Work Item

Unit

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the
work area and removal upon completion of the works
as shown in the drawings and /or as directed by the
S.O/P.D*.
Temporary guardrail

TRAFFIC MANAGEMENT AND CONTROL


TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the
work area and removal upon completion of the works
as shown in the drawings and /or as directed by the
S.O/P.D*.
Temporary Surfacing
Supply, lay and compact 200mm thick crusher run
surfacing as temporary as temporary road bypass
along the edge of existing road

m2

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TRAFFIC MANAGEMENT PLAN AND REPORT
Road & traffic management plan
Removal of temporary road diversion and structures
upon completion of project

sum

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the
work area and removal upon completion of the works
as shown in the drawings and /or as directed by the
S.O/P.D*.
Road hump at access including painting (overall length
7m)

no

Overall Average (RM)


Location

Range (RM)

Average (RM)

200.00 - 200.00

200.00

Location

Range (RM)

Average (RM)

15.00 - 15.00

15.00

Location

Range (RM)

Average (RM)

29517.00 - 29517.00

29517.00

Location

Range (RM)

Average (RM)

3000.00 - 3000.00

3000.00

RM 200.00

RM 15.00

RM 29517.00

RM 3000.00

1/9

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD DIVERSION
Pavement
Asphaltic concrete binder course 50mm thick.

m2

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the
work area and removal upon completion of the works
as shown in the drawings and /or as directed by the
S.O/P.D*.
Sand filled Light Weight Movable Barriers with
Delineators

no

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the
work area and removal upon completion of the works
as shown in the drawings and /or as directed by the
S.O/P.D*.
String Delineators

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the
work area and removal upon completion of the works
as shown in the drawings and /or as directed by the
S.O/P.D*.
Barrier Delineators

no.

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TRAFFIC MANAGEMENT TEAM

mth

Overall Average (RM)


Location

Range (RM)

Average (RM)

21.59 - 21.59

21.59

Location

Range (RM)

Average (RM)

85.00 - 85.00

85.00

Location

Range (RM)

Average (RM)

1.57 - 1.57

1.57

2.00 - 2.00

2.00

Location

Range (RM)

Average (RM)

4.92 - 4.92

4.92

30.00 - 30.00

30.00

Location

Range (RM)

Average (RM)

RM 21.59

RM 85.00

RM 1.79

RM 17.46

RM 3443.65

2/9

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

Appointment of traffic management team as follows :


Traffic Safety Officer
TRAFFIC MANAGEMENT AND CONTROL
TRAFFIC MANAGEMENT AND CONTROL
TRAFFIC MANAGEMENT TEAM
Appointment of traffic management team as follows :
Supervisor/Foreman

mth

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TRAFFIC MANAGEMENT TEAM
Appointment of traffic management team as follows :
Traffic Controller / Flagman

mth

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the
work area and removal upon completion of the works
as shown in the drawings and /or as directed by the
S.O/P.D*.
Precast Movable Reinforced Concrete Barriers or
equivalent

no.

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the
work area and removal upon completion of the works
as shown in the drawings and /or as directed by the
S.O/P.D*.
Light Weight Movable Barriers

no.

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the

no.

Overall Average (RM)


C

3443.65 - 3443.65

3443.65

Location

Range (RM)

Average (RM)

1967.80 - 1967.80

1967.80

2000.00 - 2000.00

2000.00

Location

Range (RM)

Average (RM)

983.90 - 983.90

983.90

1000.00 - 1000.00

1000.00

Location

Range (RM)

Average (RM)

245.98 - 245.98

245.98

145.00 - 150.00

147.50

Location

Range (RM)

Average (RM)

92.49 - 92.49

92.49

150.00 - 150.00

150.00

Location

Range (RM)

Average (RM)

RM 1983.90

RM 991.95

RM 196.74

RM 121.25

RM 32.85

3/9

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

work area and removal upon completion of the works


as shown in the drawings and /or as directed by the
S.O/P.D*.
Light Weight Movable Traffic Guidance Cones
TRAFFIC MANAGEMENT AND CONTROL
TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the
work area and removal upon completion of the works
as shown in the drawings and /or as directed by the
S.O/P.D*.
Blinkers including batteries

no.

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the
work area and removal upon completion of the works
as shown in the drawings and /or as directed by the
S.O/P.D*.
Beacon Light including batteries

no.

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the
work area and removal upon completion of the works
as shown in the drawings and /or as directed by the
S.O/P.D*.
Double Sided Reflective String Delineators

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the

no.

Overall Average (RM)


C

18.69 - 18.69

18.69

24.00 - 70.00

47.00

Location

Range (RM)

Average (RM)

59.03 - 59.03

59.03

38.00 - 70.00

54.00

Location

Range (RM)

Average (RM)

380.77 - 380.77

380.77

120.00 - 120.00

120.00

Location

Range (RM)

Average (RM)

4.00 - 4.00

4.00

Location

Range (RM)

Average (RM)

RM 56.52

RM 250.39

RM 4.00

RM 2336.32

4/9

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

work area and removal upon completion of the works


as shown in the drawings and /or as directed by the
S.O/P.D*.
Flashing Arrow
TRAFFIC MANAGEMENT AND CONTROL
TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the
work area and removal upon completion of the works
as shown in the drawings and /or as directed by the
S.O/P.D*.
Sand Bag

m3

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD FURNITURES
Supply temporary road furnitures including installation,
storage, maintenance, replacement, shifting within the
work area and removal upon completion of the works
as shown in the drawings and /or as directed by the
S.O/P.D*.
Temporary Lighting

no.

