MUNICIPALIDAD DISTRITAL DE
CIENEGUILLA
Junio, 2015
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
Contenido:
I.
1.2.
1.3.
1.4.
2.2
2.3
2.4
Alternativas de solucin.............................................................. 22
3.2
3.3
3.4
Costos ..................................................................................... 30
3.5
Beneficios ................................................................................ 36
3.6
3.7
3.8
3.9
Conclusiones ............................................................................ 47
4.2
Recomendaciones ...................................................................... 47
V. ANEXOS ...................................................................................... 48
5.1
Panel Fotogrfico....................................................................... 49
5.2
Presupuesto ............................................................................. 50
5.3
Planos ..................................................................................... 52
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
ndice de tablas:
Tabla 1: Unidad Formuladora .................................................................... 6
Tabla 2: Unidad Ejecutora ....................................................................... 6
Tabla 3: Poblacin Censada en el Distrito de Cieneguilla .................................. 15
Tabla 4: Poblacin segn sexo en el distrito de Cieneguilla ............................... 15
Tabla 5: Acciones planteadas para cada componente ...................................... 23
Tabla 6: Evolucin de la poblacin en el distrito de Cieneguilla .......................... 27
Tabla 7: Proyeccin de la poblacin ........................ Error! Marcador no definido.
Tabla 8: Tasa anual de crecimiento del N de miembros por familia en Cieneguilla ... 28
Tabla 9: Proyeccin del N de miembros por familia en Cieneguilla ...................... 28
Tabla 10: Proyeccin de la Poblacin Potencial -Poblacin del Asentamiento Humano
Las Colinas a de Cieneguilla .................................................................... 28
Tabla 11: Proyeccin de la Poblacin Objetivo del Asentamiento Humano Las Colinas
de Cieneguilla ..................................................................................... 29
Tabla 12: Planteamiento Tcnica de las Alternativas ...................................... 29
Tabla 13: Costos de Operacin y Mantenimiento Sin Proyecto a Precios Privados y
Precio Social- Alternativa 1 y 2. ................................................................ 31
Tabla 14: Costo de Operacin y Mantenimiento en situacin Con Proyecto a
Precios Privados y Precio Social- Alternativa 1 y 2. ........................................ 32
Tabla 15: Costo De Inversin a Precio Privado Alternativa 1 ............................. 32
Tabla 16: Costo De Inversin a Precio Privado Alternativa 2 ............................. 32
Tabla 17: Resumen del Monto de Inversin a Precios Sociales-Alternativa 1 ............ 33
Tabla 18: Resumen del Monto de Inversin a Precios Sociales (Global)-Alternativa 2 . 34
Tabla 19: Flujo de Operacin y Mantenimiento Sin Proyecto - Precio Privado ....... 34
Tabla 20: Flujo de Operacin y Mantenimiento Sin Proyecto - Precio Social ......... 34
Tabla 21: Flujos de la Alternativa 1- Precio Privado ........................................ 34
Tabla 22: Flujos de la Alternativa 1, Precio Social .......................................... 35
Tabla 23: Flujos de la Alternativa 2- Precio Privado ........................................ 35
Tabla 24: Flujos de la Alternativa 2- Precio Social .......................................... 35
Tabla 25: Costos Incrementales Alternativa 1 ................................................ 36
Tabla 26: Costos Incrementales Alternativa 2 ................................................ 36
Tabla 27: VAC de la Alternativa 1 .............................................................. 37
Tabla 28: VAC de la Alternativa 2 .............................................................. 37
Tabla 29: Evaluacin Costo/ Efectividad Alt. 1 y 2 ........................................ 37
Tabla 30: Anlisis de sensibilidad ante variaciones de la inversin ....................... 38
Tabla 31: Evaluacin de Impacto Ambiental ................................................. 42
3
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
I.
ASPECTOS GENERALES
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
1.1.
Unidad Formuladora:
Sector:*
Gobierno Local
Pliego:
Telfono:
01- 4798212
Direccin:
Persona Responsable:
Cargo:
Sector:
Gobierno Local
Pliego:
Telfono:
01- 4798212
Direccin:
Persona Responsable:
Cargo:
La
Gerencia
de
Desarrollo
Urbano
Rural,
depende
jerrquica
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
consolidacin,
subutilizacin
deterioros,
con
fines
de
1.3.
a)
Poblacin
organizada.-
Son
los
asentamientos
humanos,
1.4.
Marco de referencia.
su
financiamiento
ejecucin
en
el
marco
del
Presupuesto
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
pblico
para
consolidar
los
Centros
poblados,
Barrios
municipalidad
N 27972, Ley
Orgnica de Municipalidades.
1.4.3 Lineamientos de poltica relacionados con el proyecto:
El
Proyecto:
Creacin
de
muros
de
contencin
en
Vias
del
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
Objetivo Especfico.-
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
II.
IDENTIFICACIN
10
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
2.1
11
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de Cieneguilla Lima Lima
Ilustracin 2: Ubicacin de los muros de contencin en El Asentamiento Humano Las Colinas de Cieneguilla, Distrito de
Cieneguilla.
El muro de contencin se encuentra situado en el lado derecho e izquierdo de las partes altas de la Calle Colinas del
Asentamiento Humano Las Colinas de Cieneguilla, distrito de Cieneguilla Lima Lima.
12
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
El
sistema
de
asentamientos
industriales.-
Se
distinguen
13
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
El ecosistema urbano.
