Professional Documents
Culture Documents
TENDER
FOR
CONSTRUCTION OF NEW BUILDING FOR NIGHT SHELTER
SHELTER AT ODHAV TP2, FP-9, Opp BHIKSHUKGRUH,
NR. SERVODAYA PARK SOCIETY , ODHAV
(B)
(C)
A Printed Booklet for TENDER FOR ELECTRIC WORK for Roads and Building
Department Government of Gujarat.
The above may be referred of the printed booklets of PWD which may also be
available from Gujarat Book Stores, Sector-21, Gandhinagar 382 021.
Note:
01. The work shall be carried out in accordance with the relevant specifications
contained in PWD Hand Book Vol. I & II with the correction slips from time
to time or the latest addition.
02. The reference as indicated with page Nos. are as per the above referred
Booklets
Sr. No. of
the Item
in the
Schedule
-B of
Tender
1
2
3
4
5
6
Description of items
Sr. No. of
the Item
Description of items
in the
Schedule
-B of
Tender
d For Beams / breackates at all Levels in M20
e For Coping as per detail in M20
f For in staircase with steps / Kadi Tappa, waist
slab and landing at any height and level as
directed In M20
g For Lintels at All level as per design in M20
h For any Type of Chajja at all levels in M20
7
Providing TMT bar reinforcement for R.C.C.
work
8
Brick work in (1:6)
a foundation and plinth
b For Ground
c For First floor
d For Terrace
9
Brick work in Partition (1:4)
a For Ground
b For First floor
c For Terrace
10
15 mm thick Single coat "Mala" plaster (1:4)
11
12
13
14
15
16
17
18
19
20
21
22
Sr. No. of
the Item
in the
Schedule
-B of
Tender
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Description of items
White washing
Providing and fixing boards / sheets as
specified below including cutting to required
size and shape , fixing with aluminum glazing
clips or triangular beading including screws,
putty etc., complete, Using 12mm thick flat
pressed three layered wood based melamine
faced pre laminated particle board bonded
with Phenol formaldehyde with a decorate
laminate of same colour on both sides NOVOPAN PLT / BHUTAN BOARD Exterior grade or equivalent.
Providing & Fixing CI (Footrest) Step in
concrete in under ground tank, Sump, Over
head Tank
Providing, making, fixing & anchoring of
reinforcing bars or dowels or rebar including
drilling the holes, fixing the bars and grout the
bar with Hilty Hit -HY150
Providing and laying Name plate of different
Size on S.S.316 grade,18 gauge moulded
edges plate
Providing & fixing Floor mounting European
Closet
Providing & fixing Wash basin with single
hole for pillar Cock with C.I. or M.S. brackets
Providing & fixing white vitreous Flat back
urinal of size 440x315x265mm with Flushing
System
Providing and fixing, Stainless steel sink
Providing & fixing in position 15 mm C.P.
brass pressmatic bibcock of best quality
Sr. No. of
the Item
in the
Schedule
-B of
Tender
38
39
40
41
42
43
44
45
46
47
48
49
Description of items
Sr. No. of
the Item
in the
Schedule
-B of
Tender
50
51
52
53
Description of items
field whose effects may be transmissible to other Termites and leads to eradication of the colony.
It acts by interfering with the transmission in the nervous system and resulting in their death.
We are injecting concentrated Chemical Emulsion for Anti Termite treatment for creating
chemical barrier under & around column pits, wall trenches, basement, excavation, top surface of
plinth filling junction of wall and floor along external perimeter of the building, expansion joints,
surrounding of pipes conduits etc.
PRE CONSTRUCTION TREATMENT
1. Bottom surface and side pits up to a height of 30 cm will be treated @ 05(Five) Ltr.
Chemical Emulsion per Sq. Mtr. of surface area.
2. Back fill earth in immediate contact with the foundation structure will be treated @ 7.5 Ltr.
per Sq. Mtr. of the vertical surface of substructure of each side.
3. Treatment of RCC foundations: Treatment should start at depth of 50 cm below ground
level @ 7.5 Ltr. per Sq. Mtr.
4. Treatment of top surface of plinth filling: The top surface of the earth consolidated within
plinths wall shall be treated with Chemical Emulsion @ 05(Five) Ltr. per Sq. Mtr. of the
surface before the sand bed or sub grade is laid.
5. Soil treatment along external perimeter of building: Earth along the external walls of the
building should be treated at an interval of 15 cm and to a depth of 30 cm exposing the
wall surface. Chemical Emulsion will be poured along the wall @ 7.5 Ltr. per Sq. Mtr of
vertical surface.
POST CONSTRUCTION TREATMENT
The treatment comprises of drilling holes at the wall and floor junction level and filling it after
pumping in sufficient quantity of chemical.
This ensures a continuous chemical barrier for termites to make an entry and protect the treated
structure.
1. Treatment to wall and floor junction:
Holes of diameter 12 mm (1/2" approx.) are drilled at approximately 30 cm (12 inches) intervals
along the inner junction of wall and floor in the entire premise. Water based chemical will be
injected under pressure into these holes, to create a barrier against termite.
2. Treatment to soil under floor:
If the subject premises on the ground floor and if cracks are noticed on the floor because of
construction joints, expansion joints or shrinkage, the soil below floor needs to treated. Holes of
12 mm (1/2" approx.) dia 30 cm apart will be drilled along the cracks and water based chemical
will be injected under pressure into these holes.
3. Treatment to wooden fixtures:
Holes of diameter 12 mm (1/2" approx.) will be drilled at the base of wooden works such as
window frames; door frames etc. inset in the flooring and chemical will be injected. A oil based
chemical will be sprayed on all the wooden work infested by termites within the premise.
4. Treatment to termite tubes:
Visible shelter mud tubes will be removed and the infested area treated with Water base
chemical.
5. All the drilled holes will be sealed and made good using cement
In the case Soil Treatment along External Perimeter of a Building is done as:
Item No. 7.
The relevant specification of Item No. 14.29, P-84 of GTS book shall be followed except that
broken glaze or ceramic tiles pieces are to be used. The broken pieces shall be of approved color,
size and manufacturer and the floor shall not be polished but cleaned with water and mild oxalic
acid.
Item shall be paid on sqm basis for complete finished work.(Only plan area shall be measured)
Item No.15.
Providing and laying water proofing treatment on the slab/toilet sunk/Mosaic Surface. The
Treatment includes cleaning the surface, making 'V' groove of cracks, sealing the groves
with Polysiloxana Polymer bound material, laying reinforce fiber cloth with three coats of
Poly-Acrylic eastern latex coatings with cement in 1:2:78 proportion. (For Toilet sunk
portion)
3-4 days and ponds test is conducted. The coating converts in to flexible & impact resistant
matrix.
Item No.19.
Providing and fixing 18mm thick kesariyaji Green marble( approved by Architect) gang saw
cut mirror polished (premoulded and prepolished) machine cut for Doors &window sills,
Doors & Window Jams, (One Piece) as and similar locations of required size of approved
shade, colour and texture laid over 20mm thick base cement mortar 1:4 (1 cement : 4
coarse sand) with joints treated with white cement, mixed with matching pigment, epoxy
touch ups, including rubbing, curing moulding and polishing to edge to give high gloss
finish etc. complete at all levels.The rate includes rounding, champhering and mirror
polishing of edges, facias of kesariyagi green marble, including necessary bonding
adhesive like Araldite or equivalent.
Providing and fixing thick kesariyajiGreen marble ( approved by Architect) slab of 20 mm thick
(Uniform Thickness), machine cut edges in sill and jambs /shelves (in single piece) as per detail,
including, making zaries in brick wall and fixing with cement mortar (1:4) etc., Finishing and
polishing with all respect, etc. complete.
MODE OF MEASUREMENT:
The solid core type flush door shutter shall be decorative or non decorative type as specified in the
drawing. The size of the shutter shall be specified in drawing or as directed. Thickness of shutter
shall be 35mm with 1mm thick decorative lamination sheet both side of shutter. Colour and design
of lamination sheet shall be finalize by Architect / Consultant or as specified in drawing or as
directed. The timber species for core shall be used as per I.S. 2202 ( Part-I) 1980. The timber
shall be free from decay and insect attack. Knots and knot holes less than half the width of cross
section of the members in which they occur may be permitted. Pitch pockets, pitch streaks and
harmless pin holes shall be permissible except in the exposed edge of the core members. The
Commercial plywood, cross- bands shall conform to I.S. 303-1275.