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY GUARDRAILS
Supply item including installation, maintenance,
replacement and removal upon completion of the
works as shown in the drawings and /or as directed by
the S.O/P.D*.
Temporary Guard Rails

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY SIGNS
Supply, install in position and maintain all temporary
traffic signs of fluorescent orange prismatic
retro-reflective sheeting including all posts, frames,

no.

Overall Average (RM)


C

1672.63 - 1672.63

1672.63

3000.00 - 3000.00

3000.00

Location

Range (RM)

Average (RM)

50.00 - 50.00

50.00

Location

Range (RM)

Average (RM)

5313.06 - 5313.06

5313.06

2000.00 - 2000.00

2000.00

Location

Range (RM)

Average (RM)

200.00 - 200.00

200.00

Location

Range (RM)

Average (RM)

RM 50.00

RM 3656.53

RM 200.00

RM 358.41

5/9

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

brackets and everything complete as shown in the


drawing and/or as directed by the S.O/P.D* including
shifting at the end of each stage and removal at the
completion of the road works.
Not exceeding 1 m2
TRAFFIC MANAGEMENT AND CONTROL
TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY SIGNS
Supply, install in position and maintain all temporary
traffic signs of fluorescent orange prismatic
retro-reflective sheeting including all posts, frames,
brackets and everything complete as shown in the
drawing and/or as directed by the S.O/P.D* including
shifting at the end of each stage and removal at the
completion of the road works.
1 - 2 m2

no.

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY SIGNS
Supply, install in position and maintain all temporary
traffic signs of fluorescent orange prismatic
retro-reflective sheeting including all posts, frames,
brackets and everything complete as shown in the
drawing and/or as directed by the S.O/P.D* including
shifting at the end of each stage and removal at the
completion of the road works.
2 - 3 m2

no.

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY SIGNS
Supply, install in position and maintain all temporary
traffic signs of fluorescent orange prismatic
retro-reflective sheeting including all posts, frames,
brackets and everything complete as shown in the
drawing and/or as directed by the S.O/P.D* including
shifting at the end of each stage and removal at the
completion of the road works.

no.

Overall Average (RM)


C

316.82 - 316.82

316.82

250.00 - 550.00

400.00

Location

Range (RM)

Average (RM)

350.00 - 1000.00

675.00

Location

Range (RM)

Average (RM)

1500.00 - 1500.00

1500.00

Location

Range (RM)

Average (RM)

RM 675.00

RM 1500.00

RM 2000.00

6/9

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

3 - 4m2
TRAFFIC MANAGEMENT AND CONTROL
TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY SIGNS
Supply, install in position and maintain all temporary
traffic signs of fluorescent orange prismatic
retro-reflective sheeting including all posts, frames,
brackets and everything complete as shown in the
drawing and/or as directed by the S.O/P.D* including
shifting at the end of each stage and removal at the
completion of the road works.
More than 4 m2

no.

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD DIVERSION
Pavement
Preparation of formation as specified and as directed
by the S.O/P.D* for receiving temporary road
pavement.

m2

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD DIVERSION
Pavement
Roadbase material complying with Type I or Type II
grading limits of Table 4.3 of the specifications,
Crushed Aggregate - 300mm

m2

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TEMPORARY ROAD DIVERSION
Pavement
Bituminous Prime Coat.

m2

TRAFFIC MANAGEMENT AND CONTROL


TRAFFIC MANAGEMENT AND CONTROL
TRAFFIC MANAGEMENT PLAN AND REPORT
Road & traffic management plan

sum

Overall Average (RM)


F

2000.00 - 2000.00

2000.00

Location

Range (RM)

Average (RM)

3000.00 - 3000.00

3000.00

Location

Range (RM)

Average (RM)

0.75 - 0.75

0.75

Location

Range (RM)

Average (RM)

21.04 - 21.04

21.04

Location

Range (RM)

Average (RM)

1.74 - 1.74

1.74

Location

Range (RM)

Average (RM)

RM 3000.00

RM 0.75

RM 21.04

RM 1.74

RM 6794.50

7/9

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

Allow for the preparation and submission of traffic


management plan and method statement for approval
upon request by the S.O/P.D*.
TRAFFIC MANAGEMENT AND CONTROL
TRAFFIC MANAGEMENT AND CONTROL
TRAFFIC MANAGEMENT PLAN AND REPORT
Road & traffic management plan
Submission 6 sets of Traffic Management Safety
Report once in every 3 months.

sum

Overall Average (RM)


C

9839.00 - 9839.00

9839.00

3750.00 - 3750.00

3750.00

Location

Range (RM)

Average (RM)

4919.00 - 4919.00

4919.00

RM 4919.00

8/9

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Nota
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

Catatan

u.p: En Husnan Husin


Tel: 03-26161111
Email: husnan@jkr.gov.my

9/9

You might also like