Professional Documents
Culture Documents
PRODUCT
CFRP Plate S512, m.
QUANTITY
REASON
3. Bank Building
Bangkok
Bangkok
Chonburi
Chonburi
7. SukhoThai Palace
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
22. Cinema
Bangkok
PRODUCT
QUANTITY
REASON
22. Cinema
Bangkok
Bangkok
Bangkok
25. Cinema
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Chonburi
Bangkok
Bangkok
Bangkok
KhonKean
CholBuri
72.00
58.60 Increase load capacity of slab (Post Tension)
40. Lotus_BangKapi
Bangkok
CholBuri
CholBuri
57.00
Bangkok
Bangkok
Ayuthya
PRODUCT
CFRP Fabric, sq.m.
QUANTITY
REASON
Bangkok
Bangkok
ChiangMai
Bangkok
Phuket
Cambodia
CholBuri
150.00
222.00
54. Supercenter
Bangkok
55. Supercenter
Bangkok
56. Supercenter
Bangkok
Bangkok
Bangkok
KhonKean
480.00
42.00
Bangkok
61. Hotel
Bangkok
Bangkok
63. Hotel
Bangkok
44.00
64. Factory
Bangkok
Bangkok
66. Factory
Bangkok
PRODUCT
QUANTITY
REASON
Bangkok
60.00
Krabi
Bangkok
Phuket
67. Hotel
bearing of columns.
Bangkok
71. CP_Klang
Rayong
Bangkok
73. BTS-Discovery
Bangkok
Bangkok
Bangkok
Bangkok
Suwannaphumi
(ongoing)
Bangkok
78. Apartment
Bangkok
79. Embassy
Bangkok
Bangkok
Bangkok
Bangkok
83. University
Bangkok
84. Apartment
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
90. Apartment
Bangkok
PRODUCT
QUANTITY
REASON
Bangkok
Bangkok
93. Hotel
Bangkok
94. Hotel
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
Bangkok
102. Lotus-BangKapi
Bangkok
Bangkok
Bangkok
105. Hotel
Pattaya
106. BMA_HQ-2
Bangkok
107. TPAC
Rayong
Bangkok
109. Temple
Bangkok
110. Hotel
Chonburi
Chonburi
112. House
Bangkok
113. Condominium
Chonburi
tendon loss.
114. BTS 2nd Phase
Bangkok
Chonburi
PRODUCT
CFRP Plate S512, m.
QUANTITY
REASON
Bangkok
118. House
Bangkok
3.00
119. Factory_Preedeepanomyong
Bangkok
120. Factory_TPAC
Rayong
Bangkok
Bangkok
Pattaya
124. Hotel
Pattaya
Bangkok
Bangkok
Bangkok
128. Hotel
Bangkok
Bangkok
Bangkok
131. University
Bangkok
132. Condominium
Bangkok
133. Apartment
Chonburi
Bangkok
Bangkok
Bangkok
PRODUCT
Bangkok
Bangkok
Bangkok
Bangkok
139. Condominium
QUANTITY
REASON
140. University
142. Condominium
Bangkok
Rayong
Bangkok
145. Hospital
Bangkok
Conclusion
69,460.58
930.50
260.00
28.00
80.10
10,488.96
The Solution :
To stitch the cracks on both sides of brick wall with
20 m2 the CFRP Fabric.
The Solution :
To strengthen the columns with the CFRP Plate and
CFRP fabric. Total length of the CFRP Plate was employed 1,800.40 m.
and 202.74 sq.m.
The Solution :
To confine the columns with 2 layers of CFRP fabric
The total CFRP Fabric was employed 366 m2.
The Solution :
To confine the 1.30 x 1.30 x 3.40 m.columns with
60 sq.m. of the CFRP fabric.
The Solution :
fabric.
The Solution :
CFRP fabric.
The Solution :
To confine the columns with 2 layers of CFRP fabric
2
The total CFRP Fabric was employed 540 m . To install the CFRP Plates
on the slabs that was employed 5,032 m.
