You are on page 1of 2

CUSTOMER: M/s CAUVERY POWER GENERATION CHENNAI PVT LTD

PROJECT; 1 X 63 MW THERMAL POWER PLANT


Scope Of Work For Testing, Pre-commissioning &
HV Tests at Cauvery Power project Site
I

Standard Electrical Testing - STG packege

Generator IR, PI. Resistance measurement.

yes

RTD,BTD resitance measurement.

yes

3
4

Tests

Generator SCC and OCC and protecions during TG


commissioning.
Primary/Secondary injection and checking of all the
relays,all meters,transducers,equipments etc,. As per the
drawings.

Scope

yes
yes

Stability Test

yes

Checking of Inter connection cables(LT Power & control)


between all the panels and equipments

yes

Total functionality/control scheme/Synchronizing


schemes as per the drawing.

yes

Phase sequence,Back charging

yes

All relays, protections,alarms/trips.

yes

10

Connection tightness.

yes

11

Earthing including Earth resistance checks

yes

II

Related Panels

yes

AC Generator & Exciter

1 unit

yes

Generaor Metering and Synchronising Panel

1 unit

yes

AVR Panel

yes

Generator Relay panel

yes

Generator Transformer Relay panel

yes

Satation Transformer Relay Panel

yes

Unit Auxiliary Transformer Relay panel

yes

MCC's (STG, ACC, Boiler, ESP and Ash Handling


system)

yes

All types of CT & PT test (polarity, ratio test & etc,.)

yes

Note: 1- Any other testing not mentioned above, but required at site shall be considered.
2- No. of days to be considered for all above tests and 7days for assistance during commissioning stage.
3-Tools required for all tests shall be shown with Calibration Test Certificates.

4- All special tools and Test Kit shall be carried including Loading Transformer for Current Injection up to 5000A
Relay test kit (Omicron or equivalent to test all protection functions as per attached Generator & Transformer T
including Frequency, DF/DT, Loss of excitation, Over fluxing, Low forward Power, Reverse Power-active,reactiv
slipping, Back up Impedance, Rotor Earth fault, 100% Earth fault etc..), 3 Phase Variac and 5KV Megger etc..

Remarks

Loading Transformer for Current


Injection up to 5000Amps.

Relay Qty as shown in attached SLD

Complete control scheme check also


shall be considered
as per the drawing

tioned above, but required at site shall be considered.

red for all above tests and 7days for assistance during commissioning stage.

shall be shown with Calibration Test Certificates.

Kit shall be carried including Loading Transformer for Current Injection up to 5000Amps,
uivalent to test all protection functions as per attached Generator & Transformer Trip logics
Loss of excitation, Over fluxing, Low forward Power, Reverse Power-active,reactive, Pole
e, Rotor Earth fault, 100% Earth fault etc..), 3 Phase Variac and 5KV Megger etc..