The face panel of the shutters shall be formed by gluing by hot press process on both faces of the
core with ether plywood or cross-bands and face veneers or wooden Ghana teak wood Patti.
The al edges of the door shutters shall be square. The shutters shall be free from twist or warp in
its plane. Both faces of the shutter shall be papered with 1mm thick lamination as directed.
THE SHUTTER SHALL BE TESTED FOR
1) End immersion test: The test shall be carried out as per I.S. 2202 (part I) 1980.
There shall be no delamination at the end of the test.
2) Knife test: The face panel when tasted in accordance with I.S. 1659-1979 shall
pass the test.
3) Glue adhesion test: The flush door shall be tested for glue adhesive test in
accordance with I.S. 2202(part I) 1980. The shutters shall be considered to have passed
the test if no delamination occurs in the glue lines in the plywood and if no single
delamination more than 80mm. in length and more than 3mm. in depth has occurred in
the assembly glue lines between the plywood face and the style rail. Delamination at the
corner shall be measured continuously around the corner. Delamination at the knots,
knot holes and other permissible wood defects shall not be considered in assessing the
sample.
The tolerances in size of solid core type flush door shall be as:
In normal thickness _+ 1.2 mm
In Normal height _+ 3.0 mm
The thickness of the shutter shall be uniform throughout with a permissible
variation of not more than 0.8 mm. when measured at any two points.
MODE OF MEASUREMENT:
Dimensions is computed in square meter, rounded to two places of decimal
Item No-23
Providing and fixing FRP frame size 125x65mm and 35mm thick FRP shutter with wood
grain raised panel design finish shutter having extra reinforcement on side and edges and
in GEL coat finish. The core of shutter is to be filled up with injected fiber extinguishing
grade polyurathane foam done in situ along with embedded wooden pieces for stiffening
and also for taking hinges and fixtures. The whole FRP frame and shuter is to be
waterproof , weatherproof, termiteproof and resistance to mild acid/ Alkali resistance
including S.S. hinges with necessary screws and alluminium fixturesand fastening.(Product
should have 3-years performance guarantee)
Material
35 mm. thick shutter in depressed panel design shall be having 1.5 to 2mm. Thickness
fire extinguishing grade F.R.P. skin, Sandwich panel of 4mm. Plywood and embedded
wooden pieces for stiffing as well as holding hinges and fixture, all molded into a one
piece shutter, Core material shall be injected fire extinguishing grade rigid polyurethane
foam done in situ having density 32 to 36 Kg. /m3 compressive strength 1.8 to 2
Kg./Cm2 flexural strength 3.5 to 4.5 Kg. Cm2. Whole shutter shall be weather proof,
water proof, termite proof and mild Acid / Alkali resistance. As well as same material
for frame section of detailed size.
Shutter
35 mm. thick depressed panels F.R.P. shutter shall be join less, It shall be straight and
smooth and of standard shape finish in jell coat. All necessary fixture and fastening
shall be fixing where wooden pieces are provided.
Workman ship
Shutter shall be fixed in true line, level and proper manner having 2.0 to 3.0 mm. ply
that is Air space for smooth and easy working three S.S. hinges shall be fixed properly
with necessary screws.
Fixtures and fastening.
All others fixture likes aluminum Aldrops - tadi / Baby latch - handles shall be fix with
shutter in usual manner.
Tolerance
10
MATERIALS:
(1) Approved door, windows, and ventilator sections as per drawing using 'Jindal'
Aluminum Sections.
(2) Fixtures and fastenings including handles, stoppers, aluminum safety grills of
approved design, locking arrangement, rubber and felt gaskets for stopping leakage of
water and air.
PROCEDURE:
Aluminum door, windows, and ventilator s should be prepared from selected 'Jindal'
sturdy aluminum sections for outer frame as well as shutter frame, as per drawing. The frame shall
be fixed to the jams and sill with appropriate Rubber Gasket to prevent any leakage of water. The
shutters shall be fitted to framing with appropriate hinges fixed by riveting. A felt gasket be
fixed between the shutters for preventing leakage of air from the room.
Approved Anodized aluminum handles, adjuster stoppers and locking mechanism be used.
Aluminum safety grills of approved design are fixed to the window frame by riveting.
INCLUSIONS:
Cost of All aluminum sections, screws, fasteners and all labour for making and fixing are
included. Labour for removal of old frame, if any, is included.
MODE OF MEASUREMENT:
Measurement of lengths of all Aluminum sections in outer window frame and shutter
frame are recorded, weight is computed from standard section-weights. Weight of all fixtures,
fastenings, screws, handles, hinges, adjuster stoppers, panels etc. are excluded. No increase be
permitted due to anodizing. Payment is done by weight computed up to two decimals in kg.
Glass/wooden panels are paid separately.
Item no-25
Providing and fixing sheet glass, tinted glass selected quality, modi guard, saintgoibain, fixing
in alluminum window, lovers, vision panel, etc.
All glass shall be best quality, free from specks, bubbles, smokes, veins, air holes blisters and other
defect. The kind of glass to be used shall be mentioned in the item or specification or in special
provisions or sawn in detailed drawings. Thickness of glass panels shall be uniform. The
specifications of different kind of glass are as under. :
11
In absence of any specified thickness or weight in the item or detailed specification of the
item of work, sheet glass shall be weighing 7.5 K.G. /Sq.m. For a panels up to 600 mm. X
600mm.
For panels larger than 600mm. X 600 mm. & upto 800mm. X 800mm. the glass weighing
not less than 8.75 K.g./Sq.m. shall be used. For bigger panels up to 900mm. X 900mm. the
glass weighing not less than 11.25 K.g./Sq.m. shall be used.
Sheet glass shall be patent flattened glass of best quality and for glazing & framing purpose
shall conform to I.S.1761-1960. Sheet glass of the specified color, style, shape & design
shall be used, if shown in detailed drawing or so specified. For important buildings and for
panels with any dimension over 900mm. plate glass of specified thickness shall be used.
Plate Glass: When plate glass is specified, it shall be Polished patent plate Glass of best quality. It
shall have both the surface ground flat and parallel & polished obtain clear undisturbed vision and
reflection. The plate glass shall be of thickness mentioned in the item or as sawn in detailed
drawing or as specified. In absence of any specified thickness, the thickness of plat glass to be
supplied 6mm. and a tolerance of 0.20 mm. shall be admissible.
Clear dimensions of glass rounded off to nearest centimeter are recorded and area computed in
square meters, rounded to 2 places of decimal.
Item no-29
Providing and fixing boards / sheets as specified below including cutting to required size
and shape, fixing with aluminum glazing clips or triangular beading including screws, putty
etc., complete, Using 12mm thick flat pressed three layered wood based melamine faced
prelaminated particle board bonded with Phenol formaldehyde with a decorate laminate of
same colour on both sides - NOVOPAN PLT / BHUTAN BOARD - Exterior grade or
equivalent.
12
Item no-31
Providing, making, fixing & anchoring of reinforcing bars or dowels or rebar including
drilling the holes, fixing the bars and grout the bar with Hilty Hit -HY150 grouting chemical
,all labours, all tools &plants, necessary scaffolding, etc but excluding the reinforcement
steel completed for all lead & lift as per directed by clerk of works or Structural consultants
or Architect. For all lift, levels and Leads.
MATERIALS:
Use adhesive - Hilti HIT- HY-150, 2-component Epoxy Mortar in Capsule (Foil Pack) form.
PROCEDURE:
Clean the surface of existing concrete, accurately mark the positions of holes for anchor bars
and drill holes of appropriate diameter and depth. Clean the holes with special round wire-brush of
appropriate diameter and remove fine dust from the hole with the help of blow-out pump. For 8 and 10
mm dia. bars, prepare a putty of epoxy mortar as per the directions of the supplier and fill the same in
the hole. Insert the end of the bar in the hole gradually and allow the mortar to set.
In case of bars of diameter 12 and above, use appropriate adhesive specified by the supplier in
the foil pack, after cleaning the holes as above. Insert the bar gradually in the hole, puncturing the foil to
permit spreading of adhesive in the hole and on the surface of the bar. These operations should be done
under guidance and supervision of trained applicator of the Company.
Remove excess adhesive oozing out of the hole and wipe the bar clean before lapping another
bar for reinforcement and/or before concreting.
INCLUSIONS:
All materials associated with the adhesive inclusive of all equipment for drilling, cleaning the
holes etc, and labour for application including supervision by trained applicator are included.
