COMMITTED
Asof30September2014
Committed/
Indicative
NameoftheProject
Project
Proponent
Location
COAL
Committed
TPCCoalFiredPower
PlantExpansionProject ToledoPower
(1x82MWCoalFired Company
PowerPlant
ToledoCity,
Cebu
Rated
Capacity
(MW)
352.00
82
2X135MWConcepcion
CoalfiredPowerPlant
Committed
PalmThermal
Phase1135MW
Consolidated
(1stUnit)
HoldingsCorp.
Brgy.Nipa,
Concepcion,
Iloilo
270
Phase2135MW
(2ndUnit)
GEOTHERMAL
Committed
NasuloGeothermal
Project
ProjectStatus
FinancialArrangementSecured:LoanagreementwithBanksinplace,financialcloseon07March2013(70%Loan/30%Equity);
SecuredClearancefromDOEfortheconductofGISon3March2011;
ECCissuedlast28August2012;
BOICertificateofRegistrationNo.2012225last23October2012;
Ongoingconstruction(asofApril201490.2%completed);
Groundbreakingon11November2012;
ProjectfeeisPhp10.17B
TargetTesting&
Commissioning
October2014
TargetCommercial
Operation
December2014
FinancialArrangementSecured:Doneon24July2013;
SecuredClearancefromDOEfortheconductofGISon14June2012;
SISReportapprovedbyNGCPon17July2012;
SecuredtheAppraisalreportforthePPA/MLAfromtheDENRRegionalDirector;
CommencementofConstructionfor1stUniton18July2013;2ndUnitonSeptember2014(specificdatesforthe2ndunitwillstillfirmedupafter1st 1stUnit3rd
1stUnit2nd
unit'scommencementofconstruction);
Quarterof2015
Quarterof20162nd
Offtaker:SignedElectricPowerPurchaseAgreements(EPPA)withVRESCO(5MW)14Nov.2012,NOCECO(10MW)31Jan.2013,NORECO(1MW) 2ndUnitMay
UnitNovember
13Feb.2013,CENECO(22.6MW)on11March2013,PECO(10MW)on20May2013,AKELCO(12MW)on22Aug.2013,andCAPELCO(2MW)on5Sep. 2016toSeptember
2016(specificdates
2013;
2016(specificdates
forthe2ndunitwill
Groundbreakingofconstructionon15Jan.2013;
forthe2ndunitwill
stillbefirmedup
CommencementofConstruction1stUnit18July2013,2ndUnit(specificdatesforthe2ndunitwillstillbefirmeduplater;
stillbefirmedup
after1stunit's
Procurementofpowerplant'smajorequipmenthasbeencompleted;Manufacturingofequipmentisongoing;
after1stunit's
commencementof
Constructionasof31May2014;ScopeofWorks:a.PlantSite80%;b.CoalYard70%;PilingWorks:a.BoilerArea100%;b.ElectrostaticPrecipitator commencementof
construction);
88.50%;TransmissionFacilitya.GeologicalandTechnicalInvestigation100%;b.RouteandParcellaySurvey95%;c.RightofWayAcquisitionc.1.No. construction)
ofTowerSitesAcquired138kV66%;69kV51%;c.2.No.ofInBetweenTowersAcquired138kV30.80%;69kV29.30%;AwardedtheTransmissionLine
andSubstationProjecttoTBEAShenyang;Contractwassignedon17July2014;
DOEEndorsementforNCIPforUnit1issuedon3June2014;
ProjectcostisPhp26.356B
50.00
Energy
Development
Corporation
Nasuji,
Valencia,
Negros
Oriental
50
FinancialArrangementSecured;tobefinancedbyEDC(100%equity);
Undergoingreliabilityrun(aspartoftestingandcommissioningactivities)
SecuredClearancefromDOEfortheconductofGISon21November2011;
CertificateofCommercialityandCertificateofAdditionalInvestmentobtained;DOEServiceContractwithinGRESC#200910002;LGU
endorsement,LandUsePermits,DENRECC,andWaterRightsobtained;
StartofconstructionJanuary2013;StartofReliabilityTestonMay2014;
OngoingconstructionstartedonJan2013;
Groundbreakingon11November2012;
Projectaccomplishment:Phase1(civilworks)99.34%;Phase2(Electromechanicalworks)99.32%;
Projectcost$91M
October2014
October2014
(TargetTesting&
Commissioning)
PRIVATESECTORINITIATEDPOWERPROJECTS(VISAYAS)
COMMITTED
Asof30September2014
Committed/
Indicative
NameoftheProject
Project
Proponent
Location
HYDROPOWER
Committed
VillasigaHEP
Committed
Cantakoy
Committed
Rated
Capacity
(MW)
16.00
ProjectStatus
FinancialArrangementSecuredfromBank;
Variouspermitsobtained(WaterPermitlast19Februaru2010,ReconnaisancePermit,ECClast8July2010,BOIlast24November2010andDOE
HydropowerServiceContractlast1February2010);
AlreadysecuredLGUEndorsements,DENREnvironmentalComplianceCertificate;
SunwestWater Brgy.Igsoro,
Submittedfeasibilitystudy,detailedengineeringdesignand5YearWorkPlan;
&ElectricCo.,
Bugasong, 8.00
Offtaker:EnergySalesAgreementwithAntiqueElectricCooperative;
Inc.