Cieneguilla cuenta con dos vas principales de doble sentido que comunica a
la mayora de centros poblados del distrito:
La va paralela al ro.
14
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
Poblacin total
26,725
Poblacin Urbana
26,540
Poblacin Rural
185
POBLACIN
TOTAL
15,548
58%
15
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
Mujeres
11,177
42%
ii. Vivienda.
En primer lugar, es significativo sealar que de acuerdo a los resultados del
ltimo censo, el nmero promedio de personas por vivienda en el Distrito de
Cieneguilla es de 4.72 personas.
De las 5,667 viviendas identificadas en el distrito, solo el 58% muy por debajo
del promedio de Lima Metropolitana, lo que indica el nivel de pobreza de la
poblacin del distrito.
En cuanto a la calidad del piso de las viviendas se advierte que el 64% cuenta
con pisos de cemento, seguido de pisos de tierra, solo escasos 496 viviendas
cuentan pisos de losetas.
La falta de servicios bsicos de desage en el distrito es sumamente
preocupante, por cuanto el 75% solo cuenta con pozos spticos o letrinas,
adems el 5% no cuenta con servicios higinicos, lo que hace suponer que la
poblacin prctica la deposicin de excretas al aire libre.
El 18% de la poblacin no cuenta con alumbrado elctrico en su vivienda.
iii. Educacin.
El distrito de Cieneguilla cuenta con 10 centros educativos de nivel inicial, 11
de nivel Primario, 7 de nivel secundario y un instituto superior tecnolgico.
Aproximadamente existen 7 mil estudiantes en los tres niveles de educacin
bsica regular.
La condicin de alfabetismo en la poblacin de 5 aos y ms representa el
91% que saben leer y escribir, en tanto que el 9% no saben leer ni escribir.
iv. Salud.
En Cieneguilla existen tres (03) centros asistenciales: un centro de salud,
implementado con un centro materno infantil y dos postas mdicas, los cuales
se describen a continuacin:
Centro de Salud Tambo Viejo:
16
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
actualmente
el
sistema
de
comunicacin
radial
se
encuentra
tradicionalmente
inherente
al
desarrollo
econmico
de
17
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
ao. En
base a
esta
oferta
se distinguen
tres tipos de
flujos,
ejes
viales
del
distrito
canalizan
flujos
de
visitantes
Asociacin.
Ellos
constantemente
se
encuentran
expuestos
18
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
Distrito de Cieneguilla
Lima Lima.
2.2.2 Causas del problema.
De acuerdo al anlisis realizado a travs del Diagnstico y las visitas de inspeccin in
situ, se han identificado la causa directa que describimos a continuacin.
a) CAUSA DIRECTA 1: Incidencia de deslizamientos de tierra y rocas de la
parte superior del cerro hacia las casas aledaas.
Siendo las causas indirectas que la explica las siguientes:
a.1) Causa Indirecta 1.1: Inestabilidad del terreno.
a.2) Causa Indirecta 2.1: Inadecuada Infraestructura de contencin.
2.2.3 Efectos del problema.
De permanecer la situacin negativa actual descrita en el acpite anterior,
traer como consecuencias los siguientes efectos:
a) EFECTO DIRECTO 1: Incidencia de accidentes en la zona.
Este Efecto Directo produce el siguiente efecto indirecto:
a.1) Efecto Indirecto 1.1: Incremento en los costos de la poblacin.
b) EFECTO DIRECTO 2: Dificultad en el acceso peatonal.
b.1) Efecto Indirecto 2.1: Disminucin de las actividades comerciales y
sociales.
19
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
EFECTO INDIRECTO
EFECTO INDIRECTO
EFECTO DIRECTO
EFECTO DIRECTO
Incidencia de accidentes en
la zona
Inadecuado e inseguro
acceso peatonal
PROBLEMA CENTRAL
Insuficientes condiciones de seguridad para la habitabilidad urbana en el Asentamiento
Humano Las Colinas de Cieneguilla, Distrito de Cieneguilla Lima Lima.
CAUSA DIRECTA
Incidencia de deslizamientos de
tierra y rocas de la parte superior del
cerro hacia las casas aledaas
CAUSA INDIRECTA
CAUSA INDIRECTA
Inadecuada infraestructura de
contencin
20
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
2.3
Medio
Fundamental 1.1:
Todo lo anterior contribuir al logro del FIN LTIMO del proyecto que es: Mejora de
la calidad de vida en el Asentamiento Humano Las Colinas de Cieneguilla,
Distrito de Cieneguilla Lima Lima.
21
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
FIN INDIRECTO
FIN INDIRECTO
FIN DIRECTO
FIN DIRECTO
Disminucin de accidentes en
la zona
OBJETIVO CENTRAL
Adecuadas condiciones de seguridad para la habitabilidad urbana en el Asentamiento
Humano Las Colinas de Cieneguilla, Distrito de Cieneguilla Lima Lima.
2.4
MEDIO FUNDAMENTAL
MEDIO FUNDAMENTAL
Adecuada infraestructura de
contencin
Alternativas de solucin
22
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
Del anlisis del rbol de objetivos, se han determinado los siguientes medios
fundamentales
como
elementos
de
intervencin
para
solucionar
el
problema
identificado:
-
COMPONENTES
ACCIONES
ALTERNATIVA 1:
El
proyecto
contempla
la
construccin de un muro de
1. Obras
contencin en El Asentamiento
Humano
Las
Colinas
de
muro
mampostera
concreto
es
del
tipo
de
piedra
con
simple
(concreto
pg.
del
terreno.