MODE OF MEASUREMENT:
Measurements are taken in Numbers of Anchored bars of different diameters.
Item no-32
Providing and laying Name plate of different Size on S.S.316 grade,18 gauge moulded
edges plate with engravings alpha bate latter of size 4" with filling radium - black colour in
letters, with fixture fastening etc. Complete. as per detail & directed by consultant /
engineer in charge.
Materials
Stainless Steel plats 18 guage.
Workmanship
Cutting, hosting, edge molding or bending & any other works should be completed by C.N.C.
automotive laser printer or cutter formatter incl. Scanning or drafting as per details.
Mode of Measurements
The measurement for payment shall be per sq. cm. of sign board in position. The unit rate includes
the cost of materials, labor tools, drilling of holes, riveting or welding, fixing, curing, lettering,
painting as directed by Engineer-in-charge.
Item No-33
Providing & fixing Floor mounting European Closet Suit P/S-Trap white with PVC pan
connector, Jet spray, pvc connection, 15mm concealed cock, seat & lid (heavy duty) C.P.
brass hinges, including all internal fittings complete with rubber buffers, C.P. nuts, bolts,
etc with 25mm Concealed flush cock & making good the wall and floor.
13
European W.C. of glazed vitreous china shall be wash down, single or double symphonic type,
floor or wall mounted set, flushed by means of flush valve as specified in Bill of Quantities.
Flush pipe / bend shall be connected to the W.C. by means of suitable rubber adopter. Wall hung
W.C. shall be supported by C.I. floor mounted chair.
Each W.C. seat cover shall be so fixed that it remains absolutely stationary in vertical position
without falling down on the W.C. Seat cover shall be of white solid plastic, elongated open front
with heavy duty hinges. Exposed fixture trims shall be Chrome plated, and trims of similar
function shall be by the same manufacturer.
Flush valves shall be of the best approved quality procurable with C.P. control valve and C.P.
flush pipe.
The flush pipe/bend shall be connected to the WC by means of a suitable rubber adopter.
Alternatively if flushing cistern to be used shall conform to the requirements of IS: 774-1971.
High level cisterns shall be of cast iron unless otherwise specified. Low level cistern shall be of the
same material as the water closet or as instructed by the Owner/Architect/ Consultant. The cisterns
shall be mosquito proof & shall fulfill the requirements of the local Authority.
The levels of the WC should be checked by placing sprit level on the W.C. W.C. should be tested
on completion of fixing by putting small paper balls and flushing out. If all the paper balls are not
flushed out. The fixing will have to be rectified / re-aligned.
The rate shall be for a unit of one number
Item No-34
Providing and fixing, best Indian make, white glazed vitreous chinaware wash hand basin
of Hindware -mario or as approved by the Architect, of white colored, with single or
double hole for pillar tap, comprising of : a) White glazed vitreous chinaware wash basin,
with supporting MS or C.I. brackets. b) 1 no. 40 or 32 mm C.P. cast brass bottle trap with
extension piece to wall, wall flange with rubber adopter for waste connection and one
waste coupling. c) 1 no. heavy quality C.P. brass angular stop cock, 15 mm size. d) 1 no. 15
mm n.b. heavy quality C.P. brass inlet connection with unions at end. The supporting
bracket shall be painted with 3 coats of approved paint of approved shade.
A) Wash Basin: Hindware Mario-10087 or Equi.550 X 400mm
1.0
Materials:
1.1
The wash basin, the C.P. brass pillar tap, the C.P. brass bottle trap, the C.P. brass
angular stop cock and inlet connection shall conform relevant specifications of
plumbing materials. The bracket shall conform to IS: 775. All materials shall be of 1st
quality, of recommended make or equivalent, as approved by the Architect and
Engineer-in-charge.
2.0
Workmanship:
2.1
The wash basin shall be fixed on the wall or counter, as and where directed. The wash
basin shall be supported on a pair of MS or C.I. brackets fixed in CM 1:3 (1 cement: 3
sand). The brackets shall conform to IS : 775-1962. The wall plaster on the rear shall
be cut to rest the top edge of the wash basin. After fixing the basin, plaster shall be
made good and surface finished to match with the existing one.
14
2.2
The bracket shall be painted with 3 coats of approved ready-mixed paint of approved
shade.
2.3
The C.P. brass bottle trap and union shall be connected to 40 or 32 mm dia. waste
pipe, which shall be suitably bent towards the wall. It shall discharge into an open
drain leading to a gully trap or direct into the gully-trap on the ground floor and shall
be connected to a waste pipe through a floor trap on the upper floors. C.P. brass bottle
trap and union may not be provided where the surface drain or a floor trap is placed
directly under the basin and the waste is discharged into it vertically down.
2.4
The height of the front edge of the wash basin from the floor level shall be 80 cm or as
specified in the drawing
2.5
The necessary inlet, outlet connections and fittings such as pillar cocks or sensor tap,
C.P. brass waste coupling, waste pipe, stop cock, bottle trap chain with rubber plug,
etc. shall be fixed.
3.0
3.1
The rate includes cost of all labour, materials, tools and plant, etc. required
For satisfactory completion of this item as specified.
3.2
Item No-35
Providing & fixing white vitreous flat back urinal of size 440x315x265mm with Flushing
System with matching Urinal in one sleek, compact unit. C.I. hangers and 32mm dia cast
bottle trap and pipe to wall with C.P. flange complete including urinal valve auto closing
system with built in control cock including cutting and making good the walls and floors
wherever required.
URINAL: HINDWARE OR EQU. WHITE-60001
Angular stop cock with extension pipe spreader complete
WASTE COUPLING: HINDWARE OR EQU. : No F850002(FULL THREAD)
1.0
Materials:
1.1 The white vitreous chinaware flat back wall hung urinal of specified size shall
conform to relevant specification of plumbing material. C.P. brass heavy quality
spreader and C.P. brass waste coupling shall be of approved quality. The C.I. bracket
shall conform to IS: 775. All materials shall be of the best quality, of recommended
make or equivalent, as approved by the Architect and Engineer-in-charge.
2.0
Workmanship:
2.1
The urinal shall be fixed in position by using wooden plugs and screws and shall be at a
height of 65 cm, from the floor level to the top of the lip of urinal, unless otherwise
directed. The wooden plugs shall be 50 mm x 50 mm at base tapering to 38 mm x 38
mm at top and 50 mm in length and shall be fixed in wall in CM 1:3: (1 cement : 3
coarse sand). The urinal shall be connected to 32 mm dia. flexible P.V.C. pipe, which
shall discharge into the channel or floor trap. The connection between the urinal, waste
coupling and waste pipe shall be made by means of putty or white, clear safe do mixed
15
with chopped hemp. Necessary connecting C.P. brass pipe between stop cock and
spreader along with necessary connection shall be provided for flushing the urinal.
3.0
3.1
The rate includes cost of all labour, materials, tools and plants, etc. required for
satisfactory completion of this item.
3.2
Item No-36
Providing and fixing, Stainless steel sink, ( Nirali / Carysil Make ) single bowl, of
approved make, as recommended or equivalent, of size 950 x 510 x 230 mm,
comprising of : a) Stainless steel sink supported on MS or C.I. brackets. b) 40 mm n.b.
C.P. brass waste coupling with rubber plug and C.P. chain. c) PVC waste pipe 40 or 32
mm dia., 1 for each sink up to top of trap.
1.0
Materials:
1.1
Stainless steel sink, 40 mm C.P. brass waste coupling with rubber plug and chain
shall conform to relevant specification of plumbing material.
2.0
Workmanship:
2.1
The S.S. kitchen sink shall be supported on a pair of MS or C.I. brackets, fixed
in CM 1:3 (1 cement: 3 coarse sand). The MS or C.I. brackets shall conform to
IS: 775. The wall plaster on the rear shall be cut to rest the top edge of the sink,
over it. After fixing the sink, the plaster shall be made good and the surface
finished to match with the existing one.
2.2
The C.P. brass trap and union shall be connected to 40 mm dia. nominal bore
waste pipe (as per drawing), which shall be suitably bent towards the wall. It
shall discharge into a `P' trap leading to a gully-trap or direct into the gully trap
on the ground floor and shall be connected to a waste pipe through a floor trap
on the upper floors. C.P. brass trap and union may not be provided where surface
drain or a floor trap is placed directly under the sink and the waste is discharged
to it vertically down.
2.3
The height of the front edge of the sink from the floor level shall be 80 cm or as
shown in drawings.
