AIM
Collecting of Digitally survey
INTRODUCTION
1.
Total Station includes Theodolite, Electronic
distance measurement (EDM) & data recorders.
2.
We collect vertical & horizontal data in a single
operation. Data recorder can record information in
the
field to take
back to
the
office for
processing.
3.
Data recorders can also be used to download
previously determined data at the office for use in
the field to stake out or to locate construction
control
points & boundaries.
4.
We can also designed traditionally(manually),
data collected by the Total station in data recorders.
DISPLAY BOARD
LEVELING
Firstly level the base plate level by
CREATING JOB
BMS Screen Press Menu
CREATING JOB..(CONT)
Feed Job Name & ENT
Creating Job
BMS Screen
Feed HI
Feed NEZ
Asking Bearing
Turn to Face 2
Recording Station
Press ENT
Feed HT
Press ENT
Press ENT
PWR on DTM
Open menu
Open job manager
Select open job & click
Your job is opened & System return back to BMS
Menu key than No 5 key for Communication click
(1) No key Down Load
Type of Data : Raw Data
Enter
Ready to send Data it will appear how much data lines
are going to transfer to you computer.
GO TO COMPUTER
1.
2.
Transit
3.
4.
Transfer
5.
6.
7.
GO TO COMPUTER .Cont
8.
9.
10.
OK (You will get data Receiving Box & its waiting for data)
11.
12.
(Press)Enter in DTM-500/502/552
13.
OK (click on)
GO TO COMPUTER .Cont
15. Select or(click on) Keep All Old Coordinates ,Discard all
new coordinates
16. OK
Note :
STAKE OUT
1.
First setup the tripod on station and complete the leveling as per procedure.
2.
Open the Job (Menu Job Highlight the job and Enter.)
3.
Station Setup(7 No. Key (STN) Known (1 No. Key) ST input number input NEZ
HI input Back Sight Select Coordinate BS input number NEZ HT input
sight the
Back sight and press MSR1 key
4.
(for accuracy work press ANG for face 2 measurement and sight the same point on
face 2 and press MSR 1)
5.
6.
Select XYZ
8.
Feed the Number if available in the job instrument will take auto otherwise feed the
NEZ
9.
Now instrument will guide you. Rotate the angle and sight the prism and measure.
Now instrument will guide Left/right in/out cut/fill.
Conclusion