AGREEMENT FOR CONSTRUCTION WORK

THIS INDENTURE OF AGREEMENT FOR CONSTRUCTION WORK is made and


entered into at Village Vapi on this _____ day of ____________ between MR.
KAMLESH INDRAVADAN DESAI AGE: 39 Year OCCUP:DOCTOR RESI, @ 203
SUBHAM TOWER 1, DAMAN ROAD, VAPI-396191 (PAN NO. ABHPD0096R)
Hereinafter called as THE FIRST PART < which expression shall unless be
repugnant to the context or meaning thereof shall be deemed to mean and
include the directors from time to time, their executors, administrators and
assignees.>

AND

Mr. Jayesh Navinbhai Patel < which expression shall unless be


repugnant to the context or meaning thereof shall be deemed to mean and
include their legal heirs, executors, administrators and assignees.>
WHERE AS the first part is lawful, owner, occupier and possessor of FLAT NO.
702 Building No. A known as Life Style Royal situated in the NonAgricultural Land OF THE Survey No. 387/A/2/1
of Village Chala, Vapi
admeasuring areas 1720 Sq. Fts.
The Second part is well known civil contractor by the profession and having
large and wide experience in building construction. We are handover to carry
out construction work in our plot. The purchaser shall keep the said premises
and its external and partition walls, Sewages, drains pipe and
appurtenances of the said building in the tenantable Repairs do as to support
shelter and protect the parties and members of the said Building of the said
premises.
AND WHERE AS the first part is desirous of carrying out construction of FLAT
NO. 702 Building No. A known as Life Style Royal situated in the NonAgricultural Land OF THE Survey No. 387/A/2/1 of Village Chala. And the
second part has agreed to carryout extra construction Works on above said
plot as per the schedules A for the total consideration Rs. ____________
(_____________________________________________________________________________
)
And
first
part
has
paid
(_________________________________________)

Rs.

_____________

balance
payment
Rs.
____________
(_____________________________________________) should be made after
completion of extra work for that certain terms and condition have been
fixed between the parties which are appearing as under:-

TERMS AND CONDITION


1) It is agreed between the parties that second part shall construct extra
work of FLAT NO. 702. As per the specification mentioned in schedule
A.
2) The second part shall carry out necessary extra work of construction of
Flat as per the schedule A given by the first part. The second part

shall complete construction of the first within one months time from
the date of this agreement i.e. On or before _______.
3) The second part shall provide necessary amenities in the said flat as
mentioned in Schedule A and shall use the best quality materials /
goods for extra construction work of said flat. The second part shall
give the amenities as mentioned in schedule A without any extra
consideration from first part.

SCHEDULE A
CONSTRUCTION WORK DETAIL

Sr.
No
1
2
3
4
5
6
7
8

Total

Particulars

Sq.
Fts.
Floor/Glazed tiles
1396
Window & Doors marble 819
shill cupboard
Colour Work
7200
Grill Work
690
Allu. Section
700
RCC Rank
250
Kitchen Platform(Quartz 90
With Polishing)
Tiles
Work
Kitchen 280
(Flooring
&
Wall

Simpola Dessert)

Rate

Amount

625
600

872500
491400

65
160
290
350
900

468000
110400
203000
87500
81000

350

98000

241180
0

IN WITNESS WHEREOF the parties hereto have set and subscribed


their respective hands on the day and year above written.
FIRS PART _____________________________________________________
In the presence _____________________) (..

1. )
PART
2. )

FIRST

SECOND PART ______________________________________________


In the presence _____________________) (..
SEC
OND PART

1. )
2. )