Cieneguilla.
El
1. Estabilidad
para
cimiento
de
2. Adecuada
Infraestructura
de
sostenimiento y
contencin.
preliminares.
2. Movimiento de
tierras.
3. Concreto
simple.
4. Varios.
5. Fletes.
emboquillado
23
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
ALTERNATIVA 2:
El
proyecto
1. Obras
contempla
la
construccin de un muro de
contencin en El Asentamiento
Humano
Las
Colinas
de
1. Estabilidad
del
terreno.
2. Movimiento de
2. Adecuada
tierras
Infraestructura
de
con
sostenimiento y
concreto
armado
con
2
preliminares
contencin.
3. Concreto
armado.
4. Varios
5. Fletes
zapatas y muros.
Elaboracin: Propia.
Por
tanto,
estas
alternativas
sern
formuladas
evaluadas
24
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
25
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
III.
3.1
FORMULACIN Y EVALUACIN
26
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
Censo INEI
1993
Tasa anual
crecimiento
Lima (Provincia)
5,706,127.00
7,605,742.00
2.07%
8,993.00
26,725.00
8.09%
Distrito de Cieneguilla
Proporcin
0.35%
Ao
la Pob.
Cieneguilla
0
1
2
3
4
5
6
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
10
2025
49798
53827
58181
62888
67976
73476
79420
85845
92791
100298
108412
27
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
Poblacin
N de
viviendas
N de miembros
por familia
C=A/B
1993
8,993.0
2,426.0
3.7069
2007
26,725.
5,617.0
4.7579
1.80%
Elaboracin: Propia.
4.7579=3.7069*(1+i) 14
i=1.80%
Periodo
Ao
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
10
2025
Redondeo del N
N de Miembros por
de miembros por
familia en
familia en
Cieneguilla
Cieneguilla
5
5.49
5.59
5.69
5.79
5.89
6.00
6.11
6.22
6.33
6.44
6.56
6
6
6
6
6
6
6
6
6
7
Elaboracin: Propia.
Ao
Proyeccin de la
Pob. Cieneguilla
A
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
10
2025
49,797
53,825
58,180
62,887
67,974
73,473
79,417
85,842
92,787
100,293
108,407
N de viviendas
Cieneguilla
N Viviendas en
el AA. HH. Las
Colinas de
Cieneguilla
N de miembros
por familia en
Cieneguilla
Poblacin total de la
AA.HH las Colinas de
Cieneguilla
E=C*D
9,075
24
120
9,636
24
144
10,232
24
144
10,864
24
144
11,535
24
144
12,248
24
144
13,005
24
144
13,809
24
144
14,662
24
144
15,569
24
144
16,531
24
168
Elaboracin: Propia.
28
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
Ao
Poblacin total de la
AA. HH. Las Colinas
de Cieneguilla
2015
120
2016
144
2017
144
2018
144
2019
144
2020
144
2021
144
2022
144
2023
144
2024
144
10
2025
168
Elaboracin: Propia.
3.3
COMPONENTES
ACCIONES
29
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
ALTERNATIVA
COMPONENTES
ACCIONES
ALTERNATIVA 1:
El
proyecto
contempla
la
construccin de un muro de
contencin en El Asentamiento
Humano
Las
Colinas
de
Cieneguilla.
El
muro
es
del
tipo
mampostera de piedra con
concreto simple (concreto de
Cimiento Corrido - Mezcla C:H
1:8+30% PG Inc. Preparacin
Manual para cimiento de muros
y concreto de Asentado de Muro
de Piedra habilitada Mezcla C:A
1:6 + 75% P.G. para muros) y
emboquillado
decorativo
en
muro de piedra.
1. Estabilidad
terreno.
del
2. Adecuada
Infraestructura
de
sostenimiento y
contencin.
ALTERNATIVA 2:
El
proyecto
contempla
la
construccin de un muro de
contencin en El Asentamiento
Humano
Las
Colinas
de
Cieneguilla. El muro es del tipo
con
concreto
armado
con
concreto fc=210 kg/cm2 para
zapatas y muros.
1. Estabilidad
terreno.
del
2. Adecuada
Infraestructura
de
sostenimiento y
contencin.
1. Obras
preliminares.
2. Movimiento de
tierra.
3. Concreto
simple.
4. Varios.
5. Fletes.
1. Obras
preliminares.
2. Movimiento de
tierras.
3. Concreto
armado.
4. Varios.
5. Fletes.
Elaboracin: Propia.
3.4 Costos
Para el presente Perfil, los costos de inversin y mantenimiento se estiman de acuerdo
a los volmenes de intervencin requeridos considerando la topografa de la zona y la
situacin actual en que se encuentra el rea a intervenir.
Para la conversin de precios de mercado a precios sociales se utilizaron los siguientes
factores 0.91, 0.68 y 0.85, Mano de Obra Calificada, Mano de Obra No Calificada y
Bienes Nacionales; recomendado en el Manual de Identificacin, Formulacin y
Evaluacin de Proyectos de Inversin Pblica .
Estos costos del proyecto estn determinados por las inversiones y los costos de
Operacin y Mantenimiento, tanto
30
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
CANT.
