
22/7 / 4 x (2.25)2 x 0.3
Reinforcement
Longitudinal stirrups at T&B
Circunferential reinforcement at T&B
2) PCC M15 for benching and Channel portion
22/7/4x(1.75)^2x1.1
Deduct for pipes:22/7/4x(1)2x0.4
3) RCC M20 for the wall
22/7x1.9x5.05x0.15
Reinforcement
circumferential Reinforcement
Longitudinal Stirrups

2.25
0.3
1.75
1.1
1
0.4
1.9
5.05
0.15
2.05
1.75
2
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
1.19 Cum
193.16 Kg
81.344 Kg
111.82 Kg

Rate
3735.02
36

2.3334 Cum
2.6478 Cum
0.3144 Cum

2401.52

4.52 Cum

3735.02

102.64 Kg
47.922
54.717

36.00

6) RCC M20 over BM wall


22/7x2x0.2x0.25

0.31 Cum

3735.02

7) PCC M20 250mm thick


22/7x2x0.25x0.25

0.39 Cum

3735.02

8) Reinforcement
Weight of longitudinal stirrups

98.20 Kg
10.416 Kg

36.00

11.904 Kg
31.948 Kg
43.928 Kg

Weight of extra longitudinal stirrups


Weight of circumferential reinforcement

9)

SFRC manhole frame and cover


SFRC rungs

D A

Construction of sewer man hole for 1000mm dia >4.0M & upto 4.5M depth.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the RCC M20 wall
thickness of the wall
Diameter of the outer RCC wall
Diameter of the inner RCC wall
For the PCC above wall width
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
1) Laying of RCC M20 for foundation
22/7 / 4 x (2.25)2 x 0.3
Reinforcement
Longitudinal stirrups at T&B
Circunferential reinforcement at T&B
2) PCC M15 for benching and Channel portion
22/7/4x(1.75)^2x1.1
Deduct for pipes:22/7/4x(1)2x0.4
3) RCC M20 for the wall
22/7x1.9x4.05x0.15
Reinforcement
circumferential Reinforcement

2.25
0.3
1.75
1.1
1
0.4
1.9
4.05
0.15
2.05
1.75
2
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
1.19 Cum
193.16 Kg
81.344 Kg
111.82 Kg

Rate
3735.02
36

2.3334 Cum
2.6478 Cum
0.3144 Cum

2401.52

3.63 Cum

3735.02

102.64 Kg
47.922

36.00

54.717

Longitudinal Stirrups
6) RCC M20 over BM wall
22/7x2x0.2x0.25

0.31 Cum

3735.02

7) PCC M20 250mm thick


22/7x2x0.25x0.25

0.39 Cum

3735.02

8) Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

9)

98.20
10.416
11.904
31.948
43.928

Kg
Kg
Kg
Kg
Kg

36.00

SFRC manhole frame and cover


SFRC rungs

D A

Construction of sewer man hole for 1000mm dia upto 3.6m deep
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the RCC M20 wall
thickness of the wall
Diameter of the outer RCC wall
Diameter of the inner RCC wall
For the PCC above wall width
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
1) Laying of RCC M20 for foundation
22/7 / 4 x (2.25)2 x 0.3
Reinforcement
Longitudinal stirrups at T&B

2.25
0.3
1.75
1.1
1
0.4
1.9
3.15
0.15
2.05
1.75
2
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
1.19 Cum
193.16 Kg
81.344 Kg

Rate
3735.02
36

Circunferential reinforcement at T&B


2) PCC M15 for benching and Channel portion
22/7/4x(1.75)^2x1.1
Deduct for pipes:22/7/4x(1)2x0.4
3) RCC M20 for the wall
22/7x1.9x3.15x0.15
Reinforcement
circumferential Reinforcement
Longitudinal Stirrups

111.82 Kg
2.3334 Cum
2.6478 Cum
0.3144 Cum

2401.52

2.82 Cum

3735.02

102.64 Kg
47.922
54.717

36.00

6) RCC M20 over BM wall


22/7x2x0.2x0.25

0.31 Cum

3735.02

7) PCC M20 250mm thick


22/7x2x0.25x0.25

0.39 Cum

3735.02

8) Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

9)

SFRC manhole frame and cover


SFRC rungs

98.20
10.416
11.904
31.948
43.928

Kg
Kg
Kg
Kg
Kg

36.00

D A

Construction of sewer man hole for 1000mm dia >4.5M & upto 5.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the RCC M20 wall
thickness of the wall
Diameter of the outer RCC wall
Diameter of the inner RCC wall
For the PCC above wall width
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
Per
1.00 Cum

Amount
4458.63

1 Kg

6953.81

1.00 Cum

5603.81

1.00 Cum

16890.22

1)

Laying of RCC M20 for foundation


22/7 / 4 x (2.25)2 x 0.3
Reinforcement
Longitudinal stirrups at T&B
Circunferential reinforcement at T&B

2)

PCC M15 for benching and Channel portion


22/7/4x(1.75)^2x1.1
Deduct for pipes:22/7/4x(1)2x0.4
3)

RCC M20 for the wall


22/7x1.9x4.55x0.15
Reinforcement
circumferential Reinforcement
Longitudinal Stirrups

1.00 kg

3695.00

1.00 Cum

1173.54

6)

RCC M20 over BM wall


22/7x2x0.2x0.25

1.00 Cum

1466.93

7)

PCC M20 250mm thick


22/7x2x0.25x0.25

1.00 Kg

3535.06

8)

Reinforcement
Weight of longitudinal stirrups

Weight of extra longitudinal stirrups


Weight of circumferential reinforcement

No

1200
1320

9)

SFRC manhole frame and cover


SFRC rungs

46297.00

D A

Construction of sewer man hole for 1000mm dia >3.6M & upto 4.
Dia of Manhole:.
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the RCC M20 wall
thickness of the wall
Diameter of the outer RCC wall
Diameter of the inner RCC wall
For the PCC above wall width
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
Per
1.00 Cum

Amount
4458.63

1 Kg

6953.81

1.00 Cum

5603.81

1.00 Cum

13545.62

1.00 kg

3695.00

1)

Laying of RCC M20 for foundation


22/7 / 4 x (2.25)2 x 0.3
Reinforcement
Longitudinal stirrups at T&B
Circunferential reinforcement at T&B

2)

PCC M15 for benching and Channel portion


22/7/4x(1.75)^2x1.1
Deduct for pipes:22/7/4x(1)2x0.4
3)

RCC M20 for the wall


22/7x1.9x3.55x0.15
Reinforcement
circumferential Reinforcement

Longitudinal Stirrups
1.00 Cum

1173.54

6)

RCC M20 over BM wall


22/7x2x0.2x0.25

1.00 Cum

1466.93

7)

PCC M20 250mm thick


22/7x2x0.25x0.25

1.00 Kg

3535.06

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups
Weight of circumferential reinforcement

No

1200
1080
42712.40

Per
1.00 Cum

Amount
4458.63

1 Kg

6953.81

9)

SFRC manhole frame and cover


SFRC rungs

1.00 Cum

5603.81

1.00 Cum

10535.48

1.00 kg

3695.00

1.00 Cum

1173.54

1.00 Cum

1466.93

1.00 Kg

3535.06

No

1200
864
39486.27

D A

00mm dia >4.5M & upto 5.0M depth.

the mnhole

hannel portion

2.25
0.3
1.75
1.1
1
0.4
1.9
4.55
0.15
2.05
1.75
2
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
1.19 Cum
193.161 Kg
81.344 Kg
111.817 Kg

Rate
3735.02
36

Per
1.00 Cum

Amount
4458.63

1 Kg

6953.81

2.33344 Cum
2.64784 Cum
0.3144 Cum

2401.52

1.00 Cum

5603.81

4.07 Cum

3735.02

1.00 Cum

15217.92

102.64 Kg
47.9218
54.717

36.00

1.00 kg

3695.00

0.31 Cum

3735.02

1.00 Cum

1173.54

0.39 Cum

3735.02

1.00 Cum

1466.93

1.00 Kg

3535.06

98.20 Kg
10.416 Kg

36.00

11.904 Kg
31.9479 Kg
43.9283 Kg
No

1200
1200
44504.70

D A

00mm dia >3.6M & upto 4.0M depth.

the mnhole

hannel portion

2.25
0.3
1.75
1.1
1
0.4
1.9
3.55
0.15
2.05
1.75
2
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
1.19 Cum
193.161 Kg
81.344 Kg
111.817 Kg

Rate
3735.02
36

Per
1.00 Cum

Amount
4458.63

1 Kg

6953.81

2.33344 Cum
2.64784 Cum
0.3144 Cum

2401.52

1.00 Cum

5603.81

3.18 Cum

3735.02

1.00 Cum

11873.32

102.64 Kg
47.9218

36.00

1.00 kg

3695.00

54.717
0.31 Cum

3735.02

1.00 Cum

1173.54

0.39 Cum

3735.02

1.00 Cum

1466.93

1.00 Kg

3535.06

No

1200
960

98.20
10.416
11.904
31.9479
43.9283

Kg
Kg
Kg
Kg
Kg

36.00

40920.11

D A

Construction of inspection Chamber with BM (1:4)


Dia
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
1)

1.21
0.2
0.45
0.2
0.11
0.4
0.68
0.7
0.23
0.91
0.45
0.02
0.2
0.25
0.25
0.25

Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (1.21)2 x 0.2

2)

PCC M15 for benching and Channel portion


22/7/4x(0.45)^2x0.2
Deduct for pipes:22/7/4x(0.11)2x0.4
3)
4)

Cement brick masonry with solid cement bricks


CM(1:4)prop
for barrel wall.
22/7x0.68x0.7x0.23
Plastering with CM (1:3) on the outer face 20mm thick
22/7x0.91x0.02

in

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
0.23 Cum

Rate
1782.63

0.028029 Cum
0.031833 Cum
0.003804 Cum

2401.52

0.34 Cum

2701.80

0.06 Sqm

97.39

5)

Plastering with CM (1:3) on the inner face 20mm thick


22/7x0.45x0.02

0.03 Sqm

97.39

6)

RCC M20 over BM wall


22/7x0.68x0.2x0.25

0.11 Cum

3735.02

7)

PCC M20 250mm thick


22/7x0.68x0.25x0.25

0.13 Cum

3735.02

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups

45.36 Kg
6.55 Kg
3.74 Kg

36.00

Weight of circumferential reinforcement

9)

UPVC pieces
SFRC manhole frame and cover
SFRC rungs

17.53 Kg
17.53 Kg

D A
Construction of inspection Chamber with RR masonry
Dia
Thickness of foundation:
Diameter for benching :
Height of Benching:
Diameter of pipe:
length of the pipe coming into the mnhole
center to center diameter of the wall
Height of the BM(1:4) wall
thickness of the wall
Diameter of the outer BM wall
Diameter of the inner BM wall
Thickness of plaster
Width of RCC M20 over wall
Height of RCC M20 over wall
Width of PCC M20 over wall
Height of PCC M20 over wall
Per
1.00 Cum

Amount
410.28

1)

1.00 Cum

67.31

2)

1.00 Cum

929.38

3)

1.00 Sqm

5.57

4)

1.00 Sqm

2.75

5)

Plastering with CM (1:3) on the inner face 20mm thick


22/7x0.45x0.02

1.00 Cum

399.00

6)

RCC M20 over BM wall


22/7x0.75x0.2x0.25

1.00 Cum

498.76

7)

PCC M20 250mm thick


22/7x0.75x0.25x0.25

1632.99

8)

Reinforcement
Weight of longitudinal stirrups
Weight of extra longitudinal stirrups

1.00 Kg

Laying of PCC(1:4:8) prop using 40mm metal


22/7 / 4 x (1.35)2 x 0.2

PCC M15 for benching and Channel portion


22/7/4x(0.45)^2x0.2
Deduct for pipes:22/7/4x(0.11)2x0.4
RR Masonry wall
22/7x0.75x0.7x0.3
Plastering with CM (1:3) on the outer face 20mm thick
22/7x1.05x0.02

Weight of circumferential reinforcement

No

1200
200
5346.05

9)

SFRC manhole frame and cover


SFRC rungs

D A

asonry
1.35
0.2
0.45
0.2
0.11
0.4
0.75
0.7
0.3
1.05
0.45
0.02
0.2
0.25
0.25
0.25

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Qty
0.29 Cum

Rate
1782.63

Per
1.00 Cum

Amount
510.72

0.028029 Cum
0.031833 Cum
0.003804 Cum

2401.52

1.00 Cum

67.31

0.49 Cum

2347.14

1.00 Cum

1161.52

e 20mm thick

0.07 Sqm

97.39

1.00 Sqm

6.43

e 20mm thick

0.03 Sqm

97.39

1.00 Sqm

2.75

0.12 Cum

3735.02

1.00 Cum

440.08

0.15 Cum

3735.02

1.00 Cum

550.10

45.36 Kg
6.55 Kg
3.74 Kg

36.00

1.00 Kg

1632.99

17.53 Kg
17.53 Kg
No

1200
200
5771.89

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

Final Amount

Baricading for Safety


1(a)

Providing Barricading for trenches using 80-100 mm dia. Wooden Ballies as


vertical post, atleast 1.5 m above ground level and atleast 30-45 cm. below
ground level at a spacing of 3m. Two rows of 80 - 100 mm Wooden Ballies as
horizontal members securely tied by coconut strings with the vertical
members. Both vertical and horizontal members should be painted in red and
white colour. The rates are inclusive of removal and cleaning of site in all
respect.

