APP 02

PORTOFOLIO FOR THE APPLICATION AS ASEAN CHARTERED PROFESSIONAL ENGINEER


Name:
PROFESSIONAL EXPERIENCE IN RESPONSIBLE CHARGE OF SIGNIFI CANT ENGINEERING WORK

Februari
2012
Agustus
2013

rev 02b

E
D5
study / Masters / post
research / graduates /

engineering Other

managementPlanning /

Project Name : EIA Study of 2x1.000 MW Coal Fired


Power Plant
Project Location : Batang Regency, Central Java Province
Owner : PT Bhimasena Power Indonesia
Company Name : PT Wiratman
Duties & Responsibility :
Conduct primary survey / field

EXPERIENCE AREA (in months)


D1
D2
D3
D4
Site / field

Example: April

C
Name,
position and
address of
professional
engineer
under whom
served &

officeDesign /

B
State concisely title of position held, name of employer,
location and description of each work (make statement
brief and concise, designating each work upon which
engaged with or change of position separately: include
some indication of magnitude and complexity of work in
which engaged, your duties and degree of responsibility)

Total

A
Date (month
& year)
relating to
each
appointment

Signature of any
professional engineers
who has personal
knowledge of applicants
training or experience in
the period mentioned

observations
Perform secondary survey / study of
literature
Develop
environmental
setting
physical aspects - spatial and
transport
Analysis of the physical aspects of
the environmental impact forecaststransport
Evaluation of the impact of the
physical aspects of the environmenttransport

Page 1 of 98

APP 02
PROFESSIONAL EXPERIENCE IN RESPONSIBLE CHARGE OF SIGNIFI CANT ENGINEERING WORK

rev 02b

E
D5
study / Masters / post
research / graduates /

engineering Other

Site / field

EXPERIENCE AREA (in months)


D1
D2
D3
D4
managementPlanning /

Project Name : Detailed Spatial Plan of Mount Merapi


Project Location : Central Java and Yogyakarta Special
Region
Owner : Ministry of Public Works
Company Name : PT Wiratman
Duties & Responsibility :
Develop and monitor schedules / work schedule
Develop and monitor the manning schedule
Develop and monitor project cost
Conduct primary survey / field observations
Perform secondary survey / study of literature
Juni 2011 Identify potential problem areas and constraints
1
macro-region analysis (regional policy directives review)
Desembe micro-region analyisis (physical aspects - environmental,
r 2011
facilities, and disaster analysis)
Assist Team Leader formulate concepts and develop a
structure plan (system service centers, major
infrastructure systems and other infrastructure
systems)
Assist Team Leader formulate concepts and develop a
pattern of land use area (Region Protected Areas &
Culture)
Develop an indication of the utilization of space program
Develop referral zoning regulations
Develop land use control devices

C
Name,
position and
address of
professional
engineer
under whom
served &

officeDesign /

Example: April

B
State concisely title of position held, name of employer,
location and description of each work (make statement
brief and concise, designating each work upon which
engaged with or change of position separately: include
some indication of magnitude and complexity of work in
which engaged, your duties and degree of responsibility)

Total

A
Date (month
& year)
relating to
each
appointment

Signature of any
professional engineers
who has personal
knowledge of applicants
training or experience in
the period mentioned

Page 2 of 98

APP 02
PROFESSIONAL EXPERIENCE IN RESPONSIBLE CHARGE OF SIGNIFI CANT ENGINEERING WORK

Desember
2009 April
2010

rev 02b

E
D5
study / Masters / post
research / graduates /

engineering Other

managementPlanning /

Project Name : Energetic Material Center Masterplan


Project Location : Subang, West Java Province
Owner : PT Dahana
Company Name : PT Wiratman
Duties & Responsibility :
Develop and monitor schedules / work schedule
Develop and monitor the manning schedule
Develop and monitor project cost
Conduct primary survey / field observations
Perform secondary survey / study of literature
Analysis of macro-region (regional policy
directives review)
Analysis of micro-region (physical aspects environmental, facilities, and security analysis
evacuation system & region)
SWOT Analysis
Analysis of the needs and capacity of the
industry
Assist Team Leader to formulate the concept of
zoning plans and block plans.
Assist the Team Leader to develop subregional
plan settlements, plans subregion facility /
facilities, risk management plan, the intensity of
land use plans blocks allocation and planning
future building
Develop an indication of program and
implementation phases