P.PRIVADO
(mensual)
P.PRIVADO
(anual)
FACTOR DE
CORRECCIN
P.SOCIAL
(anual)
Costos de Operacin
S/. 0.00
S/. 0.00
0.85
S/. 0.00
Costos de Mantenimiento
S/. 0.00
S/. 0.00
0.85
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
31
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
ITEM
1
COSTOS DE OPERACIN
Pers ona l de l i mpi eza
P.PRIVADO
(mensual)
CANT.
COSTOS DE
MANTENIMIENTO
P.PRIVADO
(anual)
FACTOR DE
CORRECCIN
P.SOCIAL
S/. 150.00
S/. 1,800.00
0.68
S/. 1,224.00
S/. 150.00
S/. 1,800.00
0.68
S/. 1,224.00
S/. 690.00
S/. 8,280.00
S/. 6,813.60
Pers ona l
S/. 580.00
S/. 6,960.00
0.85
S/. 5,916.00
S/. 110.00
S/. 1,320.00
0.68
S/. 897.60
S/. 840.00
S/. 10,080.00
S/. 8,037.60
U.M
CANT
CTO UNITARIO
TOTAL
C OSTO DIREC TO
GLOBAL
S/. 312,116.67
GLOBAL
S/. 24,969.33
S/. 24,969.33
UTILIDAD 7 (% C D)
GLOBAL
S/. 21,848.17
S/. 21,848.17
SUB TOTAL
S/. 312,116.67
S/. 358,934.17
S/. 358,934.17
S/. 0.00
S/. 0.00
S/. 358,934.17
S/. 358,934.17
(B) INTANGIBLES:
S/. 28,714.73
S/. 28,714.73
IGV (18%)
GLOBAL
S/. 14,357.37
S/. 14,357.37
GLOBAL
S/. 14,357.37
S/. 14,357.37
TOTAL
S/. 387,648.90
32
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
PRINCIPALES RUBROS
U.M
CANT
CTO UNITARIO
TOTAL
C OSTO DIREC TO
GLOBAL
S/. 545,367.30
GLOBAL
S/. 43,629.38
S/. 43,629.38
UTILIDAD 7 (% C D)
GLOBAL
S/. 38,175.71
S/. 38,175.71
SUB TOTAL
S/. 545,367.30
S/. 627,172.40
S/. 627,172.40
S/. 0.00
S/. 0.00
S/. 627,172.40
S/. 627,172.40
(B) INTANGIBLES:
S/. 25,086.90
S/. 25,086.90
S/. 12,543.45
IGV (18%)
GLOBAL
S/. 12,543.45
GLOBAL
S/. 12,543.45
S/. 12,543.45
TOTAL
S/. 652,259.29
3.4.2.3
Los montos de inversin a precios sociales han sido transformados por los factores de
correccin segn la distribucin de bienes transables, no transables y mano de obra. A
continuacin se presenta un resumen de los costos de inversin a precios sociales para
cada alternativa.
Tabla 16: Resumen del Monto de Inversin a Precios Sociales-Alternativa 1
PRINCIPALES RUBROS
EXPEDIENTE TECNICO
S/. 14,357.37
COSTO DIRECTO
Insumo de Origen nacional
Insumo de Origen Importado
PRECIO PRIVADO
(En Nuevos Soles)
FACTOR DE
CORRECCIN
0.91
S/. 312,116.67
70%
0%
S/. 218,481.67
0.85
185,709.42
S/. 0.00
0.81
0.00
10%
S/. 31,211.67
0.91
28,402.62
20%
S/. 62,423.33
0.86
53,684.07
SUPERVISION
14357.37
0.91
13,065.20
GASTOS GENERALES(8%)
24969.33
0.91
22,722.09
UTILIDAD (7 %)
21848.17
0.85
18,570.94
TOTAL
387648.90
335219.55
33
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
EXPEDIENTE TECNICO
FACTOR DE
CORRECCIN
S/. 12,543.45
COSTO DIRECTO
0.91
11,414.54
S/. 545,367.30
70%
0%
467,925.14
S/. 381,757.11
0.85
324,493.54
S/. 0.00
0.81
0.00
10%
S/. 54,536.73
0.91
49,628.42
20%
S/. 109,073.46
0.86
93,803.18
SUPERVISION
12543.45
0.91
11,414.54
GASTOS GENERALES(8%)
43629.38
0.91
39,702.74
UTILIDAD (7 %)
38175.71
0.85
32,449.35
TOTAL
652259.29
562906.31
AO 0
AO 1
AO 2
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
AO 9
AO 10
COSTO DE OPERACIN
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
COSTO DE MANTENIMIENTO
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
CO S TO S DE O P ERACI N Y
MANTENIMIENTO
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
AO 0
AO 1
AO 2
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
AO 9
AO 10
COSTO DE OPERACIN
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
COSTO DE MANTENIMIENTO
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
CO S TO S DE O P ERACI N Y
MANTENIMIENTO
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
AO 9
AO 10
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
S/. 0.00
AO 0
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 0.00
1,800.00
1,800.00
1,800.00
1,800.00
1,800.00
1,800.00
1,800.00
1,800.00
1,800.00
1,800.00
S/. 0.00
8,280.00
8,280.00
8,280.00
8,280.00