1(b)

STC Consortium

Providing Barricading for trenches using 80-100 mm dia. Wooden Ballies as


vertical post, atleast 1.5 m above ground level and atleast 30-45 cm. below
ground level at a spacing of 3 m. Two rows of PVC tape (preferably red in
colour)strip barricading horizontal strip securely tied with the vertical members.
Vertical members should be painted in red and white colour. The rate are
inclusive of removal and cleaning of site in all respect.
Providing and fixing minimum 0.63 mm thick GI Corrugated sheets( minimum
width of each sheet shall be 60 cm.) for covering and baricading in one / two
rows one above another and painting in red and white strips as per
specifications and directions of Engineer incharge with proper fixing
arrangement with GI limpet washers nuts and bolts.

35
Mtr.

11080.0

387800

29
Sqm.

20000.0

580000

31
Sq.m

1000.0

31000

Page 93 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

Final Amount

PIPELINE WORKS INCLUDING EXCAVATION


3
Earth work in excavation in foundation, trenches manholes, road side
chambers etc. including dressing of sides and ramming of bottoms, including
getting out the excavated material, refilling after laying pipe/ foundation and
disposal of surplus excavated material at a lead upto 50m suitable site as per
direction of Engineer for following depths, below natural ground / Road top
level.

STC Consortium

In all types soils such as moorum, sand, sandy silt, clay, black cotton soil,
kankar, soil mixed with boulders etc.

i
ii
iii
iv
v
v
B
i
ii
iii
iv
v
v
C
i
ii
iii
iv
v
v

upto 1.5 m deep


>1.5m and upto3.0m deep
>3.0m and upto 4.5m deep
>4.5m and upto6.0m deep
>6.0m and upto7.5m deep
>7.5m and upto9.0m deep
Ordinary Rock
upto 1.5 m deep
>1.5m and upto 3.0m deep
>3.0m and upto4.5m deep
>4.5m and upto6.0m deep
>6.0m and upto7.5m deep
>7.5m and upto9.0m deep
In hard rock ( Blasting Prohibited)
upto 1.5 m deep
>1.5m and upto 3.0m deep
>3.0m and upto4.5m deep
>4.5m and upto6.0m deep
>6.0m and upto7.5m deep
>7.5m and upto9.0m deep

81
96
106
123
145
173

7122573
891456
188256
33456
3335
519

11710
27857
12428
814
35
10.00

597
689
793
899
1099
1218

6990870
19193473
9855404
731786
38465
12180

10275.00
9286.00
3551.00
1627.00
184.00
13.00

1928
2297
2697
3336
3925
4994

19810200
21329942
9577047
5427672
722200
64922

Cum
Cum
Cum
Cum
Cum
Cum

87933.00
9286.00
1776.00
272.00
23.00
3.00

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum

Page 94 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Close timbering - Providing and fixing CLOSE timbering in foundation,


manholes, wells, trenches etc at all depth including strutting, shoring and
packing cavities (wherever required) complete. (Measurements to be taken of
the face area timbered).

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

STC Consortium

Final Amount

147
Sq.m.

4662.00

Extra for planking, strutting and packing material for cavities IN CLOSE
TIMBERING if required to be left permanently in position (face area of
timber permanently left to be measured)
Sq.m

234

Providing and fixing OPEN timbering in foundation, manholes, wells,


trenches etc at all depth including strutting, shoring and packing cavities
(wherever required) complete.
Sq.m

5130

685314

928
217152

79
405270

Page 95 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

Extra for planking, strutting and packing material for cavities IN OPEN
TIMBERING if required to be left permanently in position (face area of
timber permanently left to be measured)
Sq.m
Carriage of Materials by mechanical transport including loading, unloading
and stacking : Earth with 3 Km lead

Final Amount

411
234

Cum

14162.00

Cum
Cum

2349.00
4698.00

96174

94

1331228

DISMANTLING AND REINSTATEMENT OF ROAD WORKS


9
Dismantling of flexible pavements and disposal of dismantled materials up to
a lead of 50 metres, stacking serviceable and unserviceable materials
separately as directed by Engineer.
i
ii

Bituminous courses
Granular courses

10

Dismantling of cement concrete pavement by mechanical means using


pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and
stock piling at designated locations and disposal of dismantled materials up to
a lead of 1000 metres, stacking serviceable and unserviceable materials
separately as per MoRT&H specification clause 202.

1242621
1766448

881
Cum

STC Consortium

529
376

3131.00

2758411

Page 96 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

11

Dismantling of existing structures like culverts, bridges, retaining walls and


other structure comprising of masonry, cement concrete, wood work, steel
work, including T&P and scaffolding wherever necessary, sorting the
dismantled material, disposal of unserviceable material and stacking the
serviceable material with all lifts and lead of 50 metres as directed by
Engineer.

A
B

Dismantling Brick / Tile Work in Cement Mortar


Dismantling Stoen Masonary, Rubble Stone Masonary in Cement Mortar

C
12

Stone Pitching / Dry Stone Spells


Brick Work with FPS brock of Class Designation 75 in superstructure above
plinth level upto 2 storeys in all shapes and sizes in cement mortar 1:4
(1Cement 4 sand)

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

13

Cum
Cum

40.00

Cum
Cum

10.00
619.00

Cum

40.00

Providing and laying rolled cement concrete mix of M-10 base course with
coarse and fine aggregate conforming to IS:383, the size of coarse aggregate
not exceeding 25 mm with minimum aggregate cement ratio 15:1 and
minimum cement content of 200 kg/cum, aggregate gradation to be as per
table 600-4 after blending, mixing in batching plant at optimum moisture
content, transporting to site, laying with a paver with electronic sensor,
compacting with 8-10 tonnes smooth wheeled vibratory roller to achieve the
designed flexural strength, finishing and curing complete as per clause 603,
112 of MoRT&H specification including all material, labour, machinery,
lighting, guarding and maintenance of diversion.

STC Consortium

Random rubble masonry work in cement mortar with mechanical mixer in


substructure/ super structure at all levels complete as per clause 1400 and
2200 of MoRT&H specification including all material, labour, scaffolding etc
but excluding pointing and plastering. In cement mortar 1:4 (1 cement : 4
coarse sand)

23520
2940
218507

3175
127000

2095

Cum
14

588
294
353

Final Amount

1984.00

4156480

2758
Cum

20.0

55160

Page 97 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

15

Plastering with cement mortar (1:3) on Brick/stone work in substructure/ super


structure at any height complete as per clause 1312 of MoRT&H specification
including all material, labour, scaffolding etc. 20 mm plaster on stone work

123
Sqm.

16

175.0

Providing, laying, spreading (with paver finisher only) and compacting wet
mix macadam (WMM) base course comprising of graded stone aggregate and
granular material conforming to MORT&H specifications (Table 400-II) in
layers of equal compacted thickness each consolidated, including pre-mixing
the material with water at OMC in mechanical mixer (Pug Mill), carriage of
mixed material by tippers to site, laying in uniform layers in base course on a
well prepared sub-base/ base course and compacting with power vibratoryroller to achieve the desired density complete as per MoRT&H specification
clause - 406 including all material, labour, machinery, lighting, guarding and
maintenance of diversion.

21525

1410

Cum

STC Consortium

Final Amount

4698.00

6624180

Page 98 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

17

18

19

20

STC Consortium

Providing and applying primer coat over prepared surface of granular base
with bitumern emulsion as per IS:8887 and approved quality @.0.6 kg/sqm
with the help of spray set fitted on bitumen container (boiler) after cleaning
the surface including removing of binding material and other foreign matter
with wire brushes and small picks, sweeping with brooms or soft brushes and
finally dusting with old gunny bags and compressed air to receive bituminous
treatment complete as per clause 502 of MoRTH specification including all
material, labour, machinary, lighting, guarding.

Final Amount

31

Sqm.

31320

Extra for additional bitumen, emulsion, used in above item for every 1 kg / 10
sq m
Sq m.

31320

Providing and applying tack coat over prepared surface with bitumern
emulsion as per IS:8887 and approved quality @0.2 kg/sqm with the help of
spray set fitted on bitumen container (boiler) after cleaning the surface with
brooms or soft brushes and finally dusting with old gunny bags and
compressed air to receive bituminous treatment complete as per clause 502 of
MoRTH specification including all material, labour, machinary, lighting,
guarding.
Sqm.
Extra for additional bitumen, emulsion, used in above item for every 1 kg / 10
sq m
Sq m.

970920

11

344520

31320
31320

281880

11

344520

Page 99 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

21

Providing and laying open graded premix carpet 20 mm thick( compacted) on


prepared surface in a single course as wearing course, composed of specified
graded crushed stone aggregate as per Table 500-23, premixed with
bituminous binder @14.60 Kg/10 SqM ( including cost of anti stripping
compound where ever required), including loading of material with FE loader,
hot mixing of stone aggregate and bitumen in computerised hot mix plant,
transporting the mixed material by tippers to paver and laying with paver
finisher fitted with electronic sensor control to the required level and grade,
compacting smooth wheeled roller 8-10 tonne capacity and finishing to
required level to achieve the desired density as per clause 511 of MoRTH
specification including all material, labour, machinary, lighting, guarding but
excluding the cost of tack coat/ seal coat. ( With bitumen of grade 60/ 70)

111

Sqm.
22

31320

Providing and applying premixed seal coat Type "B" comprising of thin
application of fine aggregate 0.06 CuM/ 10 SqM premix with bitumen binder
@ 6.8 Kg/10 SqM ( including cost of anti stripping compund wherever
required) laying with paver finisher with electronic sensor control and rolling
with power roller 8-10 tonne complete as per clause 513 of MoRTH
specification including all material, labour, machinary, lighting, guarding.
( With bitumen of grade 60/ 70)

3476520

48

Sqm.

STC Consortium

Final Amount

31320

1503360

Page 100 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

23

Providing and laying un-reinforced, dowel jointed, plain cement concrete of


pavement over a prepared sub base with 43 grade cement @ 400 kg per cum,
coarse and fine aggregate conforming to IS: 383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per
approved mix design, transported to site, laid with a fixed form or slip form
paver, spread, compacted and finished in a continuous operation including
provision of contraction, expansion, construction and longitudinal joints, joint
filler, separation membrane, sealant primer, joint sealant, debonding strip,
dowel bar, tie rod, admixtures as approved, curing compound, finishing to
lines and grades as per drawing complete as per clause 602, 112 of MoRT&H
specification including all material, labour, machinery, lighting, guarding and
maintenance of diversion..
PCC M-30 Grade

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

Final Amount

4957

cum

2052.00

10171764

PIPE LINE AND ALLIED WORKS


24
Providing at site, lowering & laying in trenches, aligning & jointing of RCC
pipes NP4 (with s/s ends) as per IS: 458 - 2003 (amended up to date) at all
depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382
(including cost of Rubber gaskets, lubricants) as per drawing, sectional testing
of the sewer pipe line (including cost and conveyance of water to site) etc.,
complete as per specification and / or as directed by Engineer.

