What is Insulation Coordination?


Definition
Definition in
in IEC
IEC 60071-1
60071-1

Definition
Definition in
in IEEE
IEEE 1313.1
1313.1

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

-2-

Fundamentals of Insulation Coordination


5

Magnitude of (over-)voltage / p.u.

Possible voltages without arresters


4

Withstand voltage of equipment


3

Voltages limited by arresters


0
Lightning overvoltages
(Microseconds)

Switching overvoltages
(Milliseconds)

Temporary overvoltages Highest voltage of equipment


(Seconds)
(Continuously)

Time duration of (over-)voltage

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

-3-

What is Insulation Coordination?


Procedure of insulation coordination [THI-01]
Three
Three elements
elements are
are involved
involved in
in the
the insulation
insulation coordination
coordination discipline,
discipline, namely:
namely:
the
the study
study of
of the
the "stresses",
"stresses", both
both electrical
electrical and
and environmental,
environmental, acting
acting on
on the
the equipment
equipment
insulation.
insulation. This
This is
is usually
usually performed
performed by
by calculations
calculations or
or field
field measurements;
measurements;
the
the study
study of
of the
the "strength"
"strength" (dielectric
(dielectric withstand
withstand characteristics)
characteristics) of
of the
the insulation
insulation (both
(both
new
new and
and aged)
aged) when
when submitted
submitted to
to such
such stresses,
stresses, taking
taking into
into account,
account, when
when applicable,
applicable,
the
the effect
effect of
of the
the environmental
environmental stresses
stresses (pollution,
(pollution, rain,
rain, snow,
snow, ice,
ice, atmospheric
atmospheric
conditions
conditions at
at large
large altidudes),
altidudes), including
including the
the study
study of
of the
the "test
"test and
and measurement
measurement
techniques"
techniques" which
which are
are employed
employed to
to assess
assess such
such strength.
strength. The
The strength
strength is
is determined
determined
by
by calculations,
calculations, based
based on
on suitable
suitable discharge
discharge models,
models, and/or
and/or by
by laboratory/factory
laboratory/factory tests,
tests,
on-site
on-site tests
tests and
and in-service
in-service measurements
measurements (diagnostics);
(diagnostics);
the
the assessment
assessment of
of the
the insulation
insulation performance
performance (usually
(usually expressed
expressed in
in terms
terms of
of risk
risk of
of
failure)
failure) in
in the
the considered
considered situation
situation of
of stresses
stresses and
and strength,
strength, including
including the
the selection
selection and
and
application
application of
of "protective
"protective devices
devices and
and techniques",
techniques", to
to establish
establish the
the final
final insulation
insulation
design
design fulfilling
fulfilling the
the specified
specified requirements.
requirements. This
This may
may be
be based
based on
on "deterministic"
"deterministic" or
or
"statistical"
"statistical" approach.
approach.
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

-4-

Literature (1)
[BAL-04-1]

G. Balzer
Power Systems, Part 2
Chapter 4: Insulation coordination
Script TU Darmstadt, 2004

[BAL-04-2]

G. Balzer
Elektrische Energieversorgung, Teil 2
Kapitel 4: Isolationskoordination
Skript der TU Darmstadt, 2004

[CIG-73]

CIGRE W.G. 13-02


Switching overvoltages in EHV and UHV systems with special reference
to closing and reclosing transmission lines
ELECTRA 30 (1973) pp. 70-122

[CIG-79-1]

CIGRE WG 33.02
Phase-to-phase Insulation Co-ordination:
Part 1: Switching overvoltages in three-phase systems
ELECTRA 64 (1979) pp. 138-158

[CIG-79-2]

CIGRE WG 33.03
Phase-to-phase Insulation Co-ordination
Part 2: Switching impulse strength of phase-to-phase external insulation
ELECTRA 64 1979, pp. 158-181

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

-5-

Literature (2)
[CIG-79-3]

CIGRE WG 33.06
Phase-to-phase Insulation Co-ordination
Part 3: Design and testing of phase-to-phase insulation
ELECTRA 64 1979, pp. 182-210

[CIG-79-4]

CIGRE TF 33-03.03
Phase-to-phase Insulation Co-ordination
Part 4: The influence of non-standard conditions on the switching impulse strength
of phase-to-phase insulation
ELECTRA 64 1979, pp. 211-230