8,280.00
8,280.00
8,280.00
8,280.00
8,280.00
S/. 387,648.90
S/. 358,934.17
B.1-EXPEDIENTE TECNICO
S/. 14,357.37
B.2-SUPERVISION
S/. 14,357.37
FLUJOS DE LA ALTERNATIVA 1
S/. 387,648.90
AO 1
S/. 0.00
S/. 10,080.00
AO 2
S/. 0.00
S/. 10,080.00
S/. 0.00
S/. 10,080.00
S/. 0.00
S/. 10,080.00
S/. 0.00
S/. 10,080.00
S/. 0.00
S/. 10,080.00
S/. 0.00
S/. 10,080.00
S/. 0.00
S/. 10,080.00
S/. 0.00
S/. 10,080.00
8,280.00
S/. 0.00
S/. 10,080.00
34
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
AO 0
AO 1
AO 2
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
AO 9
AO 10
S/. 0.00
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 0.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 0.00
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
INVERSIN
335219.5459
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 6,813.60
S/. 0.00
S/. 309,089.14
B.1-EXPEDIENTE TECNICO
S/. 13,065.20
B.2-SUPERVISION
S/. 13,065.20
FLUJOS DE LA ALTERNATIVA 1
S/. 335,219.55
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
AO 0
AO 1
AO 2
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
AO 9
AO 10
S/. 0.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 0.00
S/. 1,800.00
S/. 1,800.00
S/. 1,800.00
S/. 1,800.00
S/. 1,800.00
S/. 1,800.00
S/. 1,800.00
S/. 1,800.00
S/. 1,800.00
S/. 1,800.00
S/. 0.00
S/. 8,280.00
S/. 8,280.00
S/. 8,280.00
S/. 8,280.00
S/. 8,280.00
S/. 8,280.00
S/. 8,280.00
S/. 8,280.00
S/. 8,280.00
S/. 8,280.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
S/. 10,080.00
INVERSIN
S/. 652,259.29
S/. 627,172.40
B.1-EXPEDIENTE TECNICO
S/. 12,543.45
B.2-SUPERVISION
S/. 12,543.45
FLUJOS DE LA ALTERNATIVA 2
S/. 652,259.29
AO 0
AO 1
AO 2
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
AO 9
S/. 0.00
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 0.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 1,224.00
S/. 0.00
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
S/. 6,813.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
INVERSIN
CTO DE LA OBRA CIVIL
562906.31
AO 10
540077.2372
B.1-EXPEDIENTE TECNICO
11414.54
B.2-SUPERVISION
11414.54
FLUJOS DE LA ALTERNATIVA 2
562906.31
considera
los
escenarios
alternativos
(las
dos
alternativas
propuestas),
35
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
AO 0
AO 1
S/. 335,219.55
S/. 0.00
S/. 0.00
S/. 335,219.55
AO 2
S/. 8,037.60
S/. 8,037.60
S/. 0.00
S/. 8,037.60
S/. 8,037.60
AO 3
S/. 8,037.60
S/. 0.00
S/. 8,037.60
AO 4
S/. 8,037.60
S/. 0.00
S/. 8,037.60
AO 5
S/. 8,037.60
S/. 0.00
S/. 8,037.60
AO 6
AO 7
S/. 8,037.60
S/. 8,037.60
S/. 0.00
S/. 0.00
S/. 8,037.60
S/. 8,037.60
AO 8
S/. 8,037.60
AO 9
AO 10
S/. 8,037.60
S/. 8,037.60
S/. 0.00
S/. 0.00
S/. 0.00
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
AO 0
S/. 562,906.31
S/. 0.00
S/. 562,906.31
AO 1
AO 2
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
AO 9
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
AO 10
S/. 8,037.60
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
3.5
Beneficios
Los beneficios que se derivan de la ejecucin y puesta en marcha del Proyecto son de
naturaleza cualitativa e intangible, segn se puede apreciar en el rbol de Medios y
Fines. A continuacin describimos dichos beneficios:
Evaluacin Social
En razn que los beneficios que percibe el Proyecto son de naturaleza cualitativa se
utilizar la Metodologa de Evaluacin Costo / Efectividad que es la adecuada toda vez
que es difcil cuantificar los beneficios descritos en el acpite anterior.
En tal sentido se emplear la tasa social de descuento, igual al 9% para la
actualizacin de los costos del proyecto en el horizonte temporal de evaluacin. En los
siguientes cuadros se muestra el detalle de la actualizacin de los costos a precios
sociales para la alternativa 1 y 2.