STC Consortium

Page 101 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

i
ii
iii
iv
v
vi
vii
viii
ix
x
xi

200 mm internal diameter RCC pipe


250 mm internal diameter RCC pipe
300 mm internal diameter RCC pipe
350 mm internal diameter RCC pipe
400 mm internal diameter RCC pipe
450 mm internal diameter RCC pipe
500 mm internal diameter RCC pipe
600 mm internal diameter RCC pipe
700 mm internal diameter RCC pipe
900 mm internal diameter RCC pipe
1000 mm internal diameter RCC pipe

RM
RM
RM
RM
RM
RM
RM
RM
RM
RM
RM

18882.00
1424.00
737.00
632.00
1352.00
857.00
1101.00
316.00
1369.00
1817.00
2597.00

522
709
1343
2089
2388
2686
3134
3731
4602
5852
6598

Final Amount
9856404
1009616
989791
1320248
3228576
2301902
3450534
1178996
6300138
10633084
17135006

BEDDING AND ALLIED WORKS


25
Providing granular bedding having width = outer dia of pipe (Bc) + 500mm,
thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching
= 0.5Bc, with graded hard crusher broken stone of 100% passing through
20mm sheive, 20 to 50 % passing through 10mm sheive and 100 % retain on
6.3mm sheive, laying in layers of thickness 10/15cm including ramming,
consolidation etc complete for RCC pipes of following sizes as per drawing
and or as directed by Engineer. (Type A)

STC Consortium

Page 102 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

STC Consortium

i
ii
iii
v
vi
vii
ix
xii

200 mm internal diameter RCC pipe


250 mm internal diameter RCC pipe
300 mm internal diameter RCC pipe
400 mm internal diameter RCC pipe
450 mm internal diameter RCC pipe
500 mm internal diameter RCC pipe
700 mm internal diameter RCC pipe
1000 mm internal diameter RCC pipe

26

Providing and laying plain cement concrete M15 grade (using mechanical
concrete mixer) using 20mm graded hard crusher broken stone aggregate,
laying in layers of not more than 15cm thick, for bedding having width = outer
dia of pipe (Bc) + 200mm or 1.25Bc (whichever is higher), thickness below
pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.25Bc, for
RCC pipes of following sizes, including compaction, curing, formwork, etc
complete as per drawing and/ or as directed by Engineer. (Type B)

ii
iii
iv
v
vi
vii
viii
ix
xi
xii

250 mm internal diameter RCC pipe


300 mm internal diameter RCC pipe
350 mm internal diameter RCC pipe
400 mm internal diameter RCC pipe
450 mm internal diameter RCC pipe
500 mm internal diameter RCC pipe
600 mm internal diameter RCC pipe
700 mm internal diameter RCC pipe
900 mm internal diameter RCC pipe
1000 mm internal diameter RCC pipe

RM
RM
RM
RM
RM
RM
RM
RM

18882.00
43.00
12.00
436.00
292.00
493.00
168.00
447.00

99
117
136
178
210
243
398
693

RM
RM
RM
RM
RM
RM
RM
RM
RM
RM

1381.00
725.00
592.00
917.00
565.00
608.00
316.00
1201.00
1817.00
2151.00

218
250
284
318
382
451
607
1137
1480
1831

Final Amount
1869318
5031
1632
77608
61320
119799
66864
309771

301058
181250
168128
291606
215830
274208
191812
1365537
2689160
3938481

Page 103 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

Final Amount

MANHOLES AND ANCILLARY WORKS


A
Brick masonry manholes
27
Providing and constructing of sewer brick masonry circular manholes of
"Type-A" with internal dia 0.90m and depth upto 1.65m having 230mm thick
sewer brick masonry wall in cement sand mortar 1:4, including concreting
PCC M-10 grade (1:4:8) for 225mm thick foundation including curing
compaction and form work etc complete, PCC M15 for benching and channel
portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC
M20 for fixing the manhole frame and cover using stone aggregate 20mm
nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside
plaster finished with floating coat of neat cement, vata in CM1:1 around pipe
entering and leaving the manhole and also at the junction of masonry and
concrete slab, providing and fixing of SFRC foot steps of approved make at
every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC
manhole frame and cover as per IS 12592 (Part I and II) having clear opening
of 560mm, including refilling of Jhiri, including curing, watering, ramming,
hydro testing of manhole, conveyance & cost of water, and dewatering
complete as directed by the Engineer.

i
ii
iii
iv

STC Consortium

Note-Only Excavation work will be measured and paid separately.


Type-A as per drawing
Manhole "Type-A" of depth 0.90 m
>0.90 mtr. & up to 1.20 mtr. Deep
>1.20 mtr. & up to 1.50 mtr. Deep
>1.50 mtr. & up to 1.65 mtr. Deep

No.
No.
No.
No.

1
30
69
61

7174
8104
8890
10343

7174
243120
613410
630923

Page 104 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

28

Providing and constructing of sewer brick masonry circular manholes of


"Type-B" with internal dia 1.20m and depth upto 2.50m having sewer brick
masonry wall 230mm thick upto 1.5m, 345mm thick from 1.50m to 2.50m in
cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for
225mm thick foundation including curing compaction and form work etc
complete, PCC M15 for benching and channel portion, RCC M20 for 200mm
thick cover slab including reinforcement, PCC M20 for fixing the manhole
frame and cover using stone aggregate 20mm nominal size, 20mm thick inside
and outside plaster in C. M. 1:3, inside plaster finished with floating coat of
neat cement, vata in CM1:1 around pipe entering and leaving the manhole and
also at the junction of masonry and concrete slab, providing and fixing of
SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3,
supplying and fixing heavy duty SFRC manhole frame and cover as per IS
12592 (Part I and II) having clear opening of 560mm, including refilling of
Jhiri, including curing, watering, ramming, hydro testing of manhole,
conveyance & cost of water, and dewatering complete as directed
by the Engineer.

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

Final Amount

Note-Only Excavation work will be measured and paid separately.

STC Consortium

Page 105 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

i
ii
iii
iv
29

i
ii
iii
iv
iv
v

STC Consortium

Type-B as per drawing


Manhole "Type-B" of depth 1.70 m
>1.70 mtr. & up to 2.00 mtr. Deep
>2.00 mtr. & up to 2.30 mtr. Deep
>2.30 mtr. & up to 2.50 mtr. Deep

Final Amount

No
No
No
No

9
52
45
24

14951
16224
17498
19266

134559
843648
787410
462384

No
No
No
No
No
No

9
36
30
16
8
8

25998
28366
31327
34287
37247
40208

233982
1021176
939810
548592
297976
321664

Providing and constructing of sewer brick masonry circular manholes of


"Type-C" with internal dia 1.50m and depth upto 5.0m having sewer brick
masonry wall 230mm thick upto 1.5m, 345mm thick from 1.50m to 2.50m and
460mm from 2.50 to 5.0m in cement sand mortar 1:4, including concreting
PCC M-10 grade (1:4:8) for 225mm thick foundation including curing
compaction and form work etc complete, PCC M15 for benching and channel
portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC
M20 for fixing the manhole frame and cover using stone aggregate 20mm
nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside
plaster finished with floating coat of neat cement, vata in CM1:1 around pipe
entering and leaving the manhole and also at the junction of masonry and
concrete slab, providing and fixing of SFRC foot steps of approved make at
every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC
manhole frame and cover as per IS 12592 (Part I and II) having clear opening
of 560mm, including refilling of Jhiri, including curing, watering, ramming,
hydro testing of manhole, conveyance & cost of water,
and dewatering complete as directed by the Engineer.

Note-Only Excavation work will be measured and paid separately.


Type-C as per drawing
Manhole "Type-C" of depth 2.60 m
>2.60m and upto 3.0m deep
>3.0m and upto 3.5m deep
>3.5m and upto 4.0m deep
>4.0m and upto 4.5m deep
>4.5m and upto 5.0m deep

Page 106 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

30

Providing and constructing of sewer brick masonry circular manholes of


"Type-D" with internal dia 1.50m and depth upto 9.0m having sewer brick
masonry wall 230mm thick upto 1.5m, 345mm thick from 1.50m to 2.50m,
460mm from 2.50 to 5.0m and 575mm from 5.0 to 9.0m in cement sand mortar
1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick
foundation including curing compaction and form work etc complete, PCC
M15 for benching and channel portion, RCC M20 for 200mm thick cover slab
including reinforcement, PCC M20 for fixing the manhole frame and cover
using stone aggregate 20mm nominal size, 20mm thick inside and outside
plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement,
vata in CM1:1 around pipe entering and leaving the manhole and also at the
junction of masonry and concrete slab, providing and fixing of SFRC foot
steps of approved make at every 0.30m height fixed in CM 1:3, supplying and
fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and
II) having clear opening of 560mm, including refilling of Jhiri, including
curing, watering, ramming, hydro testing of manhole,
conveyance & cost of water, and dewatering complete as directed by
the Engineer.

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

Note-Only Excavation work will be measured and paid separately.


Manhole "Type-D" of depth 5.10m
>5.10m and upto 5.5m deep
>5.5m and upto 6.0m deep

STC Consortium

No
No
No

1
4
1

49416
52355
56028

Final Amount

49416
209420
56028

Page 107 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

Final Amount

31 Providing and constructing of RR stone masonry circular manholes of "Type-

A" with internal dia 0.90m and depth upto 1.65m having 300mm thick RR
stone masonry wall in cement sand mortar 1:4, including concreting PCC M10 grade (1:4:8) for 225mm thick foundation including curing compaction and
form work etc complete, PCC M15 for benching and channel portion, RCC
M20 for 200mm thick cover slab including reinforcement, PCC M20 for
fixing the manhole frame and cover using stone aggregate 20mm nominal size,
20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished
with floating coat of neat cement, vata in CM1:1 around pipe entering and
leaving the manhole and also at the junction of masonry and concrete slab,
providing and fixing of SFRC foot steps of approved make at every 0.30m
height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame
and cover as per IS 12592 (Part I and II) having clear opening of 560mm,
including refilling of Jhiri, including curing, watering, ramming, hydro testing
of manhole, conveyance & cost of water, and dewatering complete as directed
by the Engineer.

Note-Only Excavation work will be measured and paid separately.


Type-A as per drawing
Manhole "Type-A" of depth 0.90 m

STC Consortium

No.

7005

7005

Page 108 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

>0.90 mtr. & up to 1.20 mtr. Deep


>1.20 mtr. & up to 1.50 mtr. Deep
>1.50 mtr. & up to 1.65 mtr. Deep
32

i
ii
iii
iv

STC Consortium

No.
No.
No.

69
61

7821
8513
9860

No
No
No
No

9
52
45
24

14291
15406
16522
18184

30

Final Amount
234630
587397
601460

Providing and constructing of RR stone masonry circular manholes of "TypeB" with internal dia 1.20m and depth upto 2.50m having RR stone masonry
wall 300mm thick upto 1.5m, 350mm thick from 1.50m to 2.50m in cement
sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm
thick foundation including curing compaction and form work etc complete,
PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover
slab including reinforcement, PCC M20 for fixing the manhole frame and
cover using stone aggregate 20mm nominal size, 20mm thick inside and
outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat
cement, vata in CM1:1 around pipe entering and leaving the manhole and also
at the junction of masonry and concrete slab, providing and fixing of SFRC
foot steps of approved make at every 0.30m height fixed in CM 1:3, supplying
and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I
and II) having clear opening of 560mm, including refilling of Jhiri, including
curing, watering, ramming, hydro testing of manhole, conveyance & cost of
water, and dewatering complete as directed by the Engineer

.Note-Only Excavation work will be measured and paid separately.


Type-B as per drawing
Manhole "Type-B" of depth 1.70 m
>1.70 mtr. & up to 2.00 mtr. Deep
>2.00 mtr. & up to 2.30 mtr. Deep
>2.30 mtr. & up to 2.50 mtr. Deep

128619
801112
743490
436416

Page 109 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

33

Providing and constructing of RR stone masonry circular manholes of "TypeC" with internal dia 1.50m and depth upto 5.0m having RR stone masonry
wall 300mm thick upto 1.5m, 350mm thick from 1.50m to 2.50m and 450mm
from 2.50 to 5.0m in cement sand mortar 1:4, including concreting PCC M-10
grade (1:4:8) for 225mm thick foundation including curing compaction and
form work etc complete, PCC M15 for benching and channel portion, RCC
M20 for 200mm thick cover slab including reinforcement, PCC M20 for
fixing the manhole frame and cover using stone aggregate 20mm nominal size,
20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished
with floating coat of neat cement, vata in CM1:1 around pipe entering and
leaving the manhole and also at the junction of masonry and concrete slab,
providing and fixing of SFRC foot steps of approved make at every 0.30m
height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame
and cover as per IS 12592 (Part I and II) having clear opening of 560mm,
including refilling of Jhiri, including curing, watering, ramming, hydro testing
of manhole, conveyance & cost of water,
and dewatering complete as directed by the Engineer.

