Professional Documents
Culture Documents
Patel
Technical Consultancy & Civil Engineering Laboratory
E-217, Electronics Estate, G.I.D.C.,Sector-26, Gandhinagar
Observation Sheet for Binder Content Test
IRC : SP : 11
Name of Work:
Name of Client :
Name of Agency :
Lab. No.
Starting Date :
Starting Time :
Lab. Temp. 0 C :
Completion Date :
Completion Time :
Location :
Description of Material :
Source of Material :
Sample No.:
Sr. No.
Description
Sample -1
Sample -2
Remarks
Sample -3
before extraction,W1(gm)
3
For, Agency
For, Client
For, M A P T C E L
Mukesh A. Patel
Technical Consultancy & Civil Engineering Laboratory
E-217, Electronics Estate, G.I.D.C.,Sector-26, Gandhinagar
Name of Work:
Name of Client :
Name of Agency :
Lab. No.
Lab. Temp. 0 C :
Starting Date :
Completion Date :
Starting Time :
Completion Time :
Depth of Sample:
SIEVE ANALYSIS BY WET SIEVING OF SOIL ( As per IS - 2720 - P- 4 )
Maximum Size of material present in
Mass to be taken for Test
Substantial Quantities
mm
kg.
75
60
40
25
25
13
19
6.5
12.5
3.5
10
1.5
6.5
0.75
4.75
0.4
Maximum Weight retained on each sieve at the completion of sieving
IS Sieve Designation
450 - mm dia Sieves
300 - mm Dia Sieves
200 - mm Dia Sieves
Kg.
Kg.
Gm.
80 - mm
15
6
-20 - mm
4
2
-4.75 - mm
1
0.5
-2.00 - mm
--200
0.425 mm
--50
0.075 mm
--25
Weight of Dry Soil Sample
400
gms
Dish No. IS Sieve
Weight of
Cumulative weight
Persentage Cumulative
Persentage Passing
Soil retained
retained on each
weight retained on each
from each
on each
sieve
sieve
sieve
Sr. No.
sieve
mm
gm.
gm.
%
%
100
1
75
2
19
3
4
4.75
5
2.00
6
0.425
7
0.075
8
Pass 0.075
Type of Soil
1. Gravel ( G) ( Particle Size above 4.75 mm sieve )
------------2. Coarse Sand ( Particle Size in between 4.75 to 2.00 mm sieve )----3. Medium Sand ( Particle Size in between 2.00 to 0.425 sieve )-------4. Fine Sand ( Particle Size in between 0.425 to 0.075mm sieve )------5. Silt ( M) ( Particle Size in between 0.075 to 0.002 mm sieve )--------6. Clay ( C ) ( Particle Size below 0.002 mm sieve )-------------------------
For, Agency
For, Client
For, M A P T C E L
Mukesh A. Patel
Technical Consultancy & Civil Engineering Laboratory
E-217, Electronics Estate, G.I.D.C.,Sector-26, Gandhinagar
Name of Client :
Name of Agency :
Starting Date :
Completion Date :
cm3
7
Diameter of Mould =
1. Determination No.
2. Wt. of mould + compacted soil(W) gms.
3. Wt. of Mould (wm) gms.
4. Wt. of compacted soil gms. Ym.
5. Wet Density (yd)(g/cc)
6.Moisture Content (%) M.C.
7. Dry Density (yd)(g/cc)
Volume of Mould =
MOISTURE CONTENT
Determination No. ( Depth of Sample )
1. Container No.
2. Wt. of Container + Wet Soil gms ( W2)
3. Wt. of Container + Dry soil gms ( W3)
4.Wt. of Water gms ( W2- W3 )
5. Wt. of Container gms( W1)
6.Wt. of Dry Soil gms( W3 - W1)
7. Moisture content (w) (%) = (W2 -W3) x 100
(W 3-W 1)
For, Agency
For, Client
MAP Technical Consultancy
For, M A P T C E L
Mukesh A. Patel
Technical Consultancy & Civil Engineering Laboratory
E-217, Electronics Estate, G.I.D.C.,Sector-26, Gandhinagar
Field Dry Density
Name of Work:
Name of Client :
Name of Agency :
Lab. No.
Starting Date :
Starting Time :
Test Condition
Lab. Temp. 0 C :
Completion Date :
Completion Time :
D.S.No.
Layer Type :
Bulk Density of SAND(D1)
gm/cc
gm.
Chainage :
Offset
Date of Testing
Maximum Dry Density (gm/cc)
Optimum Moisture Content (%)
Field Operations
Wt. Of Sand + Cly. : W2 (gm) before puring
wt. Of Sand + Cly. : w3(gm) after puring
wt. Of sand in Hole : WB ( gm) = W2-W3-W1
Volume of hole v - WB/D1
Wt. Of wet soil + can = (gm)(WW + WC)
Wt. Of Can WC. :
Wt. Of Wt. Soil ww (gm) ( WW+WC)-(WC)
Bulk wet density of soil DW = WW/V
Remark
For, Agency
For, Client
For, M A P T C E L
Mukesh A. Patel
Technical Consultancy & Civil Engineering Laboratory
E-217, Electronics Estate, G.I.D.C.,Sector-26, Gandhinagar
Marshal Stability Test ( ASTM - D - 1559-76-1979)
Name of Work:
Name of Client :
Name of Agency :
Lab. No.
