Boiler Pending Activities:

S.N
O
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
19
20
21
22
23
24
25
26
27
28
29
30
31

Description
ID FAN
ID fan outlet & inlet expansion bellow flange rope, bolt &
nuts to be fixed. And All hardwares tightness to be done.
ID fan Inside cleaning to be done.
ID fan DE & NDE shaft sealing plate to be fixed
ID Inlet damper bolt & nut to be fixed. And all hardwares
tightness to be done.
ID fan DE & NDE Plummer block grease nipples to be
fixed
ID fan Suction damper power cylinder erection and
grouting work to be done
ID fan Coupling guard to be fixed.
FD FAN
FD fan inside cleaning to be done.
FD fan DE & NDE shaft sealing plate to be fixed.
FD Fan Suction duct erection to be done.
FD fan discharge & bypass damper handle to be
provided.
FD Fan Discharge and bypass dampers bolt and nuts
tightness to be done
FD fan Discharge and bypass damper flanges gaskets to
be removed and rope will be provided.
FD fan discharge & bypass damper before duct small
cutting to be done to check the open /Close for damper.
FD fan discharge & bypass damper open & close marking
to be done.
FD HDR expansion bellow temp. Locks to be removed.
FD fan coupling guard to be done.
PA FAN
PA fan suction casing erection to be done.
PA fan Suction IGV power cylinder grouting to be done.
PA fan Suction duct support to be fixed.
PA fan shaft sealing plate to be fixed.
PA fan DE & NDE Cooling fan & guard to be fixed.
PA coupling guard to be fixed.
PA fan DE & NDE bearing grease nipples to be fixed.
PA Fan Casing drain pipe to be fixed.
PA fan Suction power cylinder & Duct Support grouting to
be done.
PA fan Insulation and gladding sheet work to be
completed.
PA fan outlet expansion bellow flange rope to be fixed.
AIR AND FLUE GAS
PA line missed out dummy plugs to be fixed.
Air box inside cleaning to be done.

Status

Rope required
to be complete
Welding to be
complete
Rope required
Crease nipple required
Grouting to be complete
to be complete
to be complete
Welding to be complete
After checking of master
level
Completed.
To be completed.
As per Design Gasket
provided.
Completed.
Completed.

To be complete
After checking of shaft
master level
To be completed
Welding to be complete
complete
To be complete
Crease nipple required
completed
To be completed
To be complete
Rope required
To be complete
To be complete

Boiler Pending Activities:


32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63

Air box inside PA line cross flanges bolt and nuts


tightness to be done.
Furnace inside cleaning to be done.
Air nozzle pining to be done.
Economiser LHS (two elevations) casing plate to be fixed
and welding to be completed
Economiser inside cleaning to be done.
APH & Economiser outside temp. Supports to be
removed.
OFA duct expansion bellow temp. Locks to be fixed.
LHS OFA duct top & bottom connection to be done.
Rise husk bunker stiffener corner welding to be done.
Bed material filling line view glass to be fixed.
Bunker View glass (03nos) to be fixed.
PA header duct end to be closed with casing plate.
At 12.2 meter elevation platform to be extended to
hopper manhole door.
ESP inlet temperature element & draft gauge approach
plat form to be provided.
ESP outlet temperature element & draft gauge approach
plat form & ladder to be provided.
PRESSURE PARTS
Drum RHS safety valve exhaust pipe to be extended to
above roof.
Drum insulation & gladding sheet to be done.
PSH & SSH seal box scalable plate to be fixed.
Start up vent & Soot blower control valve spring support
temporary tag welding to be removed.
De-super heater line supports to be fixed.
PSH coil and roof panel temp. supports to be removed
LHS & RHS boiler bank zone manual door to seal box
welding to be completed
Boiler bank hopper LHS & RHS down comer opening to
be closed
Boiler bank rear side corner balance seal plate to be
fixed and welding to be completed.
Boiler bank zone hopper inside temp. supports to be
removed
Steam & water drum to seal box welding to be
completed.
Nose panel bottom side boiler bank zone seal box
welding to be completed.
Nose panel area temp. Supports to be removed.
Hand railing to be provided at water drum floor.
Water drum floor buck stay balance locking rods to be
fixed
PSH & SSH manhole doors top side seal box welding to
be done.
In Furnace front and rear man whole doors to casing
welding to be done.

To be complete
To be complete
To be complete
completed
To be complete
completed
To be complete
completed
completed
To be complete
To be complete
completed
completed
B&H Design Not Provide
B&H Design Not Provide

Completed
completed
completed
completed
To be complete
complete
completed
completed
completed
Flush grinding to be
complete
completed
completed
Completed.
completed
completed
completed
completed

Boiler Pending Activities:


64

77

Bottom header seal box (04 nos) top plate welding to be


done.
Furnace balance casing (04sides) welding to be
completed
Furnace inside cleaning work to be completed. And air
nozzle pining work to be completed
Furnace inside temporary supports (03 nos) to be
removed.
Furnace inside 02 nos of over fire air nozzle to be fixed.
All OFA nozzle welding to be completed
In furnace inside OFA & Bed material extended pipe to be
removed to water wall panel foinlevel.
Bottom water wall & in-bed coil header expansion
indicator to be fixed.
Furnace water wall panel insulation & Cladding sheet
work to be completed
PSH & SSH coils & headers insulation &Cgladding sheet
work to be completed
Feed water & DSH drain line connected with common
drain line.
APH inside temp. Supports to be removed.
All manhole door outside handles to be fixed.
BOILER FEED WATER PUMP
Feed water pump alignment work to be completed.

78

BFWP Coupling guard to be fixed.

79

BFWP grouting work to be completed

80

BFWP suction and discharge line welding work to be


completed.
BFP Suction & Discharge Line parrelality work
DEAERATOR
Pegging steam line supports and all flange bolt and nuts
to be fixed.
Pegging steam line pressure and temperature gauge to
be fixed.
Deaerator make up water & Steam line drain lines
connected to common drain line.
Deaerator insulation & cladding sheet work to be
completed.
HP & LP dosing tank inside cleaning to be done.

65
66
67
68
69
70
71
72
73
74
75
76

81
82
83
84
85
86

completed
completed
To be complete
complete
completed
completed
Grinding to be complete
Expansion Indicator material
to be receive
completed
completed
Not in design
completed
Completed.
Waiting for B&H Alignment
clearance
Waiting for B&H Alignment
clearance
Waiting for B&H Alignment
clearance
Waiting for B&H Alignment
clearance
To be complete
Tightening work to be
complete
To be completed
Not in design
complete
To be complete.