Structural Information | Wembley Stadium

Wembley Stadium
AE 390 Wembley Stadium, London

Structural Information
As can be seen in the single line diagram (Figure 1), the loads will follow a large number of paths to the
foundations below. Snow, live, and dead loads are all transferred through a complex web of steel and
reinforced concrete to the base. The cross bracing at the interface between the roof structure and bowl, as
well as reinforcing steel in the bowl help to resist the lateral load created by wind.

Figure 1 Single line diagram showing the load paths through the building structure.

Figure 2 Steel roof structure being erected during construction. This web of steel is used to channel the
roof and snow loads to the outside of the bowl structure, in accordance with the No obstructed view
requirement set by the client.

ae390wembleystadium.wordpress.com/struc/

1/4

11/12/13

Structural Information | Wembley Stadium

Figure 3 Aerial view of Wembley Stadium during steel roof erection. With no columns to support the roof
inside the stadium, a complex web of steel was used to channel loads out to the bowl edges.

Follow

Follow Wembley
Stadium
Get every new post delivered
to your Inbox.
Enter your email address
Sign me up

Pow ered by WordPress.com


Figure 4 This section shows the required
sight lines set forth by the Football Association, as well as the

slope of the roof structure.

Figure 5 BIM models of the stadium, showing stressing and design.

ae390wembleystadium.wordpress.com/struc/

2/4

11/12/13

Structural Information | Wembley Stadium

Figure 6 Seen in this figure are the pile locations used in the construction of Wembley Stadium. A number
of pile cap layouts were utilized for this project, from 2-piles to 5-piles per pile cap. As can be seen at the
Eastern Arch Base there were 19 piles combined under one pile cap to support the load from the 440 foot
high 1040 foot long arch.

Figure 7 This soils cross-section at the location of the Eastern Arch Base shows the layout of the 19 piles in
the pile-cap. Also shown is the depth to which these piles were required to reach in order to support the load
created by the arch.
Upon reaching the ground, the loads are dispersed into a series of 4000+ piles which stretch up to 45 meters
(approx. 150 feet) into the earth (seen in Figures 6 & 7). This is required in order to reach soil that is suitable
for supporting the overall loads of the stadium.
Structural Calculation
Structural Analysis and Description
Home
Share this:

ae390wembleystadium.wordpress.com/struc/

3/4

11/12/13

Structural Information | Wembley Stadium


Twitter

Facebook

Like

Like this:

Be the first to like this.

Wembley Stadium
The Twenty Ten Theme.

Blog at WordPress.com.

ae390wembleystadium.wordpress.com/struc/

4/4

You might also like