Starting Date :
Starting Time :
Specimen
No.
Lab. Temp. 0 C :
Completion Date :
Completion Time :
Bitumen
Content
%
For, Agency
Wt. Of
Specimen
in Air
(gm)
Wt. Of
Specimen
with wax
(gm)
Wt. Of
Wax
(gm)
For, Client
Wt. Of
specimen
in water
(gm)
Wt. Of
Voluem of Density of
S.S.D
wax
Specimen specimen
Specimen Correction
gm
gm
cc
(gm/cc)
Average
Density
(gm/cc)
For, M A P T C E L
Mukesh A. Patel
Technical Consultancy & Civil Engineering Laboratory
E-217, Electronics Estate, G.I.D.C.,Sector-26, Gandhinagar
Observation sheet for Aggregate Impact Value of Coarse Aggragate (IS - 2386 - P-4)
Name of Work:
Name of Client :
Name of Agency :
Lab. No.
Starting Date :
Starting Time :
Procudre :
Lab. Temp. 0 C :
Completion Date :
Completion Time :
The material for the test shall consist of aggregate passing a 12.5 mm IS sieve and retained
on a 10 mm IS sieve
The aggregate shall be tested in a surface-dry condition. If dired by heating the period of
drying shall not exceed four, hours, the temperature shall be 100 to 110 0C and the
aggregate shall be cooled to room temperature before testing.
The approriate quantity may be found convenitently by filling the cup measure in
three layers of approximately equal depth, each layer being tamped 25 times with the
tamping road and finally levelled off, using the tamping rod as a straight edge.
The hammer shall be raised until its lower face is 380 mm above the upper surface of the
aggregate in the cup, and allowed to fall freely on to the aggregate. The test sample shall be
subjected to a total of 15 such blows each being delivered at an interval of not less the one
second.
The crushed aggregate shall then be removed from the cup and the whole of it sieved
on the 2.36 mm IS sieve until no further significant amount passes in one minute.
The mean of the two results shall be reported to the nearest whole number as the
aggregate impact value of the tested material.
The difference of sum of the weight passing the IS sieve and retained on IS sieve and
the initial weight shall not be more than one gram,if more than one gram then results
shall be discarded and a fresh test shall be made.
Size of Sample
Sample No.
Dish No.
Remark
For, Agency
For, Client
For, M A P T C E L
Mukesh A. Patel
Technical Consultancy & Civil Engineering Laboratory
E-217, Electronics Estate, G.I.D.C. Sector-26, Gandhinagar
Test Results of Flakiness & Elongation Indices
Name of Work:
Name of Client :
Name of Agency :
Lab No.
Lab. Temp. 0 C :
Starting date :-
Completion date : -
Procedure
(1) Condition of Sample-Air Dried or oven dried at 10 0 to 1100C
(2) The total amount passing the gauge shall be weighed to an accuracy of at least 0.1 percent of the weight of the test sample.
(3) A quantity of aggregate shall be taken, sufficient to provide a minimum number of 200 pieces of any fraction to be tested.
(4) The flakiness index is the total mass of the material passing the various thickness gauges or sieves, expressed as a % of the total mass of the sample gauged.
(5) The elongation index is the total mass of the material retained on the verious length gauges, expressed as a % of the total mass of the sample gauged.
Size of aggregate
Passing
thro IS Retained
sieve
on IS sieve
( mm)
( mm)
63.0
50.0
40.0
31.5
25.0
20.0
16.0
12.5
10.0
Mass of
Aggregate
(A)Gms
No. of
Pieces
Mass of
Aggregate
retained on
Thickness
Guage ('C)
Gms.
No. of
Pieces
retained on
Thickness
Guage
Mass of
Aggregate
passing thro
Thickness
Guage (E)
Gms.
Weighted % of
No.of
% of total mass
the mass of
Pieces
of Aggregate % of total mass
pices passing
No. of Pieces retained
passing
passing thro
of Whole
thro thickness Mass of Aggregate retained on length guage, on length guage not
thro
thickness
Sample (Y)
guage
(Z) not passing thro Thickness guage (G) Gms
passing thro
Thickness Guage (X) =
=(A/A)x100 =
Thickness guage
Guage
(E/A)x100
(Xx
Y )/100
50.0
40.0
31.5
25.0
20.0
16.0
12.5
10.0
6.3
Total
Flakiness Index(%)=
Elongation Index(%)=
F/AT/02,ISSUE NO.-01
For, Agency
For, Client
For, M A P T C E L
F/AT/02,ISSUE NO.-01
Mukesh A. Patel
Technical Consultancy & Civil Engineering Laboratory
E-217, Electronics Estate, G.I.D.C. Sector-26, Gandhinagar
Gradation of Aggreagte
Name of Work:
Name of Client :
Name of Agency :
Lab No.
Lab. Temp. 0 C :
Starting date :-
Completion date : -
Source of Sample :
Sieve Analysis
Name of Test:
Reference Standard: IS : 2386-P-1
Date of Test Starting :
Size
--
Total wt. In
gms.
IS
Sieve
Size
mm
Individual
Weight
Retained
gm.
Cumulative
Weight
Retained
gm.
Cumulative
Percentage
Retained
%
Cumulative
Percentage
Passing
%
Total
For, Agency
For, Client
For, M A P T C E L