[CIG-91]

CIGRE WG 33.01
Guide to procedures for estimating the lightning performance of
transmission lines, CIGRE technical brochure No. 63, 1991
buch_020.pdf

[CIG-92]

CIGRE WG 33-07
Guidelines for the evaluation of the dielectric strength of external
insulation, CIGRE technical brochure No. 72, 1992
buch_019.pdf

[DOR-81]

H. Dorsch
berspannungen und Isolationsbemessung bei Drehstrom-Hochspannungsanlagen
Siemens AG, Erlangen, 1981 (ISBN 3-8009-1325-9)

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

-6-

Literature (3)
[ERI-88]

A.J. Eriksson, K.-H. Weck


Simplified procedures for determining representative substation impinging lightning
overvoltages, CIGRE report 33-16, 1988

[ETG-93]

ETG-Fachbericht 49
ETG-Tage '93: Isolationskoordination in Hoch- und Mittelspannungsanlagen
vde-Verlag GmbH Berlin, Offenbach (ISBN 0341-3934)

[FGH-78]

FGH Technischer Bericht 1-240


Isolationskoordination auf der Grundlage der neuen DIN/VDE-Bestimmung 0111
FGH, Mannheim, Juli 1978

[HIL-99]

A. R. Hileman
Insulation Coordination for Power Systems
Marcel Dekker, Inc., New York, Basel, 1999

[HIN-00]

V. Hinrichsen
Metalloxidableiter: Grundlagen
Siemens AG Berlin, 1. Auflage 2000
AbleiterBuch.pdf

[HIN-01]

V. Hinrichsen
Metalloxidableiter: Grundlagen
Siemens AG Berlin, Edition 1, 2001
ArresterBook.pdf

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

-7-

Literature (4)
[HIN-03]

V. Hinrichsen
Latest Designs and Service Experience with Station-Class Polymer Housed Surge Arresters
World Conference on Insulators, Arresters & Bushings
Marbella (Mlaga), Spain, November 16-19, 2003, Proceedings pp. 85-96
pub_048.pdf

[KIN-05]

V. Hinrichsen
Latest Testing Requirements and Emerging Standards for Transmission Line Arresters
World Conference on Insulators, Arresters & Bushings
Hong Kong, November 27-30, 2005
inmr_2005_paper.pdf

[KIS-84]

I. Kishizima, K. Matsumoto, Y. Watanabe, New facilities for phase switching impulse


tests and some test results, IEEE PAS TO3 No. 6, June 1984 pp. 1211-1216.

[KOE-93-1]

D. Knig, Y. N. Rao
Teilentladungen in Betriebsmitteln der Energietechnik
vde-Verlag, Berlin, Offenburg, 1993, ISBN 3-8007-1764-6

[KOE-93-2]

D. Knig, Y. N. Rao
Partial discharges in Power Apparatus
vde-Verlag, Berlin, Offenburg, 1993, ISBN 3-8007-1760-3

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

-8-

Literature (5)
[PAR-68]

L. Paris, R. Cortina
Switching and lightning impulse discharge characteristics of large air gaps and long insulation
strings, IEEE Trans on PAS, vol 87, No. 4, April 1968, p. 947-957

[RUD-99-1]

R. Rudolph, B. Richter
Dimensioning, testing and application of metal oxide surge arresters in medium voltage networks
3rd Edition, 1999, ABB Switzerland, 26 pages (also available in German)
application_guide_medium_voltage_networks.pdf

[RUD-99-2]

R. Rudolph, B. Richter
Bemessung, Prfung und Einsatz von Metalloxid-Ableitern in Mittelspannungsnetzen
ABB Schweiz AG, Wettingen (CH), 3. Auflage 1999
Anwendungsrichtlinien_Mittelspannung.pdf

[THI-01]

L. Thione
Insulation coordination in electrical power systems theory and application
Tutorial, ALPI, Milan, 2001 (www.alpiass.com)
buch_018.pdf

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

-9-

Literature (6)
[WEC-07]

K.-H. Weck
Standardization of insulation withstand levels for UHV systems in
IEC TC 28 Insulation co-ordination
IEC/CIGRE UHV Symposium Beijing 18-21 July 2007, report 5-4
5-4_KHWeck.pdf

Overview on CIGRE publications (very interesting!): Cigr Catalogue of Publications 01/07/2005