36
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
AO 0
AO 1
S/. 335,219.55
AO 2
S/. 8,037.60
S/. 0.00
S/. 0.00
S/. 335,219.55
1
S/. 335,219.55
S/. 8,037.60
S/. 0.00
S/. 8,037.60
S/. 8,037.60
0.91
0.83
S/. 7,314.22
S/. 6,671.21
AO 3
S/. 8,037.60
S/. 0.00
S/. 8,037.60
0.75
S/. 6,028.20
AO 4
S/. 8,037.60
S/. 0.00
S/. 8,037.60
0.68
S/. 5,465.57
AO 5
S/. 8,037.60
S/. 0.00
S/. 8,037.60
0.62
S/. 4,983.31
AO 6
S/. 8,037.60
S/. 0.00
S/. 8,037.60
0.56
S/. 4,501.06
AO 7
S/. 8,037.60
S/. 0.00
S/. 8,037.60
0.51
S/. 4,099.18
AO 8
AO 9
S/. 8,037.60
AO 10
S/. 8,037.60
S/. 8,037.60
S/. 0.00
S/. 0.00
S/. 0.00
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
0.47
0.42
S/. 3,777.67
S/. 3,375.79
0.39
S/. 3,134.66
S/. 367,785.39
AO 0
S/. 562,906.31
S/. 0.00
S/. 562,906.31
AO 1
AO 2
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
AO 9
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
S/. 8,037.60
0.91
S/. 562,906.31
S/. 7,314.22
0.83
S/. 6,671.21
0.75
S/. 6,028.20
0.68
S/. 5,465.57
0.62
0.56
S/. 4,983.31
S/. 4,501.06
0.51
S/. 4,099.18
0.47
S/. 3,777.67
0.42
S/. 3,375.79
AO 10
0.39
S/. 3,134.66
S/. 563,631.31
POBLACIN
INVERSION
VAC
CE
ALTERNATIVA 1
144
S/. 335,219.55
S/. 367,785.39
S/. 2,554.07
ALTERNATIVA 2
144
S/. 562,906.31
S/. 563,631.31
S/. 3,914.11
Anlisis de Sensibilidad
37
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
ALTERNATIVA 1
ALTERNATIVA 2
VAC
COSTO EFECTIVIDAD
ALTERNATIVA 1
ALTERNATIVA 2
ALTERNATIVA 1
ALTERNATIVA 2
-25%
251414.66
S/. 422,179.73
S/. 275,839.04
S/. 422,723.48
S/. 1,915.55
S/. 2,935.58
-20%
268175.64
S/. 450,325.05
S/. 294,228.31
S/. 450,905.05
S/. 2,043.25
S/. 3,131.29
-15%
284936.61
S/. 478,470.37
S/. 312,617.58
S/. 479,086.61
S/. 2,170.96
S/. 3,326.99
-10%
301697.59
S/. 506,615.68
S/. 331,006.85
S/. 507,268.18
S/. 2,298.66
S/. 3,522.70
-5%
318458.57
S/. 534,761.00
S/. 349,396.12
S/. 535,449.75
S/. 2,426.36
S/. 3,718.40
0%
S/. 367,785.39
S/. 563,631.31
S/. 2,554.07
S/. 3,914.11
5%
S/. 335,219.55
351980.52
S/. 562,906.31
S/. 591,051.63
S/. 386,174.65
S/. 591,812.88
S/. 2,681.77
S/. 4,109.81
10%
368741.50
S/. 619,196.94
S/. 404,563.92
S/. 619,994.44
S/. 2,809.47
S/. 4,305.52
15%
385502.48
S/. 647,342.26
S/. 422,953.19
S/. 648,176.01
S/. 2,937.17
S/. 4,501.22
20%
402263.46
S/. 675,487.57
S/. 441,342.46
S/. 676,357.57
S/. 3,064.88
S/. 4,696.93
25%
419024.43
S/. 703,632.89
S/. 459,731.73
S/. 704,539.14
S/. 3,192.58
S/. 4,892.63
38
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
3.8
Anlisis de Sostenibilidad
En este punto se describe los factores que garanticen que el proyecto genere los
beneficios y resultados esperados a lo largo de su vida til. Para ello se considera los
Factores, principios y finalmente Valores, inherentes a los principios, que inciden en la
viabilidad y la sostenibilidad del proyecto.
Apoyo Poltico: Se cuenta con un adecuado apoyo poltico hacia las acciones
del proyecto. Adems se tiene un entorno poltico favorable durante el ciclo de
vida del proyecto, lo cual asegura la sostenibilidad de las acciones del proyecto.
dicha
dependencia deber contar con los recursos y medios disponibles, as como del
personal calificado para realizar este tipo de Obras de Infraestructura.
Los recursos financieros para la ejecucin del proyecto sern gestionados para
su obtencin a travs del programa trabaja Per fuente tesoro pblico.
39
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
Impacto Ambiental
40
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
41
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
VALOR
TIEMPO
REVERSIBLE OCURRENCIA
EXTENSIN
Negativo
Temporal
Si
Alta
Local
Aumento de ruido
Negativo
Temporal
Si
Alta
Local
Temporal
Si
Alta
Local
Negativo
Temporal
No
Alta
Local
Falla estructuras
Negativo
Permanente
No
Puntual
Local
Accidentes de trabajo
Negativo
Temporal
No
Baja
Puntual
Negativo
Temporal
Si
Media
Puntual
Positivo
Permanente
No
Alta
Local
Huelga de trabajadores
Negativo
Temporal
Si
Media
Local
Generacin de Empleo
Positivo
Temporal
Si
Alta
Local
Mejor atencin
E. Medidas de mitigacin
E.1) Emisiones de particulado a la atmsfera
Las actividades de excavaciones y nivelacin de suelos, eliminacin de desmontes y
residuos slidos de la obra, el transporte de materiales.
Riego con agua en todas las superficies de actuacin de forma que estas reas
mantengan el grado de humedad necesario para evitar, en lo posible, la
produccin de material particulado. As mismo, se suministrara al personal de
obra el correspondiente equipo de proteccin personal.
42
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
A los vehculos se les prohibir el uso de sirenas u otro tipo de fuentes de ruido
innecesarias, para evitar el incremento de los niveles de ruido. Las sirenas slo sern
utilizadas en casos de emergencia.