Antique
ProjectcostPhp1.4B
Constructionis98%completeasof11June2014;
ProjectcostPhp1.4B
Quadriver
EnergyCorp.
FinancialArrangementSecured;
Danao,Bohol 8.00 SecuredClearancefromDOEfortheconductofGISon11July2011;
ConstructionwasonholdduetoconflictwithLGU
TargetTesting&
Commissioning
September2014
June2017
SOLAR
9.00
SanCarlosSolar
PhotovoltaicPower
Project
(PhaseB9MW)
FinancialArrangementSecured:100%equityfinanced;
AwardedwithSolarEnergyServiceContract(SESCNo.201309037)on30October2013;
AcquiredECCfromDENR,MunicipalandBarangayResolutionsofSupport,LeaseAgreementswithlandowners,andEPCContractwithConergyand
SchemaKonsult,Inc.;
SubmittedaphotocopiesofSubscriptionAgreementdated02May2013foratotalamountofUSD48.2MillionbetweenSACASOLanditssponsor,
ThomaslloydCleantechInfrastructureFundGmbh,withthecorrespondingNotesissuedamountingtoUSD1.9MM;
AcquiredtheDOECertificateofConfirmationofCommercialityon03March2014;
Phase2August
9.00 SecuredClearancefromDOEfortheconductofGISon25June2013;
2014
AcquiredNGCPSystemImpactStudy,approvedFacilityStudyandConnectionAgreement;
InagurationofSacasol115May2014
ConstructionStageasof30September2014(Preconstruction100%completed,ConstructionofSolarFarm100%completed,Interconnection100%
completed);
ObtainedSystemImpactStudyfromNGCP;
PhaseAwassuccessfullycommissionedandstartedcommercialoperationon15May2014;
TotalprojectcostisUS$43.1Million;
SanCarlos
SolarEnergy
Inc.
SanCarlos
City,Negros
Occidental
TargetCommercial
Operation
September2014
(TargetTesting&
Commissioning)
June2017
Phase2August
2014
(PhaseB
successfully
commissionedand
alreadystarted
commercial
operationon16
August2014
PRIVATESECTORINITIATEDPOWERPROJECTS(VISAYAS)
COMMITTED
Asof30September2014
Committed/
Indicative
NameoftheProject
Project
Proponent
Location
WIND
Committed
Committed
NabasWindPower
Project
PhaseI34
PhaseII16
54MWSanLorenzo
WindPowerProject
(8MW&46MW)
PetroWind
Energy
Corporation
TransAsia
Renewable
Energy
Corporation
Brgy.Pawa,
Nabas,Aklan
SanLorenzo,
Guimaras
Island
Rated
Capacity
(MW)
104.00
50
54
ProjectStatus
FinancialArrangementSecured:Submittedacertificationdated31August2012fromitsLeadArranger,ensuringtherequiredfinancingisalready
availableifneeded;
AwardedwithWindEnergyServiceContract(WESCNo.200909002)on14Sept2009;
Conducteddetailedwindresourceassessment;
CompletedfinalfeasibilitystudyonAug2012;
SecuredClearancefromDOEfortheconductofGISon16September2011;
SISFinalReportfromNGCPdated1Oct2012;
AcquiredECCfromDENRdated4Jun2012;
AcquiredCNOfromNCIP;securedBarangay,Municipal,andProvincialResolutionsofSupport;EPCContractwithEEICorp.secured31Jul2012;
HeadsofAgreementwithAKELCOforT/Lconstructionsecured28Nov2012;
AcquiredtheDOECertificateofConfirmationofCommercialityon31May2013;
Ongoingconstructionasof30September2014(Preconstruction98%completed,Construction20%completed,Interconnection69%
completed);
OngoinglandrightsacquisitionforWTGFoundations,accessroads,andcivilworksonaccessroads;
TotalprojectcostisUS$118.44M;
TargetTesting&
Commissioning
Phase1(36MW)
January2015
Phase2(14MW)
3rdQuarter2015
FinancialArrangementSecuredon12December2012(30%equityand70%debt);
AwardedwithWindEnergyServiceContract(WESCNo.200910009)on23Oct2009;
Conducteddetailedwindresourceassessment;
Completedfeasibilitystudy;
SecuredvariousLGUpermitsandResolutionofSupport;SecuredECCpermitforthewindfarmon19February2010;SecuredNCIPCertificateofNon
Overlapon23July2010;SecuredSystemImpactStudyFinalReportfromNGCP;SecuredECCfortheconstructionofoverheadT/Lon14May
2012;SecuredECCfortheupgradingofIloiloGuimarasSubmarineCableon14May2012;SecuredCAAPHeightClearancefor27WindTurbine
Generators;SecuredDPWHRightofWaypermitforoverheadT/L;SecuredContracttoLease/Sellfromlandowners;TurnkeyEPCContractawarded December2014