EXPERIENCE AREA (in months)


D1
D2
D3
D4
Site / field

Example: April

C
Name,
position and
address of
professional
engineer
under whom
served &

officeDesign /

B
State concisely title of position held, name of employer,
location and description of each work (make statement
brief and concise, designating each work upon which
engaged with or change of position separately: include
some indication of magnitude and complexity of work in
which engaged, your duties and degree of responsibility)

Total

A
Date (month
& year)
relating to
each
appointment

Signature of any
professional engineers
who has personal
knowledge of applicants
training or experience in
the period mentioned

Page 3 of 98

APP 02
PROFESSIONAL EXPERIENCE IN RESPONSIBLE CHARGE OF SIGNIFI CANT ENGINEERING WORK

Mei 2009
30
Novembe
r 2009

rev 02b

E
D5
study / Masters / post
research / graduates /

engineering Other

managementPlanning /

Project Name : Environmental Monitoring and


Environmental Management of Industrial Estate
Pulogadung
Project Location : Pulogadung DKI Jakarta
Owner : PT JIEP
Company Name : PT Wiratman
Duties & Responsibility :
Conduct primary survey / field observations
Perform spatial component of data collection
Evaluation and analysis of data
Develop Environmental Monitoring Reports
Develop Implementation Report

EXPERIENCE AREA (in months)


D1
D2
D3
D4
Site / field

Example: April

C
Name,
position and
address of
professional
engineer
under whom
served &

officeDesign /

B
State concisely title of position held, name of employer,
location and description of each work (make statement
brief and concise, designating each work upon which
engaged with or change of position separately: include
some indication of magnitude and complexity of work in
which engaged, your duties and degree of responsibility)

Total

A
Date (month
& year)
relating to
each
appointment

Signature of any
professional engineers
who has personal
knowledge of applicants
training or experience in
the period mentioned

Page 4 of 98

APP 02
PROFESSIONAL EXPERIENCE IN RESPONSIBLE CHARGE OF SIGNIFI CANT ENGINEERING WORK

Juni 2008
18
Desembe
r 2008

rev 02b

E
D5
study / Masters / post
research / graduates /

engineering Other

managementPlanning /

Project Name : Ambon City Spatial Planning


Project Location : Ambon City
Owner : Regional Planning Agency
Company Name : PT Wiratman
Duties & Responsibility :
Develop and monitor schedules / work schedule
Develop and monitor the manning schedule
Develop and monitor project cost
Conduct primary survey / field observations
Perform secondary survey / study of literature
Identify potential problem areas and constraints
Analysis of macro-region (regional policy
directives review)
Analysis of micro-region (physical aspects environmental, facilities)
Assist Team Leader formulate concepts and
develop a structure plan (system service centers,
major infrastructure systems)
Assist Team Leader formulate concepts and
develop a pattern of land use area (Region
Protected Areas & Culture)
Develop an indication of the utilization of space
program
Develop referral zoning regulations
Develop land use control devices

EXPERIENCE AREA (in months)


D1
D2
D3
D4
Site / field

Example: April

C
Name,
position and
address of
professional
engineer
under whom
served &

officeDesign /

B
State concisely title of position held, name of employer,
location and description of each work (make statement
brief and concise, designating each work upon which
engaged with or change of position separately: include
some indication of magnitude and complexity of work in
which engaged, your duties and degree of responsibility)

Total

A
Date (month
& year)
relating to
each
appointment

Signature of any
professional engineers
who has personal
knowledge of applicants
training or experience in
the period mentioned

Page 5 of 98

APP 02
PROFESSIONAL EXPERIENCE IN RESPONSIBLE CHARGE OF SIGNIFI CANT ENGINEERING WORK

Agustus
2005
April
2007

E
D5
study / Masters / post
research / graduates /

engineering Other

managementPlanning /

Project Name : Supervision of The 18th Rasuna


Residence Apartment
Project Location : DKI Jakarta
Owner : PT Bakrie Swasakti Utama
Company Name : PT Wiratman
Duties & Responsibility :
Develop and monitor schedules / work schedule
Develop and monitor the manning schedule
Develop and monitor project cost
Assist team leader to arrange monthly report.
Coordinate the implementation of ISO 9001:
2000
Project Name : Management Construction of