CATALOGUE_PUBLICATIONS_2005.pdf

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 10 -

Standards (1)
IEC 60071-1, Edition 8.0 (2006-01)
Insulation co-ordination Part 1: Definitions, principles and rules
IEC 60071-2, Third Edition (1996-12)
Insulation co-ordination Part 2: Application guide
IEC/TR 60071-4, First Edition (2004-06)

Insulation co-ordination - Part 4: Computational guide to insulation co-ordination and modelling of


electrical networks
IEC 60099-4, Ed. 2.1, 2006-07
Surge arresters Part 4: Metal-oxide surge arresters without gaps for a.c. systems
IEC 60099-5, Ed. 1.1, 2000-03
Surge arresters Part 5: Selection and application recommendations
DIN EN 60071-1, 1996-07
Isolationskoordination - Teil 1: Begriffe, Grundstze und Anforderungen (IEC 60071-1:1993); Deutsche Fassung EN
60071-1:1995
DIN EN 60071-2, 1997-09
Isolationskoordination - Teil 2: Anwendungsrichtlinie (IEC 60071-2:1996); Deutsche Fassung EN 60071-2:1997
IEEE 1313.1-1996
IEEE Standard for Insulation CoordinationDefinitions, Principles, and Rules
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 11 -

Standards (2)
IEEE 1313.2-1999
IEEE Guide for the Application of Insulation Coordination
IEEE C62.11-2005
IEEE Standard for Metal-Oxide Surge Arresters for AC Power Circuits (> 1 kV)
IEEE C62.22-1997
IEEE Guide for the Application of Metal-Oxide Surge Arresters for Alternating-Current Systems

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 12 -

Organization
1

18.10.2007

Lecture 1

25.10.2007

Lecture 2

01.11.2007

Lecture 3

Voltage stresses

08.11.2007

cancelled

in power systems

15.11.2007

Lecture 4

22.11.2007

Lecture 5

Traveling waves

29.11.2007

Lecture 6

Overvoltage protection incl. protective distance

06.12.2007

Lecture 7

Dielectric strength (incl. gap factors,

13.12.2007

Lecture 8

pollution, rain, parallel insulation, aging)

20.12.2007

Lecture 9

Insulation coordination

27.12.2007

Christmas holidays

03.01.2008

Christmas holidays

10

10.01.2008

Lecture 10

Insulation coordination

11

17.01.2008

Lecture 11

Calculation Examples

12

24.01.2008

Lecture 12

13

31.01.2008

Lecture 13

Test procedures; condition monitoring (life time aspects, partial


discharges, non-conventional approaches)

Fachgebiet
Hochspannungstechnik

Introduction

Overvoltage Protection and Insulation Coordination / Chapter 1

- 13 -

Organization
Examination
Examination
Exclusively oral

Exercises
Exercises
None; but calculation examples in the lecture

Script
Script
Slides will be available for download
www.hst.tu-darmstadt.de
User: studentiso
PW: isows0708

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 14 -

Equipment

System

Insulation Coordination - Principles

Fachgebiet
Hochspannungstechnik

System voltages

Overvoltage
protection devices

stress
versus
strength

Environment

Dielectric
strength
Overvoltage Protection and Insulation Coordination / Chapter 1

- 15 -

Insulation Coordination - Principles


Voltages of the system
Nominal voltage Un
rounded value for characterizing the system
10 kV - 20 kV - 110 kV - 220 kV - 380 kV
System voltage
voltage at which the system is being operated
around the nominal value, but not constant
Highest system voltage Us
highest operating voltage between phases under normal conditions
12 kV - 24 kV - 123 kV - 245 kV - 420 kV (IEC 60038)

Voltages of equipment
Highest voltage for equipment Um
highest voltage between phases for which the insulation is designed
12 kV - 24 kV - 123 kV - 245 kV - 420 kV (IEC 60071-1)
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 16 -

Insulation Coordination - Principles


Overvoltages
voltages exceeding the peak value of the highest system voltage
various amplitudes and shapes depending on
system configuration (grid size, degree of meshing, etc.)
origin of overvoltage (failure, switching, lightning strike etc.)

