Professional Documents
Culture Documents
CHECK LIST
PROJECT NUMBER :101119D
Page 1 of
4
PROJECT MANAGER:SHAMIM
DOCUMENT NUMBER:CL-05-11
PROPOSED WORK METHODOLOGY
WORK PARTY
LOCATION
YANBU
DESCRIPTION
REVIEW
OF
MANDATORY REQUIREMENTS
HAZARD
Unidentified Job
Specific
Hazards
CONTROL MEASURE
JHA to be carried out by staff detailing on the day
hazards that could not be practically assessed prior to
attending site in addition to this CHECK LIST. All staff
to sign on to JHA accepting this form and the on the day
hazards and controls. JHA has been completed and
approved by the relevant personnel in accordance with
the JHA Procedure
Hydro HazardsLack of
awareness of
local asset and
other
simultaneous
operations
CHECKED
GENERAL REQUIREMENTS
HAZARD
Abrasive
blasting
equipment
Abrasive
blasting
materials
Surface
coatings /
paints
CONTROL MEASURE
Nozzle must have automatic shut off fitted
Hose whip restraints fitted
Earthed for static electricity
No siliceous or toxic dust exposures
Containment of dusts and over blasts
Procedure for lead based paint removal
Clean up required after completion
Washing / showering facilities required
Disposal methods for all waste materials
Secure temporary flammable material
storage
Prevention and containment of spills
DOCUMENT REFERENCE: CL
05 11
REVISION: 0
N/A
CHECKED
DATE: 23/06/2015
Page 2 of
4
PROJECT MANAGER:SHAMIM
DOCUMENT NUMBER:CL-05-11
GENERAL REQUIREMENTS
HAZARD
Solvents and
thinners
Fire and
explosion
Unauthorised
access
Falls from
heights
CONTROL MEASURE
Hazardous substances risk assessment
Material data sheets available and
understood
Containment of paint overspray
Mechanical ventilation in enclosed areas
Spray booth used for movable items
Secure temporary flammable material
storage
No ignition sources near spray painting
No ignition sources near flammable store(s)
Appropriate fire fighting equipment on hand
N/A
CHECKED
Lack of coordination
DOCUMENT REFERENCE: CL
05 11
REVISION: 0
DATE: 23/06/2015
Page 3 of
4
PROJECT MANAGER:SHAMIM
DOCUMENT NUMBER:CL-05-11
SITE REGISTRATION (Note: Applies to all Work Parties and personnel working
on site)
REQUIREMENT
CHECKED
Permit To Work issued
Visitors register sheet or emergency board being used. Site Map
issued (showing emergency assembly areas and fire equipment)
AL-MUZAIN O H & S Induction complete
AL-MUZAIN Site induction complete
S
REQUIREMENT
CHECKED
CERTIFICATION
I have personally checked and verified all items on all pages of this check list
Project Manager Name
Signature
Date
I acknowledge and agree that all items are detailed on all pages of this check list. I
agree to ensure that all employees and sub-contractors engaged in this work will
fully comply with all control measures indicated
Manager of Work Party
Signature
Date
Name
DAILY REVIEW
IF THERE IS A SIGNFICANT
REQUIRED
DATE AND TIME
DOCUMENT REFERENCE: CL
05 11
CHANGE IN
WORK
AND OR
REVIEWED / COMMENT
REVISION: 0
CONDITIONS
A NEW
CHECK LIST
IS
PROJECT MANAGER:SHAMIM
DOCUMENT NUMBER:CL-05-11
DOCUMENT REFERENCE: CL
05 11
Page 4 of
4
REVISION: 0
DATE: 23/06/2015