You are on page 1of 2

PIPE FREEZING SERVICE QUESTIONNAIRE

Pipe Size:

ABU DHABI - NATION


TOWERS, CORNICHE
ROAD

ABU DHABI - NATION


TOWERS, CORNICHE
ROAD
500MM

Pipe Material:

BLACK STEEL

Line Medium Freeze Point:

Pipe Schedule:

SCH-40

Pressure:

13 BAR

Flow Rate:

5000 gpm

Temperature:

5 TO 11 C

Company:

Address:

Site:

Contact:

Eng Raid abu Khader

Tel No:

Fax No:

Mobile No:

0507036124

E-Mail:

raid.k@efecouae.com

Line Medium:

CHILLED WATER

Distance Above / below Ground:

BASEMENT 2

Will Scaffold Be Required:

YES

Distance of Freeze Chamber to staging area for refrigerant:

1.5 M

Distance of closest valve / dead head from freeze chamber:

40M

Distance to closest weld from freeze chamber:


Is there a vent available to relieve pressure build-up between the freeze
chamber and other head components on the pipe?
Freeze plug hold duration:

N/A
YES

Distance from freeze plug to any welding or burning during the freeze:

4 HOURS
REMOVING OLD
DRVAND FIXING NEW
DRV
N/A

Distance from freeze to mechanical repairs:

7 METERS

Type of work / repair to be preformed:

Document No.
Prepared By
Revision
Revision Date

:
:
:
:

PFDS
01
Vinod Varghese
0
24.05.2011

2011

Approved By
Approval Date
Document Status
Page 1 off

:
:
:
:

J. Allison
24.05.2011
Issued for Use
2

The information contained in this document is commercial - in - confidence . The copying of this document is strictly prohibited.
No transmission to any third party without the prior permission of UNIQUE WELLUBE FZC.

PIPE FREEZING SERVICE QUESTIONNAIRE

Freeze Chamber Configuration:Choose from the diagrams below that most closely resembles the proposed freeze plug configuration

a. Horizontal

b. Vertical

c. Tee Up

d. Tee Down

e. Elbow Up or Down

If applicable in a. or b., is there a header section off the tee?

YES

If applicable in c. or d., what is the temperature of the header section of the tee?
If applicable in c. or d., how far can the freeze chamber be installed from the header
section of the tee?
Are fixed pipe supports close to the freeze plug?
If so, they may anchor the pipe and restrict movement during the small amount of
contraction experienced by the pipe during the pipe freeze plugs. They will need to
be relaxed.
Is the proposed work area well ventilated?

Document No.
Prepared By
Revision
Revision Date

:
:
:
:

PFDS
01
Vinod Varghese
0
24.05.2011

2011

Approved By
Approval Date
Document Status
Page 2 off

:
:
:
:

YES

YES

J. Allison
24.05.2011
Issued for Use
2

The information contained in this document is commercial - in - confidence . The copying of this document is strictly prohibited.
No transmission to any third party without the prior permission of UNIQUE WELLUBE FZC.

You might also like