You are on page 1of 5

MICHAEL SARSUELO PAROT

163 D. Jackosalem St. Cebu City


Telelphone No. (+032) 2387637
Cellphone No. (+971) 505628283
(+63) 09287361634

Career Summary: A high school graduate with eleven (11) years of experience as
Rigger, Global Process Systems Inc. Fabrication Engineers and Designs Dubai UAE from Nov.
02,2005 up to the present. Torch Offshore Inc., Midnight Brave, Africa from Aug. 26 to Dec. 13,
2004, Marathon Alba Phase II Marine Terminal Pipelaying Project, Equatorial Guinea, West
Africa: Rigger in construction of oil refineries, power plant and high rise building: as Rigger in
Mideast Constructors, Qatar from November 2000 -2002; as Rigger in Mohammed Al Mojil Group,
KSA from June 1999 to August 2000; as Rigger in EEI Corp. Philippines. from 1998 up to 1999; as
Rector/Rigger in Steel Center Phil. Inc. from January to August 1998; as Erector “A” in BF Metal
Corp., Phil. From March to November 1997; ad as Erector/Rigger in Asia Construction
Development corp. Philippines from June 1994 to February 1997.

Objective: To be able to use my knowledge in rigging. To maintain safe and sufficient


operation as required deemed necessary to carry all operation in a Department and so
every individual duties effectively.

PERSONAL DETAILS:
Passport Number : VV-0943028
Expiry Date : OCT. 23, 2012
Place of Issue : PHIL. EMBASSY, ABU DBABI U.A.E
Place of Birth : BAYBAY CAMAGUE,
ILIGAN CITY
Nationality : FILIPINO
Religion : ROMAN CATHOLIC
Civil Status : MARRIED
Name of Father : ANTONIO PAROT
Name of Mother : JOCELYN PAROT
Name of Spouse : SHIELAMAE S. PAROT

EDUCATIONAL BACKGROUND:

PRIMARY SCHOOL : Baybay Camague Elem.School


SY 1983 -1989

SECONDARY : Iligan City National High School


SY 1989- 1993
WORK EXPERIENCE:

1
`
As Rigger : GLOBAL PROCESS SYSTEMS INC.
FABRICATION ENGINEERS AND DESIGN
DUBAI, UNITED ARAB EMIRATES
NOVEMBER 2,2005 up to the present

• SBM OFFSHORE SYSTEM/CHEVRON BRAZIL


UPSTREAM Glycol Regeneration Skid Project Offshore
Brazil
• OXY
Occidental Mukaizna Facilities Onshore OMAN
• TOTAL E & P
Kharir Basement Facilities
Onshore YEMEN
• DNO MIDDLE EAST
Tawke early production facilities Onshoe
KURDISTAN IRAQ
• (ADCO) ABU DHABI COMPANY FOR ONSHORE
OILOPERATION, Buhasa facilites demolition BU-1/BU-2BU-
3/BU-4 project onshore
• SANTOS
The Maleo Producer Rig Jack Up production Offshore
INDONESIA
• FRED OLSEN PRODUCTION A.S./ADDAX PETROLEUM
Antan Fpso Topside/Fpso Knock Addon Offshore
NIGERIA

As Rigger : TORCH OFFSHORE INC.


Name of Barge: Midnight Brave
Punta Europa West Africa,
Equatorial Guinea
August 26, up to December 13,2004

Project Assignments:
• Marathon Alba Phase II
Marine Terminal
Pipe laying Project

Job Description:

• Preparation of 7 anchor 3 from the bow side and 2 from the


stem side II side guy from the beach to moving the barge A to
B.
• Socketing of wire rope splicing to connect to the anchor to the
buoys

2
• Lifting of pipe and another material from supply boat to the
barge
• Wrapping and insulation of jacketing pipe and welded joint
pipe
• Installation of roller and stinger to laying the 5 pipeline gas,
butane and propane
• Lifting the flame 24 inch 35 tons 16 to 12 jacketing pipe 30tons
and 14 to 10 25 tons
• Welding and lashing of all moving material of the barge like
crane to secure the barge to towing in Gulf of Mexico

As Rigger MIDEAST CONSTRUCTION CO.,


QATAR – June 18,2001 up to October 20,2002

Project Assignments:

• Qatar gas sulfur Recovery Expansion Project


• Qatar General Petroleum Corp.NGL-4 EPC Project,
Dukhan Qatar
• Qatar Liquefied Gas Comp. Ltd.(Refinery)SRX Project

Job Description:
• Lifting of beams, girder, column, and pipe, pin fans and pipe
rack.
• Fit-Up of pipe and loading of pipe at fabrication area.
• Air blowing, bolt tightening
• Assembling and dismantling of crawler crane

As Rigger M. AL-MOJIL GROUP


KINGDOM OF SAUDI ARABIA
KEMYA OLEFINS PROJ.
JUNE 16, 1999 – JULY 19, 2000

Job Description:
• Erection of beams, girder, column, and pipe, x changer,
module, steam drum at heater structure.
• Assist of fit up of Pipe and manual erection at pipe rack
structure

• Assist of air blowing, bolt tightening structural and pipe


flanges.

3
As Rigger EEI Corporation
Mauban Quezon Power Plant Project
September 12, 1998 – February 22, 1999

Job Description:
• Assembling and erection of column girder, bridge conveyor.
• Lifting of chimney, ducting in panel board, pipe tube at boiler
and pipe area
• Dismantling and assembling of crawler crane
• Loading of crane and others materials and lashing to the
barge.

As a Erector “A” B.F. Metal Corp.


APO CEMENT CORP PROJ.
Tina-An Naga Cebu City (Phil.)
March 09, 1997 – November 06, 1997

Job Description:
• Erection of columns, beams and trusses
• Erection of gantry conveyor and its columns and support
bracing.
• Erection tank, cool mill and cool dust cylo.

As Erector/Rigger
ASIAN CONSTRUCTION DEV’T
CORPORATION PHILS.
June 03,1994 to February 06, 1997
Job Description:
• Carries out manual erection of steel tower in the mountain
area with the use of chain blocks, rope, pulleys, cable wires and
other necessary lifting gears.

REFERENCES:

4
EDILBERTO MORALES
Operator, National Steel Corp.
Purok 15, Tomino Iligan City

PETER BALASABAS
Foreman. FR Cement Compound
Teresa Rizal

RODELIO A.ILAGA
Deputy Safety Manager
Wilbros Nigeria Limited
(632) 6794947

MICHAEL S. PAROT cc;January 12,2008


Applicant

You might also like