EXPERIENCE AREA (in months)


D1
D2
D3
D4
Site / field

Example: April

C
Name,
position and
address of
professional
engineer
under whom
served &

officeDesign /

B
State concisely title of position held, name of employer,
location and description of each work (make statement
brief and concise, designating each work upon which
engaged with or change of position separately: include
some indication of magnitude and complexity of work in
which engaged, your duties and degree of responsibility)

Total

A
Date (month
& year)
relating to
each
appointment

Signature of any
professional engineers
who has personal
knowledge of applicants
training or experience in
the period mentioned

Menari & Menari Fountain Park


April
2005 - Juli
2005

rev 02b

Project Location : DKI Jakarta


Owner : PT Media Indra Buana
Company Name : PT Wiratman
Duties & Responsibility :
Develop and monitor schedules / work schedule
Develop and monitor the manning schedule
Develop and monitor project cost
Assist team leader to arrange monthly report.
Coordinate the implementation of ISO 9001:
2000

Page 6 of 98

APP 02
PROFESSIONAL EXPERIENCE IN RESPONSIBLE CHARGE OF SIGNIFI CANT ENGINEERING WORK

Januari 2005
Maret 2005

E
D5
study / Masters / post
research / graduates /

Project Location : DKI Jakarta


Owner : PT Jakarta Monorail
Company Name : PT Wiratman
Duties & Responsibility :
Assist team leader to arrange weekly and
monthly report.

engineering Other

of Jakarta Monorail

Project

managementPlanning /

Project Name : Supervision

EXPERIENCE AREA (in months)


D1
D2
D3
D4
Site / field

Example: April

C
Name,
position and
address of
professional
engineer
under whom
served &

officeDesign /

B
State concisely title of position held, name of employer,
location and description of each work (make statement
brief and concise, designating each work upon which
engaged with or change of position separately: include
some indication of magnitude and complexity of work in
which engaged, your duties and degree of responsibility)

Total

A
Date (month
& year)
relating to
each
appointment

Signature of any
professional engineers
who has personal
knowledge of applicants
training or experience in
the period mentioned

Supervision Consultancy of
Pattimura Airport Construction
Project Name :

Februari
2004
Desembe
r 2004

rev 02b

Project Location : Ambon


Owner : Department of Transportation
Company Name : PT Wiratman
Duties & Responsibility :
Assist team leader to arrange monthly report.

Page 7 of 98

APP 02
PROFESSIONAL EXPERIENCE IN RESPONSIBLE CHARGE OF SIGNIFI CANT ENGINEERING WORK

Juli 2003
Januari
2004

E
D5
study / Masters / post
research / graduates /

Preparation of the Regional


Strategy of Purwakarta

engineering Other

Development
Regency

managementPlanning /

Project Name :

EXPERIENCE AREA (in months)


D1
D2
D3
D4
Site / field

Example: April

C
Name,
position and
address of
professional
engineer
under whom
served &

officeDesign /

B
State concisely title of position held, name of employer,
location and description of each work (make statement
brief and concise, designating each work upon which
engaged with or change of position separately: include
some indication of magnitude and complexity of work in
which engaged, your duties and degree of responsibility)

Total

A
Date (month
& year)
relating to
each
appointment

Signature of any
professional engineers
who has personal
knowledge of applicants
training or experience in
the period mentioned

Project Location : Purwakarta


Owner : Department of Public Works
Company Name : PT Bernala
Duties & Responsibility :
Collecting primary data by distributing
questionnaires and statistical data processing.
Develop strategies tourism aspects of studies
using SWOT analysis.
Assist urban planner to arrange Jatilahur tourism
development strategy in order to capture market
after toll road opening
Attend meetings and discussions with Ministry
of Infrastructure and the Purwakarta Regency.

Total
Months

rev 02b