The Solution :
To strengthen the segments with the 2,628.07 m. of
CFRP Plate for flexural strength and shear strength. (on going)
The Solution :
To strengthen the cross beam with the CFRP Fabric.
Total CFRP Fabric 110.04 sq.m.
The Solution :
To strengthen the cross beam with the CFRP Plate.
Total length of the CFRP Plate was employed 168.0 m. and CFRP Fabric
56.13 sq.m.
The Solution :
To strengthen the beams with the 1,176.30 m. of
CFRP Plate for flexural strength and 114.27 sq.m.of CFRP fabric for shear
strength.
The Solution :
To strengthen the girder with the CFRP Plate for
flexural strength and CFRP fabric for shear strength.
The Solution :
To strengthen the beams with the 1,176.30 m. of
CFRP Plate for flexural strength and 114.27 sq.m.of CFRP fabric for shear
strength.
The Solution :
To strengthen the slab and beams with the 117.0 m.
of CFRP Plate for flexural strength.
The Solution :
To inject the cracks with the low viscosity epoxy resi
to the beam. Then to install the CFRP Plate S 1012 at the bottom of the
beams and top of slabs for the negative moment. The S 1012 was
employed 351 m. and S 512 was employed 1,071.9 m.
The Solution :
To strengthen the cross beam with the CFRP Fabric.
Total CFRP Fabric 100.36 sq.m.
The Solution :
To strengthen the slab and beams with the 68.30 m.
of CFRP Plate for flexural strength and 24.0 sq.m. of CFRP fabric for
shear strength.
The Solution :
To cut the post tensioning slab and strengthen at the
corners of the opening with the CFRP plate at the top and bottom of slab
to control the stress and all sides on the top of slab. Total length of the
CFRP was employed 74.1 m.
The Solution :
Strengthening with the CFRP Plate S 512 system at
the stress concentration zone. The total length of CFRP Plate S 512
employed was approx. 80 m.
The Solution :
Strengthening of 2 reinforced concrete beams with
78 m. of CFRP Plate S-1012 for increasing flexural strength and 13.2 m.
of CFRP Plate S 512 for increasing shear strength.
The Solution :
To cut the post tensioning slab and strengthen
around the opening with the CFRP plate at the top and bottom of slab
to control the stress. Total length of the CFRP was employed 30.0 m
The Solution :
To strengthen the beams with 44 m2 of the CFRP
fabric for shear strength and 84 m. for flexural strength.
The Solution :
To fill up the coring hole with the non shrink material
and strengthen the slab with 58.6 m. of the CFRP Plate S 512 on both
sides of slab.
The Solution :
To increase the load capacity of lift core with the
130 m. of CFRP Plate S 512 by diagonal reinforcement.
The Solution :
To design 1-way and 2-way slabs of Carbon Fibre
Reinforced Polymer. Total length of CFRP Plate S 512 was employed
245 m. for slab.
The Solution :
To design 1-way and 2-way slabs of Carbon Fibre
Reinforced Polymer. Total length of CFRP Plate S 512 was employed
231 m. for slab and S1012 was employed 42 m. for beams.
The Solution :
To design 2-way slab of Carbon Fibre Reinforced
Polymer. Total length of CFRP Plate S 512 was employed 234 m. for
slab and 5 m. of type S 1012 for beams.
The Solution :
To strengthen the opening with 160 m2 of the CFRP
fabric on the top and bottom of slab to control the propogation of crack
due to concentration of stresses.
The Solution :
Strengthening of the reinforced concrete beam with
246 m. of CFRP Plate for increasing flexural strength and shear strength
of beams with 46 m2 of CFRP Fabric.
The Solution :
Strengthening of the reinforced concrete slabs and
beam with 70 m. of CFRP Plate S 512 and 4 m. of S 1214 for shear and
flexural strength.
The Solution :
To cut the post tensioning slab and strengthen at the
corners of the opening with the CFRP fabric at the top and bottom of slab
to control the stress and all sides on the top of slab. Total area of the
CFRP was employed 200 sq.m.