toKanetmatsuinNovember2012;
AcquiredDOECertificateofConfirmationofCommercialityon16May2013;
ConductedGroundbreakingCeremonyon30June2013;
Ongoingconstructionasof30September2014(PreConstruction100%complete,Construction33%complete,Interconnection77%complete;
InstallationofWIndTurbineGenerator(WTG)sets:20%;OngoinglandrightsacquisitionforWTGFoundations,accessroads,andcivilworkson
accessroads;Erected350outof383polesforoverheadTL;OngoingtestingofIloiloGuimarasSubmarineCable;OngoingstringingofoverheadTL;
TotalprojectcostisUS$140.9Million;
TargetCommercial
Operation
Phase1(36MW)
January2015
Phase2(14MW)
3rdQuarter2015
(TargetTestingand
Commissioning)
December2014
(TargetTestingand
Commissioning)
PRIVATESECTORINITIATEDPOWERPROJECTS(VISAYAS)
COMMITTED
Asof30September2014
Committed/
Indicative
NameoftheProject
Project
Proponent
Location
BIOMASS
Committed
Committed
46MWUniversalRobina Universal
CorporationBagasse Robina
CogenerationFacility Corporation
20MWSCBiopower
BagasseFiredPower
GenerationProject
SanCarlos
BiopowerInc.
Committed
Hawaiian
12MWHPCoBagasse
Philippines
CogenerationPlant
Company
Committed
Victorias
34MWVMCIBagasse
Milling
FiredCogenerationPlant
CompanyInc.
Kabankalan,N
egros
Occidental
Negros
Occidental
SilayCity,
Negros
Occidental
Negros
Occidental
TotalCommittedRatedCapacity
Rated
Capacity
(MW)
55.00
ProjectStatus
TargetTesting&
Commissioning
TargetCommercial
Operation
31.00
FinancialArrangementSecured;
BREOCNo.201311040;
IssuedCertificateConfirmationofCommercialityon24April2014;
Ongoingconstruction:ProjectProgressasof30September2014:Preconstruction:100%;Construction:34%;Interconnection:73%)
Ongoingconstructionasof31May2014(OverallAccomplishment45%completed)a.PowerHouseStructuralandCivilWorks;b.SteamTurbine
GeneratorHouseStructuralWorks;c.BoilerHouseStructuralandCivilWorks;d.CoolingTowerFoundationWorks;e.TransmissionFacility
ClearancetoUnderatakeGISfromDOEissuedon18October2013;
18.00
FinancialArrangementSecured;
Ongoingsitedevelopment;
Variouspermitspermitsobtained(ECC,LGUEndorsement,LandUsePerit,etc);
HasEPC;
SECsecured29July2009;
ECCsecured28June2011;
SecuredClearancefromDOEfortheconductofGISon22June2011;
December2015
GIScompleted4June2012;
EPCsigned10Aug.2012;
CommencementofconstructiononDec.2012;
ScopeofWorkcompletion:AdminBuilding46.48%;ConstructionofTemporaryaccessroad24.56%;SiteDevelopmentforWarehouse,elctrical&
machineshop87.14%;SiteDevelopmentforFuelShedNo.227.56%;InstallationofWIndTurbineGenerator20%;
Projectcostis$3.5B
December2015
(TargetTesting&
Commissioning)
3.00
FinancialArrangementSecured;
BREOCNo.201302029;
IssuedCertificateConfirmationofCommercialityon22January2014;
ConstructingsubstationandtransmissionlinegoingtoNGCP;
SecuredClearancefromDOEfortheconductofGISon25March2013;
DeclaredCapacityis8MWbutwillbeexporting3MWtothegrid;
IssuedDeclarationofCommercialityon22January2014;
100%Constructed(OperatingforOwnUse);
ProjectStatusasof30September2014:Preconstruction100%,Construction93%,Interconnection15%;
ConstructionofInterconnectionFacilityistargetedat3rdweekofSeptember2014;
CompletionfateofTransmissionLinestilldependsontheissuanceofSISfromNGCP;Willonlystartconstructionupontherelease/issuanceofthe
SIS;
Increasedcapacityfrom8MWto12MWasperamendmentofBREOCNo.201302029whichtookeffecton9June2014;
OperatingforOwnUseonOctober2013;
November2014
(TargetTestingand
Commissioning)
3.00
FinancialArrangementSecured;
SecuredClearancefromDOEfortheconductofGISon29May2013;
ApprovedSISonSept2014;
AmendedCapacityfrom2MWto3MWon4September2014;
OperatingforOwnUse;
586.00
Phase1(16MW)
Phase1(16MW) December2014
December2014
Phase2(30MW)
Phase2(30MW) December2014
December2014
(TargetTestingand
Commissioning)
November2014