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

i
ii
iii
iv
iv
v

STC Consortium

Note-Only Excavation work will be measured and paid separately


Type-C as per drawing
Manhole "Type-C" of depth 2.60 m
>2.60m and upto 3.0m deep
>3.0m and upto 3.5m deep
>3.5m and upto 4.0m deep
>4.0m and upto 4.5m deep
>4.5m and upto 5.0m deep

No
No
No
No
No
No

9
36
30
16
8
8

24391
26460
29046
31633
34220
36806

Final Amount

219519
952560
871380
506128
273760
294448

Page 110 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

34

Providing and constructing of RR stone masonry circular manholes of "TypeD" with internal dia 1.50m and depth upto 9.0m having RR stone masonry
wall 300mm thick upto 1.5m, 350mm thick from 1.50m to 2.50m, 450mm
from 2.50 to 5.0m and 600mm from 5.0 to 9.0m in cement sand mortar 1:4,
including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation
including curing compaction and form work etc complete, PCC M15 for
benching and channel portion, RCC M20 for 200mm thick cover slab
including reinforcement, PCC M20 for fixing the manhole frame and cover
using stone aggregate 20mm nominal size, 20mm thick inside and outside
plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement,
vata in CM1:1 around pipe entering and leaving the manhole and also at the
junction of masonry and concrete slab, providing and fixing of SFRC foot
steps of approved make at every 0.30m height fixed in CM 1:3, supplying and
fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and
II) having clear opening of 560mm, including refilling of Jhiri, including
curing, watering, ramming, hydro testing of manhole, conveyance & cost
of water, and dewatering complete as directed by the Engineer.

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

Note-Only Excavation work will be measured and paid separately


Manhole "Type-D" of depth 5.10m
>5.10m and upto 5.5m deep
>5.5m and upto 6.0m deep

STC Consortium

35

Providing and constructing of RCC M-20 grade cast-in-situ circular manholes


of "Type-E" with internal dia 1.40m and depth upto 3.50m having 150 mm
thick RCC M-20 wall, including 350 mm thick RCC M-20 grade base slab
(foundation), PCC M15 for benching and channel portion, RCC M20 for
200mm thick cover slab, PCC M20 250mm thick for fixing the manhole frame
and cover, vata in CM1:1 around pipe entering and leaving the manhole,
providing and fixing of SFRC foot steps of approved make at every 0.30m
height, supplying and fixing heavy duty SFRC manhole frame and cover as per
IS 12592 (Part I and II) having clear opening of 560mm, including form work,
reinforcement, curing, watering, hydro testing of manhole, conveyance & cost
of water, dewatering etc. complete as directed by the Engineer.
Note-Only Excavation work will be measured and paid separately.

iv

for depth > 2.5 m and upto 3.0 m

Final Amount

No
No
No

1
4
1

45069
47634
50840

45069
190536
50840

Nos.

25966

129830

Page 111 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

STC Consortium

for depth > 3.0 m and upto 3.5 m

Nos.

14

27361

Final Amount
383054

Page 112 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

STC Consortium

Final Amount

Page 113 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

36

Providing and constructing of RCC M-20 grade cast-in-situ circular manholes


of "Type-E" with internal dia 1.75m and depth upto 3.50m having 150 mm
thick RCC M-20 wall, including 350 mm thick RCC M-20 grade base slab
(foundation), PCC M15 for benching and channel portion, RCC M20 for
200mm thick cover slab, PCC M20 250mm thick for fixing the manhole frame
and cover, vata in CM1:1 around pipe entering and leaving the manhole,
providing and fixing of SFRC foot steps of approved make at every 0.30m
height, supplying and fixing heavy duty SFRC manhole frame and cover as per
IS 12592 (Part I and II) having clear opening of 560mm, including form work,
reinforcement, curing, watering, hydro testing of manhole, conveyance & cost
of water, dewatering etc. complete as directed by the Engineer.
Note-Only Excavation work will be measured and paid separately.

for depth > 3.0 m and upto 3.5 m

37

Providing and constructing of RCC M-20 grade cast-in-situ circular manholes


of "Type-F" with internal dia 1.4m and depth upto 8.0m (2.0 in conical
shape) having 150 mm thick RCC M-20 wall, including 350 mm thick RCC
M-20 grade base slab (foundation), PCC M15 for benching and channel
portion, PCC M20 250mm thick for fixing the manhole frame and cover, vata
in CM1:1 around pipe entering and leaving the manhole, providing and fixing
of SFRC foot steps of approved make at every 0.30m height, supplying and
fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and
II) having clear opening of 560mm, including form work, reinforcement,
curing, watering, hydro testing of manhole, conveyance & cost of water,
dewatering etc. complete as directed by the Engineer.
Note-Only Excavation work will be measured and paid separately.

i
ii
iii
iv
v

>3.6m and upto 4.0m deep


>4.0m and upto 4.5m deep
>4.5m and upto 5.0m deep
>5.0m and upto 5.5m deep
>5.5m and upto 6.0m deep

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

STC Consortium

Final Amount

Nos.

16

36780

588480

Nos.
Nos.
Nos.
Nos.
Nos.

12
9
1
4
1

30795
32191
33586
34981
36376

369540
289719
33586
139924
36376

Page 114 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

38

Providing and constructing of RCC M-20 grade cast-in-situ circular manholes


of "Type-F" with internal dia 1.75m and depth upto 8.0m (2.0 in conical
shape) having 150 mm thick RCC M-20 wall, including 350 mm thick RCC
M-20 grade base slab (foundation), PCC M15 for benching and channel
portion, PCC M20 250mm thick for fixing the manhole frame and cover, vata
in CM1:1 around pipe entering and leaving the manhole, providing and fixing
of SFRC foot steps of approved make at every 0.30m height, supplying and
fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and
II) having clear opening of 560mm, including form work, reinforcement,
curing, watering, hydro testing of manhole, conveyance & cost of water,
dewatering etc. complete as directed by the Engineer.
Note-Only Excavation work will be measured and paid separately.

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

STC Consortium

Final Amount

Page 115 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

i
ii
iii
iv
v

Manhole of depth 3.6m as per drawing and direction of Engineer.


>3.6m and upto 4.0m deep
>4.0m and upto 4.5m deep
>4.5m and upto 5.0m deep
>5.0m and upto 5.5m deep

Nos.
Nos.
Nos.
Nos.
Nos.

3
23
7
3
2

RM
RM

17000
1700

37117
38465
40150
41834
43519

Final Amount
111351
884695
281050
125502
87038

Miscellaneous Works
39
Providing at site, lowering & laying in trenches, aligning & jointing of uPVC
pipes of class III (6 kg/ cm2) as per IS: 4985 and as per specification with
rubber ring with socket and spigot joint, (EPDM/SBR) for all depths including
well graded granular bedding (Type-E) for pipe length as per drawing and
specification including hydraulic field testing and commissioning etc complete
as directed by Engineer.

STC Consortium

ii
i

110 mm Dia (OD)


160 mm Dia (OD)

40

Construction of road side inspection chamber of "Type-A" with internal dia


450mm and depth of 900mm with 200 mm thick PCC M10 in foundation,
75mm thick PCC M15 flooring in slop, 230mm thick brick masonry/ RR stone
masonry in CM (1:4), 20mm thick inside and outside plastering with CM
(1:3), inside plaster finished with neat coat of cement, with 560mm dia SFRC
MD manhole frame and cover embedded in 200mm thick PCC M20 grade
concrete, refilling of Jhiri with watering and ramming including fixing 2 Nos.
110 OD uPVC pipe pieces and plugging the same etc complete as per
approved drawing and/or directed by Engineer. Note :Only Excavation work
will be measured and paid separately

264
377

4488000
640900

Page 116 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

i
ii

With brick masonry wall 230mm thick


With RR stone masonry wall 300mm thick

41

Construction of chamber for interceptor of size 1130 mm x 450 mm (in to in)


and depth of 900 mm with 200 mm thick PCC M10 foundation, 75 mm thick
PCC M15 flooring in slope, 230mm thick brick masonry in CM (1:4) and
providing MS grating of 20mm opening , 20 mm thick inside and outside
plastering with CM (1:4), inside plaster finished with neat coat of cement,
with 560mm dia pre cast RCC manhole frame and cover (HD 20) embedded in
15 0mm thick RCC M20 grade concrete, refilling of Jhiri with watering and
ramming including fixing 2 Nos. 110/160 mm OD uPVC pipe pieces and
plugging the same etc complete as per approved drawing and/or directed by
Engineer. Note :Only Excavation work will be measured and paid separately

42

43

Empting of septic tank/ soakage well etc, disposing of sludge within a lead of
5km and taking out sewage including refilling with local earth, ramming and
compaction in layers, cleaning of site.

Nos.
Nos.

5653
6104

Final Amount
2261200
2441600

5653

Nos.

60

Nos.

120

339180

2350

Providing, fixing and erecting precast RCC (M20) Vent shaft with cowl,
125mm and 225mm internal and external dia respectively at top, 300mm and
450mm internal and external dia at bottom and 9.0m over all length, bottom
1.175m below ground level fixed in the pit 900mmx900mmx1500mm with
PCC M15, 250mm in bed and minimum 200mm all around with top 150mm in
PCC M15 with 20mm nominal size graded stone aggregate , junction of vent
shaft and concrete grouted with cement mortar 1: including making connection
with sewer manhole with 150mm dia NP4 RCC pipe (IS 458-ammended upto
date) as required including Type-A bedding complete as per standard design
and finished with water proofing cement of approved brand as per drawings
and/or as directed by Engineer. Note : Only Excavation work will be measured
and paid separately

282000

32371

No

STC Consortium

400
400

25

809275

Page 117 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

44

Providing uPVC (class-III) drop connection externally upto following depths


drop from branch sewer line to main sewer manhole or vise versa including
inspection and cleaning eye, uPVC drop pipe and bend encased alround with
cement concrete M15 (1:2:4) with all form work required, cutting holes in
walls and making good with brick/ stone masonry work in cement sand mortar
1:4 plastered with cement sand mortar 1:3, with stiff cement mortar 1:1 around
uPVC pipe in masonary wall, making required channels complete as per
standard design and specifications and/ or as directed by Engineer : (Drop pipe
shall be of 315mm OD uPVC pipe)

i
ii
iii
iv

200 mm dia RCC pipe upto 1.5m drop


200 mm dia RCC pipe upto 2.5m drop
200 mm dia RCC pipe upto 3.0m drop
200 mm dia RCC pipe upto 3.5m drop

45

Providing DI (K7) drop connection externally upto following depths drop


from branch sewer line to main sewer manhole or vise versa including
inspection and cleaning eye, DI (K7) drop pipe and bend encased alround with
cement concrete M15 (1:2:4) with all form work required, cutting holes in
walls and making good with brick/ stone masonry work in cement sand mortar
1:4 plastered with cement sand mortar 1:3, with stiff cement mortar 1:1 around
CI pipe in masonary wall, making required channels complete as per standard
design and specifications and/ or as directed by Engineer :

i
iii

300 mm dia RCC pipe upto 1.5m drop (drop pipe of 400mm dia DI K7)
350 mm dia RCC pipe upto 2.0m drop (drop pipe of 450mm dia DI K7)

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

STC Consortium

Final Amount

Nos.
Nos.
Nos.
Nos.

2
2
1
1

5371
6681
7093
7755

10742
13362
7093
7755

Nos.
Nos.

1
1

25353
33166

25353
33166

Page 118 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

Final Amount

46
Providing, Arranging, Managing, Maintaining 500 Sqft well furnished Office
with three tables, 10 chairs, two steel almirah, one computer with printer and
operator, sufficient number of display etc including well equipped Laboratory
(As per details given in the clause 85 & 86 of Section VIII of Part A : Particular
conditions of contract) to the satisfaction of the Engineer - in charge including
electrical, water expenses etc. complete. For execution of this item the date of
start shall be considered only when the contractor has actually
rented/constructed the required premises established the office & Lab as peer
requirement.This item shall remain valid only for 30 months maximum; no
additional payment shall be made for whatsoever reason even if execution
time if porovided or date3 of completion is extended. This office, Laboratory
including furniture and all other equipment shall be property of contractor after Per
Month
completion of the project.

