Liste des Contrles dInstallation

Installation Check List

ICL
ICQ 0200

DESIGNATION DE MONTAGE :
Assembly designation
AIR INTAKE FILTER
Mechanical part
MODULE(S) : /
Modulus
NOM DE L'AFFAIRE : DEIR AMMAR

TYPE DE MACHINE : TG-9E

Project name

Machine type

MARQUAGE : 9048058/01 ; 9048064/01 &


9048065/01

N CLIENT : 104/498997, 104/498998 & 104/498999E1315


Customer Nr

Identification

Nom :

Signature :

Date :

Date/Signature :

S
Q
S

Nom :

ffi
c

Entreprise :

ia

RESPONSABLE(S) QUALITE DE L'ENTREPRISE(S) DE MONTAGE


Assembly manufacturer's quality representative

REFERENCE : 48058meca
Ce document, proprit exclusive de GE Energy Products France SNC, est
strictement confidentiel. Il ne peut tre communiqu, copi, ou reproduit sans
notre autorisation crite.

REV/Issue : A

DT-7C

PAGE :1/3

This document, exclusive property of GE Energy Products France SNC, is strictly


confidential. It must not be communicated, copied or reproduced without our
written consent.

Liste des Contrles


dInstallation
Installation Check List

REFERENCE : 48058meca
REV/Issue : A

ICL

Page : 2/3

EXIGENCES Requirements
LIGNE
Line

NATURE DES CONTROLES


Type of checks

Subcontractor
or Partner

GE

Customer

SPECIFICATIONS

01

Site inspection delivery and storage:


. Visual
. Quantity

02

Inspection of supporting structure


. Levels, alignement;
. Bolts, tightening, evenness;
. Visual and measurement

03

Erection of the flexible below


. Check need shims for horizontal position
. Check all eye lifting bolts
. Control position with gas turbine axis
. Control bolt securing on structure

Erection procedure - Mechanical


part
Tightening torque refer to appendix
of erection book

04

Erection of transition piece:


. Check need shims for horizontal position

Erection procedure - Mechanical


part
Tightening torque refer to appendix
of erection book

Tightening torque refer to appendix


of erection book
Air seal between the modules refer to
appendix of erection book

. Check all eye lifting bolts


. Control position with gas turbine axis
. Control bolt securing on structure

05

Erection of inlet module.


. Check all eye lifting bolts
. Control tightness and securing with transition piece
. Control position with gas turbine axis
. Control bolt securing on structure

V = Vrification / Verify
R = Document rapport / Document Report

REV
Issue

N RAPPORT / REPORT Nr
Signature & date

N PV NC
NCR Nr

Packing list

W = Convocation + vrification / witness point


H = Point d'arrt + vrification/Hold point + verify
Plan Qualite Site.DOT

Liste des Contrles


dInstallation
Installation Check List

REFERENCE : 48058meca
REV/Issue : A

ICL

Page : 3/3

EXIGENCES Requirements
LIGNE
Line

NATURE DES CONTROLES


Type of checks

Subcontractor
or Partner

GE

Customer

SPECIFICATIONS

06

Erection of Downstream module.


. Check all eye lifting bolts
. Control tightness and securing with transition piece
. Control position with gas turbine axis
. Control bolt securing on structure

07

Erection of coalescers cells:


check open cells are installed vertically
check the securing of latches

Erection of prefilters cells :


check open cells are installed vertically

09

Erection of HF filter cells :


check open cells are installed vertically
check the securing of latches

Erection procedure - Mechanical part

10

Final inspection of all installed equipment


Internal cleaning and dedusting of the housing and
filter frames visual control

Erection procedure - Mechanical part


Refer to the commissioning book

08

V = Vrification / Verify
R = Document rapport / Document Report

REV
Issue

N RAPPORT / REPORT Nr
Signature & date

N PV NC
NCR Nr

Erection procedure - Mechanical part


Tightening torque refer to appendix
of erection book
Air seal between the modules refer to
appendix of erection book

Erection procedure - Mechanical part


of erection book
Erection procedure - Mechanical part

W = Convocation + vrification / witness point


H = Point d'arrt + vrification/Hold point + verify
Plan Qualite Site.DOT