Dielectric strength of insulation


verified by type test in the laboratory with the help of
standardized test voltages (shape, amplitude)
specified test setups
specified environmental conditions

Insulation coordination
Determination of interdependence between voltages and
overvoltages of the system and necessary test voltages for the
equipment in the laboratory

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 17 -

Insulation Coordination - Principles


Equipment in
the system

Equipment in
the laboratory

Variety
Variety of
of amplitudes
amplitudes and
and
shapes
shapes of
of overvoltages
overvoltages

Standardized
Standardized amplitudes
amplitudes
and
and shapes
shapes of
of test
test voltages
voltages

Variety
Variety of
of operating
operating
conditions
conditions and
and age
age

Standardized
Standardized setups
setups
and
and conditions
conditions

Variety
Variety of
of
environmental
environmental conditions
conditions

Standardized
Standardized
environmental
environmental conditions
conditions

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 18 -

Insulation Coordination - Principles


Insulation phase - ground

bb 1

stressed by voltages between one phase and ground

bb 2

Insulation phase - phase

3
1

stressed by voltages between two phases

Longitudinal insulation

busbar disconnectors

stressed by voltages between same phases of


two different systems
line

3
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 19 -

Insulation Coordination according to IEC 60071-1 (and 60071-2)

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 20 -

Insulation Coordination according to IEC 60071-1 (and 60071-2)

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 21 -

Insulation Coordination according to IEC 60071-1 (and 60071-2)

...39
...39 pages
pages in
in sum
sum

Procedure
Procedure for
for
insulation
insulation
coordination
coordination
== 10
10 pages!
pages!

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 22 -

Insulation Coordination according to IEC 60071-1 (and 60071-2)

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 23 -

Insulation Coordination according to IEC 60071-1 (and 60071-2)

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 24 -

Insulation Coordination according to IEC 60071-1 (and 60071-2)

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 25 -

Insulation Coordination according to IEC 60071-1 (and 60071-2)

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 26 -

Insulation Coordination according to IEC 60071-1 (and 60071-2)

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 27 -

Insulation Coordination according to IEC 60071-1 (and 60071-2)

...125
...125 pages
pages in
in sum
sum

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 28 -

Procedure for Insulation Coordination - General


The procedure for insulation coordination consists of the selection of a set of
standard withstand voltages which characterize the insulation of the
equipment.

Range I

Fachgebiet
Hochspannungstechnik

Range II

Overvoltage Protection and Insulation Coordination / Chapter 1

- 29 -

Procedure for Insulation Coordination - General

withstand voltage

Basic difference between ranges I and II

Minimum
Minimum of
of withstand
withstand
voltage
voltage for
for switching
switching
overvoltage
overvoltage

Range
Range IIII

gap spacing 3 m

Range
Range II

Withstand
Withstand voltage
voltage
continuously
gap spacing 0.5 m continuously
decreasing
decreasing with
with time
time
duration
duration of
of stress
stress

[FGH-78]

peak

time duration of stress


Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 30 -

Procedure for Insulation Coordination in Four Steps


Determination of the representative overvoltages Urp
The representative overvoltages are derived from real service conditions, but have
just standardized shapes.
They are determined in amplitude, shape and duration by system analysis, taking
into account overvoltage limiting devices.

[IEC 60071-1]
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 31 -

Procedure for Insulation Coordination in Four Steps


Determination of the coordination withstand voltages Ucw
The coordination withstand voltages are the lowest values of withstand voltages of
each overvoltage class, for which the expected low failure rate of the equipment is not
exceeded over its full lifetime.
Derived from the representative overvoltages Urp by the coordination factor Kc.

Typical for
Germany:
0.1% per year
 1 failure in
1000 years

[IEC 60071-1]

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 32 -

Procedure for Insulation Coordination in Four Steps


Deterministic
Deterministic approach
approach

Statistical
Statistical approach
approach

Assumed
Assumed maximum
maximum
of
of representative
representative overvoltage
overvoltage

Statistical
Statistical distribution
distribution of
of
representative
representative overvoltages
overvoltages
Determination
Determination of
of
failure
failure probability
probability of
of insulation
insulation

Multiplication
Multiplication by
by coordination
coordination
factor
factor based
based on
on
operating
operating experience
experience

Calculation
Calculation of
of failure
failure risk
risk
depending
depending on
on assumed
assumed
coordination
coordination withstand
withstand voltage
voltage

Coordination
Coordination withstand
withstand voltage
voltage
(0% value)
Statistical
(10% value)
Assumed
Statistical U
Ucw
Assumed conventional
conventional U
Ucw
cw (0% value)
cw (10% value)
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 33 -

Procedure for Insulation Coordination in Four Steps


Determination of the required withstand voltages Urw
The required withstand voltages are determined by converting the coordination withstand
voltages to appropriate standard test conditions.
Usually different from the coordination withstand voltages.
Derived from the coordination withstand voltages Ucw by the safety factor Ks and the
atmospheric correction factor Kt or the altitude correction factor Ka.