47

STC Consortium

42300

30

1269000

Thrust boring for pipe laying under NH road crossing and Canal
Crossings.
Providing, lowering in trenches, laying and jointing RCC NP4 2000mm dia
pipe as per NH standards with cement mortar joints by hydraulic jacking and
smooth controlled pushing method under running traffic condition as per NH
Standards, including carrying out survey work at the job site for determining
underground cable trenches like telephone, power cable, water & sanitary lines
and resistivity tests for finding the soil strata using necessary equipments for
completion of work, mobilizing of machineries and specialized crew at the job
site, etc. complete in all respects, including driving in all types of soils & all
types of rock, including excavation of Drive pit and Exit pit with proper
protection at the three sides with shoring sheets & ISMB's, Providing and
casting MS cutting edges for front shield and constructing thrust bed at
designed level as directed by the Engineer, necessary de-watering and
providing concrete foundations at the base of the Drive pit, crane for handling
of pipes, and any other machinery, tool & tackels required, construction of
temporary works as per requirement

Page 119 of 157

RUSDIP-RUIDP Phase II - Package 3

Cost Estimate for sewerlines

missioning of Sanitary Sewers along with construction of manholes, providing property connections and restoration of roads in Bundi Town
Sl. No.

Description of Item

Unit

Quantity
6

Final Rate Rate in Words

(Rupees . . . Only)

and as approved by NH authorities and the Engineer, excluding the cost of


laying and jointing of RCC pipes of following diameter (Sewer lines) in M20
concrete saddles/beds for resting the RCC pipes inside the 2000mm dia RCC
NP4 pipe, and finally clearing of pipes with water jetting and removal of
surplus earth, closing both sides of 2000mm dia RCC NP4 pipe with brick
stone masonry in CM 1:6 230m thick with 150mm thick PCC foundation M15
grade and finishing with 18 mm thick cement plaster in single coat on outer
face and edges with CM 1:3 to prevent entry of water including all plant
machinery, equipments, labour, materials, giving satisfactory hydraulic field
testing as per IS: 12288-1987 and Commissioning, etc., complete in every
respect for crossing the National Highway and irrigation canal for 1000mm
diameter of sewer line, in all kinds of soils at necessary depth (all depths) with
all lead and lifts, as per drawing and as per specifications and as directed by
the Engineer.

141000

Rmt
TOTAL
Total Amount in Million Rs.

STC Consortium

Final Amount

90

12690000
.
252,474,510.00

Page 120 of 157

Sewer Lines
STP and SPS
O&M
TOTAL INPUT PRICE

Works contract tax


Service Tax on works contract
Labour cess
Dept Expenses
HO Overhead
Site Overhead
JV Expenses
Design Expenses
Risks and Contigencies
Storage
Insurance
Finance Expenses
Pat
6.6 Margin

Total
Factor to be loaded to Input Price

214,928,802.44
57,961,637.80
272,890,440.24

4.12
0
0
2
0.1
0
1.5
0.1
1
0
1.1
0.0
10

19.92
1.2487512488

Price with factor added

340,772,278.02

Dept Estimate

238,700,000.00

% over Estimate
Say

18%

0.5122930814
51.23%

Part A: Sewer Lines


Part B1:SPS & STP
PART B2: CIVIL FOR STP
PART B3:ELECTRICAL FOR ST
PART B4: SUPPLY OF PARTS
PART C: O & M
PART D: PRIVISIONAL SUM

sewer
stp
O&M

268,392,610.44

74.35%

72,379,667.58

20.05%

0.0000%

Provisional

9,300,000.00

2.5763%

Site Overhead

9,330,000.00

2.5846%

Financial Expenses

1,582,080.50

0.4383%

TOTAL

360,984,358.52

SUMMARY
DEPT ESTIMATE ICOMM ESTIMATE Diff
Diff %
Part A: Sewer Lines
179,790,918
214,928,802
35,137,885
20%
Part B1:SPS & STP
9,783,860
17,920,877
8,137,017
83%
PART B2: CIVIL FOR STP
25,296,390
50,169,208
24,872,818
98%
PART B3:ELECTRICAL FOR ST
2,607,250
1,927,989
(679,260)
-26%
PART B4: SUPPLY OF PARTS
840,900
882,661
41,761
5%
PART C: O & M
1,800,000
(1,800,000)
-100%
PART D: PRIVISIONAL SUM
5,500,000
9,300,000
3,800,000
69%
225,619,317

47.74
23.87

295,129,537

Item
Quantity
Project Inc
Engineers
Supervisor
Helpers
Commercial
Store keep
Accountant
Vehicle
Office Rent
Stores
Security Of
Quantity /
Travel to n fro HO
Miscellaneous
Telephone

Rate
Monthly
Total
55000
55000
1,650,000.00
20000
40000
1,200,000.00
15000
30000
900,000.00
8000
16000
480,000.00
20000
20000
600,000.00
10000
10000
300,000.00
10000
20000
600,000.00
35000
35000
1,050,000.00
15000
15000
450,000.00
10000
10000
300,000.00
5000
10000
300,000.00
20000
20000
600,000.00
10000
300,000.00
15000
450,000.00
5
1000
5000
150,000.00
9,330,000.00
1
2
2
2
1
1
2
1
1
1
2
1

0.18
Commission
(3% Annual)

ITEM

Form

Bid
Security
2%

BG

4774000

238700

3580.50

Performa
nce
Security
10%
BG
Advance
10%
BG

24000000

1200000

18000.00

2400000
31174000

120000
1558700

1800.00
23380.50
1,582,080.50

TOTAL

Amount

Margin
Money
(5.0%)

PBG 0

Sl.N
o

Description of Item

Unit

58

Cleaning grass and removal of rubbish (maximum 150 mm) by manual means and disposal
at a lead of 50 metres as per MoRT & H specification clause 201

Ha

59

Earth work in excavation in foundation, trenches manholes, road side chambers etc,
including dressing of sides and ramming of bottoms, including getting out the excavated
material, refilling after laying pipe/foundation and disposal of surplus excavated material at a
lead upto 50m suitable site as per direction of Engineer for following depths, below natural
groud / Road top level

Total
Qty

Rate in Words
(Rupees. . . Only)

Rate (Rs)

100,000.00
-

Cum

118518

Depth upto 1.5m

85.00

60

Costruction of embankment with approved material obtained from borrow pit with all lifts and
leads, trasporting to side, spreading, grading to required slope and compacting by vibratory
roller 8-10 tonne o meet requirement of table 300-2 including cost of compensation for
earch taken from private land complete as per MoRT&H specification clause 305 (Lead
taken upto 5km)

61

Turfing slopes of new banks with rough grassing including prepation of ground by loosening
soil with kassi, flooding with water, rough dressing, fine dressing, supplying and spreading
farm yard manure at the rate of 18 cum per 100 Sqm and supplying and planting doob grass
roots at 15 cm apart, complete of new banks.

62

Providing and laying Pitching on slopes laid over prepared filter media including boulder
apron laid dry in front of toe of embakment complete as per drawing and Technical
specifications and as per clause 2504 of MoRT&H specification with R.R.Stone/ bolder,
weighing not less than 40 kg, thickness not less than 150mm, specific gravity not less than
2.65

63

Construction of subgrade and earthen shoulders with apporved material obtained from
borrow area with all lifts & leads. Transporting to site, spreading, grading to required slope
and compacted in layers not exceeding 200mm thickness at OMC,with vibratory roller of 80Cum
100 KN static weigh or more to attain a density 97% maximum dry density to meet
requirement of table No.300-2 as per MoRT&H specification clause 305. (Lead taken upto 5
km)

64

Costruction of Embankment with clay/Fly ash/Pond ash available from coal or lignite burning
Thermal Plants as waste material conforming to table 1 of IRC:SP:58-2001, spread and
compacted in layer of 200mm thickness each at OMC, all as specified in IRC:SP:58-2001
and as per approved plans

Cum

9664

184.00

Sqm

4488

182.00
-

Cum

1816

2,005.00

15213

187.00

65

Earth work in excavation in foundatio, trenches manholes, road side chambers etc, including
dressing of sides and ramming of bottoms, including getting out the excavated material,
refilling after laying pipe /foundation and disposal of surplus excavated material at a lead
upto 50m suitable site as per direction of Engineer for following depths, natural groud / Road
top level.

Cum

10845

126.00

Final Amount

700,000.00
-

10,074,030.00

1,778,176.00

816,816.00
-

3,641,080.00

2,844,831.00

1,366,470.00

In all types soils such as moorum, sand silt, lay, black cotton soil. Kankar. Soil mixed
with boulders etc.
65.1 upto 1.5m deep
Ordinary Rock
65.2 upto 1.5m deep
In hard rock (Blasing Prohibited)
65.3 upto 1.5m deep

66

Carriage of material by mechanical transport including loading, unloading and stacking.

Cum

184

Cum

29

Cum

Cum

73

upto 1 Km

67

Providing and injection Chloropyrious Emulsifiable concerntrate 20% with 1% concentration


for PRE-Constructional Anti termite treatment as per IS:6313 part III as amended from time
to time and creating a continous chemical barrier under and arround the column pits, wall
trenches, basement excavation, top surface of plinth filling, junction of wall and floor along
the external perimeter of building, expansion joints, over the top surface of consolidated
earth of which aproach is to be laid surroundings of pipes and conduits etc, eomplete as per
specification (Plinth floor area only shall be measured for payment.

68

Earch filling with available surplus soil excavated from foundations and taken only rom
outside of building plinth in layers not exceeding 20cm in depth, consolidating each
deposited layer including ramming and watering and consolidation will lead up to 50 m and
lift upto 1.5m.

Concrete works

69

Providing and laying in position cement concrete of specified grade excuding the cost of
centring and shuttering - All work upto plinth level:

85.00

15,640.00

701.00
2,243.00
-

20,329.00
15,701.00
-

123.00

8,979.00

Sq.m

135

88.00

Cum

147

64

1:2:4(1 cement : 2 coarse sand: 4 graded stone aggregate 20mm


nominal size)

70

Collecting, conveying, stacking filling the trenches with stone dust including watering and
compacting of layers of 15 cm thick, up to 50 m lead and lift etc., all complete as per
specifications and as directed by Engineer.

46.00
-

Cum

3,566.00

Cum

16

421.00
-

71

Providing and laying in position specified grade of reinforced cement concrete excluding the
cost of centring, shuttering, finishing and reinforcement-All work upto plinth level:
1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal s for
raft/foundations

Cum

10

4,929.00

11,880.00

6,762.00
-

228,224.00

6,736.00
-

49,290.00

72

Reinforced cement concrete work in walls (any thickness), including attached pilasters,
buttresses, plinth and string courses. Fillets, columns, pillars, piers, abutments, posts and
struts etc. upto two stories excluding cost of centring, shuttering, finishing and
reinforcemetn.

Cum

31

5,280.00

1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) (As per
desing mix)

73

Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 0
landings,balconies, shelves, chajjas, lintels, bands, plain window sills, staircase and spiral
stair cases upto two stories exclding the cost of centring,shuttering, finishing and
reinforcement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone sggregate 20 mm
nominal size)

Cum

41

4,714.00

Providing, hoisting and fixing upto two stories precast reinforced cement concrete in shelves
including getting in cement mortar 1:3 (1 cement : 3 Coarse sand), cost of required centring,
shuttering and finishing with neat cement punning on exposed surfaces but excluding the
cost of reinforcement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5
mm nominal size)

Cum

163,680.00

5,608.00

193,274.00

16,824.00

75

Providing, hoisting and fixing upto two stories precast reinforced cement concrete in
mouldings as in cornices, windows sills etc. including setting in cement mortar 1:3 ( 1
cement : 3 coarse sand) cost of required centring, shuttering and finsishing smooth with 6
mm thick cement plaster 1:3 (1 cement: find sand) on exposed surfaces complete but
excluding the cost of reinforcement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
sggregate 20 mm nominal size)

Centering

76

Centring and shuttering at all levels including strutting, propping etc, and removal of form for:

Cum

5,608.00

5,608.00

76.1 Foundations, footings, bases of columns, etc. for mass concrete.

Sqm

72

164.00

11,808.00

76.2 Walls (any thickness) including attached pilasters, buttresses, plith and string courses etc

Sqm

64

210.00

13,440.00

76.3 Suspended floors, roofs, landings, balconies and access platform


76.4 Lintels, beams, plinth beams, girders, bressumers and cantilevers

Sqm
Sqm

170
115

210.00
210.00
-

35,700.00
24,150.00
-

8802

57.00

501,714.00

77

Providing & fabricating steel reinforcement for R.C.C. work at al levels including
straightening, cutting, bending, placing in position and bending complete including cost of
binding wire etc complete Thermo mechanically treated bars.