3.0
3.1
The rate includes cost of all labour, materials tools and plant and other
equipment required for satisfactory completion of this item, as described in item.
3.2
16
Item No-37
Providing & fixing in position 15 mm C.P. brass pressmatic bibcock of best quality
(For Drinking water fountain area)
1.0
Materials:
1.1
15 mm dia. C.P. brass screw down shall conform to IS: 781, as per relevant
specification of plumbing materials. The push type tap shall be of 1st quality, of
jaguar as recommended, or equivalent make, or as approved by Architect and
Engineer-in-charge.
2.0
Workmanship:
2.1
The screw down push type tap, 15 mm dia. as specified above shall be fixed as
directed. The threaded portion shall be smeared with white or red lead and
provided with a few turns of fine spun yarn round the screwed end of the pipe
and if necessary, the joint shall be done with teflon tape. The push type tap shall
be than screwed and fixed to, in a water tight position.
3.0
3.1
The rate shall includes cost of all labour, materials, tools and plant, etc. required
for satisfactory completion of this item.
The rate shall be for a unit of one number.
3.2
Item No-44
Supply, installation, testing and commissioning of gunmetal, male or female threaded
isolation control valve (Ball Valve), confirming to IS 778, PN 1.0, , with screwed ends,
20 kg/m2, on GI or White PVC lines with necessary specials, unions, nipple etc., to
complete the job. (For external work)
1.0
Materials:
1.1
The gun metal gate full way wheel valve of specified dia. shall conform to IS:
778 and relevant specifications of plumbing materials. All material shall be of
1st quality of recommended make or equivalent, as approved by the Architect
and Engineer-in-charge
2.0
Workmanship:
2.1
The gun metal gate valve shall be fully cleared of all foreign matter, before
fixing. The fixing of valve shall be done by applying locktite 55 or Teflon tape
on Male screwed ends. The jointing shall be leak proof. A union shall be
provided near each GM valve, stopcock or check valve.
3.0
3.1
The rate includes all labour, materials, tools and plant, etc. required for
satisfactory completion of this item.
17
3.2
Item No-45
Supplying, installing, testing and commissioning of centrifugal submersible monoset
pumps with S.S. casing, Bronze impeller, SS Shaft and driven by 415 V AC, 3 phase,
50HZ., motor running at 2900 rpm speed, of best Indian make vertical single/multi
stage centrifugal electric motor driven pump sets (with 50 % efficiency), to handle 80
LPM of clean cold water against 35 M total head, motor (not more than 2.0 H.P.) and
shall be supplied with all accessories viz., strainer, base plate, coupling, lift hook,
chain, starter panel, cabling up to panel, earthing ,and delivery pipes & valves etc.,
complete. Vertical Submersible Pumps, MOC SS 304 (U.G.Tank to O.H. tank).
1.0
Materials:
1.1
2.0
Workmanship:
2.1
3.0
3.1
The rate includes cost of all labour, material, tools and plants etc. required for
satisfactory completion, testing and commissioning of this item as described
above.
3.2
Item No-52
Boring and sinking of percolation well having 350 mm diameter of bore well with 150
mm dia, MS casing pipe as per specification with approved system as approved by the
Consultant and Engineer-in-charge complete and clearing the site on completion of
depths from: 1) 60 m.
1.0
General
1.1
1.2
The contractor shall make his own arrangement at his own cost for supply of
water and power at site required for the work as also for storing materials, watch
and ward etc.
18
1.3
1.4
Drilling will be done in all soils including rock, gravel and sand. If required, the
boring will be carried down to a depth of 240 m. If at any depth, further drilling
becomes impracticable; the bore will be abandoned and paid for as specified,
provided that the failure is due to reason other than the fault or negligence on the
part of the Contractor.
1.5
The Contractor shall prepare and maintain the following records carefully and
accurately at the site during the period of construction and hand them over to the
Employer/Consultant at the time of handing over the tube well:
(a) Records of strata encountered at various levels
(b) Daily progress of boring
(c) Details of water bearing strata
1.6
Air Compressor of suitable capacity for the work shall be arranged for by the
Contractor at his own cost for developing and testing of the well.
2.0
Site Clearance: The Contractor shall at his own cost clean the site of any trees,
growth, grass and rubbish to enable him to execute the work in proper manner.
On successful completion of the work the Contractor shall clean the site for all
surplus material, equipment and accessories.
2.2 Requirement: The yield for the well shall be approximately 200 liters/min by
compressor.
2.3 Type of Well : Tube well shall be sunk with direct/reverse circulation or any
approved method with 35 cm diameter M.S. well pipes and 15 cm diameter
strainers, gravel packed.
2.4 Boring: Boring shall be 350 mm diameter to a maximum depth of 240 meters.
The depth may be increased or decreased as per actual site conditions. Sub-Soil
water shall not be tapped. Boring shall be done by a hydraulic direct/reverse
rotary mud flush drilling machine (rig) mounted on a truck.
2.5 Well Pipes: Well pipes shall be 150 mm diameter M.S. pipe conforming to IS:
3589 having thickness 6.35 mm. A bail plug with hook shall be provided at the
bottom. Length of pipe is measured without MS strip. Casing pipe should be rust
free; bitumen solution should be coated on the outer surface.
2.6 Strainers: A low carbon galvanized screen with 1.0/1.5 mm slots strainer-pipe is
recommended. The size of the strainer will be designed to suit the size of water
bearing coarse sand, in the midst of which the strainer is to be lowered and fixed.
19
2.7 Verticality: Well assembly shall be truly vertical as per the latest Indian
Standard.
2.8 Gravel Packing : Annular space between the strainer and naked bore hole shall
be packed up with pea-shape gravel (3 mm to 6 mm size), such that shrouding
shall be done up to a height of 6 m. from the top of strainer and to a depth of 3
m. below the strainer. The remaining annular space shall be packed with puddle
clay.
Payment shall be made only for gravel shrouding. No payment will, however, be
made for puddle clay/clay ball packing and the rates shall be deemed to be
inclusive of the same.
2.9 Development: The well shall be developed by an over pumping unit or an air
compressor to make the tube well water completely sand free. After the
installation of pump set the tube well water shall remain sand free after a trial run
of 8 hours a day for one month. The Contractor shall have to ensure complete
sand free water supply from the tube well.
2.10 Yield Test: This test is to establish the yield of aquifer and to decide capacity of
the pump. A pump of higher capacity, preferably double, is to be installed
temporarily with V-notch chamber and should run on constant discharge rate and
water level measured at very close interval time during initial stage of pumping.
After 4 hrs of continuous running of pump, the same shall be stopped and water
level noted at close intervals as the recouping process continues until water level
again attains the original static level. This should be continued till this status is
achieved.
2.11 Data: The contractor shall provide necessary data regarding yield and
depression.
2.12 Water Tests: The Contractor shall get the water tested for its quality by an
approved Private or Government Health Laboratory. Bacteriological and
Chemical tests shall be conducted at any intermediate level and also after the
development of well as directed by the employer/consultant. The tests reports
shall be submitted to the employer.
2.13 Soil Samples: Samples of each stratum shall be taken at every 3 M or often if
the strata change. The samples shall be carefully indexed and preserved at site
for inspection by the Consultant and the Engineer-in-charge.
2.14 Strata Chart: A strata chart in a standard tube well form shall be maintained at
the site and shall give the following information:
a. Description and depth of strata.
b. Aquifers at which strainer pipes have been placed.
c. Position of joints in strainers and/or blind pipes.
d. Rate of progress of drilling.
e. Full particulars of final test.
Four copies of strata charts, yield and water supply quality tests shall be handed
over to the employer on completion of the well.
20
2.15 Failure: In case of failure during boring process and rejection of the tube
well/bore no payment will be made to the Contractor for the work.
3.0 Mode of Measurement and Payment:
1.0 Rates quoted shall be for complete items and inclusive of all equipment, labour,
scaffolding, tackles, etc., required to do a complete job.
1.1 Rates shall be inclusive of all taxes, e.g. VAT, Excise Duty, surcharge etc.
SR NO.
1
2
3
ITEM
Anti Termite
Cement
Steel
4
5.
6
7
8
9
10
11
12
13
14
Floor Tiles
Wall Tiles
Flush Doors
Laminate
All Furniture Harware
Aluminum
Adhesive
Glass
Paver Block-Kerbing
FRP Doors
Construction
Chemicals
Texture
Paint
15
16
APPROVED MAKE
Avitus India Pest Management Pvt. Ltd.
