You are on page 1of 8

CURRICULUM VITAE

♦ Personal details:
ƒ First name: Manh Tung
ƒ Last name: Nguyen Vu
ƒ Address: 48 Vuon Lai Street, Tan Phu district, HCM city.
ƒ Tel: 097 9793 970.
ƒ Nationality: Viet Nam
ƒ Date of birth: April 25th, 1979
ƒ Interest: music, football, art and beauty…
♦ Personal profile:
ƒ I am cheerful, kind-hearted, well-organized, responsible and reliable.
ƒ I would like to work with technical and managerial jobs.
ƒ I graduated at HCM city- The University of Technology.
♦ Key skills:
ƒ Competency in computer skills: Word, Excel, AutoCAD…
ƒ English level B, TOEIC 565
ƒ Confident communicating.
ƒ Self-motivated.
ƒ Able to cope with under pressure.
♦ Work experience:
ƒ From 12/2002 to 5/2003, supervised the 110kV power transformer station in BEN
CAT, BINH DUONG province for LICOGI 16 Company:
ƒ From 5/2003 to 12/2006, worked for PME Company:
º From 5/2003 to 11/2003, the THAI SON Office project (6 stories).
º From 12/2003 to 4/2005: the TAM DUC Hospital project (2 blocks 8 stories).
º From 4/2005 to 11/2006: the NGUYEN VAN DAU 16-storey Apartment
Building project as a Site Manager.
ƒ From 11/2006 to 1/2008, worked for DESCON Company:
The STADA – VN GMP EUROPE PHARMACY project, in VSIP, BINH DUONG
province as a Electrical Chief Engineer .
Main Duties (for the projects above):
º Made shop and as-built drawings.
º Figured out amount of material.
º Monitor the Schedule of Technical Submittal, Shop Drawing, Material delivery
on Site, Progress of Installation,….
º Ordered devices and materials depend on schedule of works.
º Managed subcontractor and company’s workers, storekeeper.
º Had conferences with owner, consultant and subcontractor weekly.
º Checked and took/hand over the installation steps and workload every floor and
installation stage such as: laying ducts, putting boxes, mounting lights, installing
ladder, cable tray, trunking lines and pulling cables … for LV and ELV systems.
ƒ From 2/2008 to now, work for VietNam Land SSG Company- the owner
The Saigon Pearl project as a M&E Engineer of Phase 1 and 2B.
Main Duties (for these phases):
º Check and approve the Electrical designed and shop drawings.
º Check and approve the Electrical technical of materials.
º Monitor the Schedule of Technical Submittal, Shop Drawing, Material delivery
on Site, M&E Progress of Installation,….to catch up the target day.
º Coordinate with all relative parties to solve the matter/obstacle even daily if any

♦ Education:
ƒ 1994-1997: Study at XUAN LOC high school, DONG NAI province.
ƒ 1997-2002: Study at HCM city- The University of Technology.
ƒ I was a student of Electrical Supply and Electrification Department.
.

You might also like