78

Painting with synthetic enamel paint of approved brand and manufacture of required colour
to give an even shade:
Two are more coats on new work over an under coat
of suitable shade with ordinary paint of apporved brand and manufacture.

Kg

C
79

Masonry Works
Random rubble masonry with hard stone in foundation and plinth including levelling up with
cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm
nominal size ( at plinth level with
cement mortar
1:6 (1cement : 6 coarse sand)

Sqm

46

175.00
-

Cum

83

2,742.00
-

8,050.00
227,586.00
-

80

Brick work with F.P.S bricks of class desingation 75 in superstructure above plinth level
upto two stories in all shapes and sizes in
cement mortar 1:6 (1 cement :6 coarse sand)

81

Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey
cement slurry mixed with pigment to match the shade of the slab including rubbing and
polishing complete with base of cement mortar 1 :4 (1 cement : 4 coarse sand )
25 mm thick

82

Kota Stone Slabs 25 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm
(average) thick cement mortar 1:3 (1 cement 3 coarse sand ) and jointed with grey cement
slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing
complete.

83

Providing and laying Ceramic glazed floor tiles 300x300 mm (thickness to be specified by
the manufacturer) of 1st quality conforming to IS: 15622 of apporved make in colours such
as White, Ivory. Grey, Fume Red Brown, laid on 20 mm thick Cement Mortar 1:4 (1 Cement : Sqm
4 Coarse sand) including pointing the joints with white cement and matching pigment etc.,
complete

Cum

166

3,157.00
-

Sqm

135

779.00
-

Sqm

21

935.00
-

D
84

18

Finsihing Works
15 mm cement plaster on rough side of single or half brick wall finished with a floating coat
of neat cement of mix

818.00

524,062.00
105,165.00
19,635.00
-

14,724.00

84.1 1.3 (1 cement :3 fine/coarse sand)

Sqm

822

144.00

118,368.00

84.2 1:4 (1 cement :4 fine/coarse sand)

Sqm

504

130.00
-

65,520.00
-

Distempering with oil bound washable distemper of approved brand and manufacture to five
an even shade
New work (two or more coats) over and including Sqm
priming coat with cement primer.

453

62.00

28,086.00

85

86

Finishing walls with water proofing cement paint of required shade:


New work( Two or more coats applied@ 3.84 kg/10sqm)

Sqm

465

36.00
-

87

Providing and laying water proofing treatment on roofs of slabs by applying cement slurry
mixed with water proofing cement compound consisting of applying : a) after surface
preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing
cement compound @ 0.253 kg/sqm. b) laying second layer of Fibre glass cloth when the
first layer is still green Overlaps of joints of fibre cloth should not be less than 10 cm, c) third
layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water Sqm
proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be
allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment
will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d)
fourth and final layer of brick tiling with cement mortar (whcih will be paid for separately For
the purpose of measurement the entier treated surface will be measured.

169

360.00

16,740.00
-

60,840.00

Doors and Windows

88

Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2mm
and braced with flat iron diagonals 20x5mm size with top and bottom rail of T-iron
40x40x6mm with 40 mm dia, steel pulleys complete with bolts, nuts, locking arrangement,
stoppers, handles, including applying a priming coat of approved steel primer.

89

Providing and fixing T-iron @ 1.8 Kg/m (30x30x4mm) frames for doors, windows and
ventilators or mild steel tee or angle sections joints mitred and welded with 15x3 mm lugs,
10 cm. Long embedded in cement concrete blocks 15 x 15 10 cm. Size of 1:3 :6 (1 cement :
Kg
3 Course sand :6 graded stone agregate 20mm nominal size) or with wooden plugs and
screws or rawl plugs and screws or with fixing of necessary butt hinges and screws and
applying a priming coat of approved steel primer.

Sqm

12

3,279.00

294

60.00

90

Providing and fixing factory made ISI marked steel glazed doors, windows and ventilators
side/top/centre hung with beading and all members such as K11 B and K12 B etc, complete
of standard rolled steel sections, joints mitred and flash butt welded and sash bars tenoned
and rivetted with 15x3mm lugs, 10cm long, embedded in cement concrete blocks
15x10x10cm of 1:3:6 (1 cement :3 coarse sand 6 graded stone aggregate 20mm nominal
Kg
xiae) or with wooden plugs and screws or rawl plugs and screws of with fixing clips or with
bolts and nuts as required, including providing and fixing of hinges, pivots, float glass panes
with glazing clips and special metal sash putty of approved make and a priming coat of
apporved steel primer excluding the cost of metal beading and other fittings except
necessary hinges or pivots complete as per approved design.

118

216.00

91

Providing Sal wood work in frames of doors, windows, clerestory windows and other frames,
Cum
wrought framed and fixed in position: Sal Wood

92

Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I)
decorative type, core of block board construction with frame of 1st class hard wood and well
matched teak 3 ply veneering with vertical grains or crss bands and face veneers on both
Sqm
faces of shutters. 35 mm thick including ISI marked Stainless Steel butt hinges with
necessary screws

500,867.00
-

13

2,090.00

93

Steel work welded in built up sections/framed work including cutting, hoisting, fixing in
position and applying a priming coat of approved steel primer using structural steel etc. as
per requred. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar
works

Plumbing and Sanitary Works

94

Providing and fixing white vitreous china laboratory sink with C.I brackets, C.P. brass chain
with rubber plug 40mm C.P. brass waste and 40mm C.P. brass trap with necessary C.P.
brass unions complete including painting of fittings and brackets, cutting and making good
the wall wherever requred.
Size 600x450x200mm

Kg

68

58.00
-

Each

2,132.00

39,348.00

17,640.00

25,488.00

500,867.00
-

27,170.00

3,944.00
-

2,132.00

95

Providing and fixing G.I. pipes complete with G.I. fittings and clamps, including cutting and
making good the walls etc. Internal work- Exposed on wall

95.1 15 mm diameter
95.2 20 mm diameter
95.3 25 mm diameter

96

Providing and fixing C.P. brass stop cock (concealed) of standard design and of approved
make conforming to IS:8931
15mm diameter

Rmt
Rmt
Rmt

15
25
45

119.00
139.00
188.00
-

1,785.00
3,475.00
8,460.00
-

No

457.00

914.00

97

98

Providing and fixing C.P. brass bib cock of approved quality conforming to IS:8931
15 mm nominal bore

99

No

Providing and fixing gun metal gate valve with C.I, wheel of approved quality (screwed end) :

98.1 Gun metal 15mm nominal bore


98.2 Gun metal 20mm nominal bore
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end)
25mm nominal bore

381.00

1
1

210.00
263.00
-

210.00
263.00
-

No

313.00

939.00

1,669.00

No

2,878.00

Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI :
102 12701 marked with cover and suitable lacking arrangement and making necessary holes for Lit
inlet, outlet and overflow pipes but without fittings and the base support for tank.

1000

6.00
-

Providing and fixing square-mouth S.W. gully trap grade 'A" complete with C.I. grating brick
masonry chamber with water tight C.I. cover with frame of 300x300 mm size (inside) the
103 weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per
standard desigh
100x100mm size P type
With F.P.S Bricks class designation 75

762.00

No
No

Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P.
brass waste of standard pattern, including painting of fittings and brackets,cutting and
No
making good the walls wherever required.
White Vitreous Chinal Wash basin size 630x450 mm a pair of 15mm C.P. brass pillar taps.

Providing and fixing water closet squatting pan (Indian type W.c. pan) with 100 mm sand
cst Iron P or S trap, 10 litre low level white P.V.C flushing cistern with manually controlled
device (handle leer) conforming to Is : 7231, with all fittings and fixtures complete including
101
cutting and making good the walls and floors wherever required:
White Vitreous Chinal Orissa pattern W.C. pan of size 580x440
mm with integral type foot rests.

100

No

1,057.00

1,669.00

2,878.00

6,000.00
-

2,114.00

Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS :
104 13592 Type A including jointing with seal righ conforming to IS : 5382 leaving 10 mm gap for Rmt
110 mm diameter.

Providing and fixing on wal face Unplasticised-PVC maoulded fittings/accessories for


105 Unplasticised Rigid PVD rain water pipes conforming to IS : 13592 Type A including jointing
with seal ring conforming to IS: 5382 leaving 10 mm gap for thermal expansion:
Beng 87.50
105 110 mm bend
Shoe (Plain)
105 110 mm shoe

106

17

No

No

Cement concrete Flooring with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate)
Finished with a floating coat of neat cement including cement slurry, but excluding the cost
Sqm
of nosing of steps etc complete
40 mm
thick with 20mm nominal size stone aggregate.

37

380.00

175.00
175.00
-

700.00
700.00
-

280.00

10,360.00

Construction of tube well for water supply at STP campus including distribution mains,
107 supply, installation of submersible pump, electrical and mechanical work etc. complete. As
per specification and as directed by the Engineer.

LS

292,075.00
-

Providing, lowering, laying in trenches, aligning, fixing in position and jointing socketed
rubber gasket type ISI marked PVC pipes of Class III (6 KG/sqcm) suitable for potable water
with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories
108
m
(excluding specials) complete including all material,labour,hydraulic testing and
commissioning as per Technical Specifications and as per direction of Engineer.
110 mm dia
G

30

342.00

Tree Platation

Planting of trees by the road side (Avenue trees) n 0.60 m dia holes, 1 m deep dug in the
109 goround, mixidng the soil with decayed farm yard/sludge manure, planting the saplings,
Each
backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year

100

219.00
-

Planting trees as compensatory afforestation at the rate of 290 trees per hectare at a
spacing of 6m by grubbing and levelling the ground upto a depth of 150mm, digging holes
110
0.9 m dia, 1m deep, mixing farm yard/sludge manure with soil, planting of sapling 2 m high
with 25 cm dia stem, backfilling the hole and watering.
H

Ha

29,208.00
-

Fencing

6,460.00

292,075.00
-

10,260.00

21,900.00
58,416.00
-

150 cm high fencing of precast R.C. posts of 15 cm X 15 cm tapered to 100 X 100 cm at top
placed at every 3m apart 30cm in ground embedded in cement concrete 1:3:6
111 (30x30X45cm) corner and every tenth posts to be strutted with same R.C. posts provided
RM
with 6 horizontal lines and two diagonals of black barbed wire between the two posts fitted
and fixed with GI staples including earch work in excavation etc. complete.

1700

935.00

1,589,500.00

112 Add for using galvanized barbed wire instead of black barbed wire in item no. 61

1700

206.00

350,200.00

RM

Fabricating, providing and fixing of 4m clear width and 2.2m height from GL MS Compound
Gate with the wicket gate of 1.5m width and 2.2m height from GL, with 50mm MS medium
gauge pipe frame, 10mm square horizontal & vertical bars at 300 mm &150mm spacing
113 respectively including fixing the gate in M20 RCC column of 450mm X 450mm size with all No.
fixing arrangement, locking arrangement & fixing the guide rail in RCC block for easy
movement of gate etc complete as er drawing and specification. the cost should include cost
of reingforcement stee., formwork, shuttering adn centring, curing etc.
I

Road Works

Providing, laying and spreading of granular sub-base by providing coarse, graded Material
(Tabke 400-2), spreading in uniform layers with motor grader on prepared surface, mixing
114 BY MIX IN PLACE METHOD with rotavator at OMC, and compacting with vibratory roller to
achieve the desired density, complete as per MoRT&H specification clause - 401 including
all material , labour , machinery, lighting, guarding.
114.1 Grading -II Material
114.2 Grading -III Material

Cum
Cum

563
563

Providing laying, spreading and compactind stone aggregates of specific sizes as per Table
400-7 to Water Bound Macadam specification including spreading in uniform thickness;
hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber,
115 applying and brooming requisite type of screeing (Table 400-8) binding materials to fill up
the interstices of coarse aggregates, watering (with water browser) and compacting to
required density, making necessary earthen bund to protect edges as per clause 404 of
MoRT&H specification including all material, labour, machinery, lighting, guarding.
115.1 Crusher Broken Grade-II (63-45mm)
115.2 Crusher Broken Grade-II (53-22.4mm)
Providing and applying primer coat over prepared surface of granular base with bitumetn
emulsion as per IS : 8887 and approved quality @ 0.6 kg/sqm with the help of spray set
fitted on bitumen Container (boiler) after cleaning the surface including removing of binding
116 material and other foreign matter with wire brushes and small picks, sweeping with brooms
or soft brushes and finally dusting with old gunny bags and compressed air to receive
bituminous treatment complete as per clause 502 of MoRT&H specification including all
material, labour, machinery, lighting, guarding.

