You are on page 1of 2

RISK ASSESSMENT

PROJECT:

CE 0716A /2008

SITE :

CAMPUS

JOB UNDER RISK


ASSESSMENT:

PAINTING WORKS

DATE OF ASSESSMENT:

03rd Mar 2013

NAME OF THE ASSESSOR:

VIJAY KUMAR

POSITION OF THE
ASSESSOR:

EHS OFFICER

IDENTIFIED
HAZARD

Mixing the
paint

HAZARD
EFFECT

Body contact
while handling

INITIAL RISK RATING


NUM
BER

SEVE
RITY

LIKELI
HOOD

RISK
RATE

75

Skin Disease,
irritation,
Dermatitis, Eye
irritation.

Painting
work

Vapor inhalation
Asphyxiation,
Intoxication,
acute and
chronic chest
pain, Dizziness,
Nausea

EXISTING
CONTROL MEASURES & WHEHER
THE RISK IS ACCEPTABLE

Take special care while mixing of paints;


avoid contact with skin; wear PVC or
rubber hand gloves and coverall (MSDS
to be referred).

CONTROL
MEASURES ADDED

Strict supervisory
control ensured
MSDS to be referred

FINAL RISK RATING


REMARKS

NUMB
ER

SEVE
RITY

LIKELI
HOOD

RISK
RATE

Risk is
acceptable

Risk is
acceptable

Use safety goggles to avoid the paint


contact with eyes. Also Paints must be
handled properly to avoid any splash.

75

Ensure local Exhaust Ventilation/General


ventilation prior to start of the painting
job.
While painting always wear proper nose
mask (referred by manufacturers
instructions).
Refer MSDS (Material Safety Data
Sheet).
Display warning signs and make others
away from inhaling the vapors.

Page 1 of 2

Refer MSDS (Material


Safety Data Sheet) .
Display warning signs
and make others away
from inhaling the
vapors.
Strict supervisory
control ensured

Ref. no.: UES-09/ F-004


Issue date: 28.02.11
Form Rev. no.: 0

RISK ASSESSMENT
Working at
heights,
Fall of Materials

Fall of Persons
from scaffold /
Major
Injury/Fatal

Spillage of Paints

Slips, Fire,
Environmental
hazards

Continuous work
in hot
environment
Poor work
posture

Dehydration/heat
stress leading to
fainting.
Pain/strain in
neck and arms

75

25

25

All working platforms are erected by


competent personnel and all scaffolds
are erected by trained and certified
personnel. Scaff tag method is
adapted in all the access to working
platforms a height. Regular periodic
inspections on scaffolds are carried
out

Strict supervisory control


ensured

Ensure proper segregation of Empty and


full drums of paints Mixing must be
carried out on concrete floor or use of
polythene sheet. Clear spillage if any
immediately.
Follow safe clean up and disposal
procedures.

Strict supervisory
control ensured

Give sufficient rest in between the


painting job.
Change persons as and when required.
Ensure Provision of proper platform.

Strict supervisory
control ensured

Risk is
acceptable

Risk is
acceptable

Risk is
acceptable

Legal Require-ments
complied Yes.

Applicable legal requirements:


1) DM Code of construction safety
practice Chapter 18
2) DM Technical Guidelines- No.22

Signature of assessor

Date of review:

Page 2 of 2

02nd Sep 2013

Ref. no.: UES-09/ F-004


Issue date: 28.02.11
Form Rev. no.: 0