Ambuja/Ultra-Tech/Sanghi/Jk-Laxmi
Tata, Sail, Vizag, Electro-Therm, National,
Gujarat Nre Cock
Marbito/Asian/Simpolo
Bajaj/ Euro Or Equivalent
Century/Green Wood/Mayur.
Sundek/Marinolam/Bloom.
Godrej/Kich/Dorset
Jindal/Hindalco/Banco.
Fevicol, Century.
Asai / Saint Gobain/ Modi Quard
Alcock/Alto Or Equivalent
Everest Or Equivalent
Cico/Fare Mate /Fosroc/Contech
Heritage/ Sherwin Williams
Asian/Berger/Nerolac
1.2 Rates for above items shall be inclusive of all accessories, threading sockets and
labour for extraction of boring, casing pipes, and lowering tube well assembly
and providing proper grip to the assembly to keep it in position without any
settlement.
1.3 No payment will, however, be made for puddle clay packing and the rates shall
be deemed to be inclusive of the same.
1.4 In case of failure to obtain water or water in required quantity, the Contractor
shall only be paid for Labour rate for boring as per length or bore actually done at
site. No other claims shall be entertained by the Employer.
1.5 The payment shall be for a unit of one number.
21
SECTION - VII
LIST OF APPROVED MAKE
All Material used shall be FIA & BIS approved.
Plumbing items Make list.
SR.NO.
1
ITEM
APPROVED MAKE
FINOLEX / SUPREME /
PRINCE / ASTRAL / KISAN
FINOLEX / SUPREME /
PRINCE / ASTRAL / KISAN
FINOLEX / SUPREME /
PRINCE / ASTRAL / KISAN
C.I.COVERS,
GIRCO /
RAJULA
TIRUMALA
PIPE
10
11
BALL VALVES
AUDCO /
ZOLOTO
12
WHEEL VALVES
LEADER / ZOLOTO
13
DCV/NRV
R.B. /LEADER /
15
CHAMPION/CAPTAIN
16
22
LEADER
/
/
17
BATH FIXTURES
JAQUAR OR EQUIVALENT
18
SANITARY FIXTURE
PARRYWARE/CERA
/HINDWARE
19
TAR
SHALIBIND / TIKIBOND-BS
20
PUMPS
KIRLOSKAR/ GRUNDFOSS/
21
R.O. PLANT
22
PUMPS
GRUNDFOSS/ KIRLOSKAR
23
MOTOR
KIRLOSKAR / CROMPTON /
GEC / SIEMENS
24
STARTER
SIEMENS / L&T
25
PRESSURE GAUGE
BELLS / H GURU
Electrical Works
A.
Material Specification
Section - 1
E-1
Section - 2
E-2
Section - 3
E-3
Section 4
E-4
Bus Duct(-NA-)
Section - 5
E-5
Section - 6
E-6
D.G . Set(-NA-)
Section - 7
E-7
MV Switchgear(-NA-)
Section - 8
E-8
Distribution Board(-NA-)
Section - 9
E-9
Cable Trench(-NA-)
23
Section -10
Section- 11
E-12
Section-12
E-13
Section-13
E-14
Internal Wiring
Section-14
E-15
Section-15
E-16
Earthing
Section-16
E-17
Section-17
E-18
Miscellaneous
Section-18
E-19
External Lighting
Section-19
E-20
Television System
Section-20
E-21
Section-21
E-22
Section-22
E-23
Section-23
E-24
Section-24
E-25
PA System(-NA-)
Section-25
E-26
UPS (-NA-)
Applicable Standards
24
Scope :
The specification covers H. T. cable laying and H. T. joints of outdoor type and
certain safety materials required to be kept in the substation for the safety
purposes.
5.2
5.2.1
H. V. Cable type
3 core cable circular standard Copper conductors, XLPE extruded dielectric,
copper tape screened and PVC over sheathed. The cables will be constructed
with steel wire armour.
Cables shall be capable of operating at a sustained conductor temperature of 90 C
and suitable for a maximum conductor short- circuit temperature of 250 C.
5.2.2
IEC-540
cables and chords.
IEC-229
IEC-287
(100% load factor).
IS-708(part-II)
IS-5831-1984
IS-3975
cables.
IEC-885(2)-1987 partial discharge test.
IS-10810
IEC-811
IEC-230
IEC-859
5.2.3
OPERATING CONDITIONS
Electric System
- System Voltage
- Frequency
- Short Circuit current
Environment
- Ground Temperature
- Ambient Air temperature
- Atmospheric Conditions
5.2.4
CONSTRUCTION
a)
Conductors
11.0 KV RMS
50 Hz.
14.1 AND 17.39 KA for 1 Second.
45 C
55 C
Dry and dusty
The conductors shall be of circular stranded Copper to IEC- 228. Sizes shall be
from 3x50 mm2 upto 3x400 mm2. Final cable sizes shall be approved by Client.
The conductors shall be compacted stranded circular. It shall be clean,
reasonably uniform in size & shape smooth & free from harmful defects. Any
other form of conductor may also be accepted if in line with modern trends.
b)
c)
Conductor Screen
The conductor screen shall consists of an extruded layer of thermosetting
semi-conducting compound which shall be extruded simultaneously with the
core insulation.
d)
Insulation
The insulation shall be super clean XLPE compound applied by extrusion and
vulcanized to form a compact homogeneous body.
e)
Insulation Screen
Each insulation have an insulation screen in two parts consisting of
(I) A water barrier tape/ Non-metallic semi conducting sellable tape part and a
metallic screen part
(ii) The non-metallic part shall be directly applied upon the insulation of each
core and may consist of an impregnated butylnylon tape or a similar approved
material or, an extruded semi-conducting material extruded simultaneously with
the conductor screen and insulation (triple extrusion).
The semi-conductor shall be readily strippable and must not be bonded in such a
manner that it has to be shaved or scraped to remove.
The metallic part shall consist of a copper tape helical applied with a 30 %
overlap. Over the water barrier tape/ blocking tape. A binder tape of copper shall
be applied over the copper wire metallic screen.
f)
Laying Up
26
The cores shall be identified on the non-metallic part of the insulation screen by
legible printing on the length of each conductor or, by the inclusion of a marker
tape.
The cores shall be laid up with a right-hand direction of lay.
Binder tape /Moisture barrier
During lay up, a suitable open spiral binder may be applied, at the manufacturers
discretion, before the application of an extruded inner covering.
g)
Fillers
Fillers shall be polypropeline.
h)
i)
Metallic Layer
The metallic layer shall be round galvanized steel wire.
j)
Outer sheath
The outer sheath, black colored PVC polyethylene for the operating temperature
of the cable shall be provided over the armour as specified in relevant standards
by extrusion process.
k)
Cable Marking
- Embossing of outer sheath :
The PVC outer sheath shall be legibly embossed with the legend : "ELECTRIC
CABLE 3300/11000 VOLT"
The letter and figures shall be raised and shall consist of upright block
characters. The maximum size of the characters shall be 13 mm and the
minimum size 15 % of the cable circumference or 3 mm whichever be the
greater. The gap between the end of one set of embossed characters as above and
the beginning of the next shall not exceed 150 mm.
- Identification of Manufacturer & year of manufacture.
An identification of the manufacturer and indication of the year of manufacture
shall be embossed at regular intervals on the PVC outer sheath. This shall not
affect the spacing between repetitions of the legend as given above.
5.2.5
27
gross weight shall also be clearly visible. The direction for rolling shall be
indicated by an arrow.
e.g. Manufacturer's Name :
3.3/11 K.V. 3 x 185 mm2 Aluminum XLPE drum Number.
5.2.6
TESTING
Type tests and Routine tests shall be carried out in accordance with the relevant
IEC standards/IS.
5.3
H. V. CABLE TERMINATION
The cable joints shall be suitable for the outdoor application with EPDM
(ethylene Propylene Diene Monomer) Rubber Components. The joint should
impair optimum combination of both impulse strength of the termination and
field grading at the outer semi conducting screen edge. There should not be
formation of air pockets in the joints and also formation of cavities should be
avoided. Creepage should be approximately 4 cm/KV. The joint should have
flame retardant properties and should be easily re-opened. The joint should
confirm to IS 13573.
5.4
M. S. Chequared Plates :
The plates shall be as specified in the item and shall have 3 coats of anti
corrosive paint. The plates shall not be brittle and shall take normal weights.