Quedan prohibidos, la instalacin y uso en cualquier vehculo destinado a la circulacin
en vas pblicas, de toda clase de dispositivos o accesorios diseados para producir
ruido, tales como vlvulas, resonadores y pitos adaptados a los sistemas de frenos de
aire.
E.3) Aumento en los volmenes de usos de agua
En caso se utilicen productos de limpieza que contengan elementos qumicos
(solventes
siliconas),
stos
debern
ser
adecuadamente
almacenados
Los
residuos
de
limpieza,
mantenimiento
debern
ser
almacenados
en
43
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
Fases
Actividades
Alternativa
nica
Duracin
(semanas/a
os)
PREINVERSION
II
INVERSION
Expediente tcnico.
III
AOS
12
18
10
Obra Civil.
16
10
Operacin y mantenimiento.
10
3.11.1
Modalidad de Ejecucin
44
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de Cieneguilla Lima Lima
Unidad de Medida
Expediente tcnico
Estudio
50,00%
50,00%
Total
100,00%
Costo directo:
Resultado 1
Global
Resultado 2
Global
50,00%
50,00%
100,00%
25,00%
25,00%
25,00%
25,00%
100,00%
Supervisin
Informe
16,67%
16,67%
16,67%
16,67%
16,67%
16,65%
100,00%
Gastos Generales
Informe
16,67%
16,67%
16,67%
16,67%
16,67%
16,65%
100,00%
Utilidades
Informe
50,00%
100,00%
50,00%
3.11.3
Actividades
Unidad de
Medida
TOTAL
10
12
14
17
Estudio
S / . 14 , 3 5 7 . 3 7
Global
S upe rvisin
Informe
G a stos ge ne ra le s
Informe
S/. 0,00
S/. 0,00
S/. 0,00
S/. 0,00
S/. 0,00
S/. 0,00
Utilida de s
Informe
S/. 0,00
S/. 0,00
S/. 0,00
S/. 0,00
S/. 0,00
S/. 0,00
S/. 14,357.37
S/. 0,00
S/. 0,00
S/. 0,00
S/. 0,00
S/. 0,00
S/. 0,00
S/. 0,00
S/. 39,014.58
S/. 39,014.58
S/. 39,014.58
S/. 39,014.58
S/. 39,014.58
S/. 39,014.58
S/. 39,014.58
S/. 39,014.58
S/. 312,116.67
S / . 1, 7 9 4 . 6 7
S / . 1, 7 9 4 . 6 7
S / . 1, 7 9 4 . 6 7
S / . 1, 7 9 4 . 6 7
S / . 1, 7 9 4 . 6 7
S / . 1, 7 9 4 . 6 7
S / . 1, 7 9 4 . 6 7
S/. 14,357.37
S/. 0,00
S/. 24,969.33
S/. 24,969.33
S/. 0,00
S / . 2 1, 8 4 8 . 17
S/. 21,848.17
S / . 1, 7 9 4 . 6 7
TOTAL
S/. 387,648.90
45
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
IV.
CONCLUSIONES Y RECOMENDACIONES
46
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
4.1
Conclusiones
sostenibilidad
del
proyecto,
institucional
financieramente
est
Recomendaciones
Es necesario que luego de ser aprobado el PIP menor, se debe precisar con
mayor detalle en un Estudio Definitivo, a fin de disminuir los riesgos de
decisin.
b)
Programar
coordinar
las
acciones
propuestas
entre
las
distintas
47
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
V.
ANEXOS
48
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
5.1
Panel Fotogrfico
49
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
5.2
Presupuesto
Proyecto:
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de Cieneguilla Lima Lima.
Ubicacin:
Organismo
Proponente:
FECHA :
Item
Descripcin de la Partida
Und.
Metrado
Precio (S/.)
Costo Parcial
1.00
OBRAS PROVISIONALES
1,543.75
1.01
000201010102 (000201010115) Cartel de obra impresin de banner de 3.60 m X 2.40 m (Soporte de Madera)
und.
1.00
743.75
743.75
1.02
mes
4.00
200.00
800.00
330.00
0.65
1,709.16
234.00
2.00
OBRAS PRELIMINARES
2.01
2.02
000201020206 (000201020206) Trazo y replanteo en Terreno Accidentado con Pendiente Pronunciada con Equipo
330.00
1.17
421.20
2.03
m2
75.00
12.00
210.36
2.04
000227010129
und.
11.00
17.53
93.60
2.05
ml
110.00
0.78
750.00
3.00
(000227010129-0301010-01) Postes para sealizacion en obras viales, 3", h=1m, dados 0.30m x
0.30m x0.10m, pintados rojo y blanco alternado
MOVIMIENTO DE TIERRAS
3.01
m3
350.05
17.19
90,046.76
6,542.17
3.02
m3
379.45
129.88
45,477.48
3.03
0002020104078 (000202010408) Excavacin de Zanjas y/o Zapatas Hmx <= 1.00m en Terreno Rocoso
143.00
42.98
6,704.88
3.04
000202020102 (000202020102-0301010-01) Acarreo de Material excedente para ser utilizado en Rellenos D<50m
m3
1,010.16
5.73
19,323.66
3.05
m3
795.45
21.61
564.89
m3
46.35
8.91
6,584.46
1,479.89
3.06
3.07
m3
217.66
12.90
3.08
m3
217.66
29.37
3,369.33
4.00
4.01
4.02
000202020136
m3
787.01
26.29
111,392.94
22,571.54
m3
787.01
41.14
35,321.16
m2
539.00
39.85
23,431.80
14,405.26
4.03
(000202020136) Carguio y Transp. de Piedra Habilitada desde Cantera hasta la obra D<18 km
Volquete 15 m3 ( Manual )
000202020302 (000202020302) Habilitacin de Piedra Laja (Labrado, E=2")
4.04
m3
787.01
25.79
4.05
und
1,372.48
0.65
973.17
4.06
m3
493.53
25.79
13,885.34
4.07
m3
106.10
7.36
804.67
92,512.36
19,344.00
5.00
5.01
000203010302 (000203010304) Cimiento Corrido - Mezcla C:H 1:8+30% PG Inc. Preparacin Manual
m3
143.00
124.00
5.02
m2
269.50
27.53
9,712.58
5.03
000205010102 (000205010105) Asentado de Muro de Piedra habilitada Mezcla C:A 1:6 + 75% P.G.
