RATE ANALYSIS

Note: Labour Constants have been taken from IS: 7272 (Part I)
1 Excavation and Earth Works a) Excavation over areas (Hard/dense soil ), depth
up to I.5 m and removal ( up to one metre from edge ) Quantity Considered Sr. No
1 a) b) Labour/Material/Others Labour Mate Mazdoor Sum 2 Water @ Sum 3 Contract
or's Profit @ Total For 10m3 3 Therefore, Per m 10 m3 Day 1 1 earthwork 3 Quatit
y/10m Rate Per 0.6 6.2 1.50% 10% 162 day 166 day Amount in Rs. 97.38 1030.13 112
7.51 16.91 1144.42 114.44 1258.86
126.00
2 Plain Cement Concrete Unreinforced concrete 1 : 4 : 8 in foundations including
mixing, pouring, consolidating and curing: 1) Hand mixed cement concrete Quanti
ty Considered Sr. No Labour/Material/Others a) b) c) 2 a) b) c) 1 Labour Mason M
azdoor Bhistie Materials Cement bags Sand Coarse Aggregates Sum 3 Water @ 4 Tool
s and Machinery Sum
3 10 m
concrete Quatity/10m3 Rate Per 1 21.3 7 34.34 4.77 182 day 166 day 162 day 329 b
ag 3 437 m
3
Day 1 1 1
Amount in Rs. 181.80 3539.00 1136.10 11290.99 2083.54 10217.34 28448.77 426.73 5
00.00 29375.50 Page 1 of 6
Calculation of Materials For 10 m dry concrete = 15.5 m3 wet concrete Therefore,
cement required = 15.5 / (1 + 4+
3
8)
Therefore, cement required = Density of Cement = Cement Required = Therefore, Ce
ment Required = 1 bag of cement = No. of Cement bags reqd. = No. of Cement bags
reqd. = Sand Required = Coarse Aggregates Reqd. =
1.19 1440 1.19 1717
m kg/m3 x 1440 kg
3
50 kg 1717 / 50 34.34 bags 3 4.77 m 3 9.54 m
9.54 1071 m 1.50% Lump sum

5 Contractor's Profit @ Total For 10m3 Therefore, Per m3


10%
2937.55 32313.05
3232.00
3 Concrete Reinf. cement concrete 1 : 1.5 : 3 insitu in foundations, concrete fo
otings bases tor columns, etc excluding form work and reinforcement Quantity Con
sidered Sr. No Labour/Material/Others 1 Labour a) b) c) d) e) f) 2 a) b) c) Maso
n Mazdoor Bhistie Mixer Operator Mixer Vibrator Materials Cement bags Sand 81.16
4.23 329 bag 437 m
3 3
10 m3 Day 1 1 1 1 1 1
concrete Quatity/10m3 Rate Per 1.7 20 9 0.7 0.7 0.7 182 166 162 182 182 182 day
day day day day day
Amount in Rs. 309.06 3323.00 1460.70 127.26 127.26 127.26 26685.41 1847.66 9049.
95 43057.56 645.86 500.00 44203.42 4420.34 48623.76
Calculation of Materials 3 For 10 m dry concrete = 15.5 m wet concrete Therefore
, Cement required = 15.5 / (1+ 1.5 +
3
3)
Cement = Density of Cement = Cement Required = Therefore, Cement Required = 1 ba
g of cement = No. of Cement bags reqd. = No. of Cement bags reqd. = Sand Require
d = Coarse Aggregates Reqd. =
2.82 1440 2.82 4058 50 4058 81.16
m kg/m3 x 1440 kg kg / 50 bags
3
4.23 m3 8.45 m3
Coarse Aggregates Sum 3 Water @ 4 Tools and Machinery Sum 5 Contractor's Profit
@ Total For 10m3 3 Therefore, Per m
8.45 1071 m 1.50% Lump Sum 10%
4863.00
4 Brick work ( Straight Walls) a) Brick work in walls exceeding one brick thick,
in cement mortar 1: 4 Quantity Considered Sr. No Labour/Material/Others 10 m3 D
ay brickwork Quatity/10m3 Rate Per Amount in Rs. Page 2 of 6
Calculation of Materials Size of Modular brick is 20 x 10 X In 1 m3, no of brick
s = 1 / 0.2 / In In 1 m3, no of bricks = 500 5000 nos nos 10 m3, no of bricks =
10 cms 0.1 / 0.1

1 a) b) c) 2 a) b) c)
Labour Mason Mazdoor Bhistie Materials Bricks Cement bags Sand Sum Sum
1 1 1
9.4 18 2 5000 20.08 2.79 1.50% 10%
182 day 166 day 162 day 5.8 nos 329 bag 3 437 m
1708.92 2990.70 324.60 29000.00 6602.30 1218.67 41845.20 627.68 42472.88 4247.29
46720.17
Size of Actual Brick is For 1 m3, Actual volume of by bricks=
y bricks= Volume of cement mortar = Volume of cement mortar =
tions = Add 10% for frogs, wastage = For 10 m3 of brickwork =
work = 3 For 10 m dry mortar = For 10 m3 of c.m, Cement = For
For 2.79 m3 of c.m. = Density of Cement = Cement Required = 1
. of Cement bags reqd. = Sand Required =

Actual volume of b
Add 10% for undula
For 10 m3 of brick
2.79 m3 of c.m. =
bag of cement = No