5.5
Safety Equipments (Rubber mats, rubber gloves, First aid kit, Sign boards,
Sand Buckets, Fire Extinguishers etc.)
The Danger notice labels shall be made on indestructible non deteriorating material
with lettering engraved in red, black, white background except where otherwise
specified. The letters shall be atleast of 12 MM and shall be of radium sticker type so
as to be visible in the night time also.
Rubber mats, Rubber gloves, boots shall confirm to the safety equipments
standard and shall with ISI approval.
Sand Buckets and Fire extinguishers shall be as per the fire safety norms and
shall be operated as specified in the item.
Emergency lights shall be with maintenance free rechargeable batteries.
28
E 10 & 11
10.1
Scope :
The scope consists of Supply, laying, tesing and commissioning of L.T. XLPE
Cable and its termination.
10.2
Standards :
AS PER SCHEDULE OF INDIAN STANDARDS; ATTACHED IN THE
DOCUMENT
10.3
A)
Cables :
All cables shall be 1100 Volt grade XLPE insulated, sheathed with or without
steel armoring as specified and with an outer PVC protective sheath. Cables shall
have high conductivity stranded aluminum or copper conductors and cores
colour coded to the Indian Standards. All cables laid up to load should be
without any joint.
B)
All cables shall be new without any kind or visible damage. The manufacturers
name, insulating material, conductor size and voltage class shall be marked on
the surface of the cable at every 600 mm centers.
10.4
A)
Connectors :
Cable terminations shall be made with copper/Aluminum Heavy duty long nack
copper crimping lugs only crimped type solderless lugs for all aluminum cables and
stud type terminals. For copper cables copper crimped solderless lugs shall be used.
Crimping shall be done with the help of hydraulically operated crimping tool.
All cable lugs should be long neck type only.
B)
Cable Glands :
Cable glands shall be of heavy duty brass single compression type as specified.
Generally single compression type cable glands shall be used for indoor
protected locations and double compression type shall be used for outdoor
locations. Glands for classified hazardous areas shall be CMRS approved.
C)
Ferrules :
Ferrules shall be of self sticking type and shall be employed to designate the
various cores of the control cable by the terminal numbers to which the cores are
connected, for ease in identification and maintenance.
D)
Cable joints :
Kit type joint shall be done and filled with insulating compund. The joint should
be for 1.1 KV grade insulation.
29
10.5
E-12
CABLE TRAY
12.1
12.1.1
The jointing between the sections shall be made with coupler plates of the
same material and thickness as the channel section. Two coupler plates,
each of minimum 200mm length, shall be bolted on each of the two sides
of the channel section with 8mm dia round headed bolts, nuts and washers.
In order to maintain proper earth continuity bond, the paint on the contact
surfaces between the coupler and cable tray shall be scraped and removed
before the installation.
12.1.2
The maximum permissible uniformly distributed load for various all the
cables trays and for different supported span are given in Table IV. The
sizes shall be specified considering the same.
12.1.3
The width of the cables tray shall be chosen so as to accommodate all the
cables In one tier, plus 30 to 50% additional width for future expansion.
This additional width shall be minimum 100mm. The overall width of one
cable tray shall be limited to 800mm.
12.1.4
30
12.1.5
The cable tray shall be suspended from the ceiling slab with the help of 10
mm dia MS round or 25 mm x 5 mm flats at specified spacing ( based on
table III ) Flat type suspenders may be used for channels up to 450 mm
width bolted to cable trays. Round suspenders shall be threaded and bolted
to the cable trays or to independent support angle 50 mm x 50 mm x 5mm
at the bottom and as specified These shall be grouted to the ceiling slab at
the other and through an effective means, as approved by the Engineer in
charge, to take the weight of the cable tray with the cables.
12.1.6
The entire tray ( except in the case of galvanized type ) and the suspenders
shall be painted with two coats of red oxide primer paint after removing the
dirt and rust, and finished with two coats of spray paint of approved make
synthetic enamel paint.
12.1.7
The cable tray shall be bonded to the earth Terminal of the switch bonds at
ends.
12.1.8
The cable tray shall be measured on unit length basis, along the center line
of the cable tray, including bends, reducers, tees, cross joints, etc, and paid
for accordingly.
12.2
12.2.1
12.2.2
E 14 INTERNAL WIRING
14.1
Scope :
The scope covers Supply, laying, testing and commissioning of Wires, PVC
pipes , Switches, Sockets and accessories.
14.2
Standards :
AS PER SCHEDULE OF INDIAN STANDARDS, ATTACHED IN THE
DOCUMENT
14.3
A)
All conduits shall be rigid PVC pipe having minimum wall thickness of medium
gauge 1.6 to 1.8 approved by F.I.A. & I.S.I. and shall confirm to IS 9537.
a) Up to 38 mm. diameter - minimum 1.8 mm. wall thickness.
b) Above 40 mm. diameter - minimum 2.2 mm. wall thickness.
31
B)
14.4
Accessories :
A)
PVC conduit fittings such as bends, elbows, reducers, chase nipples, split
couplings, plugs etc. shall be specifically designed and manufactured for their
particular application. All conduit fittings shall conform to IS:2667-1964 and
IS:3857-1966. All fitting associated with galvanized conduit shall also be galvanized.
14.5
A)
B)
Wires :
All wires shall be single core multi-strand/ flexible copper or single strand
Copper FRLS type PVC insulated as per IS:694 and shall be 660 V\1100 V
grade.
All wires shall be colour coded as follows :
Phase
Colour of wire
R
Red
Y
Yellow
B
Blue
N
Black
Earth
Green (insulated)
Control (If any)
Grey
All off wires Same as Phase wire
14.6
A)
Switches shall be moulded plate type flush piano type with silver-coated
contacts. Sockets shall be 3 pin with switch and plate type cover. Combination of
multiple switch units and sockets should be used to minimize the switch boxes.
All screws shall be brass chromium plated and shall be counter sunk type with
half round head or flat headed.
B)
Isolator mounted in a
E 16 EARTHING
16.1
SCOPE OF WORK :
The scope of work shall cover supply, laying, installation, connecting, testing and
commissioning of:
16.1.4 Bonding of Non-current carrying parts, and metallic parts of the electrical installation.
16.1.5 Provide inter connection between all earth pits of same type.
16.2
STANDARDS
16.2.2 All codes and standards mean the latest. Where not specified otherwise the
installation shall generally follow the Indian Standard Code of Practice or the British
Standard Codes of Practice in absence of Indian standard.
16.3
GENERAL
All the noncurrent carrying metal parts of the electrical installation and mechanical
equipments shall be earthed properly. The metal conduits, trunking, cables armoured
and sheath, electric panels boards, lighting fixtures, ceiling and exhaust fan and all
other parts made of metal shall be bonded together and connected by means of
specified earthing system.
An earth continuity conductor shall be installed with all the feeders and circuits and
shall be connected from the earth bar of the panel boards, to the conduit system, earth
stud of the switch box, lighting fixture, earth pin of the socket outlets and to any
metallic wall plates used. All the enclosures of motors shall be also connected to the
earthing system.
16.4
The substation earthing shall be with copper / GI plate earthing station and
equipment earthing grid shall be with hot dip galvanized iron earthing station
/Copper.
16.4.1.2
The plate electrode shall be 600 x 600 x 3.25 mm copper plate for substation
earthing and shall be of hot dip galvanized iron plate having dimensions 600
x 600 x 6.3 mm thick.
16.4.1.3
16.4.1.4
The earth resistance shall be maintained with suitable soil treatment as shown
in the drawing.
16.4.1.5
33
16.4.1.6
The earth lead shall be connected to the earth plate through copper/brass bolts
in case of copper earth plate and shall be hot dip galvanized iron for G.I. plate
earth plate as shown on the drawing.
16.4.1.7
The earthing grid and the earthing conductors shall be of copper strip in case
of copper earth plate and hot dip galvanized iron strip in case of G.I. earth
plate of size as mentioned on the drawing.
16.4.1.8
G.I. pipe with funnel with filter of approved quality shall be used for watering
the earthing electrodes \ stations.
16.4.1.9
The block masonry chamber with Cast Iron hinged cover of 300 x 300 mm
shall be provided for housing the funnel and the pipe for watering the earthing
electrodes \ stations.
16.4.1.10
16.5
16.5.1 The plate \ pipe electrode, as far as practicable, shall be buried below permanent
moisture level but in no case not less than 2.5 M below finished ground level.
16.5.2 The plate \pipe electrode shall be kept clear of the building foundation and in no case,
it shall be nearer by less than 2 M from outer face of the respective building wall \
column.