m3
569.80
84.32
52,413.31
5.04
m2
108.78
12.25
1,459.47
5.05
ml
105.00
3.05
350.75
5.06
m2
539.00
12.25
7,203.00
5.07
ml
114.40
16.26
2,029.25
6.00
PRUEBAS Y ENSAYOS
6.01
Und
2.00
193.13
813.94
386.26
6.02
Und
9.00
47.52
427.68
7.00
VARIOS
7.01
m2
330.00
0.26
14,097.76
85.80
7.02
000212010306 (000212010306) Baranda de Madera Rolliza de diam 3" (Eucalipto) H= expuesta 0.90 m
ml
110.00
46.21
5,083.10
7.03
ml
110.00
5.36
589.60
7.04
000201020129 Suministro y colocacion de placa recordatoria de metal y vidrio (segn diseno de 30cm X 42cm)
GL
1.00
265.26
265.26
7.05
GL
1.00
8,074.00
8,074.00
312,116.67
S/.
312,116.67
50
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
Descripcin
Und.
Metrado
Precio S/.
O B R A S P R O V IS IO N A LE S
Parcial S/.
S / . 1,5 4 3 .7 5
1.01
und
1.00
S/. 743.75
S/. 743.75
1.02
A LQUILER DE LOCA L P A RA OB RA
mes
4.00
S/. 200.00
S/. 800.00
T R A B A J O S P R E LIM IN A R E S
S / . 1,7 7 9 .2 3
2.01
m2
330.00
S/. 0.65
S/. 214.50
2.02
m2
330.00
1.17
S/. 386.10
2.03
und
11.00
S/. 17.53
S/. 192.83
2.04
110.00
S/. 0.78
S/. 85.80
2.05
m2
75.00
S/. 12.00
S/. 900.00
M O V IM IE N T O D E T IE R R A S
S / . 9 4 ,0 3 7 .8 2
3.01
m3
350.05
S/. 17.19
S/. 6,017.36
3.02
m3
379.45
129.88
S/. 49,282.97
3.03
m3
143.00
S/. 42.98
S/. 6,146.14
3.04
m3
795.45
21.61
S/. 17,189.67
3.05
m2
46.35
S/. 8.91
S/. 412.98
3.06
m3
1010.16
S/. 5.73
S/. 5,788.22
3.07
m3
217.66
S/. 12.90
S/. 2,807.81
3.08
m3
217.66
S/. 29.37
S/. 6,392.67
E X T R A C C IO N D E M A T E R IA LE S E N C A N T E R A
4.1
und
1372.48
S/. 0.65
S/. 892.11
4.2
m3
493.53
S/. 25.79
S/. 12,728.14
4.3
m3
106.10
S/. 7.36
S/. 780.90
m3
31.2
S/. 215.29
C O N C R E T O S IM P LE
5.1
C ON C R ET O A R M A D O
S / . 14 ,4 0 1.15
S / . 6 ,7 17 .0 5
S/. 6,717.05
S / . 3 7 2 ,5 8 9 .3 0
6.1
m3
143.00
S/. 325.19
S/. 46,502.17
6.2
m3
569.80
S/. 355.78
S/. 202,723.44
6.3
m2
269.50
S/. 34.69
S/. 9,348.96
6.4
kg
24342.45
S/. 4.54
S/. 110,514.72
6.5
m2
108.78
S/. 20.66
S/. 2,247.39
6.6
105.00
S/. 3.05
S/. 320.25
6.6
114.40
S/. 8.15
S/. 932.36
P R UE B A S Y E N S A Y O S
7.1
Und
2.00
S/. 193.13
S/. 386.26
7.2
Und
9.00
S/. 40.67
S/. 366.03
V A R IO S
S / . 7 5 2 .2 9
S / . 5 3 ,5 4 6 .7 1
8.1
m2
330.00
S/. 0.26
S/. 85.80
8.2
ml
110.00
S/. 29.73
S/. 3,270.30
8.3
ml
110.00
S/. 4.35
S/. 478.50
8.4
GL
S/. 341.50
S/. 341.50
8.5
GL
14724.612
S/. 14,724.61
8.6
FLETE TERRESTRE
glb
S/. 34,646.00
C O S T O D IR E C T O
S/. 34,646.00
S / . 5 4 5 ,3 6 7 .3 0
51
Creacin de muros de contencin en Vias del Asentamiento Humano Las Colinas de Cieneguilla, distrito de
Cieneguilla Lima Lima
5.3
Planos
52