Construction
C
t ti Plan
Pl off
400MW Thermal Power Plant
July 29, 2010
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
Project Background
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
Project Background
The Project construction includes coal resources development, 400MW
thermal power plant and transmission power lines etc.
The project is located at Ashpushta, Kohmard District, Bamyan Province.
Job place
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
The power plant will be built near the coal prospecting area
area.
The estimated installed gross capacity is 400MW, and the total
investment is preliminary planned to be 500 million US Dollars. The total
area of the p
plant would be 667000m2 and the p
power p
plant includes steam
turbine workshop, electric workshop, chemical treatment workshop and
boiler workshop. Two 20MW steam turbo-generators will be installed in the
steam turbine workshop which is environment-friendly thermal power
generating units of high capacity
capacity, high dimension and high efficiency
efficiency. It
requires 1.5million tons of fire coal annually and annual power generating
capacity is 2.88 billion kwh.
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
Work principle
MJAM combines
generall planning
bi
l i andd key
k points
i breakthrough
b kh
h in
i
the work and divides the working area into West Section, East Section
and Middle Section. The priortity sequence of coal prospect is No. 1
Layer of Lower jurassicWest
jurassic West Section and then No
No. 7 Layer of the
Middle jurassic, East Section, and finally the Middle Section
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
Prospecting Sequence
The survey will follow the
standard of: from the known to the
unknown,
k
ffrom the
th shallow
h ll
tto th
the
deep, from the center to the sides.
The drilling
g p
plan includes 13
survey lines, 21 holes and 10630
total footage, and will be adjusted
according the discovered coal
reserve situation.
10
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
Progress Achieved
East
Currently
been
completed
E t Section:
S ti
C
tl 3 drilling
d illi holes
h l have
h
b
l t d and
d
one is in operation. One drlling hole discoveres 4 layers of coal, the
thickest 2.5M and the thinnest 0.5M. Another discovers 7 uneven
layers of coal, the thickest 2.8M.
Drilling for the West and Middle Section is in preparation and can
be started the moment security arragements are confirmed.
Up to July 25, 2010, the total footage done is 1052M, 22% of the
2010 annual plan
plan.
Drilling for the whole working area is designed to be completed in
2010 and a survey report will be submitted in April 2011.
11
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
12
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
he ttaxes submitted
h
b itt d by
b Aynak
A
k Project
P j t after
ft the
th sucessful
f l operation
ti will
ill
improve financial status of the Government.
As the largest foreign investment in Afghansitan, Aynak Project is
progressing smoothly and efficiently with the active support of Ministry of
Mines. The successful construction and production of Aynak Copper Project
will surely attract more foreign investment to Afghanistan.
Aynak Project will adopt advanced mining, concentrating and smelter
t h l
technology
and
d provide
id ttraning
i ffor llocall employees.
l
All thi
this will
ill d
definitely
fi it l
accelerate the sceince and technology advance of Afghanistan and benefit
Afghan people.
13
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
15
MJAM
MCC-JCL Aynak
Minerals Company
y
p y Ltd.
Thank you!