16.5.3 The plate electrode shall be installed vertically and shall be surrounded with 150 mm.
thick layers of Charcoal dust and Salt mixture.
16.5.4 G.I. pipe for watering, shall run from top edge of the plate \ pipe electrode to the mid
level of block masonry chamber.
16.5.5 Top of the pipe shall be provided with G.I. funnel and screen for watering the earth \
ground through the pipe.
16.5.6 The funnel with screen over the G.I. pipe for watering to the earth shall be housed in
a block masonry chamber as shown in the drawing.
16.5.7 The masonry chamber shall be provided with a Cast Iron hinged cover resting over
the Cast Iron frame which shall be embedded in the block masonry.
16.5.8 Construction of the earthing station shall in general be as shown in the drawing and
shall conform to the requirement on earth electrodes mentioned in the latest edition of
Indian Standard IS : 3043, Code of Practice for Earthing Installation.
16.5.9 The earth conductors ( Strips / Wires copper/ Hot dip G.I.) inside the building shall
properly be clamped / supported on the wall with Galvanized Iron clamps and Mild
34
Steel Zinc Passivated screws \ bolts. The conductors outside the building shall be laid
at least 600 mm. below the finished ground level.
16.5.10 The earth conductors shall either terminate on earthing socket provided on the
equipment or shall be fastened to the foundation bolt and / or on frames of the
equipment. The earthing connection to equipment body shall be done after removing
paint and other oily substances from the body and then properly be finished.
16.5.11 Over lapping of earth conductors during straight through in joints, where required,
shall be of minimum 75mm. long.
16.5.12 The earth conductors shall be in one length between the earthing grid and the
equipment to be earthed.
16.6
16.6.1 Earth lead shall be bare copper or galvanized steel as specified with sizes shown on
drawings. Copper lead shall have a phosphor content of not over 0.15 %. Galvanized
steel buried in the ground shall be protected with bitumen and hessian wrap or
polytene faced hessian and bitumen coating. At road crossing necessary hume pipes
shall be laid. Earth lead run on surface of wall or ceiling shall be fixed on saddles so
that strip is at least 8 mm away from the wall surface.
16.6.2 The complete earthing system shall be mechanically and electrically bonded to
provide an independent return path to the earth source.
16.7
EQUIPMENT EARTHING :
All apparatus and equipment transmitting or utilizing power shall be earthed in the
following manner. Copper/G.I. earth strips/wires shall be used unless other wise
indicated in the Schedule B.
16.8
16.8.1 Metallic conduit shall not be accepted as an earth continuity conductor. A separate
insulated / bare earth continuity conductor of size 50 % of the phase conductor
subject to the minimum and maximum shall be provided.
Copper
Minimum (sq mm)
Maximum (sq mm)
2.5
75
Aluminum
G.I.
4.0
100
6
200
The earth continuity conductor be drawn inside the conduit shall be insulated.
16.8.2 Non metallic conduit shall have an insulated earth continuity conductor of the same
size as for metallic conduit. All metal junction and switch boxes shall have an inside
earth stud to which the earth conductor shall be connected. The earth conduct or shall
be distinctly colored (Green or Green/Yellow) for easy identification.
35
16.8.3 Armoured cable shall be earthed by two distinct earth connections to the armouring at
both the ends and the size of connection being as for the metallic conduit.
16.8.4 In the case of unarmoured cable, an earth continuity conductor shall either be run
outside along with the cable or should form a separate insulated core of the cable.
16.8.5 Three phase power panel and distribution boards shall have two distinct earth
connections of the size correlated to the incoming cable size. In case of single phase
DB's a single earth connection is adequate.
16.9
UTILIZING EQUIPMENT :
16.9.1 Three phase motors and other three phase apparatus shall have two distinct earth
connections of the size equal to 50% of the connecting cable subject to the following:
Copper
Minimum(sqmm)
Maximum(sqmm)
6.5
75
Aluminum
G.I.
10
100
20
200
16.9.2 For single phase motors and apparatus, the single earth connection shall be provided
of the above size. For all light fittings and fans a single earth connection with 1.5
sqmm copper or equivalent size shall be provided.
16.9.3 All street light poles shall have an earth stud and shall be connected to the cable
armouring using 6.5 sqmm copper or equivalent unless shown otherwise. For street
lighting poles planted in ground, 2.4 M long 10 SWG bare copper wire shall be coiled
and buried with every fourth pole in addition to connection to cable armouring.
16.9.4 An equipment earthing grid shall be established as shown in the drawing. All earth
connections to all panels, DB's and equipment shall be connected to the nearest point
of the earthing grid.
16.10 TEST :
16.10.1 The entire earthing installation shall be tested as per requirements of Indian Standard
Specification IS : 3043.
16.1.2 The following earth resistance values shall be measured with an approved earth
meager and recorded.
1)
Each earthing station
2)
Earthing system as a whole
3)
Earth continuity conductors
16.10.3 Earth conductor resistance for each earthed equipment shall be measured which shall
not exceed 1 Ohm in each case. This is responcibility of contractor to get the final
value for resistance.
16.10.4 Measurements of earth resistance shall be carried out before earth connections are
made between the earth and the object to be earthed.
36
16.11.3 The cost of earthing the following items shall become part of the cost of the item
itself and no separate payment for earthing shall be made.
a)
b)
c)
16.12
1. General
a)
b)
c)
d)
e)
The air terminal support shall consist of a minimal 5 meters Galvanized steel
(GI), Powder Coated or steel elevation pole with a minimal diameter of 50
mm. The mast having arrengment for fixing of air terminal on the top.
38
b)
The air termination support shall be fixed securely on the structure to enable
the air termination and mast system to withstand maximum locally recorded
wind velocities. Guy wires might be necessary to secure the system properly.
4.
Down-conductor
a) Down-conductors consist of strips, braided cables or round sections.
b) Materials to be used: insulated multi-strand copper (recommended) suitable
for 1.1KV insulation.
c) Minimal cross-sectional area must be 70mm
d) Down conductors shall be routed to the earth termination as direct as possible.
Sharp bends and upward sections (40cm max with a 45 slope max are
acceptable) are to be avoided.
e) Down conductors shall be attached on the basis of three fixing per metre
f) Down conductors shall eventually be protected against the risk of impact by
installing sleeves up to height of 2m above ground level
g) The down conductors shall be directly connected to the base of the air
terminal and to the earth termination system by the mean of a test clamp.
5.
Earth Termination
a)
b)
c)
d)
6.
39
7.
Earthing of Air Terminal :a) Air terminal shall be connected to Maintenance free earthing
b) Maintenance free Earthing shall be based on copper bonded earth rod
minimum copper bonding of 150 micron.
e) Suitable quantity shall be used of Back fill compound (Moisture Holder) as
recommended by manufacturer and these earth enhancing compound should
hold and absorb the moisture for long life and does not required regular
recharging of earthing system.
c) Each earth pit shall be covered with using CI Cover of 12 X 12 of GI with
6/7 mm thick.
8.
Test Joint
a)
9.
Maintenance
a) As per the standards (IS: 2309, IEC 62-305 and NFC 17-102), the lightning
protection system shall be inspected at least every 2 years.
b) A visual inspection shall be performed to make sure that: a) No extension or
modification of the protected structure calls for the installation of additional
lightning protective measures, b) the electrical continuity of visible conductors
is correct, c) all components fasteners and mechanical protectors are in good
condition, d) no parts have been weakened by corrosion
c) Measure of the earth termination resistance shall be realized to ensure it is still
below 10 ohms (or 5 ohms)
d) Air termination system shall be checked to ensure a) It is still properly
connected to the down conductor(s), b) The tip has not melt, c) The system is
still in operating conditions d) It is still properly installed on the support and
it can withstand high wind velocities (relatively to the local conditions).
E-17
Telephone Distribution
17.1.0
Scope :
17.1.1
The scope of work shall cover supply, installation, commissioning and testing of
i) Telephone cables
ii) Telephone Tag Blocks
iii) Telephone wiring in conduits
17.1.2
The telephone exchange and the hand sets shall be supplied by the clients.
40
17.2
Conduits :
17.2.1
17.3
17.3.1
17.3.2
All multi core cables and wires shall be of tinned copper conductor of not less
than 0.5 mm dia and shall be colour coded twisted pairs with rip cord.
17.3.3
The conductor resistance shall be less than 150 ohms per KM and the insulation
resistance between the conductors not less than 50 megohms and the nominal
capacitance of about 0.1 micro farad per kilometer.