19 x 500 0.77 1 0.23 0.25 x 0.19 m3 - 0.77 m3 m3


9x x
9 cms 0.09 x 0.09
3 Water @ 4 Contractor's Profit @ Total For 10m Therefore, Per m3
3
0.28 m3 10 x 0.28 m3 of cement mortar 2.79 m3 of cement mortar 3 12.5 m wet mort
ar
3 2.5 m
4673.00
2.79 0.7 1440 1004 50 20.08
x 2.5 / 10 m3 of cement kg/m3 kg kg bags 3 2.79 m
5 External Plastering: Cement plaster mixing of mortar Assume: Bottom Layer in c
ement mortar the top Layer being in cement mortar Quantity Considered Sr. No 1 a
) b) c) 2 a) Labour/Material/Others Labour Mason Mazdoor Bhistie Materials Cemen
t bags
15 mm thick over brick walls ( exterior ) including 10 mm thick 1 : 5 and 5 mm t
hick 1: 3 10 m2 Day 1 1 1 surface area, over which plaster is applied. Quatity/1
0m3 Rate Per Amount in Rs. 0.6 1 1 1.23 182 day 166 day 162 day 329 bag 181.80 1
66.15 162.30 404.42 Page 3 of 6
On c.m. c.m. Add Add
Calculation of Materials 10 m2, the quantity of cement mortar in bottom layer, i
n bottom Layer= 10 x 0.01 in bottom Layer= 0.1 m3 10% for undulations = 0.11 m3
10% for wastage, etc. = 0.12 m3
3
For 10 m dry mortar = For 10 m3 of c.m, Cement = For 0.12 m3 of c.m. = For 0.12
m3 of c.m. = Density of Cement = Cement Required = 1 bag of cement = No. of Ceme
nt bags reqd. = Sand Required =

12.5 m wet mortar 3 2.08 m 0.12 0.03 1440 36.3 50 0.73 x 2.083 / 10 m3 of cement
kg/m3 kg kg bags
3
3 0.13 m

b) 3 Water @
Sand Sum Sum
0.18 1.50% 10%
3 437 m
4 Contractor's Profit @ Total For 10m Therefore, Per m2
2
78.62 993.29 14.90 1008.19 100.82 1109.01
On c.m. c.m. Add Add
10 m2, the quantity of cement mortar in top layer, in top Layer= 10 x 0.005 in t
op Layer= 0.050 m3 1% for undulations = 0.051 m3 10% for wastage, etc. = 0.056 m
3 12.5 3.13 0.056 0.017 1440 25 50 0.5 m3 wet mortar m3 x 3.125 / 10 m3 of cemen
t kg/m3 kg kg bags
3
111.00
3 For 10 m dry mortar = For 10 m3 of c.m, Cement = For 0.06 m3 of c.m. = For 0.0
6 m3 of c.m. = Density of Cement = Cement Required = 1 bag of cement = No. of Ce
ment bags reqd. =
Sand Required =
0.05 m
6 Flooring: Precast terrazo tile flooring 20 mm thick laid over thick cement mor
tar: 1: 4 including Laying, cutting, grinding and polishing Quantity Considered
Sr. No 1 a) b) c) d) e) 2 a) b) c) 3 Water @ Sum 4 Contractor's Profit @ Total F
or 10m2 10% Labour/Material/Others Labour Mason Mazdoor Bhistie Mazdoor Machine
Materials Tiles Cement bags Sand Sum 10 m Day 1 1 1 1 1
2
10 mm Size of a Terrazo tile is In 1
3
Calculation of Materials 250 x 250 1 / 16 160 1 0.010 0.011 0.012 10 0.12 0.25 /
0.25 nos nos x 0.01 m3 m3 m3 x 0.012 m3 of cement mortar m3 of cement mortar 3
12.5 m wet mortar 3 2.5 m 0.12 0.03 1440 43.6 50 0.87 x 2.5 / 10 m3 of cement kg
/m3 kg kg bags
surface area, over which flooring is laid. Quatity/10m Rate Per 182 166 162 166
182 day day day day day Amount in Rs. 218.16 332.30 162.30 830.75 727.20 12000.0
0 286.06 52.42 14609.18 219.14 14828.32 1482.83 16311.15 Page 4 of 6
m2, no of tiles =
1.2 2 1 5 4 160 0.87 0.12 1.50%
75 nos 329 bag 3 437 m
In 1 m2, no of tiles = In 10
e of cement mortar = Add 10%
f terrazo tiling = For 10 m2
m3 of c.m, Cement = For 0.12

m2, no of tiles = Volume of c. m. over 1 m2 = Volum


for undulations = Add 10% for wastage = For 10 m2 o
of terrazo tiling = 3 For 10 m dry mortar = For 10
m3 of c.m. = For 0.12 m3 of c.m. = Density of Cemen

t = Cement Required = 1 bag of cement = No. of Cement bags reqd. =

Therefore, Per m2 Following has been assumed: Labour Mate Mason Mazdoor Bhistie
Mixer Operator Mixer Vibrator Machine Operator Rate/day 162.3 181.8 166.15 162.3
181.8 181.8 181.8 181.8
1632.00
Sand Required = Material Rate Per Unit Cement Sand Coarse Aggregates Bricks Terr
azo Tiles
3 0.12 m
Rate 329 bag 437 m3 1071 m3 5.8 no 75 no
Austin S. Rodrigues, Lecturer, Government
Polytechnic Panaji
Page 5 of 6

Page 6 of 6