Professional Documents
Culture Documents
PREVENTIVE MAINTENANCE
1. Visit General Information
Engineer:
Visit Date:
Site ID:
Site Name
2. Grounding
ITEM
CRITICITY
INSTRUCTION
A. Incoming Earthing
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Major
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Minor
H. Other:
Accepted
Rejecte
N/A
2)
3. Cabinet Installation
ITEM
CRITICITY
INSTRUCTION
Accepted
Rejecte
N/A
Major
B. Cabinet
Accepted
Rejecte
N/A
Minor
Accepted
Rejecte
N/A
Major
Accepted
Rejecte
N/A
Major
E. Transmission Cables
Accepted
Rejecte
N/A
Critical
F. Alarm Cables
Accepted
Rejecte
N/A
Major
G. DC Power Cables
Accepted
Rejecte
N/A
Critical
H. AC Power Cables
Accepted
Rejecte
N/A
Critical
I. Optical Fibers
Accepted
Rejecte
N/A
Critical
F. Labeling
Accepted
Rejecte
N/A
Major
H. Other:
Accepted
Rejecte
N/A
4. Equipment in Cabinets
ITEM
CRITICITY
INSTRUCTION
A. Door Filter
Accepted
Rejecte
N/A
Major
B. Magazines/Modules/PCB Installation
Accepted
Rejecte
N/A
Critical
C. Internal Cabling
Accepted
Rejecte
N/A
Major
D. Power/Fuse Connection
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Critical
G. Other:
Accepted
Rejecte
N/A
CRITICITY
INSTRUCTION
Accepted
Rejecte
N/A
Major
Accepted
Rejecte
N/A
Major
C. Cables connection
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Major
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Critical
G. Other:
Accepted
Rejecte
N/A
6. Cabling
ITEM
CRITICITY
INSTRUCTION
Accepted
Rejecte
N/A
Major
B. Cable installations
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Critical
E. Other:
Accepted
Rejecte
N/A
7. Backup Battery
ITEM
CRITICITY
INSTRUCTION
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Major
Accepted
Rejecte
N/A
Critical
F. Battery Cables
Accepted
Rejecte
N/A
Major
G. Eartquake zone
Accepted
Rejecte
N/A
Critical
H. Temperature Sensor
Accepted
Rejecte
N/A
Major
I. BBU
Accepted
Rejecte
N/A
Major
J. Other:
Accepted
Rejecte
N/A
8. Antenna System
Azimuths (degree Mag) on site
Antenna Height above the ground (mts/ft)
ITEM
CRITICITY
INSTRUCTION
A. Feeder Installation
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Critical
C. Clamps spacing
Accepted
Rejecte
N/A
Critical
D. Feeders/Jumpers marking
Accepted
Rejecte
N/A
Major
Accepted
Rejecte
N/A
Critical
Rejected condition: 1) Sealing is missing, 2) Selffusing rubber tape protruding through the electro tape
(PVC), 3) Connectors not tightened, 4) Self-fusing
rubber tape is missing.
Critical
Critical
Accepted
Rejecte
N/A
Accepted
Rejecte
N/A
Accepted
Rejecte
N/A
Critical
Accepted
Rejecte
N/A
Major
J. Antenna fittings
Accepted
Rejecte
N/A
Critical
K. Antenna Installation
Accepted
Rejecte
N/A
Critical
L. RRU Installation
Accepted
Rejecte
N/A
Critical
M. RRU DC Power
Accepted
Rejecte
N/A
Critical
N. RRU OIL
Accepted
Rejecte
N/A
Critical
O. Other:
Accepted
Rejecte
N/A
9. Tests
VSWR DTF (max peak)
VSWR in freq.
Return Loss DTF (max peak)
Return Loss in freq.
Voice Call
Data Call
SMS
MMS
A. VSWR
Accepted
Rejecte
N/A
Critical
B. Test Calls
Accepted
Rejecte
N/A
Critical
C. SMS/MMS
Accepted
Rejecte
N/A
Critical
CRITICITY
A. Site clean
Accepted
Rejecte
N/A
Minor
B. Cabinets Key
Accepted
Rejecte
N/A
Major
C. ESD
Accepted
Rejecte
N/A
Minor
Accepted
Rejecte
N/A
Major
E. Equipment Inventory
Accepted
Rejecte
N/A
Major
F. Red Line
Accepted
Rejecte
N/A
Minor
Accepted
Rejecte
N/A
Major
INSTRUCTION
11. Measurements
ITEM
CRITICITY
A. DC Voltage PSU
Accepted
Rejecte
N/A
Critical
B. DC Voltage Batteries
Accepted
Rejecte
N/A
Critical
C. AC Voltage
Accepted
Rejecte
N/A
Critical
INSTRUCTION
12. Observations
ITEM
Number
Letter
Observation
ITEM
Number Letter
Observation