17.3.4
Cables laid under ground or locations subject to dampness and flooding shall be
filled with polyethylene compound and shall have sufficient protection against
moisture and water ingress.
17.3.5
All armoring shall be of galvanized steel wires and protected against corrosion
by an outer sheath of PVC in the case of indoor cables and polyethylene in the
case of outdoor cables. Outer sheathing must be fire retarding and anti-termite.
17.3.6
All unarmoured single core cables and inner sheath of armored cables shall be
provided with rip cord.
17.3.7
All single pair cables for final extension to the telephone outlet box shall be
unarmoured tinned copper conductors of not less than 0.6 mm. diameter and
shall be drawn in conduits. All telephone outlets shall consist of 2 A 2 pair
polythene connector in G.I box with 6 mm perspex cover with beveled edges and
chromium plated brass hardware.
17.4
Tag blocks :
17.4.1
The telephone tag blocks shall be suitable for the multi core telephone cables and
shall have two terminal blocks, cross connect type. All incoming and outgoing
cables shall be terminated on separate terminal blocks and termination shall be
silver soldered. The cross connecting jumpers shall be insulated wires of same
diameter and screw connected.
17.4.2
The tag blocks shall be mounted inside fabricated sheet steel boxes with
removable hinged covers and shall be fully accessible. The enclosure shall be
painted with 2 coats of red oxide and stove enameled.
41
17.5
Installation :
17.5.1
17.5.2
17.5.3
17.5.4
The final branch connections with single pair cables in conduits and the
maximum number of cables in each conduit shall be as follows :
Conduit diameter
Inch / mm.
3/4"
1"
1"
1"
/ 20
/ 25
/ 32
/ 40
17.6
Mode of measurement :
17.6.1
The main telephone cables shall include supply and laying of multi pair cables
on ceiling/wall/on cable trays/racks including all supports and shall be measured
and paid on running length basis. Cable trays/racks shall be paid for separately.
17.6.2
The multi pair tag blocks shall consist of two telephone connectors strips,
jumpered interconnections silver soldered enclosure etc. and shall be measured
and paid as one unit.
17.6.3
The conduit wiring for telephone shall include single pair 0.6 diameter cable in
heavy duty rigid, PVC conduits and shall include junction boxes, pull boxes, 2
pair 2 A connector in GI box, perspex cover etc. and shall from one point.
E-18
18.1
Scope :
18.1.1
The scope of work covers the supply, installation and testing of Fire Stopper as
specified in BOQ.
18.2
Standards :
As per Applicable standard Specification of Fire stopper material suppler.
All installation of Anchor fastener has been approved by Hilti Technical staff
Material :
a) Fire Resistant Mortar
42
fire resistant, cement based mortar with thermal insulating properties from
admixed perlite CP 636 of HILTI India Pvt Ltd or Equvalrent .The product
shall be tested for withstanding Zone 4 earthquake when tested in accordance
with acceleration time history waveform VERTEQII as per IEC 60068 and
Telcordia Technologies GR-63-Core 2006-03. The product shall be age tested
for 30 years as per Dafstb and DIBT standards. The product shall be tested and
approved by third party agencies such as UL, FM and LPCB. The product shall
bear the UL and FM approval logo on the packing.
b) Fire Stop System
Providing & Supplying Passive Firestop system using HILTI Mineral wool
board along with CP 670 coating of 1 mm DFT and CP 606 Firestop filler or
Equivalent system. Fire barrier coating of 1 mm thickness should be apply on
Mineral wood board (density min. 150 kg/cu. meter) and fill the remaining gap
around entrants with suitable filler of depth same as mineral
wool panel
thickness to provide 2 hour fire rating on solid structure (wall- min. 80 mm,
floor- min. 150 mm thickness) when subject to test conditions of BS 476: part
20:1987 and after age testing to DafStb guidelines. Cables and cable tray
should be coated with above same coating up to minimum length of 300 mm to
prevent spread of fire. Fire barrier coating and filler should be approved to
international test standard like BS 476 and tested by FM, LPC, BRE, and
WFRC. For wall opening the Board system should be used on both sides of the
wall and for floor opening it should be used only on one side.
c) Fire Stop System
Providing and supplying versatile intumescent expanding foam CP 620 of
HILTI India Pvt Ltd.The product shall be tested for withstanding Zone 4
earthquake when tested in accordance with acceleration time history waveform
VERTEQII as per IEC 60068 and Telcordia Technologies GR-63-Core 200603. The product shall be age tested for 30 years as per Dafstb and DIBT
standards. The product shall provide water tightness when tested for W rating
as per UL standards and shall be tested for providing a sound insualtion of 50
when tested in accordance with ASTM E 90. The product shall be tested and
approved by third party agencies such as UL, FM and LPCB. The product shall
bear the UL and FM approval logo on the packing.
43
18.4
E-20
Mode of measurement :
As specified in BOQ.
Television Distribution
20.1
Scope :
20.1.1
The scope of work shall cover supply, installation, commissioning and testing of
i) Television cables
ii) Television Splitters
iii) Television wiring in conduits
20.1.2
The Television exchange and the hand sets shall be supplied by the clients.
20.2
Conduits :
20.2.1
20.3
20.3.1
The type of cables and the services shall be as specified in the BOQ :
20.4
Installation :
20.4.1
20.4.2
20.4.3
The connection at the spiller/junction boxes shall be made with end sockets as to
achieve minimum contact resistance.
20.4.4
The final branch connections with single cables in conduits and the maximum
number of cables in each conduit shall be as follows :
Conduit diameter Max. No. of cables
Inch / mm.
3/4"/ 20
1" / 25
1"/ 32
1 no RG 6 / 11
2/3 nos. RG 6 /11
6 Nos. RG 6 /11
20.5
Mode of measurement :
20.5.1
The main Television cables shall include supply and laying of RG 6 / 11 cables
on ceiling/wall/on cable trays/racks including all supports and shall be measured
and paid on running length basis. Cable trays/racks shall be paid for separately.
44
20.5.2
The multi way spillers shall consist of Television connectors sockets, jumpered
interconnections silver soldered enclosure etc. and shall be measured and paid as
one unit.
B.
1.0
IS No.
Description
1)
IS:2026-1977
3)
IS:660
IS:2516-1972
:
:
4)
IS:335
5)
IS:2705
6)
IS:3155
7)
IS:3236 Part II
Voltage Transformer.
8)
IS:373
9)
IS:2099
Bushing
10)
IS:5621
11)
IS:2544
Insulators
12)
13)
IS:3842
Relays.
14)
IS:1248-1958
Meters (measuring).
15)
IS:3072-1975
16)
IS:692
HV cable.
17)
IS:1255
18)
IS:3043
19)
IS:4047-1977
2)
45
20)
IS:8106-1966
21)
IS:4237-1967
22)
IS:2607-1976
23)
IS:8623-1977
24)
IS:375-1963
25)
IS:2147-1962
Cubical Boards.
26)
IS:8084-1972
27)
IS:2675-1983
28)
IS:8828-1978
29)
IS:9926-1981
30)
IS:1554 (Part I)
31)
32)
IS:2982
33)
IS:8130
34)
:3975
35)
IS:5831
36)
IS:1753
37)
IS:4288
38)
IS:961
39)
S:732
40)
IS:1646
46
41)
IS:1653
42)
IS:2667
43)
IS:3480
44)
IS:3837
45)
IS:694
46)
IS:2509
47)
IS:6946
48)
IS:1293
49)
IS:8180
50)
IS:9537-1980
Specification
installation.
51)
IS:3419
52)
IS:3854
Switches.
53)
IS:6538
54)
IS:2834-1954
55)
IS:2208
56)
IS:1913-1969
57)
IS:2944-1981
58)
IS:3528
59)
IS:3553-1966
60)
IS:1239-1958
63)
IS:2149-1970
64)
IS:9224
65)
IS:2312-1967
Exhaust Fan.
66)
IS:374-1979
47
for
conduit
for
electrical
Plugs.
NOTE :
All codes and standards means the latest where not specified otherwise the
installation shall generally follow the Indian Standard codes of practice or
relevant British Standard Codes of Practice in the absence of corresponding
Indian Standards.
PLEASE FOLLOW :
a. Indian Electricity Act of 1910 and rules issued there under revised up to date.
b. Regulations for electrical equipment in building issued by The Bombay
Regional Council of insurance Association of India.
48