[IEC 60071-1]
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 34 -

Procedure for Insulation Coordination in Four Steps


Influences covered by the safety factor Ks

Differences in equipment assembly


Dispersion in product quality
Quality of installation
Aging of the installation during expected lifetime
Other unknown influences

[IEC 60071-1]
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 35 -

Procedure for Insulation Coordination in Four Steps


Determination of the required withstand voltages Urw
The required withstand voltages are determined by converting the coordination withstand
voltages to appropriate standard test conditions.
Usually different from the coordination withstand voltages.
Derived from the coordination withstand voltages Ucw by the safety factor Ks and/or the
altitude correction factor Ka.

[IEC 60071-1]
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 36 -

Procedure for Insulation Coordination in Four Steps


Selection of the rated and of the standard insulation level
(set of standard rated withstand voltages Uw)
Most economical set of standard withstand voltages Uw of the insulation to prove that all
the required withstand voltages are met.
For each range (I or II) a combination of only two withstand voltages defined:
Range I:
standard lightning impulse withstand voltage
standard short-duration power-frequency withstand voltage
Range II:
standard switching impulse withstand voltage
standard lightning impulse withstand voltage
For range I, only phase-to-earth standard withstand voltages are defined, which have to
cover phase-to-earth, phase-to-phase and longitudinal insulation.

Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 37 -

Procedure for Insulation Coordination in Four Steps


Definitions

[IEC 60071-1]
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 38 -

Procedure for Insulation Coordination in Four Steps


Examples for
... non-self-restoring insulation
(power transformers,
instrument transformers*))
*) mixed insulation

Fachgebiet
Hochspannungstechnik

... self-restoring
insulation
(disconnectors,
insulators)

Overvoltage Protection and Insulation Coordination / Chapter 1

- 39 -

Procedure for Insulation Coordination in Four Steps


List of standard short-duration power-frequency withstand voltages (r.m.s. values in kV)

10

20

28

38

50

70

95

140

185

230

275

325

360

395

460

480

510

570

630

List of standard impulse withstand voltages (peak values in kV)

20

40

60

75

95

125

145

170

250

325

450

550

650

750

850

950

1050 1175

1300 1425 1550 1675 1800 1950 2100 2250 2400


[IEC 60071-1]
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 40 -

Procedure for Insulation Coordination in Four Steps


Range I:
Um = 1 kV up to and including Um = 245 kV
The standard voltage values are
all the same for
phase-to-earth-,
phase-to-phase-,
longitudinal
insulation!

[IEC 60071-1]
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 41 -

Procedure for Insulation Coordination in Four Steps


Range II:
Um above 245 kV
Different standard voltage values for
phase-to-earth-,
phase-to-phase-,
longitudinal
insulation!

[IEC 60071-1]
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 42 -

Procedure for Insulation Coordination in Four Steps


Outcome of insulation coordination
For three types of insulation
phase to ground
phase to phase
longitudinal
and for 4 values each of required withstand voltages Urw
required continuous operating voltage
required short-duration power-frequency withstand voltage
required switching impulse withstand voltage
required lightning impulse withstand voltage

 Standardization of tests for equipment


Reduction of these 12 values to a necessary minimum number of
withstand voltages Uw of the insulation
Determination of necessary withstand voltages from tables for two
ranges of highest voltage for equipment
Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 43 -

twelve
voltages

Procedure for Insulation Coordination in Four Steps - Summary


Flow chart acc. to IEC 60071-1
(Figure 1)

[IEC 60071-1]

continued next slide


Fachgebiet
Hochspannungstechnik

Overvoltage Protection and Insulation Coordination / Chapter 1

- 44 -

Procedure for Insulation Coordination in Four Steps - Summary


Flow chart acc. to IEC 60071-1
(Figure 1) (continued)

[IEC 60071-1]