46,732.00

46,732.00

859.00
729.00
-

483,617.00
410,427.00
-

Cum
Cum

1125
563

968.00
1,374.00
-

1,089,000.00
773,562.00
-

Sqm

7500

32.00

240,000.00

Providing and applying tack coat on the prepared surface with bitumen emulsion as per
IS:8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitument
Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting
117
with old gunny bags and compressed air to receive bituminous treatment complete as per
clause 502 of MoRT&Hspecification including all material, labour, machinery, lighting,
guarding.

Sqm

7500

9.00

67,500.00

Providing and laying open graded premix carpet 20mm thick (compacted), on prepared
surface in a single course as wearing course, composed of specified graded crushed stone
aggregate as per Table 500-23, premixed with bituminous binder @ 14.60 kg/10sqm
(including cost of anti-stripping comound wherever required), including loading of material
with F.E loader hot mixing of stone aggregate and bitument in computerised hot mix plant,
118 transporting the mixed material by tippers to paver and laying with paver finisher fitted with Sqm
electronic sensor control to the required level and grade, compacting smooth wheeled roller
8-10 tonne capacity and finishing to required level to achieve the desired density as per
clause 511 if MoRT&H specification including all material, labour,
machinery,lighting,guarding and maintenance of diversion but excluding cost of tack
coat/seal coat.
With bitumen of grade 60/70.

7500

116.00

Providing and applying premixed seal coat Type "B" comprising of thin application of fine
aggregate 0.06 cum/10 sqm premix with bitumen binder @ 6.8 Kg/10 sqm (including cost of
anti-stripping compount wherever requred) , laying with paver finisher with electronic sensor
119
Sqm
control and rolling with power roller 8-10 tonne complete as per clause 513 of MoRT&H
specification including all material, labour, machinery, lighting, guarding
With bitumen of grade 60/70
J

7500

Inter connecting pipelines

Providing, lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron
(DI) ISI marked K-7 grade S&S pipes as per IS : 8329-2000 (amended upto date), with
internal cement mortar lining for potable water with rubber ring (EPDM/SBR) joints as per IS:
120
metre
5382-1985 (excluding special accessories) complete including all material, labour, hudraulic
testing and commissining as per Technical Specifications and as per direction of Engineer.
600 mm internal diameter.

60.00

600

8,178.00

Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP2 class
(with s/s ends) as per IS: 458 - 1988 (amended up to date) at all levels with Rubber gaskets
(EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants)
121
metre
as per drawing, sectional testing of the sewer pipe ling (including cost and conveyance of
water to site) etc, complete as directed by Engineer.
600 mm
internal diameter

520

2,077.00

Providing and constructing of sewer brick masonry circular manholes of "Type-B" with
internal dia 1.20m and depth upto 2.50m having sever brick masonry wall 230mm thick upto
1.5m,345mm thick from 1.50m to 2.50m in cement sand mortar 1:4, including concreting
PCC M-10 grade (1:4"8) for 225mm thick foundation including curing compaction and form
work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick
cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using
stone aggregate 20mm naomnal size, 20mm thick inside and outside plaster in C.M. 1:3,
122
No
inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering
and leaving the manhole and also at the junction of masonry and concrete slab, providing
and fixing of SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3,
supplying and fixing heavy duty SFRC manhole froame and cover as per IS12592 (Part I
and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering
ramming, hydro testing of manhole, conveyance & costo of water, and complete as directed
by the Engineer.Note-Only Excavation Manhole "Tyoe-B" of depth 1.70m

30

33,714.00

870,000.00

450,000.00

4,906,800.00

1,080,040.00

1,011,420.00

Providing and fixing MS clamp of size 50mmx6mm for anchoring the pipe in pedestal
123 support fixing in M16 bolt of 200mm long with flat of size 50*6 complete as per specification No.
and as directed by the engineer.

200

467.00
-

124

Providing and fixing as er AWWAC 501 or IS: 13349 C.I.Gates of following size including all
taxes, freight, loading & unloading, fitting in position including cost of all labour, jointing
No.
material with nut bolts and giving satisfatory testing etc. complete and as directed by
Engineer.
600mm x700mm

84,118.00

93,400.00
-

168,236.00

38,417,281.00

Bill of Quatities: Part B-I: Sewerage Pumping main and Pre-treatment


Units of STP (inlet chamber, coarse screen chamber,sewage sump
and pump house, Pumping main from SPS to STP, inlet chamber of
STP, fine screens, grit removal chamber, flow measurement channel,
distribution chambers (including all Civil,Mechanical, piping,
instrumentation and Electrical works)
Sl.No

Description of Item

Final Rate

Unit

Quantity

Lot

Lot

467,320.00

Designing, Construction of civil works in all respects, providing, Installing


and commissioning of all mechanical, instrumentaiong & electrical
equipments along with accessories/equipments required for units of SPS &
pre-treatment of the plant in all respect complete as per the
specifications /Bid Document.
(A)

DESIGN SERVICES

48

Detailed designing and drawing(civil/mechanical/piping/instrumentation/


electrical) of all units of pre-treatment & ancillary civil units.

(B)

CIVIL WORK

49

Inlet Chamber at SPS

Lot

Lot

327,124.00

50

Coarse Screen chamber (2 Nos)

Lot

Lot

490,686.00

51

Raw sewage sump cum pump house

Lot

Lot

4,000,000.00

52

Inlet Chamber of STP

Lot

Lot

445,216.00

53

Fine Screen chambers (3 Nos)

Lot

Lot

695,384.00

54

Grit removal chambers with proportional weir (3 Nos)

Lot

Lot

134,121.00

55

Outlet Channel, Flow Measurement & Distribution Chambers

Lot

Lot

769,837.00

Rate in Words
(Rupees . . . Only)

Sub-Total (B)

MECHANICAL WORKS

56

Supply, erection, testing and commissioning of all mechanical equipmnts


such as Manually racked coarse bar screen in SPS, pumping machineries
including level control switches and lifting arrangements, internal piping of
sewage umping station, pumping main including valve arrangements for
controls, manually raked fine bar screen in PTU. Grit removal arrangement
in Grit channel, Ultra sonic open channel type flow meter, electro
magnetic flow meter for pumping main. CI sluice gates for controling flow
in the PTU &SPS etc, Providing access to Pretreatment and SPS
complete in all respects as per the specification and as directed by the
Engineer.

(D)

ELECTRICAL & INSTRUMENTAION WORK

57

Supply, Erection, Tesing, Commissioning of all electrical & instrumentation


equipments/motors includes MCC with all hard wares, cables, LPB's
glands etc including feeder main ofr uninterrepted power supply complete
for SPS & PTU) complete in all respect as per the specification and as
directed by the Engineer.

Total cost of Sewage Pumping Station & Pre- Treatment Units (Part BI)

Lot

Lot

11,000,000.00

Lot

Lot

6,500,000.00

24,829,688

Amount

467,320.00
327,124.00
490,686.00
4,000,000.00
445,216.00
695,384.00
134,121.00
769,837.00

11,000,000.00

6,500,000.00

24,829,688

Part B-3 Electrical Work for STP including area lighting and internal
electrification for all buildings
Sl.No

Description of Item

Unit

Total Qty

Final Rate

Wiring

125

125.1
125.2
125.3

126

126.1
126.2
126.3
126.4
127
127.1
127.2

Final Amount

Wiring of light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq. mm
FR PVC insulated unsheathed flexible copper conductor 1.1 kv grade and 1.5
sq.mm FR PVC insulated unsheathed flexible earth copper conductor 1.1 kv
grade (IS:694) of apporved make in surface/recessed ISI marked steel conduit
& it's accessores, round tiles, 18 SWG M.S. box with earth terminal, screwless
cage connectors for neutral looping in switch board & falce ceiling point, 6 A
switch, 3.0 mm thick phenolic laminated sheet, zinc plated/brass screws, cup
washers, bushes check nuts, making connections, testing etc. as required.
Short point (upto 3 mtr)
Medium point (upto 6mtr)
Long point (upto 10 mtr)

P.Point
P.Point
P.Point

5
15
10

Wiring of 3 pin 6 amp. Light plug point with 1.5 sq. mm FR PVC insulated
unsheathed flexible copper conductor 1.1 kV grade and 1.5 sq.mm FR PVC
insulated unsheathed flexible copper earth conductor 1.1 KV grade (IS: 694) of
approved make in surface/recessed ISI marked steel conduit & it's accessories,
18 SWG M.S. box with earth terminal, screwless cage connectors for neutral
looping in switch board & falce ceiling point, 6 A switch, 6 A socket, 3.0 mm
thick phenolic laminated sheet, zinc plated/brass screws, cup washers, bushes,
check, nuts, making connections, testing etc, as required.
On board
Short point (upto 3 mtr)
Medium point (upto 6 mtr)
Long poing (upto 10 mtr)

1760
7050
7050

P.Point
P.Point
P.Point
P.Point

5
5
5
1

S & F following sizes of ISI marked GI Conduit alongwith heavy duty


accessories in surface using saddles/clamps fasteners as required including
cutting the wall and making good the same as required (Ref note no. 4 of
RUIDP SOR P-112)
32 mm
40 mm

352
470
705
0

235
352
470
705

1175
1760
2350
705

0
R.mtr
R.mtr

150
150

352
446
0

52800
66900

128

Providing and Laying PVC insulated PVC Sheathed cables of 1.1 KV grade
with copper conductor in ground as per IS: 1255 including excavation of 30 cm
mtrs
x75 cm size trench 25 cm thick under layer of sand and kind class bricks.
2C X 2.5 sq.mm

300

176

52800

0
0

Illumination

129

P & F IP-65 protected street light luminaire on existing bracket suitable for
HPSV/MH LAMP, made out from powder coated single piece die cast
aluminium housing, electrochemically brightened and anodized POT optics
aluminium relfector, heat resistant and toughened glass cover and accessories Each
like cpper ballast, electronic ignitor, capacitor, holder prewired up to terminal
block etc. as required including making connection testing etc. as required 1 X
150 W

130

P & F Capacitors for power factor improvement in existing HPSV/HPMV/Metal


halide lamp fixture as required.
8 mfd

131

P & F High pressure sodium vapour/High pressure mercury vapour / Metal


halide / Halogen lamp as required.
125 W

10

6461

64610

0
Each

10

587

5870

0
Each

10

1762

17620

132

P & P IP -65 protected integral flood light luminaire suitable for HPSV/Metal
halide lamp comprising of powder coated die cast aluminium housing,
electrochemically brightened and anodized stipped aluminium relfector,
covered with suitably gasketed heat resistant and toughened glass, porcelain
holder, integral control gear box having copper ballast, capacitor, electronic
ignitor prewired with pvc insulated copper conductor up to terminal block
including making connection testing etc. as required (with out lamp)
1 x 250 w

133

P & F Capacitors for power factor improvement in existing HPSV/HPMV/Metal


halide lamp fixture as required.
10 mfd

Each

25

11747

293675

0
Each

25

705

17625

0
134

P & F High pressure sodium vapour/High pressure mercury vapour/ Metal


halide/Halogen lamp as required.
250 W

Each

25

1292
0

32300

135

Supply and erection of hot dipped galvanised steel swaged, tubular pole
conforming to IS: 2713 -1980 (part I to II ) with galvanised base plate of size
400mm x 400mm 7mm in position including excavation of the pit and filling the
same with C.C. of M-10 grade (1:3:6) from base plate to 50 cm above ground
level, with the help of steel frame not less than 40 cm dia up to 114.3 mm outer
Each
dia and 50 cm beyond 114.3mm outer dia around the pole. Duly finished with
cement plaster, earthing terminals , cable entry, GI cable sleeve complete as
required. The pose shall be galvanised using ISI mark seamless tube for
structural purpose ( SEE TABLE E13)
8.5 mtr

35

25842

904470

136

136.1
136.2

137

P & F industrial fluorescent tube fitting with reflector fabricated from CRCA
sheet and finished with powder coating/vitreous enamelled complete with
accessories like (OCCB, starterm starter seat) /EB, condensor, rotor holder,
terminal block duly prewired with copper conductor including making
connection, testing etc. as required (without tube)
With powder coated reflector.

