You are on page 1of 3

CHIRANJIIB KUMAR MAITI

VILL- NIJJOT GARU


POTA,
TAMLUK, EAST M EDINIPUR
PIN- 721647 (W.B)
Email- maitichiranjib@gmail.com
Ph.no-08884817881

CAREER OBJECTIVE
To work in a dynamic and challenging Career in Oil and Gas Sector where I grow with the company in
the light of its success.
ACADEMICS
Diploma in Mechanical Eng. on 2012
B.Sc. on 1997
ITI on 1996
IT Credentials: Naviswork.
PERSONAL DETAILS
Date of Birth
Marital Status

: 16th April 1975


: Married

TOTAL EXPERIENCE: 14+ YEARS OF EXPERIENCE IN PIPING, EQUIPMENT, STRUCTURAL

(OIL & GAS, POWER PLANT, CEMENT PLANT)


PROJECT EXECUTED:
SL.
ORGANIZATION
NO.
1.
Simplex
Infrastructures Ltd.
-Kolkata

NATURE OF
DESIGNATION
BUSINESS
Mangalore
Engineer (Construction)
Refinery Project
Ltd
:
Oil & Gas
Client :EIL

FROM

TO

Apr 2013
Current

SL.
ORGANIZATION
NO.
Simplex
Infrastructures Ltd.
-Kolkata

Simplex
Infrastructures Ltd.
-Kolkata

Durha Construction
Pvt Ltd

Durha Construction
Pvt Ltd
Durha Construction
Pvt Ltd

Durha Construction
Pvt Ltd

Own

NATURE OF
DESIGNATION
BUSINESS
HPCL,Vizag:
Oil & Gas
Jr Engg (Mechanical)
Client: TOYO
BALCO Korba ,
Chattishgarh :
1200MW
Captive Power
plant
Client : SEPCO
Lafarge Cement
IndiaLtd:
Jamshedpur,
Tata: Cement
Plant
Client: L&T
Dalmia Cement
Ltd, Ariyalur :
Cement Plant
Dalmia Cement
Ltd,
Cadappa,A.P :
Cement Plant
Crusher Plant
Fabrication &
Installation
Client: L&T
Crusher Plant
Fabrication &
Installation
Client: L&T

FROM

TO

Sept 2011

Mar 2013

Sr. Supervisor ( Mechanical)

Apr 2010

Aug 2011

Lead Supervisor

Mar 2009

July 2010

Lead Supervisor

Apr 2008

Feb 2009

Lead Supervisor

Jan 2007

Mar 2008

Lead Supervisor

June 2002

Dec 2007

Jan 2000

May 2002

JOB PROFILE:

Maintaining good relationship and liaising with client and consultants.


Reviewing drawings of Structural, Equipment, and Piping.
Execute Piping work using different kind of 3D Model
Executing stage wise structural steel work like Pipe Rack, onsite fabricated buildings, .
Executing stage wise Piping work (A.G Piping).
Executing stage wise Equipment Work (Rotary & Static)
Day to day planning of resources and equipments.
Material Reconciliation.

PRESENT EMPLOYER: Simplex Infrastructures Ltd.


Reporting to HOD Construction

Current Project: - Mangalore Refinery Project Ltd, Mangalore


Designation: Engineer (Construction)
Responsibilities:
Execute the over ground process and package piping, Equipment Erection, installation

along with various type of valve erection and fabrication.


Execute the job as per ISO drawing, manpower, machineries, and tools tackle arranged

as per job.
Job related all types of report prepare.
Material reconciliation.
LANGUAGE KNOWN:
English , Hindi, Bengali
PERSONAL STRENGTHS
Self-confidence, Sincere, Adaptable, Committed, Hardworking, Self-motivated & Listener.

DECLARATION
I hereby declare that the above information is true and correct to the best of my Knowledge and belief.

Chiranjib Kumar Maiti

You might also like