You are on page 1of 3

PAGE

PT. Heat Exchangers Indonesia

PEARLOIL (SEBUKU) LTD.


Contract No. 001/POSL/TDR/RUBY-EPC/II/2010

PROJECT

: RUBY FIELD DEVELOPMENT PROJECT

PO No.

: 21165-PO-RUBY-MEP-000064

DOCUMENT TITLE
DOCUMENT NO.
HEI DOC. NO.

: VENDOR DATA BOOK


: RB-HEI-PLT-QA-IX-2001
: MDRI-BO1205

EQUIPMENT TAG NO. : 213-V-03


PACKAGE NAME

ORIGINATOR

REV

DATE

PURPOSE

26 July 2012

As Built

CHECKER

APPROVER

PT . Heat Exchangers Indonesia


NAME

10

: SEAL GAS SCRUBBER

Yogga

NAME

Haris

NAME

Bayu

APPROVAL

APPROVAL

APPROVAL

WPI

MEI

Company

NAME

NAME

NAME

DATE

PEARLOIL (SEBUKU) LTD.

RUBY FIELD DEVELOPMENT PROJECT


VENDOR DATA BOOK

DOCUMENT NO :

RB-HEI-PLT-QA-IX-2001
REVISION : 10
PAGE

: 2 of 3

TABLE OF CONTENT
No.
1.0

Document Number

Rev

Description

No. of

Book

Sheets

No.

Engineering & Fabrication Document


RB-HEI-PLT-MS-CL-2001

10

Design Calculation

210

RB-WPI-PR-DS-213-V-03

Process Datasheet

16

1.2

RB-WPI-PLT-MS-SP-1001-0

User Design Specification

42

1 of 2

1.3

RB-HEI-PLT-MS-GA-2001

10

General Arrangement Drawings

1 of 2

RB-HEI-PLT-MS-DR-2001

10

Construction Detail

RB-HEI-PLT-MS-DR-2012

10

Nozzle Detail

RB-HEI-PLT-MS-DR-2023

10

Manhole Detail

RB-HEI-PLT-MS-DR-2034

10

Name Plate Detail

RB-HEI-PLT-MS-DR-2045

10

Lifting Arrangement

Not Applicable

1.1

1.4

2.0
2.1

3.0

1 of 2

1 of 2

Manuals
-

Manufacturing and Quality Documents

3.1

RB-HEI-PLT-QC-PR-2013

10

Welding Procedure Map

14

1 of 2

3.2

RB-HEI-PLT-QC-PR-2026

10

NDE Map and NDE Summary

1 of 2

List Welding Procedure Register

3.3

RB-HEI-PLT-QC-PR-2014

10

WPS-HEB-C004P1SMAW

10

RB-HEI-PLT-QC-PR-2015

10

WPS-HEB-C002P1GTSMAW

10

RB-HEI-PLT-QC-PR-2016

10

WPS-HEB-127P1SMSAW

RB-HEI-PLT-QC-PR-2017

10

WPS-HEB-C001P1GTSAW

10

RB-HEI-PLT-QC-PR-2018

10

WPS-HEB-226P1GMSAW

RB-HEI-PLT-QC-PR-2019

10

WPS-HEB-225GMFCAW

RB-HEI-PLT-QC-PR-2020

10

WPS-HEB-063100

10

RB-HEI-PLT-QC-PR-2021

10

WPS-HEB-109-P8GTSMAW

RB-HEI-PLT-QC-PR-2022

10

WPS-HEB-C005P8P1SMAW

RB-HEI-PLT-QC-PR-2023

10

WPS-HEB-105

RB-HEI-PLT-QC-PR-2025

10

Weld Repair Procedure

1 of 2

NDE Procedure
RB-HEI-PLT-QC-PR-2027

10

Radiography Test Procedure

24

RB-HEI-PLT-QC-PR-2028

10

Ultrasonic Test Procedure

28

RB-HEI-PLT-QC-PR-2029

10

Magnetic Particle Test Procedure

14

RB-HEI-PLT-QC-PR-2030

10

Liquid Penetrant Test Procedure

11

3.5

RB-HEI-PLT-QC-PR-2031

10

List of NDE Personnel

15

1 of 2

3.6

RB-HEI-PLT-QC-PR-2033

10

Hydrostatic Test Procedure

1 of 2

3.4

1 of 2

DOCUMENT NO :

PEARLOIL (SEBUKU) LTD.

RB-HEI-PLT-QA-IX-2001

RUBY FIELD DEVELOPMENT PROJECT


VENDOR DATA BOOK
No.

Document Number

Rev

3.7

RB-HEI-PLT-QC-PR-2032

10

3.8

RB-HEI-PLT-QC-PR-2034

10

4.0
4.1

REVISION : 10
PAGE

: 3 of 3

No. of

Book

Sheets

No.

1 of 2

32

1 of 2

Inspection and Test Plan

12

2 of 2

Inspection Release Notes

2 of 2

2 of 2

2 of 2

35

2 of 2

118

2 of 2

2 of 2

108

2 of 2

2 of 2

16

2 of 2

Description
Heat Treatment Procedure
Surface Preparation & Painting
Procedure

Test & Inspection Reports/Certificates


RB-HEI-PLT-QC-PR-2001

4.2

10

Code Certificate (MIGAS / ASME

4.3

Code form )
Welder

4.4

and

Welding

Operator

and

Welding

Operator

Register
Welder

4.5

MIGAS / ASME Certificates

4.6

Material Traceability with Certificates

4.7

Welding Traceability

4.8

NDE Reports

4.9

Dimensional Reports
Pressure Test Records & Calibration

4.10

Certificates

4.11

Name-plate Rubbing/ Photocopy

2 of 2

4.12

Heat Treatment Reports

2 of 2

4.13

Painting Reports

2 of 2

2 of 2

5.0

5.1

Spare Part List for Start-up/Commissioning/2 Years Operation


Spare part of commissioning & Two
RB-HEI-PLT-PG-LT-2003

Years Operation List