Each
Each

3
5

1762
2937
0

5286
14685

P & F IP-43 protected post top lantern suitable for HPMV/HPSV/MLL lamp with
integral control gear cast aluminium housing comprising of copper ballast,
capacitor, ignitor covered with suitably gasketed concal / spherical / elliptical
polyethylene moulded diffuser of dia approx. 605 mm, prewired with pvt
Each
insulated copper conductor including making connection testing etc. as
required ( without lamp)
1 X 80
Watt HPMV Lantern

3759

7518

1 X 36 Watts with OCCB


2 X 36 Watts with OCCB

0
P & F 240/415 V MCB of breaking capacity not less than 10 KA (B/C/D tripping
138

characteristic) ISI marked IS: 8828(1996)] conforming to IEC:60898 in existing


board/sheets including making connections with lugs, testing etc. as required.

138.1
138.2

6 A to 32 A
Three pole and neutral
6 A to 32 A

Each

Each

P & F ISI marked following semi modular accessories with decorative cover
plate of approved colours including making connections testing as required.
6 A bell push

880
3288

139
139.1

176
0
822
0

Each

117
0

234

139.2

RJ-11 telephone jack double two line

Each

139.3

RJ-45 computer jack with shutter

Each

139.4

T.V. socket single outlet

Each

140

P & P ISI marked flush type single line telephone jack including making
connection testing etc. as required.

Each

141

P & F ISI marked flush type coaxial T.V. socket including making connection
testing etc. as required.

142

P & F ISI marked gong bell including making connection testing etc. as
required.

117
0
176
0
176
0

468

235

235

176
176

0
Each

235

235

0
Each

587

587

0
0

Lightning Protection
143

P & F lightning conductor finial made out of 25 mm dia, 300 mm long G.I, tube
having single prong at top with 85 mm dia., 3m thick G.I. base plate including
Each
holes etc. complete as required.

144

Rivetting, sweating and soldering of copper/G.I. Tape with another copper/ G.I.
Tape, base of the final or any other metallic objects as required.

5873

5873

0
Each

1175

1175

0
145

P & F G.I. tape 20mm x 3 mm on parapet or surface of wall in


vertical/horizontal run as required.

Mtr

20

59

1180

0
0

Earthing

146

Plate Earthing as per IS:3043 with copper Earth plate of size 600 mm x 600
mm x 3.0 mm by embodying 3 to 4 mtr. Below the ground level with 20 mm dia.
G.I.. 'B' class waterig Pipe including all accessories like nut, bolts, reducer,
nipple, wire meshed funnel, and C.C. finished chamber covered with hinged
Each
type with licking arrangement C.I. Cover, C.I. Frame of size 300 mm x 300mm
complete with alternate layers of salt and coke/charcoal, testing of earch
resistance as required.

147

S & Laying following size earth wire/strip in horizontal or vertical run in


ground/surface/recess including riveting, soldering, saddles, making connection
etc. as required.

11747

11747

147.1

8 SWG GI strip

Mtr

100

0
29

2900

147.2
147.3

25mm x 3mm GI strip


50mm x 6 mm GI strip

Mtr
Mtr

10
30

141
258
0
0

1410
7740

2937

2937

Fire Protection system


148

Providing and fixing charges ABC type fire extinguisher including the cost of
fixing with nut, bolts etc as required.
2Kg

149

P & F double ball bearing capacitor start ceiling fan of approved make complete
with regulator and other accessories as required. (for estaimation purpose only) Each
900 mm sweep

150

P & F of Heavy duty capacitor start 900/1400 RPM single phase ISI marked
Exhaust fan, IS:2312 marked in existing opening including making connections Each
testing etc. as required.
300 mm sweep

151

P & F Recessed / Survace mounting heavy duty horizontal type sheet steel
Distribution board phophatised/powder painted complete with copper bus bar,
shorting link, neutral link and din bar, conforming to IS : 13032 & IS : 8623
including making internal DB terminations with copper lugs, testing etc. as
required. Double door (Three phase) 8 way

Each

0
10

2349

23490

0
3

2114

6342

Total cost of Electrical works (Part B-3)

Each

5873

5873

1,634,955.00

Part B-4 : Supply of Different Items & Miscellaneous


Sl.No

Description of Item

Providing steel Office table of size 762 mm in height and 1825 x 1220
size made of steel frame consisting of 18 guage 25m square tubes. The
board should be 18/19 thick prelaminated on both sides wood finish IS
marked. Table should have two drawers on one side and other side one
cupboard with seperate locks. Outer body of cabinet shall be in 22
152
Nos
guage sheet, drawer in 24 gauge, front of drawer in 20 guage, sliding
range is 18 guage, the welding marks ahould be properly grinded
having smooth finish. All holes, scratch etc. should be filled with filler
before priming coat. The table should e spray painted with 2 coats of
metallic paint of approved colour over a coat of approved premier

Unit

Total Qty

Rate (Rs)

4,673

Rate in Words
(Rupees . . . Only)

Final Amt

4,673.00

Providing steel Office table of size 762mm in height and 1525 x 915
size made of steel frame consisting of 18 guage 25m square tubes. The
board should be 18/19 thick prelaminated on both sides woood finish IS
marked. Table should have two derawers on one side and other side on
cupboard with seperate locks, Outer body of cabinet shall be in 22
153
Nos
guage sheet, drawer in 24 guage, front of drawer is 20 guage, sliding
range is 18 guage, the wilding marks should be properly grinded having
smooth finish. All holes, scratch etc. should be filled with filler before
priming coat. The tabel should be spray painted with 2 coats of metallic
paint of apporved colour over a coat of approved primer

3,739

7,478.00

Providing steel Office table of size 762mm in height and 1220 x 762
size made of steel frame consisting of 18 guage 25m square tubes. The
board should be 18/19 thick prelaminated on both sides wood finish IS
marked. Table should have two drawers on one side and other side one
cupboard with seperate locks. Outer body of cabnet shall be in 22
154
Nos
guage sheer, drawer in 24 guage, front of drawer in 20 guage, sliding
range is 18 guage, the welding marks should be properly grinded
having smooth finish. All holes, scratch etc. should be filled with filler
before priming coat. The table should be spray painted with 2 coats of
metallic paint of approved colour oer a coat of approved primer.

3,552

7,104.00

Providing steel office chairs made of steel frame of 1" x 14 guage pipe
duly powder coated epoxy finish. Cushion should be 3" thick in seat and
155 2" thick in back. Cushion should be covered with approved quality
Nos.
tapestry and should be mounted on 12mm thick moulded ply. Chair
should have PU arms etc. and its should be complete in all respect.

1,402

7,010.00

Providing executive revolving chair having tilting and push back


mechanism with PU arms. It should have thick cushions in seat and
back mounted over 12mm ply (low back) covered with superior quality
156
of tapestry over pressed steel bone. It should have superior quality
double PVC ball wheel five legged, dully powder coat finish etc.
complete in all respect.

3,926

3,926.00

Nos

Providing steel Almairah of size 78" x 36" x 19" with 4 fix shelves
making 5 compartments, almairah should be made of 22 guage steel
wheras doors and shelves should be made in 20 guage steel. Almairah
157 should have two way lacking device with duplicate CP keys. Almairah
Nos.
shoudl be spray painted with 2 coats of metallic paint of approved
colour over a coat of approved prime. Welding etc. should be grinded
smooth and holes filled with filler before primer coat..

9,347

18,694.00

Providing good quality wooden table of 900 x 750 x 750 mm in size.


Legs shall be min. 40 x 40 mm in section. Top should be made using
18/19 m thick wooden planks. Planks should be supported using batten
158
Nos
frame of wood. Legs shall be stiffened using wooden battens of 25 x 40
mm minimum section. Table should be French polished over a coat of
primer.

3,739

18,695.00

Providing writing tubular steel chairs of approved quality with 300mm x


300mm 12mm (thick) single side prelaminated white writing table fixed
to right handrail with cane seat and back. The chairs shall have no left
arm. The writing table shall be fixed at 250mm higher than the seat.
159
The seat shall be 350mm wide and 400mm deep and fixed at a height
of 400 mm from ground level. The back shall be of same size as that of
the seat, the chair shall be painted with two coats of white synthetic
enamel paint over two coats of primer of approved quality complete.

2,804

14,020.00

500,000

500,000.00

Supply of laboratory equipments as given below and necessary


160 chemicals and commissioning as per specifications and of approved
make, as mentioned in Sec VI Technical Specification in each set.

Nos.

1. Analytical Balance
2. Autoclave
3. Dissolved oxygen sampler
4. Drying overn (Jor air)
5. Hor plates
6. Incubator 20 OC (BOD)
7. Microscope, Binocular with oili immersion and movavle stage
counting cell
8. Membrance filter assembly
9. Muffle furnnace
10. pH meter portable
11. Refrigerator (1651)
12. Sludge sampler
13. Soxhlet extraction unit
14. Turbidity meter
15. Vaccum pump
16. Water bath (thermostat controlled)
17. Glasswares and necessary chemicals
Supply of Safety Equipments such as fire fighting equipments and tools
161 and plants etc. as specified and listed in Technical Specifications in
Set
each set.
162

Supply of Fibre Glass Row Boat, with two no chapoos and two life
jackets with each set as per Specification

Total Cost of Supply of different items & Misc (Part B4) in Rs.

Set

112,159

112,159.00

84,119

84,119.00

777,878.00

Bill of Quantities : Part 'C' - Operation and maintenance of Sewage


Treatment Plant (STP)

Sl.No

Description of Item

Unit

Total Qty

Rate

Operation and Maintenance of 8MLD Sewage Treatment Plant (waste


Stabilisation Pont) and sewage pumping station, Lab and other
163 facilities, including cost of replacement, repairs and consumables
excluding the cost of regular electricity bill, for initial five years after the
commissioning of the plant
a

For the First Year

Per Month

12

100,000.00

For the Second Year

Per Month

12

83,333.00

For the Third Year

Per Month

12

91,667.00

For the Forth Year

Per Month

12

125,000.00

For the Fifth Year

Per Month

12

152,000.00

Total (Part C)

Rate in words (Rs.)

Amount Rs

1,200,000.00
1,000,000.00
1,100,000.00
1,500,000.00
1,824,000.00
6,624,000.00

6,624,000.00

Name of Work : Design, Construction, Supply, erection,


testing,commissioning and five years operation and
maintenance of Sweage Treatment platn 8 MLDincluding
all civel, electrical, mechanical, pumping and other
allied works and supply, laying, joining,testing and
commissioning of Outfall sewer, various trunk sewer,
Bill of
collecting and lateral sewers along with all necessary
Quantitie
manholes, appurtences etc at Bundi.
s Part D:
Provision
al Sum
Sl.No
Description of Item
1

`--+--

164a

Provision for Electric connection, Water Supply connection,


under ground utililty shifting, Railway crossing by trenchless
technology and third pary inspection charges etc.
LS

164b

Provision for IEC and other activities related to health and


safety of labour

LS

Unit

Rate

Rate in words (Rs.)

8800000

500000
Total

Amount Rs
6

8800000

500000
9,300,000.00

Sewer Lines
STP and SPS
TOTAL INPUT PRICE

Works contract tax


Service Tax on works contract
Labour cess
Dept Expenses
HO Overhead
Site Overhead
JV Expenses
Design Expenses
Risks and Contigencies
Storage
Insurance
Finance Expenses
Pat

6.6 Margin

214,928,802.44
57,961,637.80
272,890,440.24

1.1748
1.168327

4.12
0
0
2
0.1
2.605
1.5
0.1
1
0
1.1
0.4418
10

Sewer Lines
STP and SPS
O&M

Total
Factor to be loaded to Input Price

22.9668
1.2981415805

Price with factor added

354,250,427.40

Dept Estimate

238,700,000.00

% over Estimate

0.4841

Say

48.41%

Provision

65,659,802.00

Sewer Lines
STP and SPS

279,008,015.30
75,242,412.10
-

252,502,253.84 SEWER
67,718,170.89 B1
-

B2

9,300,000.00

9,300,000.00 B3

363,550,427.40

329520424.7364 B4
C
D

0.5230

0.3805 TOTAL

252,474,510.00
24,829,688.00
38,417,281.00
1,634,955.00
777,878.00
6,624,000.00
9,300,000.00
334,058,312.00
39.94902%

Discount
1.200%
1.250%

Quaoted % over Est


38.270%
38.200%

Value Quoted
330,049,612
329,882,583