TP48400B Installation Key Points

TP48400B (Indoor) Installation Key Points

I.

Install power system cabinet.


1) Fix it

2015-6-24

1 , 10

TP48400B Installation Key Points

2015-6-24

2 , 10

TP48400B Installation Key Points

II.

Install cables
1) Install grounding cables
Connect to PGND screws on the cabinet and ground bus bar (outside the cabinet).

2) Install AC input cables


2015-6-24

3 , 10

TP48400B Installation Key Points

a. Install new MCB rectifier 3 pole 16 Ampere in ACPDB.


b. Install power cable from MCB in ACPDB to MCB ac input in rectifier.

3) Install DC load cables

4) Install battery cables


-

Install Battery Middle sensor to each group of battery.


Must fasten the battery bolts.

2015-6-24

4 , 10

TP48400B Installation Key Points

5) Install the communication cable


a.

Connect RS485/RS232 port on the SMU to MON 0 port on BBU :

b. Connect RS485/RS232 port from EMUA to BBU on port MON 1 :

2015-6-24

5 , 10

TP48400B Installation Key Points

6) Install external alarm cables from DDF to EMUA board

7) Install Battery temperature sensor


Connect signal cable of battery temperature sensor to port BTEMP on the UIM02C.

2015-6-24

6 , 10

TP48400B Installation Key Points

8)

Powering On and Commissioning the TP48400B


1) First, switch on rectifier MCB, check whether power system can run smoothly.
2) Set SMU parameter
If need to enter password, input like this picture below :

Password: 000001

a.

Battery capacity

2015-6-24

7 , 10

TP48400B Installation Key Points

Fill the battery capacity. Change to 170 Ah

b. Time and Date


Set time and date of installation, Time zone change to UTC +7. Follow the steps elow:
1st Menu

c.

2nd Menu

3rd Menu

Value

Battery charge current limit set to 0.10C10 or 10 %.

d. LLVD and BLVD setting


Set LLVD value is 46 V and BLVD value 43.2 V. Follow the steps below:

LLVD setting ( 46 V ) :

1st Menu

2015-6-24

2nd Menu

3rd Menu

Value

8 , 10

TP48400B Installation Key Points

1st

e.

III.

BLVD setting ( 43.2 V ) :

Menu

2nd Menu

3rd Menu

Value

Host communication address

Please find the SMU02B menu


This menu can help us how to set SMU parameter step by step.

SMU02B Menu.xlsx

IV.

Alarm Test Procedure


2015-6-24

9 , 10

TP48400B Installation Key Points

No
.
1
2

Alarm

Procedure

Main Power
Rectifier Module

Temperature

PLVD Disconnect

5
6
7
8

Arrester
Rectifier Battery
Door Open
Aviation Light

Switch off main MCB input rectifier


Plug off one PSU module
Change battery temp. protection to Reduce DC
Voltage then heat the sensor
Change LLVD threshold from 46V up to Floating
charge voltage. If already show alarm Warning
LLVD disconnect, then directly set back to default
threshold otherwise LLVD will disconnect the load.
Plug off one pole of arrester fuse
Switch off one of battery MCB
Open and close the door cabinet
Switch off the MBC of aviation light

2015-6-24

10 , 10